High Performance Chiller Plant: AP Hub - System Solution
High Performance Chiller Plant: AP Hub - System Solution
Zhao Xijing
Nov 2019
HVAC System Solution
Water Cooled Plant + AHU
0.05-0.3 0.02--0.12 0.47-0.9 0.02-0.12 0.016-0.12
kW/RT kW/RT kW/RT kW/RT kW/RT
Room
heat Outdoor
Water cooled chilled water system Air cooled chilled water system or
Unitary Air-Conditioner
Building Cooling Load Building Cooling Load
Green Mark (RT) Green Mark (RT)
Rating <500 RT ≥500RT Rating <500 RT ≥500RT
Minimum Efficiency (kW/RT) Minimum Efficiency (kW/RT)
Certified 0.85 0.75 Certified 1.1 1.0
Gold 0.8 0.75 0.70 Gold 1.0
GoldPLUS 0.75 0.7 0.68 GoldPLUS 0.85 *N.A
Platinum 0.7 0.68 0.65 Platinum 0.78
For Platinum, chiller operating efficiency Plant energy audit and performance
needs to be 0.55 kw/RT with zero tolerance. guarantee contracting to help achieve the
requirement
8
Singapore BCA Green Mark Scheme
High Performance Chiller Plant Concept
Optimize the performance of all parts of the chiller plant over the whole
operating period.
- Cooling tower fans
- Primary Pumps
- Secondary Pumps
- Condenser Water Pumps
- Variable Speed Drives
- Chillers
Always meet cooling requirements under all conditions while minimizing
energy usage and operating costs
Focus on overall Chiller plant efficiency instead of specific individual
equipment
HE equipment, optimized water distribution system design
Accurate measurement & audit and continuous monitoring
Operating
BAS system, make energy efficiency accountable Costs
Energy
Efficiency
Optimizing Chiller Plant
11 (20oF) 1.2
Chillers may 10 (18oF) 1.3
working hard 8.9 (16oF) 1.5
7.8 (14oF) 1.7
6.7 (12oF) 2.0
5.6 (10oF) 2.4
4.4 (8oF) 3.0 Pumps consume more
3.3 (6oF) 4.0
2.2 (4oF) 6.0
VSD chiller :
energy saving of 3%-5%
per 1 °C lift reduction
Compressor Lift:
Leaving condenser water temp – leaving chilled water temp
The higher lift , the more work compressor done, the more energy consumed
Plant Design Parameter: Water Temperatures
Increase CHW Temperature Difference: Low flow
CHW delta temp
CHW supply temp CHW return temp
5C 12 C 10 C 17 C
28C 32 C 33 C 40 C
CHWS and CHWR temperatures: depend on chiller and air side selection,
as well as application
CWS and CWR temperatures:consider total energy consumption of chiller,
condenser pump, towers, as well as weather condition
Low Chilled Water Supply Temp
works for ice storage system, district cooling plant , cold air distribution
system, retrofit/expansion applications
Coil Performance:
Q= U x A x LMTD
Building Load:
Tons = GPM x DeltaT/24
High Chilled Water Supply Temp
Works for DOAS systems, Datacenter, process cooling having less latent load,
normal mixed air AHU system
Chilled Beam High
Temp Chilled water
loop
OA
7C
VPF VPF
12 C 18 C
0.6
0.5
kW/ton
0.4
0.3
0.2
0.1
0
20% 30% 40% 50% 60% 70% 80% 90% 100%
Load
CT approach could
be lower to 2F( 1C)
at 82F(28C) WB
2012 ASHRAE Handbook-HVAC Systems and Equipment, Chapter 40 Cooling Towers.
Cooling Tower Approach and WB
Cooling Tower Design and Selection
Conventional design = approach 5-7 deg C
Optimized design = approach 1.5-4 deg C
Design Condition: 32-37 C OR 29.5-34.5C? OR 28.5-33.5?
CHILLER PLANT
DESIGN
Premium HE motors
VSD on tower fans
Oversized/standby CT
Good cooling tower layout
Good water treatment with continuous monitoring of water quality
! Cooling tower sizing with optimized approach saves energy at all operating conditions
Operating Envelope –Singapore : Zone 1A
WB Temp Bin
3500
3064
3000 56%
2500 % 2433
WB Temp Bin
2000 1915
1500
1000
768
503
500
0 4 58 15 0 0
0
19.5-20.5 20.5-21.5 21.5-22.5 22.5-23.5 23.5-24.5 24.5-25.5 25.5-26.5 26.5-27.5 27.5-28.5 28.5-29.5 29.5-30.5
WB Temp Bin
4000
3741
3500
2500
34%%
2000 1823
1663
1500
1161
1000
500
155 194
0 0 19 4 0
0
19-20 20-21 21-22 22-23 23-24 24-25 25-26 26-27 27-28 28-29 29-30
Optimum design of flow rate & Velocity (for big main pipe)
Piping friction loss : 100 Pa/m or 1 ft/100ft.
Water Velocity : 1.5 m/s or 5 ft/sec
Pipe Sizing
ASHRAE 90.1-2013: Maximum flow rate for each pipe size using the
prescriptive compliance approach
Low Pressure Piping Design
High efficiency
Chiller Type :
Centrifugal or Screw?
CSD or VSD?
Heat pump/heat recovery?
Chiller number and capacity sizing:
Based on load histogram and chiller efficiency sweetspot
Redundancy and backup consideration
Need to consider night load condition
Optimized Plant Control: Tower Fan Control
Cooling Tower Controls Without VSD
Total Cooling Tower Airflow = 240,000CFM
Total Power Consumption = 50 kW
120,000CFM 120,000CFM 0 CFM
34°C 25 kW 25 kW 0 kW
ON ON OFF
29°C
ON ON OFF
Cooling Tower Controls With VSD
ON ON On
29°C
ON ON OFF
Condenser Water Temp Control Strategy
Secondary Pumps
Primary/Secondary System:
Saving pump energy on secondary
pumps
Primary Pumps Decoupler
/Bypass
Primary Pumps
Bypass
Valve
Flow Meter
Typical load with 2 way valve
High Performance Chiller Plant
+
Optimized plant control system