0% found this document useful (0 votes)
38 views2 pages

Inquiry Form - Blank

1) The document provides product details for an inquiry into a failed e-rickshaw neck pipe component. 2) The component is a metallic neck pipe that was welded and used under dynamic and pressurized service conditions between 10-50 degrees. 3) The pipe broke within 10 months of use near the welding area on the e-rickshaw while it was onsite.

Uploaded by

Aditya Nehra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views2 pages

Inquiry Form - Blank

1) The document provides product details for an inquiry into a failed e-rickshaw neck pipe component. 2) The component is a metallic neck pipe that was welded and used under dynamic and pressurized service conditions between 10-50 degrees. 3) The pipe broke within 10 months of use near the welding area on the e-rickshaw while it was onsite.

Uploaded by

Aditya Nehra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Product details (Failed Component) - Inquiry Form

   
Name of the
1  E- Rickshaw Neck Pipe  
Component/product
   
Metallic Ceramic Polymer Composite  
2 Type of the Component/product
 ✓        
   
Manufacturing and processing Casting Welding Forging Other  
3 History of the
component/product    ✓       
   
Yes No NA  
4 Heat Treatment
    ✓  
   
5 Purchase Date    
   
6 Installation Date  22nd July 2022  

   
7 Maintenance History (Period) N/A   
8 Last Maintenance Date    
   
Cooled Rolled steel (IS3074)
9 Product Material Specification  
Tube Size – 60mm*40mm*3 mm  
   
Chemical
Static Dynamic Pressurised  
10 Service Application condition Storage
   ✓      
   
11 Operating Temperature 10-50 Deg   
   
Location of Failed product
12  Onsite  
(Onsite/offsite)
   
 
 Breaking of e-rickshaw Neck Tube within 10 months of on road  
13 Brief Summary of failed product
condition near to the welding area  
 
                 
14 Other Details (If Any) Please go through the report attached in mail   
                   

Report Deliverables may include below (but not limited to):

 Failure analysis brief details


 Executive Summary
 History & Background data
 Visual Inspection and other NDT
 Macro and Micro analysis
 Chemical composition
 Mechanical testing – Hardness, Microhardness and other testing if required
 SEM, EDX, TEM & XRD, analysis
 Comparative observation
 Result and Discussion
 Conclusions

Note: As a subject matter expert, we insist failure site visit to have the better understanding
of the failed product/Component before take-up the project.