0% found this document useful (0 votes)
67 views4 pages

Testing and Troubleshooting 2

The document contains multiple choice questions about testing and troubleshooting digital circuits. It addresses various troubleshooting steps and techniques, including isolating failures, using logic probes and current tracers to detect shorts and opens, and checking power supplies. Common troubleshooting methods like the half-split method are also discussed. Explanations are provided for each answer selection but no additional context is given.

Uploaded by

Ian Neil Laeno
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views4 pages

Testing and Troubleshooting 2

The document contains multiple choice questions about testing and troubleshooting digital circuits. It addresses various troubleshooting steps and techniques, including isolating failures, using logic probes and current tracers to detect shorts and opens, and checking power supplies. Common troubleshooting methods like the half-split method are also discussed. Explanations are provided for each answer selection but no additional context is given.

Uploaded by

Ian Neil Laeno
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Testing and Troubleshooting 2

1. The three basic steps for fixing a failure are ISOLATE, DIAGNOSE, and REPAIR.
A. True

B. False
Answer: Option B
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

2. An internal logic gate that shorts to either +VCC or ground will cause the inputs or output to be
stuck either LOW or FLOATING.
A. True

B. False
Answer: Option B
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

3. A noise problem in a digital circuit is often called a glitch.


A. True

B. False
Answer: Option A
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

4. The time interval between the start of two consecutive pulses is called pulse repetition time.
A. True

B. False
Answer: Option B
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

1. "Train" and "single" is the mode selection for a _______.


A. multimeter

B. logic probe

C. current tracer
D. logic pulser
Answer: Option D
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

2. The use of a logic probe may be improved through the use of a(n) ________.
A. logic clip

B. frequency counter

C. oscilloscope

D. current tracer
Answer: Option A
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

3. The control of digital circuits is usually achieved with _________.


A. random pulses

B. clock signals

C. sophisticated gating

D. selected frequencies
Answer: Option B
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

4. In order for a logic probe to operate, its red and black leads must first be connected to a
________.
A. logic clip

B. HIGH or TRUE signal

C. power source

D. logic pulser
Answer: Option C
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report
5. The ideal test equipment to use for locating shorts in digital circuitry is the ________ and
_______.
A. logic probe, clip

B. logic pulser, logic probe

C. current tracer, logic pulser

D. current tracer, logic clip


Answer: Option C
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

6. The results of internal IC failures will usually be noticed during the ______ phase of
troubleshooting.
A. diagnostic

B. isolation

C. repair

D. final test
Answer: Option A
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

7. Erratic or unexplained digital circuit activity is often due to _________.


A. a glitch

B. a random pulse

C. clock frequency changes

D. a change in slew rate


Answer: Option C
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

8. The device that would best aid in open track detection is a(n) ________.
A. multimeter

B. current tracer

C. logic probe
D. oscilloscope
Answer: Option B
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report

9. A check of all power supply voltages should be made during the ________ method of
troubleshooting.
A. half-split

B. diagnosis

C. repair

D. final test
Answer: Option A
Explanation:
No answer description available for this question. Let us discuss.
View Answer Discuss in Forum Workspace Report