This document provides a summary of a transmission protection site test report for a 400kV feeder at the 700MW CSP+250MW PV HYBRID-IPP PHASE IV substation. The test results show that voltage measurements, phase sequence, phasing out, and charging current measurements all passed. Current readings from two measurement devices matched and phase angles were within acceptable limits. The test was witnessed and verified by representatives from the contractor, utility owner, and main contractor.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

Energization Test Format

This document provides a summary of a transmission protection site test report for a 400kV feeder at the 700MW CSP+250MW PV HYBRID-IPP PHASE IV substation. The test results show that voltage measurements, phase sequence, phasing out, and charging current measurements all passed. Current readings from two measurement devices matched and phase angles were within acceptable limits. The test was witnessed and verified by representatives from the contractor, utility owner, and main contractor.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

TRANSMISSION PROTECTION

SITE TEST REPORT


Owner NE1 Name of Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Main Contractor SEGC Name Of Bay C09-MBRL2
Manufacturer ABB Equipment 400kV C09 – GIS-2 (LCC & RP)
SCADA Number FA 1060 Date 09-01-2023

ENERGIZATION MEASUREMENT REPORT: 400kV FEEDER

1. Voltage Measurement Check:


1.1 Measurement at Meter / Relay Checked Pass √ Fail NA
1.2 Measurement at BCU checked Pass √ Fail NA
2. Phase Sequence Check:
2.1 Clock Wise (at LCC) Pass √ Fail NA

3. Phasing Out Check: Pass √ Fail NA

Test Feeder:FA1110 Reference Feeder::F11140

Reference Test Feeder Test Result

Feeder Pass/Fail
R R Y B N E pass
Y 110.7V 110.7V 110.5V - - pass
B
N
E

4. Charging Current Measurements: Pass √ Fail NA

Note: Current measurement will be done after Energization

Feeder Energized:

Phase M1FP: SIEMENS 7SD522 M2FP: SEL411

Current IR 0.0% 0.000pu


IY 0.0% 0.000pu
Reading IB 0.0% 0.000pu
Remote IN 0.0% 0.000pu
Current IR 5.9% 0.043pu

Reading IY 5.8% 0.043pu


Local IB 5.9% 0.043pu
IN -
TRANSMISSION PROTECTION
SITE TEST REPORT
Owner NE1 Name of Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Main Contractor SEGC Name Of Bay C09-MBRL2
Manufacturer ABB Equipment 400kV C09 – GIS-2 (LCC & RP)
SCADA Number FA 1060 Date 09-01-2023

ENERGIZATION MEASUREMENT REPORT: 400kV FEEDER

Testing Instrument Details

Instrument Make Type Sr No Cal Due date


Phase M1FP : SIEMENS 7SD522 M2FP : SEL411

Diff Bias Rph 4.1% 0.043pu


Current Yph 4.1% 0.043pu
Bph 4.2% 0.043pu
Bias Rph 21.4% 1.000 deg 180
Current Yph 21.4% 1.000 deg 180
Bph 21.6% 1.000 deg 180

multi meter fluke 15B+ 45121493WS 8.7.2023

Phase sequence fluke 9040 Sk56610 9.11.2023


meter

TESTED BYCONTRACTOR: WITNESSED/ VERIFIED BY SEGC: WITNESSED/ VERIFIED BY NE1: