Darshan Queue Complex, Shirdi: Shrim Bhanu Construction PVT - LTD

This document contains a lighting schedule for the first floor of a darshan queue complex in Shirdi. It lists the electrical items in various zones and locations, including lights, fans, switches, and distribution boards. Zone 1 includes areas like the lift lobby, corridors, and staircases. Zone 2 covers spaces such as kiosk rooms, halls, and the AHU room. Zone 3 lists toilet areas, staff toilets, staircases, corridors, and electrical rooms. The schedule provides details of each item with their specifications to plan the electrical work for the first floor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views33 pages

Darshan Queue Complex, Shirdi: Shrim Bhanu Construction PVT - LTD

This document contains a lighting schedule for the first floor of a darshan queue complex in Shirdi. It lists the electrical items in various zones and locations, including lights, fans, switches, and distribution boards. Zone 1 includes areas like the lift lobby, corridors, and staircases. Zone 2 covers spaces such as kiosk rooms, halls, and the AHU room. Zone 3 lists toilet areas, staff toilets, staircases, corridors, and electrical rooms. The schedule provides details of each item with their specifications to plan the electrical work for the first floor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 33

Darshan Queue Complex,Shirdi

Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone 1 Electrical Work

1x36 2x36
1x40 watt
1x18 watt 1x18 watt 1x36 watt 1x18 watt 1x18 watt Watt Watt 09 Watt 1200 1400
1x30 watt Surface 400 mm
Light Fan Recessed Surface Recessed Wall Surface LED LED Mirror Buklhead Exhaust Wall Fan mm mm
SR No Location LED Light Mounted Cabin
Point Point mount LED mount LED mount LED mount LED mount LED Light Light LED Light Fitting Fan 600 mm Ceiling Ceiling
Fitting LED Light Fan
Light fitting Light fitting Light fitting Light fitting Light fitting Fitting (4 Fitting (8 Fitting Fan Fan
Fitting
Ft.) Ft.)

1 Back Side Lift Lobby

2 Front Side Lift lobby

3 Zone 1 White corridor

4 Ramp 1 FF to SF

6 ST-1 Stair case Back Side

7 ST-1 Stair case Front Side

8 ST-4 Big Staircase

9 Duct

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone-2 Electrical Work

1x36 2x36
1x40 watt
1x18 watt 1x18 watt 1x36 watt 1x18 watt 1x18 watt Watt Watt 09 Watt 1200 1400
Light Fan 1x30 watt Recessed Surface Recessed Wall Surface LED LED Mirror Surface Buklhead Exhaust Wall Fan mm mm 400 mm
SR No Location LED Light Mounted Cabin
Point Point mount LED mount LED mount LED mount LED mount LED Light Light LED Light Fitting Fan 600 mm Ceiling Ceiling
Fitting LED Light Fan
Light fitting Light fitting Light fitting Light fitting Light fitting Fitting (4 Fitting (8 Fitting Fan Fan
Fitting
Ft.) Ft.)

1 KIOSK ROOM (1-9)

2 Front Side Corridor

3 Hall No-01

4 Hall No-02

6 Back side Corridor

7 AHU Room-01

8 AHU Room-02

9 Varanda
SBCPL M&K SSST
Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone-2 Electrical Work

2 Way 3 Way 4 Way 6 Way 8 Way 12 Way 18 Way 2 3 Phase DB


SR No Location 1 Way switch switch switch switch switch switch switch 6/10 A 16 Amp 6/10 A 16 Amp 1 Modular Modular Blank
Board Switch Switch Socket Socket Dimer Plate 4 Way 6 Way 8 Way 12 Way
Board Board Board Board Board Board Board Dimer

1 KIOSK ROOM (1-9)

2 Front Side Corridor

3 Hall No-01

4 Hall No-02

6 Back side Corridor

7 AHU Room-01

8 AHU Room-02

9 Varanda

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone3 Electrical Work

1x36 2x36
1x40 watt
1x18 watt 1x18 watt 1x36 watt 1x18 watt 1x18 watt Watt Watt 09 Watt 1200 1400
1x30 watt Surface 400 mm
Light Fan Recessed Surface Recessed Wall Surface LED LED Mirror Buklhead Exhaust Wall Fan mm mm
SR No Location LED Light Mounted Cabin
Point Point mount LED mount LED mount LED mount LED mount LED Light Light LED Light Fitting Fan 600 mm Ceiling Ceiling
Fitting LED Light Fan
Light fitting Light fitting Light fitting Light fitting Light fitting Fitting (4 Fitting (8 Fitting Fan Fan
Ft.) Ft.) Fitting

1 Toilet Male

2 Toilet Female

3 Toilet Front Side Corridor

4 Electrical Room No-04

6 Staff Toilet Male

7 Staff Toilet Female

8 Front Side staircase

9 Back side staircase

10 Back side corridor

11 Electrical Room No-02


SBCPL M&K SSST
Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone-3 Electrical Work

2 Way 3 Way 4 Way 6 Way 8 Way 12 Way 18 Way 2 3 Phase DB


SR No Location 1 Way switch switch switch switch switch switch switch 6/10 A 16 Amp 6/10 A 16 Amp 1 Modular Modular Blank
Board Switch Switch Socket Socket Dimer Plate 4 Way 6 Way 8 Way 12 Way
Board Board Board Board Board Board Board Dimer

1 Toilet Male

2 Toilet Female

3 Toilet Front Side Corridor

4 Electrical Room No-04

6 Staff Toilet Male

7 Staff Toilet Female

8 Front Side staircase

9 Back side staircase

10 Back side corridor

11 Electrical Room No-02

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor:- Zone-3 Electrical Work


40 A. 2 pole 8 Way TPN 25 A. 2 Pole 40 A. 4 pole 25 A. 2 Pole 63 A. 2 Pole 63 A. 2 Pole 25 A. 2 Pole
SR No Location 6 A. MCB 16 A MCB 10 A MCB 20 A MCB
MCB DB RCCB MCB MCB MCB RCCB MCB

1 Toilet Male

2 Toilet Female

3 Toilet Front Side Corridor

4 Electrical Room No-04

6 Staff Toilet Male

7 Staff Toilet Female

8 Front Side staircase

9 Back side staircase

10 Back side corridor

11 Electrical Room No-02

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone-1 Electrical Work


2 Way 3 Way 4 Way 6 Way 8 Way 12 Way 18 Way 2 3 Phase DB
1 Way switch switch switch switch switch switch switch 6/10 A 16 Amp 6/10 A 16 Amp 1 Modular Modular Blank
SR No Location Board Switch Switch Socket Socket Dimer Plate
Board Board Board Board Board Board Board Dimer 4 Way 6 Way 8 Way 12 Way

1 Back Side Lift Lobby

2 Front Side Lift lobby

3 Zone 1 White corridor

4 Ramp 1 FF to SF

5 ST-1 Stair case Back Side

6 ST-1 Stair case Front Side

7 ST-4 Big Staircase

8 Duct

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor:- Zone-1 Electrical Work


40 A. 2 pole 8 Way TPN 25 A. 2 Pole 40 A. 4 pole 25 A. 2 Pole 63 A. 2 Pole 63 A. 2 Pole 25 A. 2 Pole
SR No Location 6 A. MCB 16 A MCB 10 A MCB 20 A MCB
MCB DB RCCB MCB MCB MCB RCCB MCB
1 Back Side Lift Lobby

2 Front Side Lift lobby

3 Zone 1 White corridor

4 Ramp 1 FF to SF

5 ST-1 Stair case Back Side

6 ST-1 Stair case Front Side

7 ST-4 Big Staircase

8 Duct

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-
First Floor:- Zone-1 Electrical Work

1 Phase DB 3 Phase RCCB 1 Phase RCCB MCB


SR No Location
6 Way 8 Way 10 Way 12 Way 25 A 32 A 40 A 63 A 100 A 25 A. 32 A. 40 A. 63 A. 6A 10 A 16 A 20 A 32 A 40 A 100 A

1 Back Side Lift Lobby

2 Front Side Lift lobby

3 Zone 1 White corridor

4 Ramp 1 FF to SF

5 ST-1 Stair case Back Side

6 ST-1 Stair case Front Side

7 ST-4 Big Staircase

8 Duct

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-
First Floor:- Zone-3 Electrical Work

1 Phase DB 3 Phase RCCB 1 Phase RCCB MCB


SR No Location
6 Way 8 Way 10 Way 12 Way 25 A 32 A 40 A 63 A 100 A 25 A. 32 A. 40 A. 63 A. 6A 10 A 16 A 20 A 32 A 40 A 100 A

1 Toilet Male

2 Toilet Female

3 Toilet Front Side Corridor

4 Electrical Room No-04

6 Staff Toilet Male

7 Staff Toilet Female

8 Front Side staircase

9 Back side staircase

10 Back side corridor

11 Electrical Room No-02

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone-4 Electrical Work

2 Way 3 Way 4 Way 6 Way 8 Way 12 Way 18 Way 2 3 Phase DB


SR No Location 1 Way switch switch switch switch switch switch switch 6/10 A 16 Amp 6/10 A 16 Amp 1 Modular Modular Blank
Board Switch Switch Socket Socket Dimer Plate 4 Way 6 Way 8 Way 12 Way
Board Board Board Board Board Board Board Dimer

1 KIOSK ROOM (10-19)

2 Front Side Corridor

3 Hall No-03

4 Hall No-04

6 Back side Corridor

7 AHU Room-03

8 AHU Room-04

9 Server/confrence Room

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone-4 Electrical Work

1x36 2x36
1x40 watt
1x18 watt 1x18 watt 1x36 watt 1x18 watt 1x18 watt Watt Watt 09 Watt 1200 1400
Light Fan 1x30 watt Recessed Surface Recessed Wall Surface LED LED Mirror Surface Buklhead Exhaust Wall Fan mm mm 400 mm
SR No Location LED Light Mounted Cabin
Point Point mount LED mount LED mount LED mount LED mount LED Light Light LED Light Fitting Fan 600 mm Ceiling Ceiling
Fitting LED Light Fan
Light fitting Light fitting Light fitting Light fitting Light fitting Fitting (4 Fitting (8 Fitting Fan Fan
Fitting
Ft.) Ft.)

1 KIOSK ROOM (10-19)

2 Front Side Corridor

3 Hall No-03

4 Hall No-04

6 Back side Corridor

7 AHU Room-03

8 AHU Room-04

9 Server/confrence Room
SBCPL M&K SSST
Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone5 Electrical Work

1x36 2x36
1x40 watt
1x18 watt 1x18 watt 1x36 watt 1x18 watt 1x18 watt Watt Watt 09 Watt 1200 1400
1x30 watt Surface 400 mm
Light Fan Recessed Surface Recessed Wall Surface LED LED Mirror Buklhead Exhaust Wall Fan mm mm
SR No Location LED Light Mounted Cabin
Point Point mount LED mount LED mount LED mount LED mount LED Light Light LED Light Fitting Fan 600 mm Ceiling Ceiling
Fitting LED Light Fan
Light fitting Light fitting Light fitting Light fitting Light fitting Fitting (4 Fitting (8 Fitting Fan Fan
Ft.) Ft.) Fitting

1 Toilet Male

2 Toilet Female

3 Toilet Front Side Corridor

4 Electrical Room No-3

6 Staff Toilet Male

7 Staff Toilet Female

8 Front Side staircase

9 Back side staircase

10 Back side corridor

11 Electrical Room No-1


SBCPL M&K SSST
Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone-6 Electrical Work

2 Way 3 Way 4 Way 6 Way 8 Way 12 Way 18 Way 2 3 Phase DB


SR No Location 1 Way switch switch switch switch switch switch switch 6/10 A 16 Amp 6/10 A 16 Amp 1 Modular Modular Blank
Board Switch Switch Socket Socket Dimer Plate 4 Way 6 Way 8 Way 12 Way
Board Board Board Board Board Board Board Dimer

1 KIOSK ROOM (20-29)

2 Front Side Corridor

3 Hall No-05

4 Hall No-06

6 Back side Corridor

7 AHU Room-05

8 AHU Room-06

9 Varanda
SBCPL M&K SSST
Darshan Queue C
Shrim Bhanu Constructi
First Floor :- Zone-6

1x18 watt 1x18 watt 1x36 watt


Light Fan 1x30 watt Recessed Surface Recessed
SR No Location LED Light
Point Point mount LED mount LED mount LED
Fitting
Light fitting Light fitting Light fitting

1 KIOSK ROOM (20-29)

2 Front Side Corridor

3 Hall No-05

4 Hall No-06

6 Back side Corridor

7 AHU Room-05

8 AHU Room-06

9 Varanda

SBCPL M&K
Darshan Queue Complex,Shirdi
m Bhanu Construction Pvt.Ltd. Date:-

Electrical Work

1x36 2x36
1x40 watt
1x18 watt 1x18 watt Watt Watt 09 Watt 1200
Wall Surface LED LED Mirror Surface Buklhead Exhaust Wall Fan mm
Mounted
mount LED mount LED Light Light LED Light Fitting Fan 600 mm Ceiling
LED Light
Light fitting Light fitting Fitting (4 Fitting (8 Fitting Fan
Fitting
Ft.) Ft.)

M&K SSST
1400
mm 400 mm
Cabin
Ceiling
Fan
Fan
Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone-5 Electrical Work

2 Way 3 Way 4 Way 6 Way 8 Way 12 Way 18 Way 2 3 Phase DB


SR No Location 1 Way switch switch switch switch switch switch switch 6/10 A 16 Amp 6/10 A 16 Amp 1 Modular Modular Blank
Board Switch Switch Socket Socket Dimer Plate 4 Way 6 Way 8 Way 12 Way
Board Board Board Board Board Board Board Dimer

1 Toilet Male

2 Toilet Female

3 Toilet Front Side Corridor

4 Electrical Room No-3

6 Staff Toilet Male

7 Staff Toilet Female

8 Front Side staircase

9 Back side staircase

10 Back side corridor

11 Electrical Room No-1

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor:- Zone-5 Electrical Work


40 A. 2 pole 6 A. 8 Way TPN 25 A. 2 Pole 40 A. 4 pole 25 A. 2 Pole 63 A. 2 Pole 63 A. 2 Pole 25 A. 2 Pole
SR No Location 16 A MCB 10 A MCB 20 A MCB
MCB MCB DB RCCB MCB MCB MCB RCCB MCB

1 Toilet Male

2 Toilet Female

3 Toilet Front Side Corridor

4 Electrical Room No-3

6 Staff Toilet Male

7 Staff Toilet Female

8 Front Side staircase

9 Back side staircase

10 Back side corridor

11 Electrical Room No-1

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-
First Floor:- Zone-5 Electrical Work

1 Phase DB 3 Phase RCCB 1 Phase RCCB MCB


SR No Location
6 Way 8 Way 10 Way 12 Way 25 A 32 A 40 A 63 A 100 A 25 A. 32 A. 40 A. 63 A. 6A 10 A 16 A 20 A 32 A 40 A 100 A

1 Toilet Male

2 Toilet Female

3 Toilet Front Side Corridor

4 Electrical Room No-3

6 Staff Toilet Male

7 Staff Toilet Female

8 Front Side staircase

9 Back side staircase

10 Back side corridor

11 Electrical Room No-1

SBCPL M&K SSST


Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor :- Zone 7 Electrical Work

1x36 2x36
1x36 watt 1x40 watt
1x18 watt 1x18 watt 1x18 watt Watt Watt 09 Watt 10 watt 1200 1400
Recessed Ceiling 400 mm
Light Fan Recessed Surface Wall LED LED Mirror LED Exhaust Wall Fan mm mm
SR No Location mount LED Mounted Cabin
Point Point mount LED mount LED mount LED Light Light LED Light Buklhead Fan 600 mm Ceiling Ceiling
Light fitting LED Light Fan
Light fitting Light fitting Light fitting Fitting (4 Fitting (8 Fitting Fitting Fan Fan
(2x2) Fitting
Ft.) Ft.)

1 Back Side Lift Lobby

2 Front Side Lift lobby

3 Zone 7 White corridor

4 Ramp 2 FF

5 ST-1 Stair case Back Side

6 ST-1 Stair case Front Side

7 ST-4 Big Staircase

8 Duct
SBCPL M&K SSST
Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor Electrical Work


160 A 4 4 Pole 160 A
UPS Power UPS Main TPN 63 A TPN 40 A TPN 32 A 63 A 4 Pole 6/10 A 6/10 A 2 MultiFunction RYB
SR No Location Light Panel Lift Panel Pole Earth Changeo Contactor Timmer
Panel Panel Panel MCCB MCCB MCCB MCCB MCB SP Pole MCB Meter indicator
MCCB Protector ver

Zone-5 Electrical Room No-


1 1 1 1 - - 7 8 7 2 1 12 - 3 3 9 - - -
01

Zone-3 Electrical Room No-


2 1 1 1 - - 7 8 7 2 1 12 - 3 3 9 - - -
02

Zone-5 Electrical Room No-


3 - - - 1 1 - - - 3 19 6 2 2 3 11 1 2 1
03

Zone-3 Electrical Room No-


4 - - - 1 - - - - 1 11 3 2 1 1 5 1 2 1
04

Total 2 2 2 2 1 14 16 14 8 32 33 4 9 10 34 2 4 2
SBCPL M&K SSST
Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First :- Zone-7 Electrical Work

2 Way 3 Way 4 Way 6 Way 8 Way 12 Way 18 Way 2


1 Way 6/10 A 16 Amp 6/10 A 16 Amp 1 Modular Blank
SR No Location switch switch switch switch switch switch switch Modular
Board Switch Switch Socket Socket Dimer Plate
Board Board Board Board Board Board Board Dimer

1 Back Side Lift Lobby

2 Front Side Lift lobby

3 Zone 7 White corridor

4 Ramp 2 SF

5 ST-1 Stair case Back Side

6 ST-1 Stair case Front Side

7 ST-4 Big Staircase

8 Duct
SBCPL M&K SSST
Darshan Queue Complex,Shirdi
Shrim Bhanu Construction Pvt.Ltd. Date:-

First Floor:- Zone-7 Electrical Work

1 Phase DB (SPN) 3 Phase DB (TPN) 1 Pole MCB (SP) 2 Pole MCB 4 Pole MCB 2 Pole RCCB
SR No Location
12 Way 10 Way 6 Way 12 Way 8 Way 6Amp. 10 Amp. 16 Amp. 20 Amp. 25 Amp 32 Amp 25 Amp. 32 Amp. 40 Amp. 63 Amp. 40 Amp. 63 Amp. 32 Amp. 25 Amp. 32 Amp. 40 Amp. 63 Amp.

1 Back Side Lift Lobby

2 Front Side Lift lobby

3 Zone 7 White corridor

4 Ramp 2 FF

5 ST-1 Stair case Back Side

6 ST-1 Stair case Front Side

7 ST-4 Big Staircase

8 Duct
SBCPL M&K SSST

You might also like