Actual
SL# Description Unit Price Amount
UOM QTY
transformer 5KVA (
1 Tecnolventure/TS transformer ) Each 3 40,850.00 122,550.00
(SBTGDNB002)
GI electric pole (Supply And
2 Each 1 16,447.50 16,447.50
Installation) (SBTGDNB002)
Wooden board for meter
3 Each 1 236.50 236.50
(SBTGDNB002)
Electric Works_PVC flexible pipe,
4 RM 8 59.13 473.04
38mm dia (SBTGDNB002)
In Words: Two Lac Forty Eight Thousand Sixty Seven Taka And Four Paisa only.
Received
Submitted By By
Managing Director
PURCHASE ORDER FORM
Supplier Name : Purchase Order No : 2101232
PO Date : 19 August, 2021
6 Power Item_Solar Panel System 20 Watt with Battery, 1 Set 8,062.50 8,062.50
Controller, Safety casing for Battery and Controller,
necessary cabling ( SBTGDNB002)
7 Power Connection from REB (12 KW, 440 Volt) ( 1 Set 96,750.00 96,750.00
SBTGDNB002)
Grand Total Amount (Including all related taxes and charges): 249,959
In Word: BDT Two Lac Forty Nine Thousand Nine Hundred and Fifty Nine only.
TERMS & CONDITIONS :
1. GENERAL:
i. All ordered goods shall be delivered and/or rendered by the Supplier strictly as per approved specifications and the entire
work/job must be completed by the Supplier within the delivery date as mentioned in this PO;
ii. Defective works and /or items will be rejected, rejected items must be replaced by the Supplier within the time to be specified
by the Purchaser and for such cases entire cost shall be borne by the Supplier.
2. WORK COMPLETION TIME:
Vendor has to complete the task within the delivery date mentioned in the PO. If vendor fail to maintain SLA or time line STL
9. CONFIRMATION OF ACCEPTANCE:
i. The supplier shall have to confirm the acceptance of this Purchase Order by signing in the specified space of the Purchase
Order;
ii. The accepted copy of the Purchase Order must be sent to Summit Towers Limited through hand delivery.
10. OTHERS:
i) Original PO copy, Received Challan, GRN/Work Completion Certificate and MUSHOK 6.3 must be attached with the Invoice
copy;
ii) Any change in schedule will have to be notified to SCM through a written application referring to this PO;
iii) STL has the right to cancel/withhold PO/Payment without showing any whatsoever reason to the vendor.
Supplier's signature
Site Information
Site Type: GF Tower 42m
Site Modality 42M_3LEG_210 Structure Type Mat Foundation
STL Supervisor
Work Progress
Picture : BTS/Equipment Room Front View Picture : DB Wall (Front view final pic)
Picture :GF Post Pole/RT Power Cable Lesing Picture : STL Power Cabinet Pics
Site ID STL ID CW Start Date CW End Date Civil Vendor
DHK6230 21-05-21 13-06-21 HS Engineering
Site Information
Site Type: GF Tower/Pole Height 42m
Site Modality 42M_3LEG_210 Structure Type Mat Foundation
STL Supervisor
Work Progress
Site Information
Site Type: GF Tower 42M
Site Modality 42M_3LEG_210 Structure Type Mat Foundation
STL Supervisor
Work Progress