This document outlines productivity rates for various formwork activities. It provides 64 items listing the crew size, hourly production rate in square meters, and estimated daily production in square meters for tasks like formwork to footings, rafts, beams, columns, walls, slabs, stairs, and more. Crew sizes typically include 2 carpenters and 1 helper or 1 carpenter and 1 helper. Hourly production rates range from 0.5 to 1.8 square meters and daily production is estimated based on an 8 hour workday.
This document outlines productivity rates for various formwork activities. It provides 64 items listing the crew size, hourly production rate in square meters, and estimated daily production in square meters for tasks like formwork to footings, rafts, beams, columns, walls, slabs, stairs, and more. Crew sizes typically include 2 carpenters and 1 helper or 1 carpenter and 1 helper. Hourly production rates range from 0.5 to 1.8 square meters and daily production is estimated based on an 8 hour workday.
This document outlines productivity rates for various formwork activities. It provides 64 items listing the crew size, hourly production rate in square meters, and estimated daily production in square meters for tasks like formwork to footings, rafts, beams, columns, walls, slabs, stairs, and more. Crew sizes typically include 2 carpenters and 1 helper or 1 carpenter and 1 helper. Hourly production rates range from 0.5 to 1.8 square meters and daily production is estimated based on an 8 hour workday.
This document outlines productivity rates for various formwork activities. It provides 64 items listing the crew size, hourly production rate in square meters, and estimated daily production in square meters for tasks like formwork to footings, rafts, beams, columns, walls, slabs, stairs, and more. Crew sizes typically include 2 carpenters and 1 helper or 1 carpenter and 1 helper. Hourly production rates range from 0.5 to 1.8 square meters and daily production is estimated based on an 8 hour workday.
Production Rate Per 8 hrs. Square Meters Square Meters FW FORMWORK FW01 Formwork to footings 2 CARPENTERS, 1 HELPER 1.2 sq.m per day 9.6 sq.m per day FW02 Formwork to isolated footings 2 CARPENTERS, 1 HELPER 1.6 sq.m per day 12.8 sq.m per day FW03 Formwork to rafts 2 CARPENTERS, 1 HELPER 1.4 sq.m per day 11.2 sq.m per day FW04 Formwork to rafts D>0.75m 2 CARPENTERS, 1 HELPER 1.8 sq.m per day 14.4 sq.m per day FW05 Formwork to tie beams 2 CARPENTERS, 1 HELPER 1.0 sq.m per day 8 sq.m per day FW06 Formwork to high level tie beams D>0.45M 2 CARPENTERS, 1 HELPER 1.2 sq.m per day 9.6 sq.m per day FW07 Formwork to Neck Columns 2 CARPENTERS, 1 HELPER 4 sq.m per day FW08 Formwork to U/G Water tank 2 CARPENTERS, 1 HELPER 6 sq.m per day FW09 Formwork to basement retaining walls 2 CARPENTERS, 1 HELPER 9 sq.m per day FW10 Formwork to columns (small size) 2 CARPENTERS, 1 HELPER 7 sq.m per day FW11 Formwork to Columns (large size) 2 CARPENTERS, 1 HELPER 9 sq.m per day FW12 Formwork to D/S beam internal (shallow) 2 CARPENTERS, 1 HELPER 6 sq.m per day FW13 Formwork to D/S beam external (Deep) 2 CARPENTERS, 1 HELPER 7 sq.m per day FW14 Formwork to D/S beam external (Shallow) 2 CARPENTERS, 1 HELPER 4 sq.m per day FW15 Formwork to D/S beam external (Deep) 2 CARPENTERS, 1 HELPER 6 sq.m per day FW16 Formwork to lift walls single core 2 CARPENTERS, 1 HELPER 6 sq.m per day FW17 Formwork to lift walls multi core 2 CARPENTERS, 1 HELPER 8 sq.m per day FW18 Formwork to slab decking (10ft) hourdi 2 CARPENTERS, 1 HELPER 1.6 sq.m per day 12.8 sq.m per day FW19 Formwork to slab decking (>10ft) hourdi D/S beams 2 CARPENTERS, 1 HELPER 1.2 sq.m per day 9.6 sq.m per day FW20 Formwork to slab decking (>10ft) hourdi 2 CARPENTERS, 1 HELPER 1.2 sq.m per day 9.6 sq.m per day FW21 Formwork to slab decking (>10ft) hourdi 2 CARPENTERS, 1 HELPER 1.0 sq.m per day 8 sq.m per day FW22 Formwork to staircase (non spiral) 2 CARPENTERS, 1 HELPER 4 sq.m per day FW23 Formwork to balcony parapets 2 CARPENTERS, 1 HELPER 6 sq.m per day FW24 Formwork to roof parapets 2 CARPENTERS, 1 HELPER 8 sq.m per day
D = DEPTH U. GR. = UNDERGROUND D/S = DECK - SLAB > = GREATER THAN < = LESS THAN
PRODUCTIVITY RATES FOR FOWMWORKS
Item No. CREW SIZE Hourly Production
Production Rate Per 8 hrs. FW 25 shutter Manufacture for pile caps 1 CARPENTER + 1 HELPER 2 sq.m per hour 16 sq.m per day FW 26 shutter Fix for pile caps I CARPENTER + 1 HELPER 1.5 sq.m per hour 12 sq.m per day FW 27 Deshutter footings/pile caps 1 HELPER 6 sq.m per hour 48 sq.m per day FW 28 Shutter make column necks 1 CARPENTER + 1 HELPER 1.5 sq.m per hour 12 sq.m per day FW 29 Shutter fix column necks 1 CARPENTER + 1 HELPER 1.2 sq.m per hour 9.6 sq.m per day FW 30 Deshutter Column necks 1 HELPER 4.8 sq.m per hour 38.4 sq.m per day FW 31 Shutter make tie beams 1 CARPENTER + 1 HELPER 1.2 sq.m per hour 9.6 sq.m per day FW 32 shutter fix tie beams 1 CARPENTER + 1 HELPER 1 sq.m per hour 8 sq.m per day FW 33 Column shutter making 1 CARPENTER + 1 HELPER 1.2 sq.m per hour 9.6 sq.m per day FW 34 Column shutter fixing 1 CARPENTER + 1 HELPER 1 sq.m per hour 8 sq.m per day FW 35 Column deshuttering 1 HELPER 4 sq.m per hour 32 sq.m per day FW 36 Walls shutter making 1 CARPENTER + 1 HELPER 1.5 sq.m per hour 12 sq.m per day FW 37 Walls shutter fixing 1 CARPENTER + 1 HELPER 0.8 sq.m per hour 6.4 sq.m per day FW 38 De shutter Tie beam shutter 1 HELPER 4 sq.m per hour 32 sq.m per day FW 39 Wall formwork deshuttering 1 HELPER 3.2 sq.m per hour 25.6 sq.m per day FW 40 Staircase formwork making 1 CARPENTER + 1 HELPER 0.8 sq.m per hour 6.4 sq.m per day FW 41 staircase formwork fixing 1 CARPENTER + 1 HELPER 0.8 sq.m per hour 6.4 sq.m per day FW 42 Staircase formwork deshuttering 1 HELPER 1.6 sq.m per hour 12.8 sq.m per day FW 43 Drop beams formwork making 1 CARPENTER + 1 HELPER 1 sq.m per hour 8 sq.m per day FW 44 Drop beams formwork fixing 1 CARPENTER + 1 HELPER 0.8 sq.m per hour 6.4 sq.m per day FW 45 Drop beams formwork stipping 1 HELPER 3.2 sq.m per hour 25.6 sq.m per day FW 46 suspended slab formwork fixing 1 CARPENTER + 1 HELPER 1.2 sq.m per hour 9.6 sq.m per day FW 47 suspended slab formwork deshutter 1 HELPER 5 sq.m per hour 40 sq.m per day FW 48 Formwork fixing for sunshades 1 CARPENTER + 1 HELPER 0.7 sq.m per hour 5.6 sq.m per day FW 49 Parapet formwork making 1 CARPENTER + 1 HELPER 1.2 sq.m per hour 9.6 sq.m per day FW 50 Parapets formwork fixing 1 CARPENTER + 1 HELPER 1 sq.m per hour 8 sq.m per day FW 51 Parapets formwork stripping 1 HELPER 4 sq.m per hour 32 sq.m per day FW 53 Fixing of lintle formwork 1 CARPENTER + 1 HELPER 0.5 sq.m per hour 4 sq.m per day FW 54 Deshutter lintle formwork 1 HELPER 2 sq.m per hour 16 sq.m per day FW 55 Deck formwork fixing 1 CARPENTER + 1 HELPER 1.5 sq.m per hour 12 sq.m per day FW 56 Deck Formwork deshuttering 1 HELPER 6 sq.m per hour 48 sq.m per day FW 57 Pipe scaffolding erection for slab 1 SCAFFOLDER 0.85 sq.m per hour 6.8 sq.m per day FW 58 inverted beam shutter fixing 1 CARPENTER + 1 HELPER 1 sq.m per hour 8 sq.m per day FW 59 De-Shuttering Manholes, square - circular (Timber) 1 CARPENTER + 1 HELPER 4 sq.m per hour 32 sq.m per day FW 60 Manhole Shutter erection - square or circular(Timber) 1 CARPENTER + 1 HELPER 1.5 sq.m per hour 12 sq.m per day FW 61 Metal Shutter for Manholes 1 CARPENTER + 1 HELPER 1 sq.m per hour 8 sq.m per day FW 62 Metal Shutter for Precast Beams 2 CARPENTERS + 2 HELPERS 3 sq.m per hour 24 sq.m per day FW 63 Metal Shutter for Pile caps 2 CARPENTERS + 2 HELPERS 3 sq.m per hour 24 sq.m per day FW 64 Metal Shutters for Pile cap Beams 2 CARPENTERS + 2 HELPERS 3 sq.m per hour 24 sq.m per day