Roof 10
Roof 10
Roof 10
diagram
k
Z=d {0.5+√ 0.25− } =0.96>0.95d ,take 0.95d
0.9
M 10.14 x 10⁶
Hence As= =
0.95 fyz 0.95 x 460 x 0.95 x 309
= 481.75 mm2/m
k
Z=d {0.5+√ 0.25− } =0.933>0.95d ,take 0.93d
0.9
M 47.46 x 10⁶
Hence As= = = 376.71 mm2/m
0.95 fyz 0.95 x 460 x 0.933 x 309
Support K
M=49.63 kNm (hogging moment)
b=200mm
d=309mm
K=0.087
Z=0.892x309=275.5 m
2
Ast=412.24 m m /m
Provide, 4 T12 ( 452 mm2/m) Top reinforcement at support
Minimum reinforcement check
0.48 >0.13 hence reinforcement provided is adequate
Support M
M=93.52 kNm (hogging moment)
b=200mm
d=309mm
K=0.039
Z=0.95x309=293.6 mm
2
Ast=728.9m m /m
Provide, 3 T12+2T16{2 –layers} ( 741 mm2/m) Top reinforcement at support
Minimum reinforcement check
0.56 >0.13 hence reinforcement provided is adequate.
UTMOST CONSULTING Job no: 08 sheet no: 1/2 rev: 01
ENGINEERS UTM-PT 14/02/ 2021
consultation sheet RC BEAM DESIGN
JOB TITTLE: PROPOSED MIXED USE COMMERCIAL BUILDING AT Org. ref. STR/UTM-PT/14/02/2021
MUGUTHA, RUIRU KIAMBU COUNTY: PLOT 1/10246 made by MMM date: 14/11/21 chd FMG
1st, 2nd,3rdand 4th. floor typical beams Signature…………… Signature…………………….
BEAM DESIGN
Fy 460N/mm2
Fcu 30N/mm2
B 200mm
H 500mm
Cover 25mm
References Calculations Output
Table 3.25
SHEAR REINFORCEMENT DESIGN
Support At: A
cl.3.4.5.1
Only two T16 mm diameter bars extend a distance d,from support face,
Summary of links
Supports A-T8 @ 225 c/c{nominal links}
D-T8 @225mm c/c
G-T8 @200mm c/c
K- T8 @175mm c/c
M- T8 @100 mm c/c
Number of links:
SUPPORT At D;
( 0.9 2+ 0.4 ) x 200 x 309
Vc+0.4 = = 56.9 kN
1000
Shear Force at D =70.3 kN
(VB−VN ) (70.3−56.9)
XB = = =0.57m
W 23.53
Right of support D
= 0.57m Right of support D
0.57
No. of links at D = = 2.53, say 3 No.
0.225
3 No. T8 @225 mm c/c 0.57 m Right of support D
UTMOST CONSULTING Job no: 08 sheet no: 1/2 rev: 01
ENGINEERS UTM-PT 14/02/ 2021
consultation sheet RC BEAM DESIGN
JOB TITTLE: PROPOSED MIXED USE COMMERCIAL BUILDING AT Org. ref. STR/UTM-PT/14/02/2021
MUGUTHA, RUIRU KIAMBU COUNTY: PLOT 1/10246 made by MMM date: 14/11/21 chd FMG
1st, 2nd,3rdand 4th. floor typical beams Signature…………… Signature…………………….
BEAM DESIGN
Fy 460N/mm2
Fcu 30N/mm2
B 200mm
H 500mm
Cover 25mm
References Calculations Output
Support At G:
Left of support At G;
0.92 x 200 x 309
Vc+0.4 = = 56.9 kN
1000
Distance = ( 73.23−56.9
39.98 )
= 0.41 left of G
0.41
No of links = =2.05 say 3No.
0.200
3 No. T8@200 C/C 2.05 m left of support G
Right of support At G;
Vc+0.4=0.92
F1=73.23kN
Distance = ( 73.23−56.9
14.48 )
= 1.12m
1.12
No. of links = = 5.6 say 6 No.
0.200
6 No. T8@200 C/C 1.12 m Right of support G
Support At K
Vc+0.4=1.0
F1=91.4 kN
Left of support At K:
Distance = ( 91.4−61.8
14.8 )
= 2.0m
2.0
No. of links = =11.43 say 12 No.
0.175
12 No. T8@175 C/C 2 m left of support K
Right of support At K;
1.0 x 200 x 309
Vc+0.4 = = 61.8 kN
1000
Distance = ( 91.4−61.8
44.01 )
= 0.67m
0.69
No of links = =3.85 say 4 No.
0.175
4 No. T8@175 C/C 0.67 m Right of support K
Support At M;
Vc+0.4=1.0
F1=112.05 kN
Distance = ( 112.05−61.8
44.01 )= 1.14 m
1.14
No. of links = = 11.4 say 12 No.
0.100
12 No. T8@100C/C 1.14 m left of support M.