Question 1 of 25
Question 1 of 25
GMAW since Aug. 3, 2006. A failed retest is in the file, dated Feb 12, 2007. The final document in the file
shows they passed the retest on Feb. 13, 07.
the welder did not need to take the first retest
The February 13th test is accepted if it was two welds of each type and position that the welder failed in
the first test.
the welder is acceptable
the welder is not acceptable
Mark for follow up
Question 2 of 25.
Which of the following is not a qualification requirement for NDE Level II personnel?
Have at least three months experience with procedures for examination of welds.
Have written and practical examinations for use of equipment and procedures.
Be certified by the Level III.
Have at least six months experience on the same or similar equipment.
Mark for follow up
Question 3 of 25.
The All Weld Metal Tension test shall be tested according to:
ASTM A 360
ASME IX
ASTM A 370
ASTM A 390
Mark for follow up
Question 4 of 25.
AWS D1.1 allows some degree of departure from the variables used to qualify a WPS. However, departure
from variables which affect the mechanical or chemical composition of material properties or soundness of the
weldment are not allowed without?
re-qualification approval
client approval
manufacturer approval
engineer’s approval
Mark for follow up
Question 5 of 25.
While observing UT testing a discontinuity is detected. As the UT operator moves his probe the indication
remains unchanged when the probe is moved in one direction, but drastically changed when moved in other
directions. The UT has most likely detected:
incomplete fusion
porosity
crack
elongated slag
Mark for follow up
Question 6 of 25.
2 each 30” (762mm) X 0.500W (12.7mm) and 3 each 30” X 0.375W (9.525mm)pipe pups are being single side
welded in place with the following conditions: There are 2 each 0.500W pups, one 34” long joined to the other
one which is 32” long which is joined to a 35” long 0.375W pup.
Yes No
Question 7 of 25.
While observing UT testing a discontinuity is detected. As the UT operator moves his probe the indication has
a maximum spike, then multiple spikes as the probe is moved. The UT has most likely detected:
elongated slag
hollow bead
aligned porosity
crack
Mark for follow up
Question 8 of 25.
Based on the information given, for CVN testing which of the following is not true?
When the requirements of a test are not met, one re-test may be performed.
For the above specimen, with a min. yield of 52ksi (358Mpa), the minimum Average absorbed energy
should be 20ft-lbf (27J).
The test may have 5 specimens which are averaged to reduce the scatter associated with CVN testing.
For the normal 3 specimen CNV, the individual values are acceptable as recorded, 21, 17 & 14ft-lbf (
28.5, 23, 19 J)
For material measuring 9/16” (11mm) the test specimen shall be 10X10mm.
Mark for follow up
Question 9 of 25.
Discontinuities observed in X-rays shall be evaluated on the basis of being either elongated or rounded.
True False
Question 10 of 25.
A welder is fitting a bent “I” beam by heating with his torch. You request a temperature check and the welder
applies his temperature crayon marked 1100 degrees F (600C), and it melts. Which statement below is most
accurate?
The process is not acceptable.
The process did not tell you all you need to know.
The process should be started over after water cooling.
The process is acceptable.
Mark for follow up
Question 11 of 25.
In the review of the Weld Design on a 2” (51mm) Tubular Connection you see this symbol, “r”. What does this
stand for?
effective radius intersection
radius of branch
root opening
corner radius of rectangular hollow sections…
Mark for follow up
Question 12 of 25.
Which of the following conditions would be CAUSE FOR REJECTING low-hydrogen electrodes E-70XX for use
at any time?
Electrodes were in the shop, in an unheated quiver, for 4.25 hours, they have been baked for 2.5 hours at
650 degrees F (343C), and placed in a holding oven at 250 degrees F (120C).
Electrodes were in quiver which was open to a rain water roof leak for 30 minutes.
Electrodes had been checked out 4 times and returned after 3 hours each time, then placed in the oven at
a holding temperature of 250 degrees (120C) for 4 hours between uses.
Electrodes had been checked out 2 times and returned after 9 hours each time, then baked for 4 hours at
800 degrees F (430C) between uses and placed in the holding oven at 300 degrees (149C) till next use.
Hermetically sealed container arrives by UPS with a hole in the bottom.
Mark for follow up
Question 13 of 25.
You have witnessed the torque testing on a galvanized stud measuring 5/8” (15.9mm) with a META of
0.226sq.in. (145.8sq.mm) with 11 threads per inch. The weld failed at 104.8lb-(142.09J). Is this an acceptable
result?
Yes No
Question 14 of 25.
While observing UT testing a discontinuity is detected. As the UT operator moves his probe around the
discontinuity the indication remains unchanged. The UT has most likely detected:
crack
porosity
incomplete fusion
hollow bead
Mark for follow up
Question 15 of 25.
UT requirements in D1.1 for tubular T-,Y-, and K-connections for procedures, personnel and their qualifications
have been developed from which document?
ANSI/AWS D10.4-86
ASTM 1.01
ASME IX
API RP2X
Mark for follow up
Question 16 of 25.
Question 17 of 25.
While reviewing a radiographic film, you see a symbol “B” on the film. What is the significance of that?
This is the “other end” pipe weld x-ray
Backscatter radiation
Backing material present
Film is unacceptable
Mark for follow up
Question 18 of 25.
What is the highest allowed mandatory moisture content (dew point) for shielding gas?
-30F or -30 C
-40F or -40 C
-60F or -60 C
40F or 40 C
Mark for follow up
Question 19 of 25.
For AWS D1.1 which of the following IS/ARE LIMITATION/S of the code?
Steels with a minimum specified yield strength greater than 100ksi (690 MPa)
Steels less than 1/8 in (3 mm) thick
Vessels and piping
Base metals other than carbon or low-alloy steels
Mark for follow up
Question 20 of 25.
The standard UT Reference Standard for D1.1 is the IIW UT reference block, however other reference blocks
may be used. Which of the following are acceptable?
DC Block Type
DSC Block Type
SC Block Type
Corner Block Type
Mark for follow up
Question 21 of 25.
2 each 30” (762mm) X 0.500W (12.7mm) and 3 each 30” X 0.375W (9.525mm)pipe pups are being single side
welded in place with the following conditions: There are 2 each 0.500W pups, one 34” long joined to the other
one which is 32” long which is joined to a 35” long 0.375W pup. Is this allowed by the code?
Yes No
Question 22 of 25.
While observing UT testing a discontinuity is detected. As the UT operator moves his probe the indication has
a maximum reflection from only one angle and the indication changes with angular movements of the probe.
The UT has most likely detected:
inadequate joint penetration
crack
elongated slag
widely spaced porosity
Mark for follow up
Question 23 of 25.
Which of the following are correct statements concerning the handling of X-rays by the Contractor for the
Owner?
Contractor does not have to keep film once he delivers a full set to the Owner.
A full set of the accepted product film shall be delivered to the Owner upon completion of the work.
Contractor may dispose of the film after one full year.
All of the above
None of the above
Mark for follow up
Question 24 of 25.
What is the maximum size discontinuity appearing on X-ray allowed for Cyclically Loaded Non-tubular Tension
Weld with an E - weld size of ¾” (20mm)?
¼” (6mm)
½” (12mm)
3/16” (5mm)
5/16” (8mm)
Mark for follow up
Question 25 of 25.
Single-Pass Fillet Welds, up to which of the following sizes, may not be made using any of the filler metals for
Group II base metals?
GMAW - 5/16 in (8 mm)
FCAW - 5/16 in (8 mm)
SMAW - 5/16 in (8 mm)7
SAW - 5/16 in (8 mm)