Sr. No. Particular Tie Beam
Sr. No. Particular Tie Beam
Sr. No. Particular Tie Beam
Sr.
Particular
no. L B H
→ RINGS-8 AT 150C/C
→ RINGS-8 AT 150C/C
EXTRA TOP
→ RINGS-8 AT 150C/C
BAR BENDING SCHEDULE - TB
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
-0.050 0 2 2
-0.050
0.075 0 1 2
-0.050 0.075 -0.050
-0.050
4.670 0 2 12
1.900
0.250 12 2 12
0.180
0.075 8 48 12
0.350 0.075 0.350
0.180
2.450 0 2 4
1.800
0.150 12 1 4
0.180
0.075 8 18 4
0.350 0.075 0.350
0.180
NDING SCHEDULE - TB
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
0.450 2.700 - -
0.450 2.700 - -
-0.050 -0.200 - -
5.170 124.080 - -
5.170 248.160 - -
4.670 112.080 - -
2.150 51.600 - -
2.950 23.600 - -
2.950 35.400 - -
2.450 19.600 - -
1.950 7.800 - -
0.150 1.210 87.120 34.412 -
- - - -
- - - -
- - - -
- - - -
110.431 - - -
220.862 - - -
- - - -
45.924 - - -
- - - -
21.004 - - -
31.506 - - -
- - - -
6.942 - - -
- - - -