PENETRANT EXAMINATION REPORT
Owner : PT. PERTAMINA PATRA NIAGA Contractor : PT. Indoteknik Tjandra Utama Report No. : DPT-GIT/ITU/III/2023 - 001
Project : PERBAIKAN TANKI TIMBUN NO. 08 KAP 5000 KL Procedure No. : GIT-PT-API650-01 Date : 27 March 2023
Subject : JALUR PIPA AIR Aplicable CODE : API 650 Drawing No :
Material Spec. : GLV ASTM A53 Welding Process : SMAW
Penetrant Type / Method : X Visible X Solvent Removable Other
Brand's Name / Type : Magnaflux Penetrant : SKL-SP2 Cleaner : SKC-S Developer : SKD-S2
Method Pre-Cleaning : X Solvent Spray Drying After Cleaning : 5 Minutes
Penetrant Application : X Brush X Spray Dwell Time : 10 Minutes Temperature : Ambient
Light Intensity : Min. 100 fc Light Source : Natural light
Method Removing Excess Penetrant : Wiping with dry clean cloth
Drying After Remove Penetrant : 2 Minutes Developer App. : Spray Developing Time : 10 Minutes
Batch No. : Penetrant : 190612 Cleaner : 190601 Developer : 190603
Surface Preparation : X As awelded Machining Grinding Others
Time of Examination : X After Welding After Hydro-Test After PWHT Others
Scope of Examination : Base Metal Edge Preparation Back Chipping
X Weld Part Repair Weld Others
Diameter Thickness Result Type of
No. Part Name Joint No. Remarks
( Inch ) ( Sch) Accepted Rejected Discontinuities
JT. 02 4" 40 Accepted - No indication
JT. 03 4" 40 Accepted - No indication
JT. 04 4" 40 Accepted - No indication
JT. 05 4" 40 Accepted - No indication
JT. 06 4" 40 Accepted - No indication
JALUR
JT. 07 4" 40 Accepted - No indication
PIPA AIR Ø 4"
JT. 08 4" 40 Accepted - No indication
JT. 09 4" 40 Accepted - No indication
JT. 10 4" 40 Accepted - No indication
TOTAL 9
Sketch ( Identify discontinuities listed above ) if necessary
Examined by, Reviewed / Witnessed by, Witnessed/Approved by :
PT. Gintam Inspeksi Tehnik PT. Indoteknik Tjandra Utama PT. Pertamina Patra Niaga FT Sibolga
Name : Vrengky Tampubolon Name : M. Safaat Ridho Name :
Position : MT/PT Level II Position : Site Manager Position : Fuel Terminal Manager
PT. GINTAM INSPEKSI TEHNIK
NDT Service Solution Cert No. IDN 08
PENETRANT EXAMINATION REPORT
Owner : PT. PERTAMINA PATRA NIAGA Contractor : PT. Indoteknik Tjandra Utama Report No. : DPT-GIT/ITU/III/2023 - 002
Project : PERBAIKAN TANKI TIMBUN NO. O8 KAP 5000 KL Procedure No. : GIT-PT-API650-01 Date : 27 March 2023
Subject : JALUR PIPA AIR Aplicable CODE : API 650 Drawing No :
Material Spec. : GLV ASTM A53 Welding Process : SMAW
Penetrant Type / Method : X Visible X Solvent Removable Other
Brand's Name / Type : Magnaflux Penetrant : SKL-SP2 Cleaner : SKC-S Developer : SKD-S2
Method Pre-Cleaning : X Solvent Spray Drying After Cleaning : 5 Minutes
Penetrant Application : X Brush X Spray Dwell Time : 10 Minutes Temperature : Ambient
Light Intensity : Min. 100 fc Light Source : Natural light
Method Removing Excess Penetrant : Wiping with dry clean cloth
Drying After Remove Penetrant : 2 Minutes Developer App. : Spray Developing Time : 10 Minutes
Batch No. : Penetrant : 190612 Cleaner : 190601 Developer : 190603
Surface Preparation : X As awelded Machining Grinding Others
Time of Examination : X After Welding After Hydro-Test After PWHT Others
Scope of Examination : Base Metal Edge Preparation Back Chipping
X Weld Part Repair Weld Others
Diameter Thickness Result Type of
No. Part Name Joint No. Remarks
( Inch ) ( Sch) Accepted Rejected Discontinuities
JT. 11 4" 40 Accepted - No indication
JT. 13 4" 40 Accepted - No indication
JT. 14 4" 40 Accepted - No indication
JT. 15 4" 40 Accepted - No indication
JT. 16 4" 40 Accepted - No indication
JALUR
JT. 17 4" 40 Accepted - No indication
PIPA AIR Ø 4"
JT. 18 4" 40 Accepted - No indication
TOTAL 7
Sketch ( Identify discontinuities listed above ) if necessary
Examined by, Reviewed / Witnessed by, Witnessed/Approved by :
PT. Gintam Inspeksi Tehnik PT. Indoteknik Tjandra Utama PT. Pertamina Patra Niaga FT Sibolga
Name : Vrengky Tampubolon Name : M. Safaat Ridho Name :
Position : MT/PT Level II Position : Site Manager Position : Fuel Terminal Manager
PT. GINTAM INSPEKSI TEHNIK
NDT Service Solution Cert No. IDN 08
DYE PENETRANT DOCUMENTATION
Owner : PT. PERTAMINA PATRA NIAGA Contractor : PT. Indoteknik Tjandra Utama Drawing No. :
Project : Perbaikan Tanki Timbun No. 08 Kap 5000 KL Location : Fuel Terminal Sibolga Date : 27 Maret 2023
Subject : JALUR PIPA AIR Aplicable CODE : API 650 Remarks : PIPA AIR Ø 4"
PT. GINTAM INSPEKSI TEHNIK
NDT Service Solution Cert No. IDN 08
DYE PENETRANT DOCUMENTATION
Owner : PT. PERTAMINA PATRA NIAGA Contractor : PT. Indoteknik Tjandra Utama Drawing No. :
Project : Perbaikan Tanki Timbun No. 08 Kap 5000 KL Location : Fuel Terminal Sibolga Date : 28 Maret 2023
Subject : Shell to Bottom Plate Annular Aplicable CODE : API 650 Remarks : SHELL TO ANNULAR