0% found this document useful (0 votes)
74 views2 pages

Project Proposal

The document proposes a concrete flooring and additional ceiling project for Pimbalayan Elementary School. It includes a budget allocation of 9,110.35 for materials and labor costs. The project will be monitored by the school's Physical Coordinator and aims to beautify the school, encourage student and community involvement, and increase a sense of community pride.

Uploaded by

ABBIE KAMAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views2 pages

Project Proposal

The document proposes a concrete flooring and additional ceiling project for Pimbalayan Elementary School. It includes a budget allocation of 9,110.35 for materials and labor costs. The project will be monitored by the school's Physical Coordinator and aims to beautify the school, encourage student and community involvement, and increase a sense of community pride.

Uploaded by

ABBIE KAMAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Region XII
Department of Education
Division of Sultan Kudarat
Lambayong III
PIMBALAYAN ELEMENTARY SCHOOL

PROJECT PROPOSAL
I. IDENTIFYING INFORMATION
 Project Title: Concrete Flooring and Additional Ceiling for Covered Walkway
 Budget Allocation:
 Source of Fund: School MOOE

II. RATIONALE
Along with encouraging students to be more involved in their school day and
encourage stakeholders’ participation, beautification teaches students how to be more
respectful of the environment and to clean up after themselves. As the community sees
how well-treated their nearby school is, a sense of pride will begin to consume the
community.
The most visible results of school beautification projects are the changes to the
physical surroundings. Removing graffiti from walls, picking up litter, and fixing or
repairing some destroyed facilities or equipment.

III. Project Description: Concrete Flooring and Additional Ceiling for Covered
Walkway
IV. Budgetary Requirements

ITEM DESCRIPTION TOTAL REMARKS


I MATERIALS COST 7, 341.00
II LABOR COST 2, 569.35
III TOTAL 9, 110.35
I. PROJECT MANAGEMENT
The project will be closely monitored by the school Physical Coordinator who will submit
reports as the status of the project upon the n termination of the work duration.

Prepared by: Noted by: Checked and Validated by:

LOUIE A. APELLIDO ABBIE H. KAMAD ANGELICA A. SULIT


Teacher- III Principal- I Senior Bookkeeper

Checked and Reviewed by

ENGR. VIRGIL GLENN D. VEGO


ENGR III
APPROVED BY:

LEONARDO M. BALALA, CESE


Schools Division Superintendent
Republic of the Philippines
Region XII
Department of Education
Division of Sultan Kudarat
Lambayong III
PIMBALAYAN ELEMENTARY SCHOOL

PROGRAM OF WORKS
Project Title: LANDSCAPING
Budget Allocation: 42, 957.00
Source of Fund: School MOOE
Period Covered: June to September 2022
UNIT COST TOTAL COST

NO DESCRIPTION UNIT QUANTITY MATERIAL LABOR MATERIAL TOTAL


1 Corrugated GI sheets PCS 5 282 493.5 1410 1903.5
2 CHB PCS 70 8 196 560 756
3 Sand PCS 1 1800 630 1800 2430
4 Cement PCS 14 230 1127 3220 4347
5 Roun Bar 9mm pcs 3 117 122.85 351 473.85
6         0 0 0
               
               
TOTAL 2437 2569.35 7341 9910.35

Prepared by: Noted by: Checked and Validated by:

LOUIE A. APELLIDO ABBIE H. KAMAD ANGELICA A. SULIT


Teacher III Book Keeper Senior Bookkeeper

Checked and Reviewed by

ENGR. VIRGIL GLENN D. VEGO


ENGR III

APPROVED BY:

LEONARDO M. BALALA, CESE


Schools Division Superintendent

You might also like