Bachelor Degree Project: Application To The Swedish Power Grid

This bachelor's thesis examines time series analysis and forecasting techniques to predict electricity load for the Swedish power grid. The author analyzes hourly electricity load data over multiple years using ARIMA, neural network, and LSTM models to determine which technique most accurately forecasts load. The LSTM model achieved the lowest average forecasting error of 6.1% compared to the other models. The thesis aims to investigate forecasting methods that can predict power loads at a finer granularity to help dynamically adapt the grid in real-time.

Uploaded by

Yeswanth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views40 pages

Bachelor Degree Project: Application To The Swedish Power Grid

This bachelor's thesis examines time series analysis and forecasting techniques to predict electricity load for the Swedish power grid. The author analyzes hourly electricity load data over multiple years using ARIMA, neural network, and LSTM models to determine which technique most accurately forecasts load. The LSTM model achieved the lowest average forecasting error of 6.1% compared to the other models. The thesis aims to investigate forecasting methods that can predict power loads at a finer granularity to help dynamically adapt the grid in real-time.

Uploaded by

Yeswanth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

Bachelor Degree Project

Time series analysis and forecasting


Application to the Swedish Power Grid

Author: Christian Fagerholm


Supervisor: Mirko D’Angelo
Semester: VT/HT 2019
Subject: Computer Science
Abstract
In the electrical power grid, the power load is not constant but continuously
changing. This depends on many different factors, among which the habits of the
consumers, the yearly seasons and the hour of the day. The continuous change in
energy consumption requires the power grid to be flexible. If the energy provided by
generators is lower than the demand, this is usually compensated by using renewable
power sources or stored energy until the power generators have adapted to the new
demand. However, if buffers are depleted the output may not meet the demanded
power and could cause power outages. The currently adopted practice in the indus-
try is based on configuring the grid depending on some expected power draw. This
analysis is usually performed at a high level and provide only some basic load aggre-
gate as an output. In this thesis, we aim at investigating techniques that are able to
predict the behaviour of loads with fine-grained precision. These techniques could
be used as predictors to dynamically adapt the grid at run time. We have investigated
the field of time series forecasting and evaluated and compared different techniques
using a real data set of the load of the Swedish power grid recorded hourly through
years. In particular, we have compared the traditional ARIMA models to a neural
network and a long short-term memory (LSTM) model to see which of these tech-
niques had the lowest forecasting error in our scenario. Our results show that the
LSTM model outperformed the other tested models with an average error of 6,1%.

Keywords: Time series forecasting, ARIMA, SARIMA, Neural network, long


short term memory, machine learning
Preface

I want to thank my supervisor Mirko D’Angelo for guiding me through all of this and I
want to thank my fiancé Frida for all the love and support. Without you, this would not
have been possible.
Contents
1 Introduction 1
1.1 Problem formulation and objectives . . . . . . . . . . . . . . . . . . . . 3
1.2 Scope, Limitation and target group . . . . . . . . . . . . . . . . . . . . . 4
1.3 Outline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

2 Method 5
2.1 Scientific Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.2 Method description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.3 Reliability and Validity . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

3 Related work 7
3.1 Machine learning techniques . . . . . . . . . . . . . . . . . . . . . . . . 7
3.2 ARIMA (Auto-Regressive Integrated Moving Average) models and hy-
brid implementations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3.3 Other techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.4 Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

4 Data set analysis 11


4.1 Data set description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
4.2 Stationarity Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

5 Forecasting 15
5.1 Long term forecasting vs short term forecasting . . . . . . . . . . . . . . 15
5.2 Forecasting error metrics . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5.3 ARIMA Models . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
5.3.1 Training the model . . . . . . . . . . . . . . . . . . . . . . . . . 16
5.3.2 Model selection and fitting of model . . . . . . . . . . . . . . . . 16
5.3.3 Short-term forecasting . . . . . . . . . . . . . . . . . . . . . . . 19
5.3.4 Long-term forecasting . . . . . . . . . . . . . . . . . . . . . . . 23
5.3.5 Evaluation of the forecasting results . . . . . . . . . . . . . . . . 24
5.4 Neural Network and machine learning . . . . . . . . . . . . . . . . . . . 25
5.4.1 Training the neural networks . . . . . . . . . . . . . . . . . . . . 26
5.4.2 Forecasting with the Neural Network . . . . . . . . . . . . . . . 27
5.4.3 LSTM (Long Short-Term Memory) Model . . . . . . . . . . . . 29
5.4.4 Forecasting with LSTM model . . . . . . . . . . . . . . . . . . . 30
5.4.5 Evaluation of forecasting results . . . . . . . . . . . . . . . . . . 32
5.5 Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
5.6 Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

6 Conclusion and future work 34

References 35
1 Introduction
The Swedish power grid consists of over 150 000 kilometers of power lines, roughly 160
substations and 16 stations that connect to other countries [1]. To handle the load demand
we have separate power grids, the transmission and the distribution grid. The transmission
grid is the power grid that handles the transport of power between the power generators
and the substations while the distribution grid handles all the power distribution from
the substations to the consumers. All of this is required to power our houses, cellphones,
computers etc. Sweden has a wide variety of power generators, but the main power comes
from nuclear power plants, hydro or renewable power generators such as wind power,
however on the other side other forms of renewable energy sources such as wind power is
not constant and can vary a lot. This means that the power plant needs to be adaptable to be
able to increase the power production if the wind power generators fail to produce power
enough due to weather conditions. The thermal power plants such as coal or nuclear
are able to increase their power production, but it often takes a while to reach the new
requested power level.
In transmission and distribution electrical power grids, the loads on the power lines
are not constant but continuously changing. This depends on various factors, among
which the season and the habits of the consumers. Moreover, power usage differs greatly
depending on the current time of day and other unexpected factors that could change the
amount of power consumption from the grid. If loads increase this is usually compensated
in modern grids by using flexible power sources, which can sustain different demand
levels up to a certain maximum [2]. However, if resource buffers deplete, the draw could
exceed the produced output leading to a power shortage.
One of the most prevalent solutions to this problem is forecasting. If we are able to
accurately predict the power load required, we can adapt preemptively. To be able to
forecast the required power load we need some kind of data to base our prediction on.
Most often, we are using a time series, which is data stored over a long time period.
A time series is a set of observations, each one recorded at a time interval [3]. A
discrete time series is a set of observations recorded in a fixed interval. This might be
daily, weekly, hourly etc. These time series are often one dimensional, just a time/date and
a value however, there are multiple factors to take into account when analyzing the data.
A simple graphical representation of the data set can tell us a lot. Figure 1.1 shows the
wine sales in Australia. By looking at figure 1.1 we can see that is has a clear increasing
trend. We can also observe the increase in sales during the spring and the summer, which
is referred to as seasonality. The unusual highs and lows for the data series are called
white noise. White noise is a variable that is neither trend nor seasonality but still affects
the time series.
Time series is commonly used in other areas such as economics to forecast the stock
prices and it is not uncommon for companies to use forecasting techniques to predict the
workload to be able to increase or decrease the number of workers needed.
To correctly operate a transmission grid load forecasting is of utmost importance
[4, 5]. The currently adopted practice in the industry is based on configuring the grid
depending on some expected power draw. However, this analysis is usually performed at
a high level and provide only some basic load aggregate as an output [5]. On the other
hand, we aim at investigating and finding techniques that are able to predict the behaviour
of loads with fine-grained precision. These techniques could be used as predictors to
dynamically adapt the grid at run time. The techniques we are investigating are the tradi-
tional ARIMA models and different machine-learning approaches.

1
Figure 1.1: Australian wine sales , Jan. 1980-Oct 1991

The field of time series forecasting has been used for multiple different tasks that
require planning often due to restrictions in adaptability [3]. One of the most popular
algorithms for time series forecasting is ARIMA. ARIMA models were firstly introduced
in the 1950s but were made popular by George E. P. Box and Gwilym Jenkins in their
book "Time Series Analysis: Forecasting and Control" [6]. To get a clear overview of
what ARIMA is, we must first break it down into smaller pieces. ARIMA is a combination
of multiple forecasting principles. The Autoregressive model (AR) is a representation of
a random process. The autoregressive model specifies that the output depends on the
previous inputs and a stochastic term (an imperfect predictable term) therefore making it
a stochastic differential equation [6]. Basically, autoregressive models take the previous
steps into account when predicting and calculating the next step. The issue with the AR
model is that temporary or single shocks affect the whole output indefinitely. To avoid
this issue the AR process often has a lag value. The lag value is how many of the previous
steps that should contribute more to the output than others. The AR model can be non-
stationary as it can be represented by a unit root variable [6].
The MA (Moving Average) model in contrary to the AR model is always stationary.
The moving average is a linear regression of the current value against the white noise or
random shocks in the series, contrary to the AR model which is the linear regression to
non-shock values [7].
There is no reason why you cannot combine these models and that’s where the ARMA
process comes in. The ARMA model combines the previous two models to make an even
more accurate prediction. The ARMA model compares the results for both of the models
and makes a prediction based on the results [3]. The issue with the ARMA process is
that it assumes that your time series is stationary. This means that the series will not
take trend or seasonality into account. That’s where ARIMA comes in handy. The I in
ARIMA is for integrated, which is the differencing of the previous observations in the
series (subtracting an observation from a previous observation in the series to make the
series stationary). Non-seasonal ARIMA is often described as ARIM A(p, d, q) where p
is the number of lags in the AR model, d is the grade of differentiation (the number of
time the data has previous values subtracted) and the q is the order of the MA model[8].

2
As the ARIMA models are a combination of models, ARIM A(1, 0, 0) is the same as an
AR(1) model as the integrated part and the moving average are not used. Lag is the delay
in time steps between two points in a data set that you are comparing to each other. The
order of MA is how many of the previous shocks that the model will take into account
when predicting. A shock is an external influence or something that changed the value to
an extreme point, both high or low. In the same way any ARIM A(p, d, q) where p is 0 is
equal to an ARM A(p, q) model.
Lastly, we aim to investigate different machine learning techniques as machine learn-
ing has been more and more prevalent in many areas in the last years. The idea of machine
learning is not to instruct the program on how to explicitly solve a given task, but rather
give them a problem and let the computer solve it by using different patterns. One of the
most prevalent solutions in regards to machine learning and time series forecasting is the
usage of neural networks. A neural network is a network of nodes that are connected and
communicate with each other to solve a task. The network has one or more invisible layers
that contain "neurons". These are the information nodes that help calculate the result or
function for the given problem. The result is not a definitive result, but rather an estimated
result and the accuracy of the result depends on the number of hidden "neurons" and lay-
ers in the network[9]. The more neurons and layers, the more calculations/operations and
the more accurate output. Machine learning is growing as the computational power of
today’s technology is steadily increasing, which in turn means that we can do even more
complex and bigger computations at run time.

1.1 Problem formulation and objectives


In this project, we will investigate different techniques for (load) time series analysis and
forecasting. These techniques could be applied to predict the behaviour of the loads in
the grid with a fine-grained precision with the aim providing insights on the expected
behaviour of consumers in particular time slots (e.g., what will be the expected average
consumption in one day).
My project will consist of surveying the literature as well as develop a tool for time
series data analysis and forecasting. The first part of the work consists of gathering the
knowledge needed to develop the software artifact from the literature (i.e., which are the
best techniques/models/algorithms for our scope?). The second part consists of using the
gathered knowledge to develop a software artifact dealing with load analysis and forecast-
ing by adapting the state-of-the-art solutions to our case.
We will base our investigation on a real load data set from the Swedish transmission
grid recorded hourly between the first of January 2010 to the 31st of December 2015.
The data set can be found at https://www.entsoe.eu/data/power-stats/
hourly_load/.
Our main research question is which forecasting algorithm is the best for this type
of data set/series. What we want to achieve is to have a good comparison of different
forecasting algorithms to find out which of the algorithms has the best prediction accuracy
for the investigated data set.

3
O1 Investigate the data set
O1.1 Analyze the properties and characteristics
O1.2 Verify what kind of predictions it is possible to do
O2 Investigate previous research and state of the art techniques
O3 Apply the theory and models to our use case (real data set)
O3.1 Either developing or customizing existing tools and algorithms
O4 Validation of adopted algorithm(s)
O4.1 Validate prediction accuracy
Objective 1, 1.1, 1.2, we have to investigate the data set and extrapolate the properties
and the characteristics of the data set. This is crucial as we need to know the properties
of the data set in order to know which forecasting algorithms can be used for the data set.
We need to know if the data set is stationary, non-stationary, follow a trend or seasonality
etc.
Objective 2 requires us to investigate previous research to see what they did and how.
We also gather data to see which types of algorithms are used and how they are applied
to the investigated data set. Depending on our findings, there might limitations to our
data set that makes us favor some forecasting techniques over others. In this step, we
exclusively explore the literature, as we need a lot of data to figure out which of these
methods and algorithms are applicable to our data set.
Objective 3, 3.1. After performing the literature study, we will apply the identified
techniques to our data set.
Objective 4, 4.1 Lastly, we will validate our models by the performance of the chosen
algorithms and methods to measure the prediction accuracy based on widely used metrics
in this area, both for short and long term forecasting.

1.2 Scope, Limitation and target group


Due to a limited time frame, this report will cover models and techniques in isolation,
therefore we will not investigate model combinations.
The targeted audience for this project will mainly be developers and architects in the
forecasting field. This will also be of interest to those working with maintaining the
power grid. This could also be of interest to economics or statistics students as the same
algorithms and methods could be applied to similar time series.

1.3 Outline
The coming chapter will include the methodology and the scientific approach for this
project. Chapter 3 will contain the related work and information gathered from the lit-
erature study. The 4th chapter will contain the information and analysis of the data set
for the time series such as the characteristics. Chapter 5 will contain a small overview of
the implementation, libraries used, forecasting models, the forecasts and the results of my
forecasts. The 6th chapter will contain the conclusion, discussions and future work for
this project.

4
2 Method
In this chapter, we describe our scientific approach, how we intend to answer the research
questions, and we outline reliability and validity for the study.

2.1 Scientific Approach


To answer which of the algorithms that are most widely used and how they are imple-
mented, we did an extensive literature review. This included scientific reports and papers
containing the implementation, comparisons and usage of forecasting algorithms. We
collected data from these reports and decided which of the algorithms are suitable for the
time series and how they have been used previously. In essence, this means that we gather
data from the previously mentioned reports and articles and selected which algorithms
that we found to be applicable to our data set. This data also included methods on how to
analyze our data set and data set properties. We will then use this data to construct models
and use these models to experiment on our data set and document the results to assess the
overall performance of the algorithms in regards to our data set.

2.2 Method description


Firstly, we did the literature review which gave us much of the contents for the previous
chapters. We anticipated that this would give us much information regarding the algo-
rithms and methodology regarding time series forecasting. After analysing the contents,
we decided to divide the different forecasting methods into separate groups. One of the
major properties of the data sets in the literature is stationarity. Some of the algorithms
are limited by not being able to handle seasonality and trends (non-stationary data sets),
which is why we decided to further analyze the data set with the methods used in the
articles and scientific papers before selecting which algorithms are applicable to our data
set. After analyzing the data set we will select some of the most effective/appropriate
algorithms and implement a test suite so that we may test and validate their performance
in regards to our data set. We will implement the test suite in python with already existing
libraries for plotting and forecasting and we expect to get good forecasting results and
also graphical representations of the results. Once the implementation of the test suite
is done we expect to forecast with good accuracy with multiple methods and record the
performance for later validation. In the end, we will provide detailed results for each of
the algorithms and some discussion and conclusion will be stated.

2.3 Reliability and Validity


In our case, the reliability is dependant on the implementation of the different Python
libraries we are using. This should be very high, as many of the most common algorithms
for time series forecasting are already implemented in different software libraries and we
are mainly using these algorithms and fit them to our data set.
In regards to construct validity, this is dependent on the parameters we use to fit the
parameter and the way to find the correct parameters for the models. We intend to reduce
this issue by studying previous works and use the common methodology for finding fitting
parameters to our models. By using the best practices, we should be able to increase our
validity.
The internal validity of this project is heavily dependant on the system we are using
for the experiments and testing, which would be our python implementations and the

5
attached libraries. We cannot really detail how this would affect our validity, but we can
assume that the effect would be negligible
The external validity is the validity of applying the conclusions of our scientific study
outside the adopted context. This should be very high, as we using commonly used
methodology and procedures for this field. If we find a similar data set with similar
properties, the same methods could be used for that data set. However, we did not explore
this in this thesis.

6
3 Related work
We performed a literature review on related work. We investigated two of the most com-
plete databases, the IEEE database and the ACM database. The search string we used was
"time series forecasting" and found the same recurring forecasting methods in a majority
of the articles and reports. We did not specify "time series forecasting for a smart grid" as
we wish to do a more general search and get a broader view of the time series forecasting
field. We will use these data sources as the base for our methodology and implemen-
tation. We have decided to separate the methodology into three subgroups. Machine
learning, ARIMA, and other techniques.

3.1 Machine learning techniques


In a report from 2012, Mehdi Khashei and Mehdi Bijari[10], proposed a hybrid of ARIMA
and ANN (Artificial Neural Network) models to circumvent the limitations of the ARIMA
models. The model was then tested on 3 different data sets with different characteristics.
According to the report, the ARIMA models traditionally have low accuracy for predict-
ing non-linear data. The results show that their hybrid solution outperformed the individ-
ual solutions in regards to Mean Absolute Error (MAE) and Mean Squared Error (MSE)
for both short-term and long-term forecasting on both linear and non-linear data.
Bangzhu Zhu and Yiming Wei [11] suggested a hybrid model that uses the ARIMA
models combined with a Least Squared Vector Model, which is a neural network model
to forecast the carbon prices in the EU. The report proposes three different hybrid models
that were used on a non-stationary data set and the results show a clear advantage of
combining models to overcome the limitation of ARIMA models with non-linear data.
Mehdi Khashei et al. [12], compare performance for the ANN, SARIMA, and Fuzzy
logic models both individually and in combinations. Their results show that it is often
better to combine different models than to just go with one model. Many of the other
models and methods in combination make up for the fact that SARIMA favors linear data
instead of non-linear data. The SARIMA and ARIMA models require a set of previous
data, which is not often the case in the real world. Often the data available is limited and
as such, ARIMA might not be the best fit for such a forecast.

3.2 ARIMA (Auto-Regressive Integrated Moving Average) models and hybrid im-
plementations
F.Marandi and S.M.T Fatemi Ghomi [13] used ARIMA and were successful in forecasting
the waste generation in Tehran. They used the forecasting libraries in the R software to
plot out and fit the model. The plotting of the data set clearly showed a trend which means
that their time series was not stationary. The report has a clear focus on identifying which
ARIMA model to use and also did comparisons between ARIMA models. For their data
set, ARIMA(2,0,0) outperformed the others in regards to MAPE, MASE, and RMSE.
Gordon Reikard made a comparison between ARIMA and other popular forecasting
algorithms for forecasting the solar radiation [14]. They tried different algorithms on
6 different data sets to compare the short term prediction accuracy. They did hourly
forecasts for four hours on each data set and compared the results. The results show
that the simpler ARIMA and the hybrid models had the lowest error margin in all 6 data
samples.
Debasish Sena and Naresh Kumar Nagwani used ARIMA to successfully forecast
the disposable income in Germany [15]. Their time series was non-stationary and their

7
findings suggest that ARIMA is heavily dependant on fitting the correct model. To get the
perfect fitting, we need good knowledge regarding the ACF and PACF values to the series.
Their results were promising in with a very low prediction error but the report stresses the
importance of a correct evaluation of the Auto Correlation Function (ACF) and Partial
Auto Correlation Function (PACF) values to fit a good model for the prediction. The ACF
and PACF are methods to measure how the values in the data set are affected by previous
values in the data set. The R package software was also used for the calculations and
plotting.
In regards to our subject, similar tests and research were done in a hospital, where
they did forecasting in their medium voltage power grid [16]. The authors discovered that
their tests were slightly off due to the lack of information in their time series. Their data
set only had 45 days of input, which means that the models only had a small selection of
data to use for the prediction. The paper does, however, prove the efficiency and validity
of the Box-Jenkins method as the better way to fit a Seasonal ARIMA (SARIMA) model.
A report from 2014 details the usage of a combination of ARIMA and Kalman filtering
which is a machine learning technique [17]. This hybrid was used to perform short-term
forecasting for wind speed. The Kalman filter is a recursive algorithm where incorrect
or noisy predictions can estimate the correct value of a prediction. Since the weather
can be random, they found the traditional time series methodology to be very inaccurate.
The ARIMA model had a MAPE of 15.442% however, the maximum average error of
the fluctuating wind speed data was 50.227%. The Kalman filtering alone had an error
margin of 5,80% and a maximum error of 11,26%. The combination of these two methods
was surprisingly effective with an error margin of 2,70% and a maximum error margin
of 4,94%. The paper proves the validity of wind speed forecasting with ARIMA and the
Kalman algorithm for wind speed forecasting, however, it still has some error with the
uncertainty of fluctuating winds.
Jianguang Deng and Panida Jirutitijaroen[18] published a study detailing the compar-
ison in load forecasting in Singapore between the ARIMA models and a multiplicative
decomposition solution. Their series is similar to ours in terms of stationarity. Their
tests proved that the multiplicative decomposition slightly outperformed the SARIMA in
this case due to the multiplicative decomposition model not being as affected by random
shocks as the ARIMA models. Their main testing was done using Matlab.
A study from 2005[19] suggests a hybrid between machine learning and traditional
ARIMA modeling for financial time series forecasting. They combined ARMA with
a Generalized Regressive Neural Network (GRNN) to further increase the forecasting
accuracy. Their data set was non-stationary as it showed a clear falling trend. The models
tested are the ARIMA, the GRNN and their suggested ARIMA-GRNN hybrid, which
outperformed the other two individual forecasting models in terms of MAPE, MAE, and
Root Mean Squared Error (RMSE).
Heping Liu and Jing Shi[20] did a comparison of the ARMA combined with GARCH
models for forecasting the electricity price in New England. The GARCH models were
introduced due to the volatility of the electricity price. Their results showed that the
ARMA-GARCH-M method slightly outperformed the other 5 ARMA-GARCH models
however, their time series was somewhat limited. The time series only had 2 months of
recorded data, which might be a small sample to get a definitive answer.
A study from 2014[21] compared the traditional ARIMA model with or without inter-
vention to forecast the cases of campylobacteriosis in New Zealand. An intervention is an
external event or influence that drastically changes the data set. Their results proved that
ARIMA even with intervention gave poor forecasts due to the intervention in their time

8
series. Holt-Winters method was the far better solution in regards to MAPE and MSE
and their results prove that the strength of the Holt-Winters method to predict the coming
steps even with a structural change in the time series. The Holt-Winters method is an
exponential smoothing method which similar to MA models as they put weight on previ-
ously regressed values however, the weight set will decrease exponentially. Holt-Winters
is also known as the triple exponential smoothing.

3.3 Other techniques


There are multiple different techniques used for time series forecasting, but the two pre-
viously mentioned methods are by far the more popular options today. There are different
mathematical models that can be used for forecasting such as state-space models [22].
The idea of space state models is that any dynamic system can be defined by differential
equations. This means that the current state of the system is defined by the previous state
and a state variable that changed the state. By this observation, we can define any system
as a function of its states and external inputs. By knowing some of the observed data, we
can calculate the optimal estimation for a selected state. The ARIMA models can also
be converted into space state models, as they are to some degree differential equations as
well. There are many variations on SSM but the most commonly used is the linear SSM
[22]. Other works tend to use a combination of models to create hybrid models to elim-
inate the inherent flaws of some models [20, 23] and many of the works compare their
hybrid solution to the preexisting models [12].
A study from 2013[24] uses an Exponential Smoothing Space State model comparing
it with other algorithms to forecast solar irradiance. The used data set had data collected
monthly and the Kwiatkowski-Phillips-Schmidt-Shin (KPSS) stationary test proved the
time series to be non-stationary. The results showed concluded that the ESSS model out-
performed ARIMA, Linear Exponential Smoothing, and Simple Exponential smoothing
except for two months, but was only 0.5% behind, which means that the ESSS is a reliable
model for their data set.

3.4 Discussion
From our literary review, we find that the most commonly used techniques for time se-
ries forecasting are different versions of the ARIMA models, such as SARIMA, machine
learning techniques such as neural networks and hybrid models. Many of the hybrid mod-
els combine ARIMA with machine learning techniques[10, 20]. These will be the starting
models we will consider for the forecasting part of our study. The common ground for
the ARIMA models and hybrid models using an ARIMA model are the methods to fit the
model. Multiple studies use the Box-Jenkins method as a method to check for stationarity
and also as a method to fit the ARIMA parameters [8].
There seems to be no difference in model selection for long and short term forecasting.
The same models can be used for both long and short-term forecasting [3] as the ARIMA
model does not have an inherent issue that prevents long term forecasting. There are also
no issues with the neural networks that prevent long-term forecasting. The neural network
requires no modifications for long-term forecasting.
One of the major concerns we extract from the related work is that the selection of
ARIMA model is heavily depending on whether the data set is stationary or not [6]. A
stationary data set means that the time series does not have a trend and is therefore not
time-dependent. This affects the selection of applicable models to the data set as the AR,
MA and ARMA models are not applicable to a non-stationary data set. This means that

9
we need to analyze the data set thoroughly before we can decide which type of ARIMA
model is applicable in our study. In the next section, we will further explore this facet.

10
4 Data set analysis
In this section, we will further analyze the data set and its properties. This is important
for selecting the appropriate models and methods for the forecasting part. Section 4.1
will cover the analysis of the data set and section 4.2 will cover a stationarity analysis by
investigating the autocorrelating function of the data set and the unit root test.

4.1 Data set description


The data set that we are using is recorded on an hourly basis over 5 years time period
and it shows us the power load in the transmission grid in Sweden from the years 2010-
2015. This gives us enough data for the forecasting and we should be able to do accurate
forecasts. The data set was being gathered by multiple power organisations and the load
in the power grid is stored in GWh (Gigawatts = 106 ). This data set contains the recorded
power in the transmission grid and is publicly available at Entsoe web page 1 .

Date 00 01 02 03 04 05 06 07 08 09
2010-01-01 18754 18478 18177 18002 17897 18042 18441 18870 19061 19190
2010-01-02 18119 17786 17688 17762 17831 18049 18601 19210 19785 20398
2010-01-03 19388 19059 18920 18928 19020 19278 19722 20214 20574 21003
2010-01-04 18833 18488 18398 18407 18605 19367 20941 22571 23276 23362
2010-01-05 19642 19390 19375 19562 19925 20627 22336 23898 24664 24757
2010-01-06 21285 20884 20689 20636 20759 21010 21707 22455 22826 23291
2010-01-07 20817 20548 20491 20521 20792 21564 23112 24798 25428 25335
2010-01-08 21249 20911 20881 21082 21297 22009 23654 25048 25678 25697
2010-01-09 21731 21372 21218 21211 21291 21513 21999 22661 23174 23832

Table 4.1: A sample of the data set

Table 4.1 shows a small sample of the data set. The values are the power load in GW/h
and the headers are the hour of recording. There are in total 2192 rows and 24 columns
for the time series. From this sample, we can see that we are having lower value in the
early hours, but it is slowly increasing until 05:00 and then increases faster. This is very
likely the effect of industries, shops, and other infrastructure starting up their services.
The load remains at roughly these values until 16:00 where it starts declining again. It is
very likely that the reduction of power usage after 16:00 is also due to the industry and
other power demanding consumers close for the day. The values then continue to drop and
reach their lowest points at about 02:00-03:00, which is reasonable as most of the Swedish
population is sleeping by that hour, and then the cycle repeats itself throughout the year.
By further analyzing the data set, we can see that there is also a weekly seasonality where
the Mondays have a higher power load than the other workdays. We then have a lower
power load from Tuesday to Thursday, but between the days in this interval, there is
little to no difference in the power load. On Friday and through the weekend we have a
decreasing power load and we reach the lowest part on Sunday which is reasonable as we
reach the end of the week and we transition into the new week. Then it rapidly increases
and reaches the highest point on Monday. As we have these stable cycles, we have a
seasonality where the duration of this season is one week, therefore we have a weekly
seasonality as well as the yearly.
In order for us to select appropriate algorithms or methods to use for the data set
forecasting, we must first analyze the data set to examine its properties. From what we can
1
https://www.entsoe.eu/data/power-stats/hourly_load/

11
tell from the overview is that we have a clear seasonality, but we also see a minor declining
trend on the peaks of the curve. The summer seasons seem to be roughly the same, but the
winter seasons seem to decrease in their maximum power usage. This could be affected
by many different external factors, such as milder winters or more effective/alternative
heating sources.

Figure 4.2: The overview of the time series.

4.2 Stationarity Test


When comparing data sets or time series, one of the most important properties to ana-
lyze is the stationarity of the time series [3]. A stationary time series means that it is
not affected by seasonality or trend, but is rather consistent. This means that the time
series fluctuates between roughly the same values at all times, and are therefore more pre-
dictable. A consistent seasonality, like the one we have in this data set, does not make the
time series non-stationary. It is stable in the sense that we can expect the same values for
each season. Stationary time series are easier to predict since they are not time-dependent
[6]. The plotting of the data set can be seen in figure 4.2. Here we can see that the time
series is stable, as over the time period we keep coming back to the same values. In figure
4.2 looking at the interval between 2010-2013, the curve looks symmetrical which is a
sign of stationarity however, we can see that the peaks of the curve are decreasing, which
means that we have a decreasing trend in the winter period.
A non-stationary time series is affected by some kind of interference or outer influence
such as trends or seasonality. There can be many things that affect the data. If we look at
our data set, we can see that the tops of the winter periods are slightly decreasing for every
year. This could occur for any number of reasons, and this also affects the data as there is
a lower power demand. This makes the time series much harder to predict since we need
to analyze and measure this interference so that we may add take them into account when
forecasting.
To prove if the data set is stationary, in addition to observing the data, can be done
by doing a root test. A unit root test is a more mathematically precise way to check for
stationarity as using only an observation of the time series could be misleading. By doing
a root test, we can prove by using mathematical formulas and comparisons whether the
time series is stationary or not. The intuition behind using a root test is to decide how

12
strongly a data set is defined by a trend [25]. A root test used for verifying if our data set
can reject the so-called null hypothesis. The null hypothesis is that the time series can be
represented by a unit root (and some time variable), which would prove that the series is
non-stationary. The other hypothesis would be to reject the null hypothesis, that there is
no unit root to represent the series, and would, therefore, prove that the series is stationary
since it does not have a time-dependent structure. If there is a unit root, then every value
in the time series is a factor of that root in some sense. Hence, if a series has a unit root,
then the series shows an unpredictable systematic pattern and is, therefore, non-stationary
[25]. To evaluate the stationarity of our data set we perform the Augmented Dickey-Fuller
test [25]. This test uses an autoregressive model and optimizes for different lag values.
The lag value is the delay in time between two values in the series that you are comparing
to each other. This is done to calculate the autocorrelation function for the series. To get
a deeper understanding, we must first analyze the normal Dickey-Fuller test. The formula
for the Dickey-Fuller root test is shown below.

yt = ρyt−1 + ut (1)
For equation 1 yt is the variable of interest, t is the time index, ρ is a coefficient, and ut
is the error term. A unit root is present if ρ = 1. The model would be non-stationary in
this case. After some rewriting of the formula, we get the regression model to look like
equation 2.
∆yt = (ρ − 1)yt−1 + ut = δyt−1 + ut (2)
where ∆ is the first difference operator. This model can be estimated and tested for a unit
root where δ = 0(whereδ ≡ ρ − 1). Since these tests are done over residual data instead
of raw data, these do not follow the standard distribution for calculating the critical values,
but are instead following a specific distribution. These are the critical values that can be
shown in the table 4.2.
The Augmented Dickey-Fuller[25] includes a lag variable in order to remove the au-
tocorrelation from the results. There are three different versions of the Dickey-Fuller test.
There is the normal unit root test, unit root with drift and lastly, a version for a unit root
with a drift and a deterministic trend. We will use the normal one, as it is safer to use, even
if we should have a drift or deterministic trend. Wrongly inclusion of the drift and deter-
ministic trend reduces the power of the root test[25]. The formula for the Dickey-Fuller
test for a normal unit root is shown in the formula below.

∆yt = a + βt + γyt−1 + δ 1 ∆yt−1 + ... + δ p−1 ∆yt−p+1 + t (3)


The yt is the variable of interest, t is the time index and ut is an error term. The ∆ is an
operator for the first difference level. α is a constant, β the coefficient on a time trend and
p the lag order of the autoregressive process. Imposing the constraints α = 0 and β = 0
corresponds to modelling a random walk and using the constraint β = 0 corresponds to
modeling a random walk with a drift. The unit root test is then carried out under the
null hypothesis γ = 0 against the alternative hypothesis of γ < 0. We did not set these
parameters ourselves, instead, we used an already implemented method. We will discuss
this further in the implementation. Once a value for the test statistic is computed it can
be compared to the relevant critical value for the Dickey-Fuller Test. Table 4.2 shows a
figure of the critical values for the Dickey-Fuller test. If the value is below the critical
value, we can then reject the null hypothesis and prove stationarity.
This is one of the most important steps when analysing stationarity and properties of
the data set [16]. Figure 4.3 shows the ACF and PACF values for our data set. We can

13
Sample size 1% 5%
T = 25 -4,38 -3,60
T=50 -4,15 -3,50
T=100 -4,04 -3,45
T=250 -3,99 -3,43
T=500 -3,98 -3,42
T= 501+ -3,96 -3,41
Calculated value -3.085

Table 4.2: The critical values for the Augmented Dickey-Fuller tests for a series with
trend and our results from the root test.

see that we have a linear downward going trend and also that we have seasonality as the
ACF values are cyclical. This proves that the data set does have a trend, which means that
the time series is non-stationary. This trend will have to be accounted for when fitting the
forecasting models. To correctly analyze a root test, we have to compare our calculated
values to the critical values of the Augmented Dickey-Fuller test. The critical values are
nothing we calculate but rather, they are constants that have already been established. If
our calculated values are lower than the 5% value, then we can reject the null hypothesis
with more than 95% certainty, and if the value is below the 1% value, we can reject the
null hypothesis with more than 99% certainty. Looking at the critical values in table 4.2,
we can see that our calculated value is not lower than the critical values. This means that
our root test values are not lower than the critical values which in turn means that we
cannot reject the null hypothesis and the time series is non-stationary. For example, if our
value would be -3,50 and our data set has more than 500 inputs, then we would be able
to reject the null hypothesis with a 95% certainty as our calculated value is lower than
the critical value for 5%. We would not be able to reject the null hypothesis with 99%
certainty as our value is not lower than the 1% critical value. If our calculated value is
higher than the critical values, we cannot reject the null hypothesis at all, which means
that we cannot prove stationarity.

Figure 4.3: The ACF and PACF values for the series.

14
5 Forecasting
In this section, we will delve deeper into the actual forecasting of the data set and fitting
existing models used in the literature. We will look at the difference between long-term
and short-term forecasting. We will explain the different forecasting metrics adopted to
evaluate our solution. Finally, we will explain how we trained the models for the time-
series forecasting.

5.1 Long term forecasting vs short term forecasting


It is possible to classify forecasting in two categories, long term, and short term forecast-
ing. Short term in regards to forecasting is the most common choice of approach due to
having smaller errors in the forecast. In fact, intuitively, it is easier to predict the weather
for tomorrow than to predict the weather for next year for example. There are also other
outside factors that might affect the prediction which will also increase the error on a
long term forecast. If you were forecasting business economics, price change might be a
big factor and that could greatly increase the error of your forecast. There are multiple
outside factors that might not be accounted for, which is why short term forecasts are pre-
ferred over long term forecasts generally. The methods used for short term forecasts are
also used or can be adapted for the long term forecasts[6]. As an example, A. Sorjamaa
[26] adapted a neural network model to do long term forecasts by doing direct forecasts
instead of a regressive forecast. The neural network picked out reliable data from their
neighboring nodes and used them for the forecast.
Since the data can differ in regards to the time interval between recorded values, we
cannot decide if a forecast is a short or long term forecast based on the time between
recordings. Therefore, we calculate the number of time steps when attempting to forecast.
A step is the next data point, so if you have your data recorded daily, one step would be
one day. To evaluate the short term vs long term capabilities we have decided to use daily
data and set the test periods where the short term are 1, 5 and 10 steps (days) forecast,
mid-range forecasts will be 30 and 60 days ahead and lastly, long term will be 6 months
to one year forecast.

5.2 Forecasting error metrics


In order to forecast the next coming steps in a data set, we need some previous data. The
most common approach is to divide the data set into two parts, training and testing data.
The training data is usually 80% of the data set and the test data is the remaining 20%
of the data set [6]. The test data is only used for comparing the forecast with the actual
value, while the training data is used for fitting the forecasting model or feeding the neural
network if you are employing this machine learning approach.
To evaluate the individual forecasting models prediction ability, we use commonly
used metrics found in the literature for measuring prediction errors. Prediction errors
are the difference between the predicted values and the actual values. To represent these
differences, we have to use error metrics commonly used in the literature. Referring to
equation 4, MAE is the average of the absolute values of all the errors in the forecast and
referring to equation 5, RMSE is the error in regards to the median of the data.
N
1 X
M AE = |Xt − Yt | (4)
N t=1

15
v
u N
u 1 X
RSM E = t (Xt − Yt )2 (5)
N 1
The Xt is the predicted data and the Yt is the training data of the series.
We also calculate the percentage error of the forecasts as a pure data result can be harder to
evaluate and eventually compare with other results. Referring to equation 6 the common
used metric for the percentage error is MAPE. It is the average of all the predicted values
divided by the actual values.
N
1 X Xt − Yt
M AP E = | | (6)
N t=1 Yt

5.3 ARIMA Models


One of the most common techniques that we found in the literature was ARIMA. ARIMA
is a collection of models who are used in combinations of each other in order to get an as
accurate result as possible. There are even multiple extensions to the ARIMA models, as
there are certain limitations with the ARIMA models. The AR, MA, and ARMA require
the data set to be stationary and the ARIMA does not handle seasonality [6] which is
why one of the most popular extensions to the ARIMA models is the SARIMA. ARIMA
models also have issues with non-linear data and are often handled by combining the
ARIMA model with different techniques[23].

5.3.1 Training the model


As we mentioned in the previous section, the common practice is to have your training
data be 80% of the original data set, and the testing data for verifying your accuracy will
be the remaining 20%. As the time series stretches over 5 years, the first 4 years will be
the training data and the last year will be the testing data for verification. The training in
this sense will be the fitting of the model. The training data will also be used as the stored
data for the regressions (we need previous data to do any type of regression method).

5.3.2 Model selection and fitting of model


Since our previous results showed that the time series is non-stationary, this affects which
of the ARIMA models we can use. We are not able to use the AR, MA or the ARMA
as they require the time series to be stationary. Since our time series shows both sea-
sonality and trend, we have chosen to use the SARIMA model as the SARIMA model
takes both seasonality and trend into account when doing the forecast. Hulisani Matsila et
al [16] used a SARIMA model for the forecasting with success in regards to their small
data set. They had a weekly seasonality and did shorter forecasts with high accuracy,
which is why we chose to use the SARIMA model instead of the ARIMA model. This,
however, requires more parameters to fit these models as the SARIMA model has two
sets of parameters. The SARIMA model requires 7 parameters and is usually denoted
with SARIM A(p, d, q)(P, D, Q)m where p, d, q are the trend order and P, D, Q, m are
the seasonal order [7]. The trend order is the same values you would use for fitting an
ARIMA model, which means that p is the autoregressive order, d is the differencing order
and q is the moving average order. The seasonal elements also have the autoregressive,
difference and the moving average order however, the m is the number of time steps for
each season.

16
In order for us to get the trend order, we have to fit the model for an ARIMA model
first. According to George E.P. Box et al [6], one of the most used methods to fit an
ARMA/ARIMA model to the series is to use the Box-Jenkins method. The Box-Jenkins
method requires us to calculate and plot the ACF (autocorrelation function) and PACF
(Partial ACF) for the series. The ACF is a measurement of how related the actual value is
to the previous values including trend and seasonality. The PACF, unlike the ACF, finds
the correlation between the residual values in the series, therefore it is only the partial
function. The ACF and PACF are commonly used to get a good overview of the time
series, but these are required for the Box-Jenkins method as we use these to find the best
parameters for the SARIMA model fitting our data set.
Figure 4.3 shows the ACF and the PACF values for the time series. According to the
Box-Jenkins method, we make use of the ACF and PACF and their behaviour to select the
parameters for the ARIMA model. The Box-Jenkins can be summarized by reading the
ACF plot and identifying the ACF plots behaviour with this method. The bold text is the
behaviour of the ACF plot and the following text is the suggested model/action according
to the Box-Jenkins method.

• ACF has an exponential decay to zero : Autoregressive model (use the partial
autocorrelation plot to identify the order p). The p is the last notable value in the
PACF plot before they all become similar.

• ACF has damped oscillations and is decaying (exponentially) to zero: Autore-


gressive model

• ACF has one or more spikes, the rest is essentially zero : Moving average model
(order q identified by where autocorrelation plot becomes zero).

• ACF has an exponential decay starting after a few lags : Mixed autoregressive
and moving average model.

• ACF has no significant autocorrelations (zero or close to zero) : White noise.


The test is inconclusive.

• ACF has high values at fixed intervals : Include seasonal autoregressive terms

• ACF has no decay to zero or a very slow decay : Non-stationarity or long-


memory effects.

Referring to figure 4.3, we can see two things that are mentioned in the Box-Jenkins
method. We have both cycles with even intervals, which means that we have seasonality,
and we have a very slow decline. This means that we have a trend and this further proves
the time series is non-stationary. The amount of dots in the cycle is 7, which means that
we have a weekly seasonality, which is what we discovered earlier. To be able to find
the parameters for the seasonal order, we have to difference the series. If the trend is
linear, we can remove the trend with a first-level differentiation and only get the seasonal
values. After differencing, we plot the new ACF values, and we do the Box-Jenkins
method again in order to fit our seasonal values for the SARIMA model. Differencing is
performed by subtracting the previous observation from the current observation, which is
shown in equation 7.

dif f erence(t) = observation(t) − observation(t − 1) (7)

17
Taking the difference between consecutive steps is called 1-lag differencing and data
sets with a seasonal component the lag may be expected to be the period of the season.
Some temporal structure might remain after differencing, such as if the series contains a
non-linear trend. The differencing may then be done as many times as needed in order to
force stationarity and the number of differencing is called difference order.

Figure 5.4: The ACF and PACF values for the differenced series.

Figure 5.4 shows the differenced values for the data set. We difference the series to
force stationarity for the data set. If we get a conclusive AFC and PACF for the differenced
series, we can then use the Box-Jenkins method to find the values for the seasonal param-
eters for the SARIMA model. The differenced plot is not conclusive either. We cannot
really detail the values from this plot either. We tried with multiple levels of differencing,
but no model gave a good result. There was no plot where we could fit the model with the
Box-Jenkins method, as they did not follow the patterns required, so we have decided to
try a different approach. Another way to fit the parameters for the SARIMA model is to
do a grid search. A grid search is a trial and error method to try out the different possible
models and compare their error results.
Instead of using the Box-Jenkins method, we went with a grid search to get the most
fitting parameters for the SARIMA forecasting models. The plan is to define a set of
model combinations in order to test which forecast model that has the lowest error in
regards to our data set. To evaluate which model is the best fitted, we evaluate based on
multiple one-step forecasts and comparing with the actual value and calculate the RMSE.
Figure 5.3 shows the result of the grid search. We start by splitting the data into the
test and training data. After the split, we take model parameters from our selection and
fit our data set with these model parameters. We then make multiple one-step forecasts
and compare the predicted values with the actual values. Once we have done this for a
number of steps, we calculate the RMSE for the predictions and use this as a metric for
evaluating the model. As there are many combinations to try, we speed up this process by
having multiple threads doing these evaluations and lastly, we present the top 3 models
with the lowest error. Since the top three models presented have the same autoregressive
component as well as seasonal component, it is safe to say that the model seems like a
good fit. The trend is the only part that changes between the models.

The models that the grid search found out to be the best model is the SARIM A(2, 1, 1)(2, 0, 2, 7)

18
Model Trend RMSE
(2, 1, 1)(2, 0, 2, 7) Constant and linear 834.3001089409712
(2, 1, 1)(2, 0, 2, 7) Linear 836.9687538893095
(2, 1, 1)(2, 0, 2, 7) None 837.1173747930893

Table 5.3: Results from the grid search

with no trend, linear trend and also constant with a linear trend. The error difference be-
tween all three models is so low, that we will have to test them all. We will hereby mention
them by model 1 (constant and linear trend), 2 (linear) and 3 (no trend). The last seasonal
parameter being 7 is not surprising, as we could see in the data set that there was weekly
seasonality.

5.3.3 Short-term forecasting


Firstly, we will test the short-term forecasting ability of the three models. We are using the
same training data and testing data for every model. This will include one day, 5 days, 10
days and 1-month forecast. From what we can see from table 5.4 the third model, where
we do not account for the trend, the one day (one step) forecast has the highest accuracy.
This is the only experiment where this model outperforms the other models. For the
later experiments, the trend has a bigger effect as we can see on the 5-day forecast. The
second model (linear trend) has the highest accuracy for this forecast, but the first model’s
results are close to the second model. For the next coming experiments, the first model
outperforms the other models with ease. Looking at the table 5.4, it is clear that from the
10-day forecast and forward, the first model outperforms the other two models in all three
of the measurements.

Model Metric 1 Day 5 Days 10 Days 1 Month


1 MAE 1886.024 1163.223 1162.065 953.017
1 RMSE 1886.024 1245.288 1259.660 1124.953
1 MAPE 11.475% 6.496% 6.073% 4.678%
2 MAE 1478.747 1127.285 1470.273 1949.965
2 RMSE 1478.747 1210.464 1614.663 2078.490
2 MAPE 8.997% 6.241% 7.535% 9.505%
3 MAE 1188.342 1276.204 1768.926 2408.409
3 RMSE 1188.342 1437.822 1959.292 2542.665
3 MAPE 7.230% 6.985% 9.005% 11.752%

Table 5.4: Results from the short-term forecasting with the SARIMA models

19
Figure 5.5: graphs for the 5 day forecasts

20
Figure 5.6: graphs for the 10 day forecasts

21
Figure 5.7: graphs for the 1 month forecasts

22
Figure 5.8: The two-month forecast with model 1

We do run into problems when attempting long term forecasting with these models.
Figure 5.8 shows the two-month forecast with the first model. We can see that it does not
follow the seasonality, but rather keeps on increasing and all of the three models follow the
same pattern. This is due to the last seasonal parameter for the SARIMA model defines
the number of steps in the seasonality. Since this seasonality is yearly, the last parameter
is 365 however, since we used a normal laptop for the experimentation, the laptop that we
had available was not able to store the amount of data required for these calculations as
it was not possible with 8 gb of ram. For longer forecasts, the common practice is to use
monthly or quarterly data.

5.3.4 Long-term forecasting


For the long term forecasting, we will have to build another SARIMA model due to the
SARIMA seasonal parameters lack some scalability. In order to handle the mid-term to
long term forecasting, we will use the monthly values for forecasting instead of daily
values like we had in the short-term forecasts. We have the same split as the short-term
models for the training and testing data. We have chosen to use the first day in every
month as our time-step and will have to do another grid search for these parameters. The
grid search showed that the SARIM A(6, 0, 6)(1, 0, 0, 12) with a constant trend to be the
best fit for the long term forecasting. The other models that were found were very far off
in regards to RMSE, therefore we only need to fit this model for the forecasting. The table
5.5 shows the result of the forecast.

Metric 1 Month 2 Months 6 Months 1 Year


MAE 1237.615 918.440 1122.637 894.820
RMSE 1237.615 972.319 1322.890 1099.754
MAPE 7.530% 5.357% 6.698% 5.604%

Table 5.5: Results from the mid to long-term forecasting with the SARIMA models

23
One interesting part regarding the results in table 5.5 is comparing the results for
the short-term forecasts in table 5.4 regarding the 1 Month forecast, the short-term have
higher accuracy than the long-term model. This is a clear indication that for our data
set, the mid-term forecasting seems to be better, as the short-term forecasts and long
term forecasts have lower accuracy than mid-term forecasts. However, from 2 months
and forward, the long term model is way more accurate in regards to all three metrics
for forecasting accuracy. Since the long term model can calculate the whole seasonality
period, it follows the curve rather than having a steadily increasing trend.

Figure 5.9: The long-term forecast graphs of the SARIMA model

5.3.5 Evaluation of the forecasting results


In regards to our results in table 5.4 and 5.5 and comparing with the articles and reports
in the related work section, our results are bad in terms of prediction accuracy. Hulisani
Matsila et al [16] used SARIMA for 14 days forecast with a MAPE score of 3.9% using
daily data and a smaller data set. Jianguang Deng et al [18] compared the use of SARIMA
and their own suggested multiplicative decomposition model. Their SARIMA model had

24
an overall forecast error of 3,4% for their short-term forecasting. Gordon Reikard [14]
showed an error of 0,4% in his forecasts with the SARIMA model. The data was stored
hourly and the focus of the report was a comparison of different forecasting models for
short-term forecasting.
The results in our models have performed have a higher error than expected as our
overall error for our short-term forecasts 7,1% for the first model, which had the best
average error in regards to our short-term forecasts. Our long term forecasts seem more
promising as the average error for those forecasts is 6,3%. This is due to the model only
having to account for one seasonality, instead of both weekly and yearly seasonality.

5.4 Neural Network and machine learning


Since machine learning is the state of the art technique and its popularity is steadily in-
creasing, we have selected two different machine learning methods to implement and
compare with the SARIMA models above. The first technique that we will use is ANN
(Artificial Neural Network). A neural network is a machine learning methodology that
is modeled after the brain in the sense that you have neurons (or perceptrons as they are
called for machine learning) that do simple signal processing and sending to other neu-
rons. The learning is done by having the network analyze training data and examples that
are labeled. A common example found in the literature for ANN is image recognition
[27] where you provide the network with images of objects, for example, a cat, and the
network will analyze these images and find common patterns for these images and will
learn to categorize these images [27].
The neural networks consist of multiple layers. There is the input layer where you
send in your actual data, then there are multiple hidden layers of neurons that all commu-
nicate with each other and attempt to solve the issue. Each node decides what they want
to send to the next layer, and so the passing of data and information will continue until
the reached the output layer. This means that the data will be altered for each step and
measured in regards to a provided measurement as the ANN will not be able to measure
the output without a provided metric of measurement. In our case, we use the RMSE as
a metric for evaluating the results as we found this after testing other metrics, to be the
metric with the smallest error in regards to our data set. There is no limit on how many
hidden layers or neurons a neural network can have, but the general principle is that more
layers and neurons give a more precise answer, but there will be a trade-off in perfor-
mance as the number of calculations and operations will increase. It is hard to classify
neural networks since the number of layers and neurons is arbitrary, therefore they are
classified based on their depth (the number of layers in the network). Figure 5.10 shows
an overview of a neural network and its layers.

25
Figure 5.10: Example of the neural network model and its layers

5.4.1 Training the neural networks


As we did previously, we split the data into training data and testing data. Since the time
span of this data set stretches over 5 years, we have the first 4 years as the training data
and the last year as the testing data. We tried with different amount of layers and neurons,
but we stuck with a model where our neural network has a total of 6 layers as there
were little to no difference between them. We have one input layer with 100 neurons,
4 layers with 100 neurons each and we have an output layer with one neuron. The one
neuron in the output layer was due to the implementation as the implementation required
1 node output layer due to the output data being one-dimensional. There may have been
a greater difference if we did more extensive testing however, it was not possible to do
within the time frame of this project. To successfully implement an ANN model, we first
need to have a strategy for teaching the network its task. The choice of strategy is greatly
dependent on the data you are using. An important attribute to consider for the choice
of strategy is whether the data is labeled or not. The label in this sense is if the data
has some named attribute, for example, a date or for the previous example, the pictures
have the name of the objects they are containing such as cat etc. This helps the network
establish a common nominator for the data and the network can then categorize the data
with regards to the label. Our data set has date labeled for every data, which means that
our data set is labeled.
Now that the label has been established, we need to select the appropriate learning
strategy for this model. There are multiple teaching strategies for teaching the machine
and these are the most commonly used [28].
• Supervised learning. This is by far the easiest learning strategy since this learning
strategy requires an already labeled data set. The network just goes through the data
set and will be modified to get the expected result.

• Unsupervised learning. This is used when the data set has not been labeled. Then

26
Figure 5.11: 10 step forecast with the Neural Network

the network will analyze the data set and also a weight method which will tell the
network how far off the target value it was. The weight will then be measured and
the network will then use this data to adapt in order to get a more accurate result.
• Reinforced learning. This strategy includes having methods and algorithms to
reinforce good results and punish bad results which force the network to learn over
time.
In regards to our data set, we can use the supervised learning strategy since our data
set is already labeled. This means that we do not have to create a weight or other artificial
measurements to teach the network what to do, instead, we can just feed the network the
entire training data.

5.4.2 Forecasting with the Neural Network


Since we did not need to build multiple models, we decided to not split this section into
subsections, as all the results fit in one table and there are no changes to the network or
model between short and long term forecasting. To get an accurate representation be-
tween models, we are using the same amount of steps for the forecasting as the SARIMA
models. Figure 5.11 shows a forecast for the first 10 steps. Here we see that we have
some deviation from the actual data. The network has decided to use the previous known
day as the starting point for their forecast.
We can see that the values are slightly off the actual values. The later forecasts are
however closer to the target. Figure 5.12 shows the 2-month forecast where we can see
that the predicted values are very similar to the predicted values. After the 10 days fore-
cast, we have a stable error of roughly 5.3% however, this changes in the 1-year forecast.
As you can see in Figure 5.14, the values differ a lot during the middle of the forecast.
This is at the end of the summer season, but it seems we had a warmer season than an-
ticipated, or some other factor affected the power usage. Therefore the power usage went
way below expected values and we see a clear change.

27
Figure 5.12: 2 Months Neural Network forecast

Figure 5.13: 6 Months Neural Network forecast

Figure 5.14: 1 Year Neural Network forecast

28
5.4.3 LSTM (Long Short-Term Memory) Model
As the second method for testing machine learning solutions, we chose to set up a LSTM
(Long short-term memory) model, which is a recurrent neural network [28]. Like many
of the neural network ideas, they have been around since the ’80s but haven’t really been
popular until a few years ago. This model is a good candidate for forecasting and will
be a good choice to test out the capabilities of the recurrent neural networks. The benefit
of a RNN is that they have an internal memory which means that they can remember
properties of the input they just received, which makes it easier predicting what’s coming.
The difference between a recurrent neural network and a normal "feed-forward" network
is that the RNN instead of sending the data to the next layer can keep the data and process
it more times. Since it also has a memory, it keeps the output and sends it through the
network again for even more evaluation and analysis. The recurrent neural network also
has the ability for backward propagation, which means that the data can travel backward
in layers, analyze which derivatives that affected the output and measuring their weight.
In short, it means that the RNN tweaks the weights of the neurons while training. Figure
5.15 shows a basic example of a recurrent neural network.

Figure 5.15: An example image of a Recurrent Neural Network

The LSTM is an extension of the traditional neural network. It uses the same method-
ology, except that it has its own special layer. One major difference between a traditional
neural network and LSTM is that the LSTM has an extended memory and is well suited
for processes that have long lags between or where the learning is slow. LSTM can be
seen as an additional layer to the old recurrent neural network and allows for the network
to further store their memory, and the LSTM has the access to read, write and delete the
information stored. The LSTM won’t store everything instead, there is a "gatekeeper"

29
that measures if the data is worth storing or not. This is done by asserting which level
of importance this assigns to the information. The assigning of importance is done by
adding weights to the information, which the algorithm then learns. This means that the
computer learns which information is important over time.

5.4.4 Forecasting with LSTM model


As we can see from the results in table 5.6 and compare them to the table 5.4, we can see
that the third SARIMA model still has the lowest error with a 7,23% and the closest is the
NN with 7,5%. After the one day forecast, the LSTM outperforms all of the SARIMA
models in regards to short-term having a steady forecasting error of 6,15 - 5,2 %. The
1-month forecast for the first SARIMA model has a lower error than the LSTM by having
a 4,5% to the LSTM’s 5,2%. Otherwise, the LSTM has the lowest error of all the methods
for short-term forecasting.
For the long term forecasting, we can also see that the LSTM forecast is far superior
to the traditional neural network until we get the 1-year forecast, where the long-term
SARIMA model has a lower error of 5,6% instead of the LSTM 6,9%. We do get a big
drop in accuracy in long term forecasts. If we compare Figure 5.18 with Figure 5.14
however, we can see that both models fail to predict the values from day 150 to 225
correctly. One explanation could be that we had a warmer summer than predicted, or we
had some external factors that affected the power usage. Referring to table 5.6 we can see
that the LSTM model was the most accurate for this data set.

30
Figure 5.16: 2 Months LSTM model forecast

Figure 5.17: 6 Months LSTM model forecast

Figure 5.18: 1 Year LSTM model forecast

31
Model Metric 1 Day 5 Days 10 Days 1 Month 2 Months 6 Months 1 Year
NN MAE 1233.550 1193.600 1150.640 1080.518 1083.199 1033.472 1233.102
NN RMSE 1233.550 1424.965 1308.409 1439.743 1511.533 1432.712 1547.269
NN MAPE 7.505% 6.433% 5.919% 5.338% 5.401% 5.873% 7.991%
LSTM MAE 1309.884 1139.250 1040.869 1068.268 1067.785 1014.515 1092.685
LSTM RMSE 1309.884 1356.199 1237.330 1362.212 1422.452 1342.837 1405.800
LSTM MAPE 7.970% 6.149% 5.345% 5.206% 5.250% 5.825% 6.978%

Table 5.6: Results from the LSTM and NN forecasts

5.4.5 Evaluation of forecasting results


Even though our forecasting results are better than our SARIMA results, compared to
other studies and comparisons in the field, our results have a higher error than expected.
Gordon Reikard [14] had a surprisingly low error as the presented neural network model
had an error of 0,3-0,46% for the short-term prediction.
The implementations we made and the results we got from our implementations were
less accurate than anticipated. The average error for the neural network was 6,343 % and
the error for the LSTM average error was 6,1%. The reason why the LSTM outperforms
the neural network is very likely due to the recurrent nature of the LSTM. The neural
network uses a feed-forward method while the LSTM iterates over itself, both with the
data set and also with the predicted results. This allows the LSTM to adjust to the errors
in the first prediction and get a more accurate second prediction.

5.5 Discussion
In the previous sections, we analyzed our data set for properties needed to decide which
models were eligible for forecasting. We implemented both the traditional SARIMA
method as well as two of the state of the art machine learning techniques, neural network
and a LSTM. After the analysis, we divided the training and testing data according to
best practice [6] and used the training data for fitting the SARIMA model, training the
neural network and the LSTM model. These models were fitted using a grid search which
we implemented after the Box-Jenkins method proved to be inapplicable on our data set.
Even after multiple levels of differencing, our ACF plots did not match a behaviour that
fits the Box-Jenkins method. After the training and fitting of models, we set certain time
intervals for our models to forecast. We decided to have 1,5,10 and 30 days as our short-
term forecasts and have 2 months, 6 months and one year as our long-term forecasts. We
predicted these intervals and measured their accuracy by comparing the predicted value
to the real value.
In both our SARIMA models as well as the Machine learning models, we found our
results to be not as good as anticipated. The reports mentioned previously in this report
found greater success in their forecasting accuracy, often having 0,5-3% error, contra our
LSTM implementation with 6,1%, neural network with 6,3% and our SARIMA models
with 7,1% for the short-term forecasts and 6,3% for the long-term forecasts.

32
5.6 Implementation
For the experimenting and testing suite, we programmed these in python due to python
having good documentation and there are multiple good libraries in python for math and
statistical data handling. The libraries we used for the implementation are:

• Numpy. This is one of the most common math libraries. It is also really good for
array handling and collections.

• Statsmodels. This is a great library with many forecasting models and other tools
for statistical data handling.

• Pandas. This library has a lot of functionality for both series, reading external csv
files and data handling in terms of series and other files. It is one of the more
commonly used data analysis libraries.

• Matplotlib. It handles the plotting of data and has been used for all the plotted
figures in the implementation.

• Keras. Keras is the base library used for the machine and deep learning methods.

To make sure what kind of data set or series we are dealing with, we have decided to
program a few tools in Python to plot the series, check the ACF and PACF as well as do
the root test for the series. This is to test if the series is stationary and also to find a fitting
ARMA/ARIMA model for this series. For the SARIMA model forecasting, we used the
Statsmodels library as they had an already implemented SARIMA method, and we fit the
model to our data set. Numpy and Pandas handled the series and converted it to a fitting
format for the SARIMA method. We also used the Matplotlib to plot the forecasted values
and the actual values to get a graphical overview of the prediction.
For our machine learning implementations, we found a python library called Keras
which is a high-level neural network and a deep learning library. The library was the
base for the neural network and by using this library we set up a neural network and a
LSTM model, which is a recurrent neural network implementation. Both of these models
are created using the Keras "sequential" model with 1 input layer of 100 neurons, then
4 hidden layers of neurons, then lastly it contains a 1 node output layer. We used an
optimized called "SGD" as the implementation required an optimizer to compare data,
and the measurement for evaluating the data is the RMSE as the optimizer could only use
one error metric for optimization. We tried different error metrics such as the MAE and
MAPE, but we found this one to be the best one in regards to our data set. The layers are
so-called "dense" layers.
The implementation can be found at:
https://github.com/elaktomte/Degree-Project-Final.

33
6 Conclusion and future work
We analyzed our data set and experimented with the traditional SARIMA model and
compared it to a neural network and a long short-term memory model for time series
forecasting. From the results gathered, in our case and for this data set, the LSTM model
had the best prediction accuracy of the tested methods and models. Our results were not
as good as anticipated, but from the results we gathered, we could see that the models
we implemented worked best for mid-term forecasting (10-30 steps) on this data set. For
future work, we should attempt to refine our models and explore other techniques for the
fitting of models. We tried two techniques for the fitting of our models, but there are other
methods worth exploring such as the Box-Ljung[6] method or the Akaike information
criterion (AIC)[6].
Due to the limited time for this degree project, we did not have time to test more
than these 3 methods. There could have been greater accuracy using different methods or
extensions to the SARIMA model or finding a better method for fitting the model. The
Holt-Winter method [21], also known as triple exponential smoothing, was not included
in this report but is worth testing for future work. Also due to time constraints, we did not
experiment as much with the machine learning models as we wanted. It could be possible
to obtain better accuracy using different layers or models. Another future direction is com-
bining the SARIMA and the machine learning models, as many of the reports combine
these two methodologies to gain better accuracy than the individual models[23, 10, 19].
Therefore there is a clear argument for combining and creating hybrid models and will be
left for future work.
For future work, we shall consider using models or extensions that enable fitting
ARIMA models with multiple seasonalities. With regard to this, there is a method called
Fourier trends[29] that can be added to ARIMA models that handles multiple seasonali-
ties, which should be tested on this data set.

34
References
[1] “Swedish power statistic,” https://www.svk.se/en/national-grid/the-control-room/,
accessed: 2019-04-08.

[2] U.S Department of energy. (2016) Maintaining reliability in the modern power
system. [Online]. Available: https://www.energy.gov/sites/prod/files/2017/01/f34/
Maintaining%20Reliability%20in%20the%20Modern%20Power%20System.pdf

[3] P. J. Brockwell and R. A. Davis, Introduction to Time Series and Forecasting, 3rd ed.
Springer, 2016.

[4] J. W. Taylor, “Triple seasonal methods for short-term electricity demand forecast-
ing.” European journal of operational research, vol. 204, pp. 139–152, 2010.

[5] M. C. M. L. J. Soares, “Modeling and forecasting short-term electricity load: a


comparison of methods with an application to brazilian data.” International Journal
of Forecasting, vol. 24, pp. 630–644, 2008.

[6] G. C. R. George E. P. Box, Gwilym M. Jenkins and G. M. Ljung, Time Series Anal-
ysis : Forecasting and Control, 6th ed. John Wiley Sons, Incorporated, 2016.

[7] NIST/SEMATECH. (2012) Nist/sematech e-handbook of statistical methods. [On-


line]. Available: https://www.itl.nist.gov/div898/handbook/pmc/section4/pmc446.
htm

[8] D. Asteriou and S. G. Hall, ARIMA Models and the Box–Jenkins Methodology,
2nd ed. Palgrave MacMillan, 2011.

[9] “Neural networks,” http://neuralnetworksanddeeplearning.com/chap4.html, ac-


cessed: 2019-04-12.

[10] M. Khashei and M. Bijari, “A novel hybridization of artificial neural networks and
arima models for time series forecasting,” Expert systems with applications, vol. 39,
pp. 4344–4357, 2012.

[11] B. Z. . Y. Wei, “Carbon price forecasting with a novel hybrid arima and least squares
support vector machines methodology,” Omega, vol. 41, pp. 517–524, 2013.

[12] M. B. Mehdi Khashei and S. R. Hejazi, “Combining seasonal arima models with
computational intelligence techniques for time series forecasting,” Soft Computing,
vol. 16, pp. 1091–1105, 2012.

[13] S. F. G. F.Marandi, “Time series forecasting and analysis of municipal solid waste
generation in Tehran city,” in 2016 12th International Conference on Industrial En-
gineering (ICIE). IEEE, 2016.

[14] G. Reikard, “Predicting solar radiation at high resolutions: A comparison of time


series forecasts,” Solar Energy, vol. 83, pp. 342–349, 2009.

[15] D. Sena and N. K. Nagwani, “Application of time series based prediction model to
forecast per capita disposable income,” in IEEE International Advance Computing
Conference (IACC). IEEE, 2015.

35
[16] H. Matsila and P. Bokoro, “Load Forecasting Using Statistical Time Series Model in
a Medium Voltage Distribution Network,” in IECON 2018 - 44th Annual Conference
of the IEEE Industrial Electronics Society. IEEE, 2018.

[17] Z. H. Yunxiang Tian, Qunying Liu and Y. Liao, “Wind speed forecasting based on
Time series - Adaptive Kalman filtering algorithm,” in 2014 IEEE Far East Forum
on Nondestructive Evaluation/Testing. IEEE, 2014.

[18] J. Deng and P. Jirutitijaroen, “Short-term load forecasting using time series anal-
ysis: A case study for Singapore,” in 2010 IEEE Conference on Cybernetics and
Intelligent Systems. IEEE, 2010.

[19] J.-J. L. Wei-Min Li, Jian-Wei Liu and X.-R. Wang, “The financial time series fore-
casting based on proposed ARMA-GRNN model,” in 2005 International Confer-
ence on Machine Learning and Cybernetics. IEEE, 2005.

[20] H. Liu and J. Shi, “Applying arma–garch approaches to forecasting short-term elec-
tricity prices,” Energy Economics, vol. 37, pp. 152–166, 2013.

[21] A. Al-Sakkaf and G. Jones, “Comparison of time series models for predicting
campylobacteriosis risk in new zealand,” Zoonoses and public health, vol. 61, pp.
167–174, 2014.

[22] F. D. K. S. R. K. V. M. V. J. W. W. Paninski L, Ahmadian Y, “A new look at state-


space models for neural data,” Journal of Computational Neuroscience, vol. 29, pp.
107–126, 2006.

[23] G. P. Zhang, “Time series forecasting using a hybrid arima and neural network
model,” Neurocomputing, vol. 50, p. 159 – 175, 2003.

[24] T. R. Zibo Dong, Dazhi Yang and W. M.Walsh, “Short-term solar irradiance fore-
casting using exponential smoothing state space model,” Energy, vol. 55, pp. 1104–
1113, 2013.

[25] W. A. Dickey, D. A.; Fuller, “Distribution of the estimators for autoregressive time
series with a unit root,” Journal of the American Statistical Association, vol. 74, p.
427–431, 1979.

[26] A. Sorjamaa, “Methodology for long-term prediction of time series,” Neurocomput-


ing, vol. 10, pp. 1–5, 2007.

[27] D. M. Pelt and J. A. Sethian, “A mixed-scale dense convolutional neural network for
image analysis,” Proceedings of the National Academy of Sciences, vol. 115, no. 2,
pp. 254–259, 2018.

[28] Q.-Y. S. C.-K. Huang, Guang-Bin; Zhu, “Extreme learning machine: theory and
applications,” Neurocomputing, vol. 70, p. 489–501, 2006.

[29] G. R. Richards, “Identifying trends in climate,” INTERNATIONAL JOURNAL OF


CLIMATOLOGY, vol. 18, pp. 583–594, 1998.