0% found this document useful (0 votes)
116 views47 pages

Installation Instruction For Smart Anti-Rejection Box: Model: SAR-100

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 47

User Manual

Installation Instruction for Smart


Anti-rejection Box

Model: SAR-100

Version V1.1

1
User Manual

Table of Contents
Introduction ................................................................................ 3
Parameters .................................................................................. 3
Product Installation .................................................................... 4
3.1 Tool ..................................................................................... 4
3.2 Location .............................................................................. 5
3.3 Notice .................................................................................. 5
Anti-rejection System Diagram ................................................... 6
Device Installation ....................................................................... 7
5.1 Installation........................................................................... 7
5.2 Device wiring ...................................................................... 8
Networking Configuration ........................................................ 10
6.1 WiFi Access ...................................................................... 10
6.2 Ethernet Access ................................................................. 21
.................................................................................................... 27
7.1 Anti-rejection setup ........................................................... 27
Instruction for Indicator Light, Dial Switch and Reset Button . 31
8.1 Indicator Light .................................................................. 31
8.2 Dial Switch........................................................................ 32
8.3 Reset Button ...................................................................... 32
.................................................................................................... 33
9.1 Register ............................................................................. 33
9.2 SOLARMAN Smart APP ................................................. 34
9.3 SOLARMAN Business APP ............................................. 40
Contact ...................................................................................... 46

2
User Manual

Introduction
SOLARMAN anti-rejection box enables the real-time monitoring of grid-tied
situation through the integration of three-phase meter, logger and CT, which
meets the requirement of real-time adjusting inverter output power at power
consumption scenario. It can connect to many inverters and support data
transmission via WiFi&Ethernet. It also supports the anti-rejection application of
parallel-connected machine for G3 series PV inverter.

Parameters
Parameter
Product Model SAR-100
Remote Communication 2.4G WiFi+Ethernet
Three-phase 3-110KW G3 series PV inverter
Applicable Machine
(High-voltage model not supported)
Local Communication RS 485
No. of Connections 10
Accessing Method Three-Phase Four-Wire
Working Voltage 3x230/400V 50/60Hz
Working Current 3x1.5(6)A
CT (Regular) 250/5A, 600/5A, 800/5A, 1000/5A, 1500/5A,
2000/5A
IP Grade IP65
Working Temperature -25 ~+60
Working Humidity 5%-95% (No Condensation)
Installation Method Wall-Hanging
Size ~400*300*170mm
Weight ~3.3kg

3
User Manual

Product Installation
3.1 Tool
Table 3.1 Preparation Tool
Tool Name Picture Usage Note

Wire stripper Strip cable insulation

Cross screwdriver Use to connect


Connect logger with Shielded
Cable
router twisted pair
Use to install Specification:
Expansion Screw
anti-rejection Box M6*60
Use to fix expansion
Adjustable Wrench
screws

Percussion Drill Use to drill holes

Computer with Use to operate


network port network configuration

(Shielded
twisted pair)
COM Line RS485Communication
Diameter:
3-7mm
Specification:A
Voltage-sampling Use to connect voltage
WG 12-18,
cable sampling signal
105 /600V
Specification:A
Use to connect CT
Double-core cable WG 16-22,
signal
105 /600V

4
User Manual

3.2 Location
The installation location must meet the following requirements.
3.2.1 The logger should be installed in doors, avoiding damp and dust
environment. Direct sunlight and aggressive vapour should also be avoided.
3.2.2 Environment temperature: -25 +60 .
3.2.3 Max. communication distance for RS485 should be less than 500m.
Away from other wiring routes or pipes in doors, such as gas pipe, water
pipe, electric wire and etc.
3.2.4 Away from metal structure to ensure wireless signal strength.

3.3 Notice
3.3.1 Power off the device before installation.
3.3.2 Double check the connection before power on the device.

5
User Manual

Anti-rejection System Diagram

If 485 link communication is not successful for some inverters, please connect a
120 resistance with repeater and A&B point of the last inverter.
6
User Manual

Device Installation
5.1 Installation (Find a location near grid side to install.)
1.Select a right (firm&flat) place to install the device
2. Determine the drilling hole positions according to hangers (Refer to Fig. 5.1)
3. Fix the device using expansion screws

Fig. 5.1 Installation Diagram (Unit: mm)

7
User Manual

5.2 Device Wiring

Notice

1. Connect inverter output to the grid. Connect to phase line R ,S, T, N


accordingly.
2. Connect voltage-sampling signal line, communication distance should
be less than 100m. Connect to phase line R ,S, T, N accordingly.
3. Connect CT, communication distance should be less than<10m. CT
direction should be from grid to load and make sure R-phase CT connect
to CT1-1/2, S-phase CT connect to CT2-1/2, T-phase CT connect to
CT3-1/2.
[Phase sequence of CT should be consistent with the phase sequence of
voltage-sampling signal. 1/2 cannot be reversed. (Select current sensor
according to the device capacity.)]
4. RS485A-B cannot be reversed.
5. All devices can connect to ground line.

Inverter address settings


1.Meter address: 1
2.For one inverter, inverter address: 2
3.For multiple inverters, inverter address: 2, 3, 4, 5
Tip: Address cannot be the same.
4.No need to set anti-rejection function at LCD screen.

Notice: Please make sure local anti-rejection function: OFF.

8
User Manual

Double check the wiring and power on the device

9
User Manual

Networking Configuration
If the networking configuration is required, please follow the step and the stick logger along
with the inverter does not need to install.
If the anti-rejection box is only used for anti-rejection purpose, users can skip this step directly
and install the stick logger accordingly.

Notice
1. DIN-Rail logger supports WiFi&Ethernet access. Please select
one method to access according to actual situation.

6.1 WiFi Access


Go to DIN-Rail logger configuration page
Step 1 Prepare a computer/smart phone that can connect to wireless network
Step 2 Connect to logger AP (Please do Not connect the cable when configuring
the logger) Select and connect AP XXXXXXXXX in the network list (XXXXXXXXX
means logger SN)

10
User Manual
Step 3 Log in to logger WEB page
Open a browser and enter 10.10.100.254.
Username: admin
Password: admin

Notice

Supported browser: IE 8+, Chrome 15+ Firefox 10+

Step 4 During the first login, the browser will remind you whether to save the
password. You can decide according to your usage habit.
Step 5 During the first login, the system will prompt that the AP is not encrypted.
Click OK to encrypt it, click Cancel if not.

11
User Manual

Step 6 If you choose to encrypt AP, you will go to AP Encryption Modification ,


enter your password and click Save.
Example: choose WPA2-PSK as encryption mode, AES as encryption algorithm,
password: 1234578 (Please remember the password.)
Users can select encryption mode according to actual situation. After AP has
been encrypted, it requires to connect AP again.
(If you forget your password or want to cancel the encryption, please long press
Reset button for 4s to reset which will got to reconfiguration process. AP
password, network information and anti-rejection settings will restore factory
settings at this time.)

12
User Manual
Step 7 Click Reboot after saving.

After AP encryption has been set, you will be reminded again during network
settings.
If the following prompt shows, you can select "AP encryption modification"
accordingly.

13
User Manual

Step 8 Refresh the WEB page and log in again.


Username: admin
Password: admin

14
User Manual

Notice
1. Step 6-8 are for AP encryption. If you will not select AP encryption,
skip step 6-8, click cancel in step 5 and go to step 9 directly.

Step 9 Go to setup guide page. Click Start

Step 10 Select Wireless connection and click Next

15
User Manual

Step 11 Select router name and click Next, refresh the page if no target router
listed

Notice
1. Router name and password do not support =' characters.
2. 5G WiFi is not supported.
3. Router DHCP function: ON.
4. Router can connect to a network.

16
User Manual
Step 12 Set router password and click Next

Step 13 If allocating fixed IP address is not required, select Obtain an IP address


automatically: Enable (Recommended) and click Next

17
User Manual
Step 14 If allocating fixed IP address is required, select Disable
Enter the target IP address and click Next

Step 15.1 If you wish to enhance safety, you can choose Hide AP or AP
Encryption Modification .
AP Encryption Modification is recommended.
If you already set AP encryption, please refer to previous steps.

Notice
1 If you select Hide AP , AP will be hided automatically. If you wish to
open again, please long press Reset button for 4s to reset which will got to
reconfiguration process. AP password, network information and
anti-rejection settings will restore factory settings at this time.)

18
User Manual

Step 15.2 If enhancing safety is not required, click Next. System will remind you
to encrypt AP, click Cancel.

19
User Manual
Step 16 Click OK to complete WiFi configuration

Step 17 Connect AP again according to the notification around 40s. Log in to WEB
page and check if the network is successful.

20
User Manual

6.2 Ethernet Access


Use cable to connect DIN-Rail logger and router

Notice
1. Ethernet port of DIN-Rail logger has no lighting function
2. Router DHCP function: ON

Step 1 Select Cable connection , and set Wireless function: Enable. Click Next.
(Otherwise, you can't connect to AP through mobile phone or computer for web
page setting)

21
User Manual

Step 2 If allocating fixed IP address is not required, select Obtain an IP address


automatically: Enable (Recommended) and click Next

22
User Manual
Step 3 If allocating fixed IP address is required, select Disable
Enter the target IP address and click Next

Step 4 If you wish to enhance safety, you can choose Hide AP or AP


Encryption Modification .
AP Encryption Modification is recommended.
If you already set AP encryption, please refer to previous steps.

Notice
1 If you select Hide AP , AP will be hided automatically. If you wish to
open again, please long press Reset button for 4s to reset which will got to
reconfiguration process. AP password, network information and
anti-rejection settings will restore factory settings at this time.)

23
User Manual

Step 5 If enhancing safety is not required, click Next. System will remind you to
encrypt AP, click Cancel.

Step 6 Click OK to complete Ethernet configuration.


24
User Manual

Step 7 Connect AP again according to the notification. Log in to WEB page and
check if the network is successful.
If you need to enter the web page through IP address via LAN, please remember
the actual IP address in "Wireless Mode".

25
User Manual

After the network setting is completed, you can enter the web page through two
methods to set up anti-rejection.
Method 1(Recommended): If AP is visible, connect AP via computer, mobile and
other devices. Open a browser and enter
10.10.100.254 to go.

Method 2: If AP is hided, AP cannot be connected via computer, mobile and other


devices. You need to keep the computer or mobile in the same LAN with the
logger, and enter the assigned IP address by the logger in the browser to enter
the web page.

26
User Manual

Anti-rejection Settings
This step is required no matter what the network situation is.

7.1 Anti-rejection setup


Step 1 Click Advanced Setup- Anti-rejection setup
Notice
Default: Anti-rejection Function: ON

Step 2 If anti-rejection function is required, select Enable , set inverter number,


CT ratio and power.

27
User Manual

Inverter Number Instruction


Inverter number: 10, and click save. (Set according to actual situation on site.)

CT Ratio Setup Instruction


If CT is 200/5A, please enter 40 and save.
After CT ratio is set, the logger will automatically send the ratio to the meter after
restarting, and the power and energy displayed on the meter screen will be
converted into the real value multiplied by the ratio. However, the original value
transmitted by the meter to the logger through RS485 is still the original value
without ratio conversion, so after adding the plant, the meter data is still the
original value in the "Device Details".

Power Setup Instruction


Set power according to actual situation. (Default: 100W.)
E.g. If you set 100W, which means inverter adjustable production power is 100W
less than load power and will continue to buy 100W from the Grid.
If you set 0W, which means all inverter production power is used for load and
grid-tie power is 0W.
(Due to there is a certain time difference between the power reduction
command issued by the logger and the power reduction command executed by
the inverter, it might encounter the situation of the fluctuation of actual grid-tie
power when the inverter power is set to 0.)
If you set -100W, which means inverter production is used for load and there is
still 100W for grid-tie.
Please Note: If the inverter load power is less than min. production power, the
surplus power will go on grid.

28
User Manual

Step 2.1 If anti-rejection function is not required, select Disable and click Save.

29
User Manual

Step 3 Click Restart

Step 4 If the successful page is displayed, it means the anti-rejection setting is


successful.

30
User Manual

Instruction for Indicator Light, Dial Switch


and Reset Button
8.1 Indicator Light
After DIN-Rail logger (WiFi/ETH) connected to the device and networking is
normal, check the status of STATUS light, LINK light, 485/422 light.
(There is only one light for each STATUS light, LINK light, 485/422 light.)

Logger light
Light Implication Instruction
1. OFF DIN-Rail logger (WiFi/ETH) works
abnormally.
Logger
2. ON DIN-Rail logger (WiFi/ETH) works
working
normally.
status
3. ON after 5s DIN-Rail logger (WiFi/ETH)
starts/restarts.
1. Flashing: Network configuration is not
Communicati conducted after first power on or reset.
on status 2. Configure to WiFi and connect to router
with logger Light: ON; If not, Light: OFF
and router 3. Configure to Ethernet and connect to router:
Light: Flash; If not, Light: Flash
1. ON/Fast Flash DIN-Rail logger (WiFi/ETH)
Communicati connected to inverter and communicate
on status with normally.
logger and 2.OFF: DIN-Rail logger (WiFi/ETH) not
inverter connected to inverter and communicate
abnormally.

31
User Manual
Repeater light
Light Implication Instruction
1. OFF No data transmission
RS485 IN 2. Flash Data transmitting
3. ON Abnormal
1. OFF No data transmission
RS485 OUT 2. Flash Data transmitting
3. ON: Abnormal

1. ON Normal power-on
Power
2. OFF Fail to power on

8.2 Dial Switch


Light Implication Instruction
Default:Term
ON:A problem with 485 link
when there are various inverter
RS485 terminal 120
on site
matching
(Turn on one dial switch either
resistance switch
for logger or inverter;
If a repeater is connected, there
is no need to turn on this switch)

8.3 Reset Button


Light Implication Instruction
Long press for 4s to reset the
Reset button logger and restore factory
settings.

32
User Manual

SOLARMAN Monitoring
If the anti-rejection box is only used for anti-rejection purpose, networking is not required,
users can skip this step directly.

9.1 Register
If you have a household PV plant, it is recommended to use SOLARMAN
Smart.
Scan the QR code below to download or go to Android/App Store searching
for SOLARMAN Smart.
For web: https://home.solarmanpv.com

SOLARMAN Smart

If you are a distributor, O&M provider, manufacturer in PV field, it is


recommended to use SOLARMAN Business.
Scan the QR code below to download or go to Android/App Store searching
for SOLARMAN Business.
For web: https://pro.solarmanpv.com

SOLARMAN Business

33
User Manual

9.2 SOLARMAN Smart APP


Step 1 Registration
Go to SOLARMAN Smart APP and click Register a new account and select
E-mail or Phone Number to register.

Step 2 Create a plant


Click Add Now .
Choose Yes to select Create Plant By Myself .
Choose No to select Create Now .

34
User Manual
Step 2.1
Users can select plant location automatically or enter plant location manually,
then click Next . Please select system type as Self-consumption .
Users need to enter plant information here, click Done to complete.

Step 3 Add a logger


Click Go to Add , enter SN manually or scan bar code, then click Add .

35
User Manual
Step 3.1
Click Skip to return homepage and click plant name to visit a plant.
User can click ... in the upper right corner and click Add a logger .
(Please follow step 3)

Step 4 Select associated device


After the logger is added, system will go to Select associated device , if you will
not change associated method, click Done . If you are going to change
associated method, click Manual selection .
(Network configuration has been done at step 6)
Click Later to return to homepage.

Notice
Logger SN will be displayed in the device list after 10 mins.

36
User Manual

Step 5 Meter configuration


Click plant name to visit a plant. (If you are in plant details page, you can click
Device directly)
Click Device - Meter - Meter configuration , go to select Three-phase System
- Grid , click a blue arrow in CT direction and change to Energy Purchase .
Current ratio can set according to CT specification. (e.g. If you choose 200/5A CT,
set current ratio as 200/5)
Click Done to return to Device page.

37
User Manual
Step 6 Plant Settings
Set power calculation method, data sourcing and non-operating hours
6.1 Power calculation method

Based on device data Based on


calculation data Based on device data
grid-tie energy Based on device data
Save

6.2 Data sourcing


Click Data sourcing - Switch to manual selection . Select Gird-tie for grid side,
select Inverter data summation for generation, select Meter data
summation for grid and select Calculation method for consumption and
Save

38
User Manual

6.3 Non-operating hours


Click Non-operating hours settings and enable it.
Effective time: From sunrise to sunset.
Click Save .
(Uses can set the time according to actual situation.)

6.4 Back to plant details to check data.

39
User Manual

9.3 SOLARMAN Business APP


Step 1 Registration Go to SOLARMAN Business APP and click Register - Switch
to E-mail registration .Tick T&Cs and click Next .Select Business Type ,
enter Business Name , select Business Area , select Type and click Next .
If you already have an account, click Click here to return to login page.

The following page will display and click Finished and Log In to return to login
page.Enter information and click Log In .

40
User Manual
Step 2 Create a plant
Click + in the upper right corner, select Create a Plant and enter plant
information, select system type as PV+Grid+Consumption , then click Save .

Step 3 Add a logger


Click Add Data logger , enter SN manually or scan bar code, then click Done .

Step 3.1
If not, click Done to return to Dashboard .
Click ... in the upper right corner in Dashboard page, click Add Data logger ,
enter SN manually or scan bar code, then click Confirm .
41
User Manual

Notice
Logger SN will be displayed in the device list after 10 mins.

Step 4 Meter configuration


Click Devices , choose target meter and click Meter configuration , go to select
Grid , click a blue arrow in CT direction and change to Energy Purchase .
Current ratio can set according to CT specification. (e.g. If you choose 200/5A CT,
set current ratio as 200/5)
Click Save to return to Devices page.
(System will use three-phase/single-phase system in default.)

42
User Manual

Step 5 Plant Settings (SOLARMAN Business APP does not support the settings,
please go to SOLARMAN Business Web to set.)
Set power calculation method, data sourcing and non-operating hours

5.1 Data sourcing


Click More in the upper-right corner, and click Data
sourcing .
Select Manual Modification and the arrow at Place 4 will point to grid.
Select Inverter data summation for generation, select Meter data
summation for grid and select Calculation method for consumption and
Save

43
User Manual

5.2 Power calculation method


Click Power calculation method
Select Accumulated production summation uploaded by devices for calculation
of accumulated production.
Select Daily consumption summation for calculation of accumulated
consumption.
Select Energy purchased summation uploaded by devices for calculation of
energy purchased.
Select Grid feed-in summation uploaded by devices for calculation of grid
44
User Manual
feed-in.

5.3 Non-operating hours


Click Non-operating hours settings and enable it.
Effective time: From sunrise to sunset.
Click Save .
(Uses can set the time according to actual situation.)

45
User Manual

5.4 Back to plant details to check data.

Contact
IGEN Tech Co., Ltd.
46
User Manual
Add: Block F4, China IoT International Innovation Park, No. 200, Linghu Avenue,
Wuxi, Jiangsu, P. R. China
Tel: +86-400-181-0512
Email: [email protected]
Website: www.solarman.cn

47

You might also like