ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN BIAYA TENAGA BIAYA BAHAN JUMLAH

PEKERJAAN PONDASI
SNI 1 M3 Pancang Ulin 10/10 - 8m (Sambung)
3
6,1 0,0800 m Balok Ulin @ Rp. 6.500.000,00 520.000,00
1,0000 ls Membuat Sambungan @ Rp. 325.000,00 325.000,00
2836-2008 0,5000 org Tukang Kayu @ Rp. 150.000,00 75.000,00
0,0500 org Kepala Tukang Kayu @ Rp. 160.000,00 8.000,00
0,2000 org Pekerja Biasa @ Rp. 135.000,00 27.000,00
0,0100 org Mandor @ Rp. 175.000,00 1.750,00
JUMLAH 111.750,00 845.000,00 956.750,00
PROFIT 10% 11.175,00 84.500,00 95.675,00
SUB TOTAL 122.925,00 929.500,00 1.052.425,00

PEKERJAAN KAYU

SNI 1 m 3 Membuat kuda-kuda kayu

3
1,1000 m Balok Kuda Kuda @ Rp. 5.100.000,00 5.610.000,00
03-3434-2002 15,0000 kg Lemkayu @ Rp. 21.000,00 315.000,00
0,8000 kg Paku Kayu 2" 6" / 57 cm @ Rp. 17.000,00 13.600,00
12,0000 org Pekerja Biasa @ Rp. 135.000,00 1.620.000,00
1,2000 org Kepala Tukang Kayu @ Rp. 160.000,00 192.000,00
4,0000 org Tukang Kayu @ Rp. 150.000,00 600.000,00
0,2000 org Mandor @ Rp. 175.000,00 35.000,00
JUMLAH 2.447.000,00 5.938.600,00 8.385.600,00
PROFIT 10% 244.700,00 593.860,00 838.560,00
SUB TOTAL 2.691.700,00 6.532.460,00 9.224.160,00
3
SNI 1 m Pasang Goording
1,1000 m3 Balok @ Rp. 5.100.000,00 5.610.000,00
0,8000 kg Paku Kayu 2" 6" / 57 cm @ Rp. 17.000,00 13.600,00
12,0000 org Pekerja Biasa @ Rp. 150.000,00 1.800.000,00
1,2000 org Kepala Tukang Kayu @ Rp. 185.000,00 222.000,00
4,0000 org Tukang Kayu @ Rp. 165.000,00 660.000,00
0,2000 org Mandor @ Rp. 210.000,00 42.000,00
JUMLAH 2.724.000,00 5.623.600,00 8.347.600,00
PROFIT 10% 272.400,00 562.360,00 834.760,00
SUB TOTAL 2.996.400,00 6.185.960,00 9.182.360,00

Page 1
NO URAIAN PEKERJAAN BIAYA TENAGA BIAYA BAHAN JUMLAH
2
F.16 1 m Pasang usuk 5/7, reng 2/3
1,1000 m3 Balok Kuda Kuda @ Rp. 5.100.000,00 5.610.000,00
0,1500 kg Paku Reng @ Rp. 19.000,00 2.850,00
0,1000 kg Paku Reng @ Rp. 19.000,00 1.900,00
0,1000 org Pekerja Biasa @ Rp. 150.000,00 15.000,00
0,0100 org Kepala Tukang Kayu @ Rp. 185.000,00 1.850,00
0,1000 org Tukang Kayu @ Rp. 165.000,00 16.500,00
0,0025 org Mandor @ Rp. 210.000,00 525,00
JUMLAH 33.875,00 5.614.750,00 5.648.625,00
PROFIT 10% 3.387,50 561.475,00 564.862,50
SUB TOTAL 37.262,50 6.176.225,00 6.213.487,50

SNI 1 m 3 Pekerjaan Balok kayu Kelas I


6,1 1,1000 m3 Balok @ Rp. 6.500.000,00 7.150.000,00
3434-2008 1,2500 kg Paku 10 cm @ Rp. 23.300,00 29.125,00
1,0000 kg Lem Kayu @ Rp. 37.000,00 37.000,00
7,0000 org Tukang Kayu @ Rp. 165.000,00 1.155.000,00
21,0000 org Pekerja Biasa @ Rp. 150.000,00 3.150.000,00
2,1000 org Kepala Tukang Kayu @ Rp. 185.000,00 388.500,00
0,3500 org Mandor @ Rp. 210.000,00 73.500,00
JUMLAH 4.767.000,00 7.216.125,00 11.983.125,00
PROFIT 10% 476.700,00 721.612,50 1.198.312,50
SUB TOTAL 5.243.700,00 7.937.737,50 13.181.437,50
SNI 1 m 3 Pekerjaan Papan kayu Kelas I
3
6,1 1,1000 m Balok @ Rp. 7.000.000,00 7.700.000,00
3434-2008 1,2500 kg Paku 10 cm @ Rp. 23.300,00 29.125,00
1,0000 kg Lem Kayu @ Rp. 37.000,00 37.000,00
7,0000 org Tukang Kayu @ Rp. 165.000,00 1.155.000,00
21,0000 org Pekerja Biasa @ Rp. 150.000,00 3.150.000,00
2,1000 org Kepala Tukang Kayu @ Rp. 185.000,00 388.500,00
0,3500 org Mandor @ Rp. 210.000,00 73.500,00
JUMLAH 4.767.000,00 7.766.125,00 12.533.125,00
PROFIT 10% 476.700,00 776.612,50 1.253.312,50
SUB TOTAL 5.243.700,00 8.542.737,50 13.786.437,50
SNI 1 m Listplank ukuran (2 x 20) cm, kayu kelas I atau II
6,22 0,0110 m3 Papan Listplank @ Rp. 4.500.000,00 49.500,00
3434-2008 0,0500 kg Paku Kayu 2" 6" / 57 cm @ Rp. 17.000,00 850,00
0,1000 org Tukang Kayu @ Rp. 165.000,00 16.500,00
0,2000 org Pekerja Biasa @ Rp. 150.000,00 30.000,00
0,0200 org Kepala Tukang Kayu @ Rp. 185.000,00 3.700,00
0,0050 org Mandor @ Rp. 210.000,00 1.050,00
JUMLAH 51.250,00 50.350,00 101.600,00
PROFIT 10% 5.125,00 5.035,00 10.160,00
SUB TOTAL 56.375,00 55.385,00 111.760,00

PEKERJAAN ATAP
SNI 1 m Pasang bubung Spandek
6.23 2,1000 lbr Bubungan Atap Spandek @ Rp. 98.000,00 205.800,00
03-3436-2002 6,0000 bh Paku Sekrup @ Rp. 35.000,00 210.000,00
0,1250 org Tukang Kayu @ Rp. 165.000,00 20.625,00
0,0130 org Pekerja Biasa @ Rp. 150.000,00 1.950,00
0,0840 org Kepala Tukang Kayu @ Rp. 185.000,00 15.540,00
0,0040 org Mandor @ Rp. 210.000,00 840,00
JUMLAH 38.955,00 415.800,00 454.755,00
PROFIT 10% 3.895,50 41.580,00 45.475,50
SUB TOTAL 42.850,50 457.380,00 500.230,50
SNI 1 m 2 Pasang atap Spandek
03-3436-2002 1,0200 m2 Atap Spandek @ Rp. 175.000,00 178.500,00
6.32 0,2000 kg Paku Genteng Metal @ Rp. 25.000,00 5.000,00
0,1000 org Tukang Kayu @ Rp. 165.000,00 16.500,00
0,0100 org Pekerja Biasa @ Rp. 150.000,00 1.500,00
0,2000 org Kepala Tukang Kayu @ Rp. 185.000,00 37.000,00
0,0010 org Mandor @ Rp. 210.000,00 210,00
JUMLAH 55.210,00 183.500,00 238.710,00
PROFIT 10% 5.521,00 18.350,00 23.871,00
SUB TOTAL 60.731,00 201.850,00 262.581,00