Arcelormittal South Africa Limited Tubular Products Steelmaking Facility Arcelormittal South Africa LTD
Arcelormittal South Africa Limited Tubular Products Steelmaking Facility Arcelormittal South Africa LTD
Chemical Composition:
Element(%) C Si Mn S P Cr Ni Mo Cu V Al Ti Sn Ca N B Nb CE R22 R24
Minimum - - 0.29 - - - - - - - - - - - - -
Maximum 0.240 0.40 1.06 0.015 0.025 0.40 0.40 0.150 0.400 0.050 0.040 0.0005 0.0500 0.43 0.15 0.060
Heat 0.189 0.30 0.79 0.008 0.015 0.08 0.18 0.042 0.060 0.005 0.026 0.003 0.006 0.0026 0.0081 0.0004 0.0010 0.36 0.01 0.006
Product 0.18 0.30 0.78 0.005 0.008 0.11 0.17 0.039 0.050 0.001 0.024 0.001 0.003 0.0025 0.0083 0.0005 0.0000 0.35 0.002 0.001
Product (ADD) 0.17 0.30 0.77 0.003 0.008 0.11 0.17 0.039 0.050 0.001 0.024 0.001 0.003 0.0020 0.0080 0.0004 0.0000 0.34 0.002 0.001
Mechanical Properties: Orientation and type of tensile test: Longitudinal, Strip, 19.430mm Orientation of impact test piece:
Specification Limits UTS (Rm) Yield (0.2%) %EL OTHER TESTS OTHER TESTS
MPa MPa 50mm Category Results Category Results
Minimum 415 290 30.0 Bending PASSED NDI: UT UT not required
Maximum 655 495 - Flattening PASSED HV 10 Kg 158 159 159
(1) Actual 507 340 36.0 Hydrostatic 20700 kPa (3000 psi) - 5 sec Impact(J) 99 112 128 Ave 113 @ 0 °C
(2) Actual 513 350 38.0 NDI: EMI PASS - ASTM E570 - 12.5% NOTCH Shear Fracture(%) 50 60 60 Ave 57 @ 0 °C
Remarks:
Material in accordance with NACE MR0175:15/ISO15156-2:15, MR0103:15. Dimensions to ASME B36.10:15. End finish to ASME B16.25:17. Material guaranteed to conform to the yield strength requirements as per ASME ,Sect II, Pt D, Table Y-1,
2017. Material conforms to the visual and dimensional requirements and is made to a suitable fine grain practice. The QM System of ArcelorMittal SA meets the requirements of PED 2014/68/EU, Annex I,Par 4.3 and AD 2000-Merkblatt W0 as
certified by TUV cert 01 202 ZA/Q-02 0004.
Quality Assurance Engineer, Certification: M Makgoba Date of Release: 2019.12.02 Certified by:______________________
We hereby certify that the material was manufactured, tested and inspected to and fully comply with the requirements of referenced specifications. No changes, amendments or additions may be made to this document. Any changes which are effected shall invalidate this certificate.