Flow Chart For EE Room Entry
Flow Chart For EE Room Entry
Flow Chart For EE Room Entry
Note:
KEYS OF ROOMS: MDBI
EE/Aux/POS Room KEYS OF PANEL BOARD : VECC
Not Electrical Works (Archi Electrical Works, Not into Working Under Enegized
No need permit. Energized Panel Board
Works) Panel Board
Request for Shutdown
NO
Voltage to Lock the Voltage to Lock the
Panel Board Panel Board EE/Aux/POS Entry & Work Permit
STOP STOP
ENERGIZED PANEL
NO NO
PANEL BOARDS ARE BOARDS ARE
LOCKED LOCKED
YES
YES
BEGIN
Request for Energization
Work Scope