Nabo Ghosh

From: Javeed Shah Halith


Sent: 06 April 2023 10:37
To: Nabo Ghosh
Subject: FW: STARWAY- GYRO SYNCRONIZATION CMZ-900D LOST FOR SHORT TIME<No-AutoEnc-file> //
ETA Point Tupper 10/4

Kind regards,

JAVEED SHAH HALITH| Executive,Technical Services | Eastern Pacific Shipping Pte. Ltd. | 1
Temasek Avenue, #38-01, Millenia Tower, Singapore 039192 | Direct: +65 6433 5208 ||
[email protected] | [email protected] | www.epshipping.com.sg ||

From: Sano Takahiro <[email protected]>  
Sent: Wednesday, April 5, 2023 4:35 PM 
To: Javeed Shah Halith <[email protected]>; STARWAY <[email protected]>; MB v_nav_svg_001 
([email protected]) <[email protected]>; Nagura Yuya <[email protected]>; 
Deng Hua Yun <[email protected]
Cc: Gupta T.P. ( EPSHIPPING ) <[email protected]>; Ranadev Chemparathy 
<[email protected]>; EPS Tanker2‐Technical <[email protected]>; Radio 
Navigation <[email protected]>; Deng Hua Yun <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> // ETA Point 
Tupper 10/4 
 
Javeed san

We were advised by the technical department but could not arrive at a definite cause.
As a conclusion, we propose to replace the C.Main and C.Term of the C-operation unit under warranty,
although it is a prospective parts replacement.
(It seems that M-operation was also frozen, but there is no past case that two units were frozen at the
same time. )

I would wait for your information.

Sano

From: Javeed Shah Halith <[email protected]>  
Sent: Wednesday, April 5, 2023 4:11 PM 
To: Sano Takahiro <[email protected]>; STARWAY <[email protected]>; MB v_nav_svg_001 
1
([email protected]) <[email protected]>; Nagura Yuya <[email protected]>; 
Deng Hua Yun <[email protected]
Cc: Gupta T.P. ( EPSHIPPING ) <[email protected]>; Ranadev Chemparathy 
<[email protected]>; EPS Tanker2‐Technical <[email protected]>; Radio 
Navigation <[email protected]>; Deng Hua Yun <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> // ETA Point 
Tupper 10/4 
 
Dear Sano San / Nagura San / YDK Support, 
 
Please advise soonest to close out the issue.  
We will revert with the agent details soon. 
 
Kind regards, 
 
JAVEED SHAH HALITH| Executive,Technical Services | Eastern Pacific Shipping Pte. Ltd. | 1
Temasek Avenue, #38-01, Millenia Tower, Singapore 039192 | Direct: +65 6433 5208 ||
[email protected] | [email protected] | www.epshipping.com.sg ||  

 
 
From: Javeed Shah Halith <[email protected]>  
Sent: Tuesday, April 4, 2023 9:21 AM 
To: Sano Takahiro <[email protected]>; STARWAY <[email protected]>; MB v_nav_svg_001 
([email protected]) <[email protected]>; Nagura Yuya <[email protected]
Cc: Gupta T.P. ( EPSHIPPING ) <[email protected]>; Ranadev Chemparathy 
<[email protected]>; EPS Tanker2‐Technical <[email protected]>; Radio 
Navigation <[email protected]>; Deng Hua Yun <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> // ETA Point 
Tupper 10/4 
  
Dear Sano San, 
 
Good Day! 
 
What was the root cause of the issue? We need to inform internal audit to close out the issue. 
 
Kind regards, 
 
JAVEED SHAH HALITH| Executive,Technical Services | Eastern Pacific Shipping Pte. Ltd. | 1
Temasek Avenue, #38-01, Millenia Tower, Singapore 039192 | Direct: +65 6433 5208 ||
[email protected] | [email protected] | www.epshipping.com.sg ||  

 
 
From: Sano Takahiro <[email protected]>  
Sent: Tuesday, April 4, 2023 9:03 AM 
To: Javeed Shah Halith <[email protected]>; STARWAY <[email protected]>; MB v_nav_svg_001 
([email protected]) <[email protected]>; Nagura Yuya <[email protected]
2
Cc: Gupta T.P. ( EPSHIPPING ) <[email protected]>; Ranadev Chemparathy 
<[email protected]>; EPS Tanker2‐Technical <[email protected]>; Radio 
Navigation <[email protected]>; Deng Hua Yun <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> // ETA Point 
Tupper 10/4 
  
Javeed san 
 
We would replace C.Operation unit PCB by under warranty. 
Could you let me know ships agent detail of Bayway Terminal,NJ? 
 
Sano 
 
 
From: Javeed Shah Halith <[email protected]>  
Sent: Monday, April 3, 2023 10:24 AM 
To: STARWAY <[email protected]>; Sano Takahiro <[email protected]>; MB v_nav_svg_001 
([email protected]) <[email protected]>; Nagura Yuya <[email protected]
Cc: Gupta T.P. ( EPSHIPPING ) <[email protected]>; Ranadev Chemparathy 
<[email protected]>; EPS Tanker2‐Technical <[email protected]>; Radio 
Navigation <[email protected]>; Deng Hua Yun <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> // ETA Point 
Tupper 10/4 
Importance: High 
  
Dear Sano San / Nagura San / YDK Team, 
 
Good Day! 
 
Vessel have come back with the findings, if this is a hardware fault 
Kindly assist to arrange warranty service at Point Tupper . 
 

PORT  ETA (EOSP) 

POINT TUPPER  10 April 2023/ 1200 hrs LT 
BAYWAY TERMINAL, NJ,NY  15th April / 0600 LT (Tentative) 
 
 
Kind regards, 
 
JAVEED SHAH HALITH| Executive,Technical Services | Eastern Pacific Shipping Pte. Ltd. | 1
Temasek Avenue, #38-01, Millenia Tower, Singapore 039192 | Direct: +65 6433 5208 ||
[email protected] | [email protected] | www.epshipping.com.sg ||  

3
 
From: STARWAY <[email protected]>  
Sent: Monday, April 3, 2023 6:35 AM 
To: Javeed Shah Halith <[email protected]>; 'Sano Takahiro' <[email protected]>; 'MB 
v_nav_svg_001 ' <[email protected]>; 'Nagura Yuya' <[email protected]
Cc: EPS Tanker2‐Technical <[email protected]>; Radio Navigation <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> 
  
Good day! 
  
Please find attached the requested data collected as per maker advice. 
 
aa) Both G1/G2 displays in C op OR G1 or G2, C op could not operate? ‒ GMZ900 was completely frozen,
Gyros input could not be selected. 
bb) Neither G1/G2 display in the electrical room OR G1 or G2, M op could not operate? ‒ Both Gyros G1 &
G2 display in the electrical room was frozen even when the vessel altered its heading. 
cc) Repeater display & PCR record ‒ Repeater displays were frozen. 
dd) Azimuth display of radar & ECDIS, etc. ‒ Azimuth displays of radar and ECDIS were reported frozen. 
  
Weather during the time of incident: Rough Seas and Moderate swell. No Thunderstorm or lightening was reported. 
  
  
Thanks & Best Regards 
  
Capt. Anil Kumar Bhagat | Master, STARWAY 
FBB Voice:+870773063074  | FBB FAX: +870783059618 |  VSAT Voice:+870771364250 
MASTER OFFICE:+6531596415  |  Sat C Telex:463736598 /463736599  | E‐mail address:[email protected] 
Eastern Pacific Shipping Pte. Ltd |  1 Temasek Avenue. #38‐01,Millenia Tower, Singapore 039192   

 
               
  
From: Javeed Shah Halith <[email protected]>  
Sent: Friday, 31 March 2023 6:36 am 
To: STARWAY <[email protected]>; Sano Takahiro <[email protected]>; MB v_nav_svg_001 
([email protected]) <[email protected]>; Nagura Yuya <[email protected]
Cc: EPS Tanker2‐Technical <[email protected]>; Radio Navigation <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> 
Importance: High 
  
Dear Capt Bhagat, 
 
Good Day! 
 
Kindly advise on the below. 
 
Kind regards, 
 
4
JAVEED SHAH HALITH| Executive,Technical Services | Eastern Pacific Shipping Pte. Ltd. | 1
Temasek Avenue, #38-01, Millenia Tower, Singapore 039192 | Direct: +65 6433 5208 ||
[email protected] | [email protected] | www.epshipping.com.sg ||  

 
 
From: Javeed Shah Halith <[email protected]>  
Sent: Thursday, March 30, 2023 9:34 AM 
To: STARWAY <[email protected]>; Sano Takahiro <[email protected]>; MB v_nav_svg_001 
([email protected]) <[email protected]>; Nagura Yuya <[email protected]
Cc: EPS Tanker2‐Technical <[email protected]>; Radio Navigation <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> 
Importance: High 
  
Dear Capt Bhagat, 
 
Good Day! 
 
Kindly check and revert on the below from maker. 
 
Kind regards, 
 
JAVEED SHAH HALITH| Executive,Technical Services | Eastern Pacific Shipping Pte. Ltd. | 1
Temasek Avenue, #38-01, Millenia Tower, Singapore 039192 | Direct: +65 6433 5208 ||
[email protected] | [email protected] | www.epshipping.com.sg ||  

 
 
From: Sano Takahiro <[email protected]>  
Sent: Thursday, March 30, 2023 9:17 AM 
To: Javeed Shah Halith <[email protected]>; MB v_nav_svg_001 ([email protected]
<[email protected]>; Nagura Yuya <[email protected]
Cc: EPS Tanker2‐Technical <[email protected]>; Radio Navigation <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME<No‐AutoEnc‐file> 
  
Javeed san 
 
In this case, we think Presumed factors are: C-op or M-op or changeover unit failure, crew mishandling,
lightning, etc.) 
Therefore, we would like to check the command history and error history of Gyro as material for
understanding the current situation. 
We would appreciate it if you could fill in the command history and error history in the attached excel file. 
Also, just to be sure, please reconfirm which of the following was the cause of the orientation freeze. 
aa)Both G1/G2 displays in C op OR G1 or G2, C op could not operate? 
bb)Neither G1/G2 display in the electrical room OR G1 or G2, M op could not operate? 

5
cc)Repeater display & PCR record 
dd)Azimuth display of radar & ECDIS, etc. 
(Please also check sea conditions to see if there were any lightning strikes during TR) 
 
Sano 
 
From: Javeed Shah Halith <[email protected]>  
Sent: Wednesday, March 29, 2023 11:28 AM 
To: Sano Takahiro <[email protected]>; MB v_nav_svg_001 ([email protected]
<[email protected]>; Nagura Yuya <[email protected]
Cc: EPS Tanker2‐Technical <[email protected]>; Radio Navigation <[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME 
  
Dear Sano San / YDK Technical Support, 
 
Good Day! 
 
Kindly seeking your advise on what was the cause of the Gyro Sycn Failure. Please advise the root
cause and preventive measure. 
We need to close out the issue for follow up. 
 
Please advise as soon as possible. 
 
Kind regards, 
 
JAVEED SHAH HALITH| Executive,Technical Services | Eastern Pacific Shipping Pte. Ltd. | 1
Temasek Avenue, #38-01, Millenia Tower, Singapore 039192 | Direct: +65 6433 5208 ||
[email protected] | [email protected] | www.epshipping.com.sg ||  

 
 
From: STARWAY <[email protected]>  
Sent: Monday, December 19, 2022 4:01 PM 
To: Javeed Shah Halith <[email protected]>; 'Sano Takahiro' <[email protected]>; 
[email protected] 
Cc: EPS Tanker2‐Technical <[email protected]>; Radio Navigation <[email protected]>; EPS 
Safety <[email protected]>; EPS Tanker Ops <[email protected]>; Deng Hua Yun 
<[email protected]>; Nabo Ghosh <[email protected]>; Anish Kumar Saxena 
<[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME 
  
Good day, 
  
Please note both gyros are working fine without any errors. Worklist number is 39 
  
Vessel is at Hound Point/UK with ETD on 22 dec 2022 (TBC) followed by Gdansk/Poland ETA on 26 dec 2022.  
  
Best Regards 
6
Capt. Catalin Dumitrache | Master of  STARWAY 
FBB Voice:+870773063074  | FBB FAX: +870783059618 |  VSAT Voice:+870771364250 
MASTER OFFICE:+6531596415  |  Sat C Telex:463736598 /463736599  | E‐mail address:[email protected] 
Eastern Pacific Shipping Pte. Ltd |  1 Temasek Avenue. #38‐01,Millenia Tower, Singapore 039192   

 
               
  
From: Javeed Shah Halith <[email protected]>  
Sent: Monday, 19 December 2022 7:26 am 
To: STARWAY <[email protected]>; Sano Takahiro <[email protected]>; ML 
[email protected] <[email protected]
Cc: EPS Tanker2‐Technical <[email protected]>; Radio Navigation <[email protected]>; EPS 
Safety <[email protected]>; EPS Tanker Ops <[email protected]>; Deng Hua Yun 
<[email protected]>; Nabo Ghosh <[email protected]>; Anish Kumar Saxena 
<[email protected]
Subject: RE: STARWAY‐ GYRO SYNCRONIZATION CMZ‐900D LOST FOR SHORT TIME 
Importance: High 
  
Dear Capt Catalin, 
 
Good Day! 
 
What is the current situation on board now? Are both the gyros are working? 
Please advise the worklist number. 
 
Also please advise the vessel schedules. 
 
RIC: 
 
Dear Sano San / YDK Technical support, 
 
Good Day! 
 
Kindly seeking your troubleshooting procedure to resolve the issue 
 
Kind regards, 
 
JAVEED SHAH HALITH| Executive,Technical Services | Eastern Pacific Shipping Pte. Ltd. | 1
Temasek Avenue, #38-01, Millenia Tower, Singapore 039192 | Direct: +65 6433 5208 ||
[email protected] | [email protected] | www.epshipping.com.sg ||  

 
 
From: STARWAY <[email protected]>  
Sent: Monday, 19 December, 2022 2:39 PM 
To: Deng Hua Yun <[email protected]>; Nabo Ghosh <[email protected]>; Anish Kumar 
Saxena <[email protected]
Cc: EPS Tanker2‐Technical <[email protected]>; Radio Navigation <[email protected]>; EPS 
7
Safety <[email protected]>; EPS Tanker Ops <[email protected]
Subject: STARWAY‐ GYRO SYNCRONIZATION LOST FOR SHORT TIME 
  
Good day, 
  
Please note vessel has experience Gyro synchronization lost for short time on 17 dec 2022/1910 hrs  during sailing to 
Hound point. Vessel has started hand steering using Magnetic compass and corrected the course. The gyro indication 
monitored and since the incident occurred and observed in order without any error or malfunction. 
  
Course of events: 
17 dec 2022 
1911 hrs‐ Bridge team observed that vessel is altering to Stbd. Gyro heading is frozen and ROT is zero. On gyrocompass 
operation unit GMZ900 gyro heading for both units is frozen. 
1912 hrs‐ Master called on bridge and Vessel on hand steering, course corrected using Magnetic compass. Tried to 
change over to TMC but panel is frozen. During this time several alarms received that Speed is not updated (speed was 
on auto). 
Also received an alarm that Synchronization lost. Tried to make photo of alarm but disappear from display. Checked 
both Master gyro from Electrical equipment room and found that while vessel is altering the gyro heading is frozen.  
  
1915 hrs Vessel on TMC and all repeaters synchronized. 
Vessel is correcting the course. 
1922 hrs Changed back to Gyro heading input and found in good working condition.   
  
During next hours received a few times alarm that Speed input lost but alarm disappear  after acknowledge. 
  
Training carried out with Bridge team for close monitoring of gyro heading while on auto pilot along with procedure for 
changing over to TMC/ hand steering. 
  
Best Regards 
Capt. Catalin Dumitrache | Master of  STARWAY 
FBB Voice:+870773063074  | FBB FAX: +870783059618 |  VSAT Voice:+870771364250 
MASTER OFFICE:+6531596415  |  Sat C Telex:463736598 /463736599  | E‐mail address:[email protected] 
Eastern Pacific Shipping Pte. Ltd |  1 Temasek Avenue. #38‐01,Millenia Tower, Singapore 039192   

 
               
  

This email and any attachments are confidential. If you are not the intended recipient please delete it and notify us
immediately by telephoning or emailing the sender. You should not copy it or use it for any purpose nor disclose its
contents to any other person.This email and any attachments may contain computer viruses or other defects, may not be
accurately replicated on other systems, or may be intercepted, deleted or interfered with without the knowledge of the
sender or the intended recipient. Anyone who communicates with us by email is taken to accept these risks. We reserve
the right, to the extent and under circumstances permitted by applicable law, to retain, monitor and intercept all email
communications through our networks. Eastern Pacific Shipping Pte. Ltd. is a private limited company registered in
Singapore with registered number 198702276Z. Further information regarding Eastern Pacific Shipping Pte. Ltd. can be
found on our website: www.epshipping.com.sg.  

This email and any attachments are confidential. If you are not the intended recipient please delete it and notify us
immediately by telephoning or emailing the sender. You should not copy it or use it for any purpose nor disclose its
contents to any other person.This email and any attachments may contain computer viruses or other defects, may not be

8
accurately replicated on other systems, or may be intercepted, deleted or interfered with without the knowledge of the
sender or the intended recipient. Anyone who communicates with us by email is taken to accept these risks. We reserve
the right, to the extent and under circumstances permitted by applicable law, to retain, monitor and intercept all email
communications through our networks. Eastern Pacific Shipping Pte. Ltd. is a private limited company registered in
Singapore with registered number 198702276Z. Further information regarding Eastern Pacific Shipping Pte. Ltd. can be
found on our website: www.epshipping.com.sg.  

This email and any attachments are confidential. If you are not the intended recipient please delete it and notify us
immediately by telephoning or emailing the sender. You should not copy it or use it for any purpose nor disclose its
contents to any other person.This email and any attachments may contain computer viruses or other defects, may not be
accurately replicated on other systems, or may be intercepted, deleted or interfered with without the knowledge of the
sender or the intended recipient. Anyone who communicates with us by email is taken to accept these risks. We reserve
the right, to the extent and under circumstances permitted by applicable law, to retain, monitor and intercept all email
communications through our networks. Eastern Pacific Shipping Pte. Ltd. is a private limited company registered in
Singapore with registered number 198702276Z. Further information regarding Eastern Pacific Shipping Pte. Ltd. can be
found on our website: www.epshipping.com.sg.