1.△Safety instruction
!
L L L L L L L L
E E E
3)Countermeasure against the failure of the SPD and unlikely event of the operation of power switch
and so on
a) Personnel without authorization to work on electrical circuitry – immediately contact the relevant
authorized personnel but do not touch the SPD.
b) Authorized person
During inspection of the SPD, it should be confirmed the SPD is disconnected from the circuit by
switching off the main power switch on the electric input side of the SPD, to protect against an
electric shock.
Refer to “3 item, regular maintenance” when checking the inspection contents.
2. Installation method
Only authorized person should install the SPD and conduct the wiring construction.
1) Installation method
Use the installation hole of φ4.5 on the SPD and fix it by M4 screw.
2) Wiring
・SPD should be wired by connecting crimp terminal to the wire of the SPD.
・Cut off the wire of the SPD to conduct wiring easily.
But during and after wiring, pulled power on the wire (More than 40N) Indicator
should not be stable.
3.Regular maintenance
When maintenance, follow the below caution items.
(Ref. 1.Safety instruction, 2)Instruction for regular maintenance)
<SPD inspection method>
φ4.5
Replace the SPD if it is under below conditions Installation hole
○Appearance check
・If the indicator of the SPD turns red, SPD deteriorates.
Replace the SPD.
・If it is noted that the plastic housing has changed color or shape, Fig.2 Insulation hole, Indicator
replace the SPD.
○Measurement of insulation resistance
・Insulation resistance between the wire on L side and E side should be measured. If the insulation
resistance does not meet “more than 10MΩ by 500V insulation tester”, replace the SPD.
Company
OTOWA ELECTRIC CO.,Ltd. (e-mail : [email protected])