Power Cable and Motor Winding Insulation Resistance Tests: BWC 20Mld Phase 1
Power Cable and Motor Winding Insulation Resistance Tests: BWC 20Mld Phase 1
Power Cable and Motor Winding Insulation Resistance Tests: BWC 20Mld Phase 1
Test Equipment
Digital Insulation Tester Clamp Tester Inspected By:
Brand: Brand:
Model: Model:
Serial No.: Serial No.: Witnessed By:
BWC 20MLD PHASE 1
MOTORISED VALVE CABLE INSULATION RESISTANCE TEST
Insulation Resistance
Cable Serial Cable Number of (MΩ
From To Size
Number Number Brand Cores
L1-L2 L2-L3 L1-L3
P001 Philflex THHN 22mm2
P002 Philflex THHN 22mm2
P003 Philflex 4C 5.5mm2
P004 Philflex 4C 5.5mm2
Insulation Resistance
Cable Serial Cable Number of (MΩ
From To Size
Number Number Brand Cores
L1-L2 L2-L3 L1-L3
P001 Philflex THHN 22mm2
P002 Philflex THHN 22mm2
P003 Philflex 4C 5.5mm2
P004 Philflex 4C 5.5mm2
Test Equipment
Digital Insulation Tester Clamp Tester
Brand: Brand: Inspected By:
Model: Model:
Serial No.: Serial No.:
Witnessed By:
ACME CHEMICALS (M) SDN BHD
Project : Page :
BNR Solutions - Granular Adsorption
Media Project - BWC PHASE 1 STP
1 Motorized Valves
1.1 1 - CV -1
1.2 1 - CV -2
1.3 1 - CV -3
1.4 1 - CV -4
1.5 1- CV -5
1 - CV -6
1.6
1 - CV -7
1.7
1 - CV -8
1.8
1.,9 1 - CV -9
2.0 1- CV -10
2.1 1 - CV -11
2.2 1 - CV -12
2.3 1 - CV -13
Name Name
Signature Signature
Designation Designation
Company Company
Date Date
ACME CHEMICALS (M) SDN BHD
Project : Page :
BNR Solutions - Granular Adsorption
Media Project - BWC PHASE 1 STP
1 Motorized Valves
1.1 2 - CV -1
1.2 2 - CV -2
1.3 2 - CV -3
1.4 2- CV -4
1.5 2- CV -5
2 - CV -6
1.6
2 - CV -7
1.7
2 - CV -8
1.8
1.,9 2 - CV -9
2.0 2- CV -10
2.1 2 - CV -11
2.2 2 - CV -12
2.3 2 - CV -13
Name Name
Signature Signature
Designation Designation
Company Company
Date Date
ACME CHEMICALS (M) SDN BHD
Project : Page :
BNR Solutions - Granular Adsorption
Media Project - BWC PHASE 1 STP
1 Motorized Valves
1.1 3 - CV -1
1.2 3 - CV -2
1.3 3 - CV -3
1.4 3 - CV -4
1.5 3- CV -5
3- CV -6
1.6
3 - CV -7
1.7
3 - CV -8
1.8
1.,9 3 - CV -9
2.0 3- CV -10
2.1 3 - CV -11
2.2 3- CV -12
2.3 3 - CV -13
Name Name
Signature Signature
Designation Designation
Company Company
Date Date
ACME CHEMICALS (M) SDN BHD
Project : Page :
BNR Solutions - Granular Adsorption
Media Project - BWC PHASE 1 STP
1 Motorized Valves
1.1 4 - CV -1
1.2 4 - CV -2
1.3 4 - CV -3
1.4 4 - CV -4
1.5 4- CV -5
4 - CV -6
1.6
4 - CV -7
1.7
4 - CV -8
1.8
1.,9 4 - CV -9
2.0 4- CV -10
2.1 4 - CV -11
2.2 4 - CV -12
2.3 4 - CV -13
Name Name
Signature Signature
Designation Designation
Company Company
Date Date
ACME CHEMICALS (M) SDN BHD
Project : Page :
BNR Solutions - Granular Adsorbent
Media Project - BELARMINO STP (MWCI)
1 of 1
Ok a Not Working x
1 Control Panel
Light Indication ON
1.2 Voltages
2 PLC
Name Name
Signature Signature
Designation Designation
Company Company
Date Date
ACME CHEMICALS (M) SDN BHD
Project : Page :
BNR Solutions - Granular Adsorbent
Media Project - BELARMINO STP (MWCI)
1 of 1
Ok a Not Working x
1 MCC
Light Indication ON
1.2 Voltages
DESCRIPTION PHOTOS
Completed Tasks:
3 - CV -1
3- CV -2
6. Installation of Valves
7. Installation of disc filter
and multibag
8. Media Pouring
9. Wire Pulling
Ongoing Tasks:
Work Started: March 26, 2022
1. Installation of Pullboxes Target Completion: April 02, 2022
Completion Percentage: 80%
Ongoing: Termination of Cables
2. Control Panel
Installation Delivered last 19 March
Internal Wiring works: 50%
Target Completion: 31 March
Pending Tasks:
Installation of conduits and
pullboxes Ongoing Termination of Cables
Programming Balance and Termination of Sub-
Control Panel Installation pump
Report No.: 008
Date: March 28-April 03, 2022
rd Sytstem, MEC
REMARKS
100%
100%
100%
100%
100%
100%
80%