Event Management System
Event Management System
Project Proposal
BY
What is the research question or the problem domain or hypothesis that is being addressed?
Ans: The project deliverables/ my Project outcomes are valuable for events because they
help create deliverables to meet their purpose and goal and taking data measurements and
comparing them to your initial outcome goals at the start of the project also to the
creation and improvement of huge scope occasions like celebrations, meetings, services,
formal gatherings, events, or shows.
2. Background
Why is the problem significant?
Ans: The problems that I want to solve in my project are that event including shows, speakers,
and other event activities as well as connection among participants and sponsors in truly
imaginative and genuine ways. Then I prioritize networking activities in an event and backup
plan for bad weather is also done in my project. Furthermore, to manage crowds in events.
Objectives
4. Methodology
a) Problem domain investigation
● Series of interview
● Comparison of system
● Literature review
● Speed
● Reliability
● Usability
● Scalability
d) System testing
System testing will be done using Black box testing and White box testing throughout
project i.e., Event management system.
e) Ethical Considerations
The ethical aspect for event management calls for thinking in dealing with all stakeholders
as well as kindness, tolerance, fortitude, compassion, justice, endurance, and politeness.
f) Legal Considerations
5. Implementation
How do you intend to implement it?
6. Testing/ Evaluation
I intend to evaluate the outcomes by following testing
8. Resource Requirements
● No
● Apache sever
● SQL for database
9. References, Information Sources that Provide a Context for the Project
Thomas, O., Hermes, B. and Loos, P. (1970) Towards a reference process model
for event https://link.springer.com/chapter/10.1007/978-3-540-78238-4_45
(Accessed: November 9, 2022).
Appendix 1
Gantt Chart Of Project