Cv. Tokewall: Rencana Anggaran Biaya Pengadaan Dinding Panjat Lintasan Lead L.3Mxt.15M & Speed L.6Mxt15M

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

CV.

TOKEWALL

Rencana Anggaran Biaya


Pengadaan Dinding Panjat Lintasan Lead L.3mxT.15m & Speed L.6mxT15m

Harga Sat Jumlah Harga Sat


No Uraian Pekerjaan Sat Vol.
(Rp) (Rp)
Lintasan Fiber Lead dan Speed
A Pekerjaan Lintasan Fiber
1 Lintasan Fiber Lead Uk. 3mx15m m2 45.00 Rp 2,880,000 Rp 129,600,000
2 Lintasan Roof 3m2 m2 3.00 Rp 1,800,000 Rp 5,400,000
3 Lintasan Fiber Speed Uk. 6m x 15m Pcs 40.00 Rp 4,200,000 Rp 168,000,000

B Pekerjaan Pondasi
Bahan & Ongkos Kerja
1 Pondasi Tapak m3 5.25 Rp 4,800,000 Rp 25,200,000
2 Pondasi Sloof m3 2.70 Rp 4,800,000 Rp 12,960,000
3 Finishing Ls 1.00 Rp 2,400,000 Rp 2,400,000

C Pekerjaan Konstruksi Besi Tower Utama


Bahan & Ongkos Kerja
1 Baja Siku ± 80x80x8 Kg 1,400.00 Rp 27,600 Rp 38,640,000
2 Baja Siku ± 70x70x7 Kg 221.40 Rp 27,600 Rp 6,110,640
3 Baja Siku ± 60x60x6 Kg 1,354.00 Rp 27,600 Rp 37,370,400
4 Baja Siku ± 50x50x5 Kg 1,660.00 Rp 27,600 Rp 45,816,000
5 Plat tapak kaki tower Kg 138.00 Rp 27,600 Rp 3,808,800
6 Sepatu kaki tower Kg 42.00 Rp 27,600 Rp 1,159,200
7 Baut 12mm Pcs 1,400.00 Rp 2,640 Rp 3,696,000

D Pekerjaan Connecting
Bahan & Ongkos Kerja
1 Plat Kupingan Connecting Kg 96.00 Rp 27,600 Rp 2,649,600
2 Baja siku Connecting 50x50x5 Kg 1,820.50 Rp 27,600 Rp 50,245,800
3 Baut 10mm Pcs 1,000.00 Rp 2,400 Rp 2,400,000
4 Baut 12mm Pcs 700.00 Rp 2,640 Rp 1,848,000

E Pekerjaan Pengecatan
1 Pengecatan Ls 1.00 Rp 14,400,000 Rp 14,400,000

KANTOR Office Raya Darmo Indah H - 11 Surabaya 60187 INDONESIA TELP Phone / Fax +62.31.7316505
MOBILE Cellular +62 0818 411677
eMAIL [email protected] [email protected] Web www.tokewall.com

CV. TOKEWALL

F Pekerjaan Pemasangan
1 Erection Tower Kg 6,731.90 Rp 9,000 Rp 60,587,100
2 Setting Fiber Block + Connect Ls 1.00 Rp 14,400,000 Rp 14,400,000

G Lain Lain
1 Tali (Karmantel)
a. Dinamis (50 m) Roll 2.00 Rp 1,750,000 Rp 3,500,000
b. Statis (50 m) Roll 2.00 Rp 2,100,000 Rp 4,200,000
2 Carabiner Oval 8 ml Pcs 30.00 Rp 50,000 Rp 1,500,000
3 Carabiner Snap Pcs 30.00 Rp 175,000 Rp 5,250,000
4 Carabiner Cruw Pcs 6.00 Rp 255,000 Rp 1,530,000
5 Carabiner Pcs 2.00 Rp 125,000 Rp 250,000
6 Sling (60 cm) Pcs 30.00 Rp 150,000 Rp 4,500,000
7 Figur Of Eight Pcs 2.00 Rp 175,000 Rp 350,000
8 Bilay Devis Pcs 2.00 Rp 350,000 Rp 700,000
9 Gri gri Pcs 2.00 Rp 1,750,000 Rp 3,500,000
10 Hand Drill Pcs 2.00 Rp 2,000,000 Rp 4,000,000
11 Harnes Pcs 4.00 Rp 950,000 Rp 3,800,000
12 Wibing Roll 2.00 Rp 175,000 Rp 350,000
13 Hangger Pcs 30.00 Rp 90,000 Rp 2,700,000
14 Point Lead Set 25.00 Rp 350,000 Rp 8,750,000
15 Point Speed Record Set 2.00 Rp 7,500,000 Rp 15,000,000
16 Baut Point Pcs 600.00 Rp 3,000 Rp 1,800,000
Jumlah Rp 688,371,540
Ppn + Pph 11,5 % Rp 79,162,727
Total Rp 767,534,267

Surabaya, 12 March 2017


Hormat kami

Catatan:
1. Asumsi tanah pondasi adalah tanah normal (bukan tanah
gambut atau tanah yang memerlukan penanganan
( Koentono Halim ) khusus)

KANTOR Office Raya Darmo Indah H - 11 Surabaya 60187 INDONESIA TELP Phone / Fax +62.31.7316505
MOBILE Cellular +62 0818 411677
eMAIL [email protected] [email protected] Web www.tokewall.com

You might also like