HIRARC-AB-001 - Land Clearing & New Access Route-05042019
HIRARC-AB-001 - Land Clearing & New Access Route-05042019
HIRARC-AB-001 - Land Clearing & New Access Route-05042019
High
Medium
Low
Table A
ATLANTIC BLUE SDN BHD
Likelihood of an occurrence
This value is based on the likelihood of an event occurring. Likelihood
levels range from “most likely” to “inconceivable.”
Table B
Note: HIRARC to be reviewed and approved by contractor team before forward to Asia Meranti. ATLANTIC BLUE SDN BHD- 9.99MWac Kinta Solar PV Project
Hazard Identification, Risk Assessment & Risk Control (HIRARC) Form
Control Number:001
HIRARC FORM
Contractor: AB Name: Anand Designation: SHO & SHE Manager
HIRARC Conducted by:
Activity: Land clearing & new access route Signature: Date:
Acknowledge by Client : (Name, Designation, Date & Signature) Name: Designation:
Reviewed and approved by:
Signature: Signature: Signature: Date:
Name & Designation: Name & Designation:
Review Date:
Date: Date:
1. Hazard Identification 2. Risk Analysis 3. Risk Control
No unauthorized person
allowed surrounding
Traffic accident work area.
Operation radius shall
1. Materials and work tools mobilization to work area. On-going traffic Materials blocking be barricade or 2 4 8 (Medium) Assign a full time Supervisor to monitor on-going traffic and arrange for traffic controller when working near public roads. SHO & SHE Supervisor
Limited space access or exit route. SHE Officer/Supervisor to double check materials storage practice to avoid blocking road or other routes.
controlled.
Compliance with site
basic PPE's requirement.
Perform visual
Large machinery Machinery failure or inspection on all 2 3 6 (Medium) To assign a person in-charge for all machineries inspection before use on daily basis. Site Supervisor & SHE
physical injury (accident) Supervisor
machinery before use.
2.
Heat stroke or Brief workers on this risk To have break in between working hours during extreme heat. Site Supervisor & SHE
Extreme weather/heat during daily morning 2 3 6 (Medium) To setup drinking water facility once Site Office & Workers Resting Area are established.
Dehydration Supervisor
TBMs. Workers to carry along drinking water bottles to work site after taking water from the drinking water facility.
Perform visual
Oil spill from lorry or Environment pollution. To stop machineries use if detected any oil spill (hydraulic, diesel, etc). Environmental Officer &
inspection on all 2 4 8 (Medium)
other machineries. To assign a person in-charge for all machineries inspection before use on daily basis. SHE Supervisor
machinery before use.
Trees removing from site land by pulling out method. 2 units of excavators with
sharp device are suppose to push down the Hit by trees while Briefing to all workers to
3. palm trees and subsequently to chop or split the trunk or even shorten trunk Trees relocating. removing or hit by All workers to maintain distance during machineries activities. Site Supervisor & SHE
Machineries movement. machineries during be alert on this matter 2 4 8 (Medium) To assign a full time Supervisor to monitor this activity and control machineries use at site. Supervisor
length for easy handling and during daily TBM.
transportation. movement or activity.
Works Supervisor to Machine operators such as Lorry, Excavator, Log Loader, etc to always maintain their compartment cabin glass window closed to prevent Bees or other insects from
Biological (bee hive or Physical injury (stung by monitor work area Site Supervisor & SHE
2 4 8 (Medium) entering to them.
other poisonous insects). bee, etc). before performing trees Supervisor
pulling or chopping. To stop work and call Fire & Rescue Dept if notice any large Bee Hive or other insects nest at work area.
Checking of all loads Site personnel will show the way of outgoing and incoming vehicles to
Unbalance trees on the Falling trees hitting make sure traffic safety is under controlled.
lorry. workers or public, other before lorries leaving 2 4 8 (Medium) To make sure all waste or unwanted trees for disposal are stacked properly on the lorry to avoid falling over. Site Supervisor & SHE
work site. Supervisor
vehicles on the road. Prepare road warning signs to make other road users alert on large vehicles movement.
Checking of all loads Prepare road warning signs to make other road users alert on large vehicles movement.
Disposal of waste trees and other debris from work site using Log Loader and before lorries leaving Site personnel will show the way of outgoing and incoming vehicles to Traffic controller. SHO or
4 Traffic. Road accident. 2 4 8 (Medium)
Lorries. To remove from work site to the disposal area. work site. make sure traffic safety is under controlled. SHE Supervisor.