Data2Unified: Modernization of Comfort Panels
Data2Unified: Modernization of Comfort Panels
https://support.industry.siemens.com/cs/ww/en/view/109770510
WinCC Unified
Data2Unified Add-In
Customer Benefits:
• No double efforts
• Reduced converting time
Page 2
WinCC Unified
Data2Unified Add-In Target and motivation
➢ Converting most of the mass data (Tags, Alarms, Logs,…) from existing project into Unified.
Page 3
WinCC Unified Data2Unified
Add-in
Data2Unified Description
Page 4
WinCC Unified
Data2Unified Add-In User Interface
Page 5
WinCC Unified
Data2Unified Preparation
The existing Comfort Panel project (in the TIA Portal) needs to be
prepared in order to achieve an optimal result of the conversion with the
tools. The necessary steps for this preparation are the following points:
7.- Cycles
Page 9
WinCC Unified - Panel Modernization @ SITRAIN access
Curriculum with 3 courses
The differences, but also the similarities between Comfort Panels and Unified Comfort Panels will
be considered.
Get one month unlimited access to the curriculum and over 200 other web-based trainings on SITRAIN access:
1. View the WinCC Unified - Panel Modernization (Curriculum) on SITRAIN access.
2. Click on the login button in the top right corner.
3. Use your Online Support or iMall credentials to login (or register for a new account)
4. Type in the code „Unified_Modernization_Trial“ and click „Submit“
1 2
4
3
Preparation Demo
LIVE DEMO
Demo project
5. Preparation of faceplates
6. User management
7. Cycles
TP900 TP1200 MTP1000
LIVE DEMO
Demo project