Happy Elevators India PVT LTD: Sub: Elevator Quotation
Happy Elevators India PVT LTD: Sub: Elevator Quotation
Happy Elevators India PVT LTD: Sub: Elevator Quotation
We thank you for your valued inquiry referred above and based on the details,
we are pleased to submit our offer for the subject elevator, and further to add,
we hereby furnish the details for your perusal.
Our Company
HAPPY Elevators was established in the year 2003 and supported by 100
dedicated employees catering to the 2000 elevators installed in undivided
Andhra Pradesh. We are happy to say our customers are satisfied with the
quality of our product and service comfort extended to them for more than a
decade. Our key success is our capability to make custom-built vertical
transport systems.
2
INDEX
1. Technical Specification
2. Price Schedule
3. Execution Schedule
5. Scope of work
3
1 TECHNICAL SPECIFICATION-A
The detailed specification of the
proposed HAPPY Elevator is here below
Price Schedule.
The price schedule for design, Supply, Installation and testing of the subject
Elevator is here below:
Machinery: Gearless
Controler: Hp Mount.
Doors: Auto doors SS
Buttons: Touch buttons.
Safety features: Emergency Alarm,
Emergency Door
opening lockset.
Power backup: Emergency power
backup system.
Payment Terms
60% of the contract value along with 100 taxes against readiness of materials
before dispatch.
Note:
GST on supply of goods has been considered @18% being the rate
prevailing on the date of this quotation. However, if there is any
amendment or variation in the rates, the same shall be payable by
you as applicable, in addition to the prices stated herein.
EXECUTION SCHEDULE
Execution of the contract starts from the day of technical and commercial
clearance (terms of payment) as agreed.Theentirescheduleof12weeks is
divided here below.
Engineering:-we require 1week for the following (NOTE:-FROM THE DATE OF LIFT
SHAFT IS READY WITHPLASTING).
Delivery at the site: -we require 1 week for delivery and unloaded at site.
1. SCOPE OF WORK
Allpreparatorybuildingworksuchaselevatorshaftwithenclosureproperly
plastered and whitewashed during erection, waterproof dry and clean
elevator pit.
7
Light point in the elevator shaft opposite each landing and in the pit.
EntranceArchitraveorelevatorfacedecorationatallfloorlandings,allpainting job
except of elevator material.
230VSinglephase, 5A.Socketnearcontrolboardand415Vthreephase50HZA.C.power
supply with suitable switch fuseun it and earth leakage circuit breaker (ELCB) of
required capacity as per GAD within 5 meters of each elevator controller for testing
and commissioning and at ground floor for Erection/Installation, Timely provision of
permanent supplies for testing purposes.Effective double earthing from a separate
earth pitexclusively for elevators . Lighting arrestor and other electrical protective
devicthe es necessary to meet the local requirement. (Shaft lightening should be
independent the of main switch provided fthe or controlboard).electric wiring
between the client's main meter board to the client's main switchboard near
thecontroller.
A safe dry, lockable storage space with sufficient lighting and two numbers
three-pin plug points, of a minimum of 50 sq meters per elevator near the elevator
shaft on the ground or basement floor, shall be made available during the entire
installation period for storage of the material at the site.
Dryandcleanmachineroomwithprovisionofcrossventilationandexhaustfa
n, sufficient machine room lighting, a lockable door, provision of rain
protection guard on doors and windows, a direct approach from
terrace to machine room by stairs or rigid ladder with handrails and
fall protection rails, and Load hook of capacity specified in GAD above
the machine location.
8
All electrical wirings &earthling for the lighting & other electrical
fittings in the elevator shaft shall be carried from your end and the
same is excluded from the Happy’s scope of the work
Accepted
Date:- Date:-