Bill of Materials For Assembly MK'D: Ama3-7: Assy Qty: 1
Bill of Materials For Assembly MK'D: Ama3-7: Assy Qty: 1
60
60
60
60
60
90 90
90 90
4*90=360
90 90
4*90=360
90 90
90 90
30 * D 33
90 90
30 * D 33
50 * D 33 50 * D 33
30 * D 33
30 * D 33
2785
2950
85
976 1024
B B 85
16
A A
MA3-47 MA3-47
MA3-47
MA3-47
MA3-27
MA3-27
8400
7560
7560
8400
7560
8400
7560
7560
MA3-27
8400
8400
8400
8400
3515
MA3-27
3350
MA3-27
976 1024
85 85
16
A A F F
MA3-27
MA3-47
MA3-47 MA3-47 MA3-47
MA3-27
MA3-27
2100
2100
30 * D 33 30 * D 33 50 * D 33 30 * D 33
50 * D 33 30 * D 33
90 90
90 90
4*90=360
90 90
4*90=360
60 90 90
60 90 90
60 90 90
60
60
For General Notes Please Read this Drawing Along With Erection Drawings
976
976
85
85
85 WELDING NOTES
1476
T1
16
16
6 * D 22 = = 0.7 min.(t1,t2)
45
MA3-47 MA3-47
6 * D 22 MA3-47 FULL PENETRATION WELDEDING
45
MA3-47 MA3-47
65 70
180
MA3-27
1024
1024
MA3-27
16
MA3-27
65 70
180
55 60 60 55
230 55 60 60 55
230 S
SECTION A - A SECTION B - B SECTION F - F
ALTERNATIVE SOLUTION
AMA3-7 AMA3-8
S = CLEARANCE OF THE EDGES TO BE WELDED
MUST BE DEFINED DURING THE CONSTRUCTION,
CONSIDERING THE PROPER WELDING SHRINKAGE
NOT ALLOWED