Liability
BRCGS1 publishes information and expresses opinions in good faith, but accepts no liability for any error or omission
in any such information or opinion, including any information or opinion contained in this publication.
Whilst BRCGS has endeavoured to ensure that the information in this publication is accurate, it shall not be liable
for any damages (including without limitation damages for pure economic loss or loss of business or loss of profits
or depletion of goodwill or otherwise in each case, whether direct, indirect or consequential) or any claims for
consequential compensation whatsoever (howsoever caused) arising in contract, tort (including negligence or breach
of statutory duty), misrepresentation, restitution or otherwise, in connection with this publication or any information
contained in it, or from any action or decision taken as a result of reading this publication or any such information.
All warranties, conditions and other terms implied by statute or common law are, to the fullest extent permitted by
law, excluded.
Nothing excludes or limits the liability of BRCGS for death or personal injury caused by its negligence, for fraud
or fraudulent misrepresentation or for any matter which it would be illegal for it to exclude or attempt to exclude
liability for.
The Global Standard for Storage and Distribution Issue 4 and the terms of the disclaimer set out above shall be
construed in accordance with English law and shall be subject to the non-exclusive jurisdiction of the English
Courts.
Copyright
© BRCGS 2020
All rights reserved. No part of this publication may be transmitted or reproduced in any form (including
photocopying or storage in any medium by electronic means) without the written permission of the copyright owner.
Application for permission should be addressed to the Commercial Director of Global Standards at the British Retail
Consortium (contact details below). Full acknowledgement of the author and source must be given.
The contents of this publication cannot be reproduced for the purposes of training or any other commercial activity.
No part of this publication may be translated without the written permission of the copyright owner.
Warning: Any unauthorised act in relation to a copyright work may result in both a civil claim for damages and
criminal prosecution.
BRCGS
Second Floor
7 Harp Lane
London EC3R 6DP
1
BRCGS is a trading name of BRC Trading Ltd.
2 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Contents
Part I – Outline of the Standard
Welcome to Issue
What’s new for Issue ?
Principles of the Standard
Benefits of using the Standard
The certification process
Scope of the Standard
Effective date of Issue
Acknowledgements: a ‘thank you’ from BRCGS
Part II – Requirements
How the requirements are set out
Position statements
Exclusion of requirements
Senior management commitment
Hazard and risk analysis
Product safety and quality management system
Site and building standards
Vehicle operating standards
Facility management
Good operating practices
Personnel
Handling of open food products
Wholesale module
Wholesale requirements
Cross-docking module
Cross-docking requirements
E-commerce module
E-commerce requirements
Contracted services modules
Contractual arrangements (all services)
Product inspection
Contract packing (repacking, assembly packing)
Quantity control inspection
Contract chilling/freezing/tempering/defrosting and high-pressure process operations
Contract cleaning of baskets, roll cages and other distribution containers
Waste recovery and recycling
brcgs.com 3
STORAGE AND DISTRIBUTION
ISSUE 4
Appendices
Appendix Other global standards by BRCGS
Appendix Registration, qualifications, training and experience requirements for auditors
Appendix Certificate template
Appendix Products included within the scope of the Standard
Appendix Cross-docking annex to the main site certification
Appendix Glossary of terms
Appendix Acknowledgements
4 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part II Requirements
Details the requirements of the Standard with which a company and site must comply in order to gain certification.
Appendices
Appendices 1–7 provide additional useful information including details of other BRCGS standards, competency
requirements for auditors, a certificate template, a list of products included within the scope of the Standard, a cross-
docking annex, a glossary of terms, and a list of acknowledgements.
brcgs.com 5
STORAGE AND DISTRIBUTION
ISSUE 4
6 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Part I
Outline of the Standard
Welcome to Issue 4
Part II
What’s new for Issue 4?
Announced audit programme (with mandatory in
unannounced)
Blended audit
Colour-coding of requirements
New additional modules (included within the
Standard)
Part III
Quality management system and suitable operating
conditions
Part I
Outline of the Standard
Welcome to Issue 4
Welcome to the fourth issue of the Global Standard for Storage and Distribution (henceforward referred to as the
Standard).
In 2006 BRCGS introduced the Global Standard for Storage and Distribution to complement the suite of global
standards covering the production of food, packaging and consumer products. This Standard allows the chain of
product certification to be completed, from primary processor to manufacturer, and from manufacturer to retailer
(or food service company in the case of food) or the final consumer (for e-commerce). In response to demand, the
Standard has been translated into many languages to facilitate implementation of the Standard across the world.
The Standard is designed to reflect best practice and facilitate a process of continual improvement through well-
designed risk-based product safety management systems. The objective is to ensure that the quality and safety
of products are maintained during their storage and distribution (and where subject to other activities such as
wholesale, contracted services, etc.), and that customer confidence is upheld through audit and certification.
In many countries the storage and distribution of products, in particular food products, is controlled through
legislation. This Standard is based on best practice and is not intended to replace the requirement of any legislation
that requires a higher standard for a specific industry sector. In countries where the principles of due diligence apply,
certification to the Standard may provide part of a due diligence defence.
Certification to this Standard should give customers confidence in the site; however, the decision to use a particular
supplier rests with the individual customer.
Issue 4 has been developed by a multi-stakeholder group including retailers, food service companies, industry trade
associations, independent experts and certification bodies, and builds upon the experience of the previous issue. In
revising the Standard, BRCGS has attempted to develop the requirements to ensure that they are robust enough to
meet current industry needs. Where applicable, the requirements have been aligned with those that feature in the
other BRCGS standards to ensure consistency and confidence throughout the entire supply chain.
• including industry best practice by encouraging the development of a product safety culture
• ensuring global applicability and benchmarking to the Global Food Safety Initiative (GFSI)
• increasing emphasis on continual improvement by enhancing root cause analysis and internal audit requirements
• adding clarity to the requirements for open food product-handling operations
• reflecting the changing role of the logistics sector, as seen in the growth of e-commerce and the diversification of
operational activities (e.g. cross-docking, automation including robotics)
• incorporating position statements and learnings from the previous issue.
8 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
The requirements of Issue 4 represent an evolution from previous issues with a continued emphasis on management
commitment, a product safety programme based on hazard and risk analysis (HARA) or hazard analysis and critical
control point (HACCP) principles, and a supportive quality management system.
Part II
implementation of a product safety culture. To echo this in the supply chain, the GFSI benchmark introduced the
requirement for all certificated sites to have at least one mandatory unannounced audit every 3 years, regardless of
whether they selected announced or unannounced audit options (i.e. following the initial announced audit, the site
must have at least one unannounced audit in the next 2 years, with subsequent unannounced audits occurring at
least once every 3 years). See Table 3 in Part III for worked examples of this programme.
Blended audit
With the evolving role of technology in the supply chain, auditing activity is adapting to incorporate remote
assessment elements into the process with the overall aim of evaluating evidence objectively to determine
the extent to which the audit criteria are being fulfilled. Introduction of the blended audit option provides an
opportunity for sites to engage with the auditor using ICT (information and communication technology). ICT is used
for gathering, storing, retrieving, processing, analysing and transmitting information. This option is only available for
the announced audit programmes and includes an off-site remote assessment followed by an on-site audit. The
significance of this audit option resides in its ability to offer flexibility in achieving the audit outcome by using ICT
Part III
to conduct a document and record review, tour of the premises (where required), and presentation of findings.
Colour-coding of requirements
Product-handling processes represent the key activities on site. The requirements in Part II have been colour-coded
in this issue to distinguish those activities that would be audited as part of the assessment of the facilities, and those
that would form part of an audit of records, systems and documentation.
Part IV
Principles of the Standard
A business must have a full understanding of the products handled, stored and distributed, and have systems in
place to identify and control hazards significant to the safety, quality and legality of the products. The requirements
of the Standard in Part II are divided into nine sections, with sections 1–3 setting out the key principles of the
Standard, and the later sections focusing on the more specific requirements of particular aspects of the operation.
The starting point for effective implementation of the Standard is the commitment of senior management to the
development of an all-encompassing policy to guide the activities which collectively ensure that products are
stored and distributed in a way that maintains their quality, safety and legality.
brcgs.com 9
STORAGE AND DISTRIBUTION
ISSUE 4
A risk-based system
The Standard requires an evaluation of the risks to the products during their handling, storage and distribution. The
hazard and risk analysis process defined in the Standard should enable potential risks to be identified and controlled
either through existing programmes such as pest control (prerequisite programmes) or by the introduction of
specific controls. An effective hazard and risk analysis provides the basis for the management system.
• The Standard is internationally recognised, providing a report and certification that can be accepted by customers
in place of their own audits – reducing time and cost.
• The comprehensive scope of the Standard, covering areas of quality, hygiene and product safety, provides a
benchmark for best practice in the storage and distribution industries.
• When effectively adopted, the Standard can reduce damage, waste and therefore costs to the business.
• The accredited audit provides greater credibility and recognition when certification is achieved.
• Certificated sites may appear in the BRCGS Directory (open to the public) providing recognition of their
achievements and the use of a logo for marketing purposes.
• The Standard addresses part of the ‘due diligence’ requirements of both the certificated company and the
customers using its service.
• Ongoing surveillance and follow-up corrective actions after an audit help to ensure that a self-improving quality,
hygiene and product safety system is established.
The audits and certificates are site-specific, so companies with a number of sites would need separate certification
for each site. The Standard is a process and product certification programme in which businesses are certificated
upon completion of a satisfactory audit by an auditor employed by an independent third party – the certification
body.
In order for a business to receive a valid certificate on completion of a satisfactory audit, the organisation must
select a certification body approved by BRCGS. BRCGS lays down detailed requirements that a certification body
must satisfy in order to gain approval, as well as specific requirements for auditors with regard to auditing expertise
and product sector knowledge.
More information about the certification process and certification bodies is given in Parts III and IV. A list of
certification bodies approved by BRCGS is available on the BRCGS Directory website: brcgsdirectory.com.
10 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
The Standard may be applied where the company requesting certification has legal title to the products and where
legal title is held by a third party. These products may be branded, private label or unbranded.
The Standard does not cover other important requirements applicable to the operation of a storage or distribution
business – for example, health and safety, environmental concerns or ethical issues.
Part II
Scope of applicable company operations
The Standard sets out requirements for companies primarily providing storage and distribution of products. Where
a company provides one of the services covered by the specified additional voluntary modules (sections 10–19) at a
storage or distribution site, this may be included within the scope of its audit and certification process. The purpose
of the Standard is to provide a certification scheme that ensures the quality and safety of products during their
storage and distribution. To be eligible for the scheme, the company must be able to demonstrate that it directly
manages and thereby controls those aspects of the Standard which are being assessed.
The storage and distribution operations to which the Standard may be applied can be at any point in the distribution
chain from primary production to retail, subject to the restrictions on the scope of applicable products. For example,
this could include distribution from:
• farm to processor
• primary processor to manufacturer
Part III
• manufacturer to off-site warehousing
• warehousing to retail depots
• retail depots to store
• store to final consumer (internet shopping).
Note that distribution networks, such as couriers, postal distribution services and pallet networks or less-than-load
type operations, are not included within the scope of this Standard except in section 12 (e-commerce) where these
operations can be used to complete the final mile delivery.
Additionally, it is common for companies involved in both storage and distribution to employ some subcontracted
storage sites or hauliers to supplement their own operations at periods of peak demand; these operations can be
covered under the scope of the certification of the subcontracted companies, given that they meet the stated criteria
in the Standard (Part II, section 3.5.2).
The following situations will be acceptable for certification; however, where eligibility of a company is unclear Part IV
because of unusual circumstances, this should be checked with the BRCGS team before progressing to audit.
Storage
Where the storage facilities are owned, leased or subcontracted from a third party and all of the following apply:
• the staff and quality systems are directly managed by the certificated company
• the company is able to control the condition of the buildings (e.g. ensure upkeep of the fabric)
• the company is able to control building services to ensure that they remain within the requirements of the
Standard (e.g. provision of pest control).
Distribution
The distribution of products may be by road, rail, air freight or ship. It is envisaged, however, that transport other
Appendices
than by road will usually involve the transportation of sealed (and, where necessary, environmentally controlled)
containers. The management of the distribution of the containers would be specified in contracts between the
owner of the container and the shipper. The shipper in such cases would not be included within the scope of this
Standard.
brcgs.com 11
STORAGE AND DISTRIBUTION
ISSUE 4
• some or all the distribution vehicles are directly managed by the site
• the vehicles used are leased by the company and the servicing and repairs are under the management control of
the company
• the distribution vehicles and staff are provided by a third party under contract, but the company can demonstrate
that the management of the vehicles and staff is under its direct control. Note that this differs from a
subcontracting arrangement where a third party provides the service under contract (e.g. vehicles and staff), but
the direct management of the service is controlled by the subcontractor.
Please note that where the loading and/or unloading of vehicles is carried out by the customer and not by the
distribution company, these activities will be outside the scope of the audit. In such circumstances the scope shall
include the wording ‘transport only’ instead of ‘distribution’ and the exclusions from scope shall include the loading/
unloading of vehicles.
Where a company provides one of the specified contracted services modules (except section 11 – cross-docking)
and decides to exclude these activities from its scope of certification, this would become a stated exclusion on its
certificate and report; however, this action would not impact its ability to use BRCGS logos.
Food
Only permitted food products shall be received into storage and released into distribution without any further
preparation, sorting or processing. Where such additional operations take place, the facility shall be certificated using
the Global Standard for Food Safety.
A permitted exception to this rule is where the main activity of the site is storage and distribution, and this includes
a small amount of order-picking from trays of fruit and vegetables to smaller quantities to fulfil customer orders (e.g.
for food service customers) without any further preparation (including cutting or trimming) or processing.
Packaging materials
These include pre-packed and bulk packaging materials for later conversion to food and non-food use. Where any
conversion or other operation that changes the nature of the incoming packaging materials is undertaken, the facility
shall be audited against the Global Standard for Packaging Materials.
12 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Consumer products
These include pre-packed products manufactured for the consumer market (e.g. general merchandise, personal care
and household) to be sold by retail, or similar products supplied to the food service industry.
The Standard applies only to packaged products. ‘Packaged’ in the context of consumer products is intended to
include packaged individual items, bound or shrink-wrapped palletised materials, and items packed in bulk bags as
Part II
used, for example, for building materials.
• operations where any form of process is undertaken on open food products (such facilities shall be audited to the
Global Standard Food Safety)
• operations where any form of process is undertaken to convert or change the nature of the incoming packaging
materials (such facilities shall be audited to the Global Standard for Packaging Materials)
• operations where consumer product items that are not in themselves packaged for consumer sale are assembled
to produce the final consumer product (such facilities shall be audited using the Global Standard for Consumer
Products)
• operations where a company only has an office location that carries out service functions (e.g. product inspection
or import processes) and does not have a physical storage location for its products (such facilities shall be audited
Part III
against the Global Standard for Agents and Brokers).
Exclusions from food products include live animals (except crustaceans prepared for placing on the market for
human consumption).
brcgs.com 13
STORAGE AND DISTRIBUTION
ISSUE 4
14 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Part II
Requirements
How the requirements are set out 4 Site and building standards
Part II
Colour-coding of requirements . Location, perimeter and grounds
. Site security and product defence
. Layout, product flow and segregation – product
Position statements intake, handling, storage and dispatch areas
. Fabrication – product intake, handling, storage
Exclusion of requirements and dispatch areas
. Staff facilities
Non-applicable clauses
Risk-based exclusions
5 Vehicle operating standards
1 Senior management . Vehicle standards
. Vehicle and load security
commitment . Vehicle management
Part III
. Senior management commitment and continual . Vehicle temperature controls
improvement
. Management review
. Organisational structure, responsibility and
6 Facility management
management authority . Equipment
. Maintenance
. Calibration and control of measuring and
2 Hazard and risk analysis monitoring devices
. Housekeeping and hygiene
. Waste and waste disposal
3 Product safety and quality . Pest management
management system
. General documentation requirements
. Internal audits
. Corrective and preventive action Part IV
. Customer contractual arrangements
. Purchasing
. Traceability
. Management of product withdrawal and product
recall
. Incident management and business continuity
. Control of non-conforming product, damages
and returns
. Complaints handling
Appendices
7 Good operating practices E-commerce module
. Receipt of goods
. Product handling
. Environment control
12 E-commerce requirements
. Physical and chemical product contamination . Senior management commitment
risk . Customer contractual agreement
. Stock rotation . Traceability and mass balance
. Product release . Product handling and returns
. Management of allergens . Packaging system performance – testing and
validation
. Use of the distribution network for final mile
8 Personnel deliveries only
. Training and competency
. Personal hygiene
Contracted services modules
9 Handling of open food products
. Hazard and risk analysis
13 Contractual arrangements (all
. Staff facilities services)
. Fabrication – product intake, handling, storage
and dispatch areas
. Maintenance 14 Product inspection
. Housekeeping and hygiene
. Protective clothing
15 Contract packing (repacking,
Wholesale module assembly packing)
Part I
Part II
Requirements
How the requirements are set out
Part II
In Part II, each clause of the Standard begins with a statement of intent with which all sites must comply in order to
gain certification.
Below this statement of intent the requirements are set out in a tabular format, specifying the criteria against which
the audit will be carried out.
The requirements in sections 1–8 shall be applied to all operations. Any site that handles open food products
(limited to those food products listed in Part I, scope of applicable products) shall meet the requirements in section
9. Where companies undertake wholesaling, e-commerce, cross-docking or contracted services, the requirements for
these activities (sections 10–19) shall be included in addition to the requirements outlined in sections 1–9.
Colour-coding of requirements
Product-handling processes represent the key activities on site. The audit process therefore gives specific emphasis
to the practical implementation of product safety procedures on-site and general good storage and distribution
Part III
practices. Auditing these areas forms a significant proportion of the audit. As an aid to this process, the requirements
within the Standard have been colour-coded. Colour-coding shows the activities that would usually be audited
as part of the assessment of the facilities, and those that would form part of an audit of records, systems and
documentation.
Position statements
During the lifetime of a published standard, the BRCGS technical advisory committees may be asked to either review
the wording of a clause or provide an interpretation of a requirement or rule.
The decision made by the technical advisory committee is known as a position statement. Position statements
are binding on the way that the audit and certification process is carried out and are seen as an extension to the
Standard.
Position statements are notified to sites and certification bodies through regular newsletters and are posted on the
Appendices
brcgs.com 17
STORAGE AND DISTRIBUTION
ISSUE 4
Exclusion of requirements
Non-applicable clauses
The majority of the requirements of the Standard will apply to both storage and distribution operations and all the
requirements shall be reviewed for applicability, even where the company operates only storage or only distribution.
Distribution companies should be aware that some ‘storage’ requirements become applicable wherever a
distributor temporarily removes product from one vehicle and transfers it to another (e.g. during trans-shipment or
consolidation of loads).
Wherever a storage facility subcontracts the distribution of the products, the contract and checks of vehicles may
include some or all of the vehicle-specific requirements.
There are, however, some clauses which apply specifically to distribution operations and some which are specific
to storage facilities that are not applicable to the site being audited. Where both storage and distribution are not
included within the scope of the site’s activities, these specific requirements may be excluded and will be marked as
not applicable (N/A) in the final audit report. The auditor will assess and decide on the applicability of any clauses
which the site believes are not applicable.
It is anticipated that most clauses will be applicable to all operations; however, some clauses may not be applicable,
and these are signified by the following codes:
X Not applicable to the products handled (e.g. clauses concerning temperature controls)
Risk-based exclusions
The requirements have been written to reflect requirements of the highest product risk categories (e.g. chilled foods)
and some may not be appropriate when lower-risk non-food items are stored or distributed. On the basis of risk,
some requirements may be excluded; however, in each case a documented risk assessment must be provided for the
auditor to evaluate.
The final audit report will include comments on any clauses deemed not applicable or excluded on the basis of risk.
18 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
1 Senior management commitment
1.1 Senior management commitment and continual improvement
The company’s senior management shall demonstrate that they are fully committed to the implementation of
Part II
the requirements of the Global Standard for Storage and Distribution. This shall include provision of adequate
resources, effective communication, systems of review, and actions taken to identify and effect opportunities for
improvement.
Clause Requirements
1.1.1 The company’s senior management shall develop and document a quality policy statement
which states the company’s intentions for the safe and legal storage and/or distribution of
products and its responsibility to its customers. This statement shall be:
• authorised
• reviewed
• signed and dated by an appropriate senior manager
• effectively communicated throughout the company.
Part III
1.1.2 The site’s senior management shall define and maintain a clear plan for the development
and continuing improvement of a product safety and quality culture. This shall include:
• defined activities involving all sections of the site that have an impact on product safety.
As a minimum, these activities shall be designed around:
• communication
• training
• feedback from employees
• performance measurement on product safety related activities
• an action plan indicating how the activities will be undertaken and measured, and the
intended timescales
• a review of the effectiveness of completed activities.
1.1.3 The company’s senior management shall provide the human and financial resources required
to implement the requirements of this Standard and effect improvements identified through Part IV
management review processes.
1.1.4 The company’s senior management shall ensure that objectives are established for the
storage and/or distribution of products to maintain product safety, quality and legality in
accordance with the company’s quality policy and this Standard. The objectives shall be:
• documented and include targets or clear measures of success
• clearly communicated to relevant staff and each operating location
• monitored, and the results reported at least quarterly to the company’s and site’s senior
management.
1.1.5 Employees shall be aware of the need to report any evidence of product safety, legality,
Appendices
quality or integrity issues to a designated manager to enable the resolution of those issues
requiring immediate action. This shall include suggestions for improvement.
brcgs.com 19
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
1.1.6 The company shall have a confidential reporting system to enable staff to report concerns
relating to product safety, legality, quality and integrity.
The mechanism for reporting concerns must be clearly communicated to staff.
The company’s senior management shall have a process for assessing any concerns raised.
Records of the assessment and, where appropriate, actions taken, shall be documented.
1.1.7 The company shall have a current, original hard copy or electronic version of the Standard
available and be aware of any changes to the Standard or protocol that are published on the
BRCGS website.
1.1.8 The most senior operations manager on site shall attend the opening and closing meetings
of the audit for the Standard. Relevant departmental managers or their deputies shall be
available as required during the audit. Where central management systems are operated for
multi-site operations, a manager with responsibility for the management system shall be
available during audits of hub and satellite operations.
1.1.9 Where required by legislation, the company and operating locations shall be registered with
X (or approved by) the appropriate authority, and evidence of this shall be available.
1.1.10 Where the site is certificated to the Standard, it shall ensure that announced recertification
audits occur on or before the audit due date indicated on the certificate.
1.1.11 The site’s senior management shall ensure that the root causes of any non-conformities
against the Standard identified at the previous audit have been effectively addressed to
prevent recurrence.
1.1.12 The BRCGS logo and references to certification status shall be used only in accordance with
the conditions of use detailed in the audit protocol (Part III, section 6.6).
The site’s senior management shall ensure that a management review is undertaken to ensure that the product
safety and quality management system is both fully implemented and effective, and that opportunities for
improvement are identified.
Clause Requirements
1.2.1 Management review meetings attended by the company’s or site’s senior management shall
be undertaken at appropriate scheduled intervals, as a minimum annually, to review the site’s
performance against the Standard and the objectives set out in clause 1.1.4.
20 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
1.2.2 The review process shall include, but is not limited to, the evaluation of:
• previous management review documents, action plans and timeframes
• the results of internal audits, including any prerequisite programmes
Part II
• the results of second- and third-party audits
• any customer performance indicators and feedback
• the underlying reasons for any objectives that have not been met. This information shall
be used when setting future objectives and to facilitate continual improvement
• feedback from a review of the effectiveness of the HARA or HACCP system, product
safety and quality culture plan, product fraud vulnerability or authenticity plan, product
defence plan and site security risk assessments, where applicable
• any complaints, incidents, product rejection/returns, wastage and resultant corrective and
preventive action plans, and non-conforming materials
• any resource requirements
• the impact of any applicable legislative and certification scheme changes.
1.2.3 The meeting shall be documented and used to revise the objectives. The decisions and
actions agreed within the review process shall be effectively communicated to appropriate
Part III
staff, and actions implemented within agreed timescales. Records shall be updated to show
when actions have been completed.
1.2.4 The site shall have a demonstrable operational meeting programme that enables product
safety, legality, quality and integrity issues to be brought to the attention of senior
management. These meetings shall occur at least monthly.
The company shall have an organisational structure that clearly ensures the definition and documentation of the
job functions, responsibilities and reporting relationships of staff whose activities affect product safety, legality
and quality.
Part IV
Clause Requirements
1.3.1 The company shall have an up-to-date organisational chart demonstrating the management
structure of the company.
This shall, where appropriate, include the responsibilities for any associated hub or satellite
depots and any responsibilities carried out by a head office.
1.3.2 The senior management of the company shall ensure that all employees are aware of their
responsibilities and that mechanisms are in place to monitor the effectiveness of their
operation.
1.3.3 The senior management of the company shall ensure that levels of responsibility and
Appendices
accountability are clearly defined for key staff involved with product safety, legality and
quality systems. To this end, job descriptions shall be available. There shall be appropriate
documented arrangements in place to cover for the absence of key staff.
brcgs.com 21
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
1.3.4 The senior management of the company shall have a system in place to ensure that it is
kept informed of all relevant legislation, product safety issues, scientific and technical
developments, and industry codes of practice. There shall be a system in place to ensure that
relevant information is passed to the management at other locations, where appropriate.
22 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
2 Hazard and risk analysis
The site’s product safety plan shall be based on the principles of hazard and risk analysis (HARA) or the Codex
Alimentarius General Principles of Food Hygiene; the plan shall be documented, systematic, comprehensive,
fully implemented and maintained, and meet the relevant legislative requirements. In the food industry, these
principles are commonly known as HACCP (hazard analysis and critical control points).
Part II
Clause Requirements
2.1 Prerequisite programmes
Prior to conducting a hazard analysis, the company shall ensure that any prerequisites are
in place. The control measures and monitoring procedures for the prerequisite programmes
must be clearly documented and included within the development and reviews of the
HARA or HACCP plan. Where applicable, product safety prerequisites or handling
requirements shall include, but not be limited to:
• the condition and maintenance of buildings, equipment and transport vehicles as
appropriate
• documented practices for the safe handling, storage and transport of products
Part III
• procedures for handling damages, waste product and returns
• procedures related to the allergen management plan
• pest management procedures
• the approval of services or subcontractors
• sanitation procedures (cleaning and disinfection)
• maintenance of the cold chain (not applicable to ambient stable products) and controlled
environment (e.g. humidity, modified air)
• personal hygiene standards (limited applicability to pre-packed food products or
consumer products)
• training
• any other activities covered by the additional voluntary modules.
brcgs.com 23
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
2.4 Team members shall ensure that the HARA or HACCP study is based on comprehensive
information sources, which are referenced and available on request. As a guide, these may
include the following, although this is not an exhaustive list:
• historical, known and foreseeable product safety hazards associated with specific
processes and products
• known likely product defects that affect safety, legality, quality and integrity
• relevant codes of practice or recognised guidelines (where applicable)
• customer requirements
• legislative requirements.
2.5 Where the HARA or HACCP study has been undertaken centrally, the site shall be able
X to demonstrate that the study has been verified to meet the specific activities of the local
operation to which the study applies, including any additional voluntary modules.
2.6 The HARA or HACCP plan and resulting procedures shall have senior management
commitment, and shall be implemented through the site’s documented management
systems.
2.7 Scope
The scope of the HARA or HACCP plan shall be clearly defined and documented, and shall
cover all products/product categories and processes included within the intended scope
of certification. Consideration must also be given to the activities that are bespoke to the
additional voluntary modules.
The scope shall include:
• a description of the types of products stored or distributed, subcontracted activities, and
any particular specified storage or handling conditions (e.g. temperature control, fragility,
maximum stacking height, propensity to water damage, conditions of light)
• the product flow from receipt, storage and dispatch, including transport to the recipient of
the product, as applicable. The flow shall detail any intermediate storage steps which may
be used in the distribution, and any back-haul or returns activities.
24 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
2.9 Hazard analysis and risk assessment
The HARA or HACCP team shall identify and record all potential hazards associated
with each step of the product flow as identified in clause 2.8. The company shall include
Part II
consideration of the following types of hazard:
• microbiological growth resulting from temperature abuse of products that require
temperature control
• physical contamination (e.g. glass contamination from broken lights, wood splinters from
pallets, dust, splashing during transfer, pests)
• chemical contamination (e.g. product tainting, spillage, cleaning chemicals)
• physical damage (e.g. breakage, puncturing of packaging, water damage)
• allergenic risks (e.g. cross-contamination of loose product or outer packaging by allergenic
products)
• malicious contamination of products
• hazards mandated by the customer or relevant regulatory authorities
• hazards associated with activities covered by the additional voluntary module.
2.10 The HARA or HACCP team shall complete a documented analysis of the potential hazards
Part III
in order to identify those which need to be controlled. The following shall be considered:
• the likely occurrence of the hazard, as established by previous company/industry
experience
• the severity of the hazard (e.g. injurious to health, potential to cause food-poisoning,
rejection or a product recall)
• existing prerequisite programmes that effectively prevent or reduce the hazard to
acceptable limits.
• documentation concerning all procedures and records appropriate to these principles and
their application.
brcgs.com 25
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
2.13 Control by prerequisites and documentation
Where the control of hazards is by means of prerequisite programmes, these shall be fully
implemented and be demonstrably effective in controlling or reducing the hazard.
2.14 Review
The HARA or HACCP plan and prerequisite programmes shall be reviewed whenever new
product types that have different characteristics from the products included within the
original study are stored or transported, or where new operations/process steps (including
additional voluntary modules) are introduced that may affect product safety. This review
shall be documented by the HARA or HACCP team at least annually.
26 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
3 Product safety and quality management system
3.1 General documentation requirements
Part II
The company shall document procedures and processes to demonstrate compliance with the Standard, facilitate
training, and support due diligence. It shall ensure that all documents necessary to demonstrate the effective
operation and control of the processes underpinning this compliance are in place.
Clause Requirements
3.1.1.1 The site’s documented policies, procedures, working methods and practices shall be collated
in the form of a printed or electronic quality manual which is readily accessible.
Where the site is part of a company governed by a head office, the interaction between the
site’s system and that of other sites and the head office shall be documented. All policies
and procedures necessary for the operation of the site must be readily available to relevant
staff at the site.
Part III
3.1.2 Documentation control
The company’s senior management shall ensure that all documents, records and data critical to the management
of product safety, legality and quality are in place and effectively controlled.
Clause Requirements
3.1.2.1 The company shall have a procedure to manage documents which form part of the product
safety and quality management system. This shall include a list of all controlled documents
indicating the latest version number, and the method for the identification and authorisation
of controlled documents.
Where documents are stored in electronic form, these shall be stored securely (e.g. with
authorised access, control of amendments, or password-protected) and backed up to prevent Part IV
loss.
3.1.2.2 Documents shall be clearly legible, unambiguous, in appropriate languages and sufficiently
detailed to enable their correct application by appropriate personnel. They shall be readily
accessible to relevant staff at all times.
3.1.2.3 There shall be a record of the reason for any changes or amendments to documents critical
to product safety, legality or quality systems and procedures.
3.1.2.4 Changes to documents shall be effectively notified to document users. A procedure shall be
in place to ensure obsolete documentation is rescinded and, if appropriate, replaced with a
revised version.
Appendices
brcgs.com 27
STORAGE AND DISTRIBUTION
ISSUE 4
The company shall maintain records to demonstrate the effective control of product safety, legality and quality.
Clause Requirements
3.1.3.1 The records shall be legible and genuine, and retained in good condition for an appropriate
defined time period. The record retention time period shall reflect product shelf life and any
specific customer or legal requirements, but shall never be less than 1 year.
3.1.3.2 The company shall operate procedures for the alteration, collation, maintenance, storage and
retrieval of all relevant records. Justification for alterations shall be recorded.
Where records are in electronic form, these shall be:
• suitably backed up to prevent loss
• stored securely (e.g. with authorised access, control of amendments, or password-
protected).
The company shall audit those systems and procedures that are critical to product safety, legality and quality to
ensure they are appropriate and complied with.
Clause Requirements
3.2.1 There shall be a scheduled programme of internal audits.
As a minimum, the programme shall include at least two different audit dates spread
throughout the year. The frequency at which each activity is audited shall be established
in relation to the risks associated with the activity and previous audit performance. All
activities and locations included within the scope of certification shall be covered at least
once each year.
As a minimum, the scope of the internal audit programme shall include the:
• HARA or HACCP plan
• prerequisite programmes
• procedures implemented to achieve the Standard and any additional voluntary modules.
3.2.2 Internal audits shall be carried out by appropriately trained, competent auditors, who shall
not audit their own work or those areas where they have direct influence on the operation
being audited.
3.2.3 Records of internal audits shall be maintained to ensure that conformity, as well as non-
conformity, can be clearly identified, and include objective evidence of the findings.
3.2.4 Results of the internal audit and positive and negative comments shall be brought to the
attention of the personnel responsible for the activity audited. Corrective actions and
timescales for their implementation shall be agreed. Root cause analysis shall be used to
determine preventive actions where appropriate, and their completion verified.
28 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
3.2.5 In addition to the internal audit programme, there shall be a separate programme of
documented inspections to ensure that the site environment and equipment are maintained
in a suitable condition. The frequency of these inspections shall be based on risk, but no
less than once every 3 months. As a minimum, these inspections shall include:
Part II
• hygiene inspections to assess cleaning and housekeeping performance
• inspections to identify risks to the product from the building or equipment.
The company’s senior management shall ensure that procedures exist to record, investigate, analyse and correct
the cause of failure to meet standards, specifications and procedures which are critical to product safety, legality
and quality.
Clause Requirements
Part III
3.3.1 An appropriate staff member shall be identified and allocated the responsibility and
accountability for each corrective action. This shall be documented.
3.3.2 The company shall ensure that effective actions are taken to correct each non-conformity
and shall monitor and record their completion within an appropriate timescale.
Where a non-conformity places the safety, legality or quality of products at risk, this shall be
investigated and recorded including:
• clear documentation of the non-conformity
• assessment of the consequences by a suitably competent and authorised person
• the action to be taken to address the immediate issue
• an appropriate timescale for correction
• the person responsible for correction
• verification that the correction has been implemented and is effective.
Part IV
3.3.3 The site shall have a procedure for the completion of corrective actions and root cause
analysis to determine preventive actions (where appropriate). As a minimum, root cause
analysis shall be used to implement ongoing improvements and to prevent recurrence of
non-conformities in the event of:
• an analysis of non-conformities for trends which shows that there has been a significant
increase in a type of non-conformity
• a non-conformity which places the safety, legality, quality or integrity of a product at risk
(including withdrawals and recalls).
Appendices
brcgs.com 29
STORAGE AND DISTRIBUTION
ISSUE 4
The company’s senior management shall ensure that processes are in place to determine their customers’ needs
and expectations, clearly define their requirements and ensure that these requirements are fulfilled.
Clause Requirements
3.4.1 Customer requirements for the storage and/or distribution of their product shall have been
agreed with the customer and documented prior to fulfilment. This shall include any specific
handling requirements for the products, e.g. temperature, humidity, light conditions, stack
height or compatibility requirements. This may be in the form of a company-issued service
specification where no customer-issued specification exists.
3.4.2 The company shall have the ability to meet defined customer requirements without
compromising product safety, legality and quality.
3.4.3 Where specified by the customer, a review of customer needs and requirements shall be
undertaken. Any changes to existing agreements or contracts shall be agreed, documented
and communicated to appropriate personnel.
3.4.4 There shall be key performance indicators established relating to customer requirements,
performance shall be measured, and results communicated to relevant staff.
3.5 Purchasing
The company shall control all its purchasing processes that are critical to product safety, legality and quality to
ensure that services procured conform to defined requirements.
3.5.1 Supplier approval and performance monitoring of service providers and equipment suppliers
Clause Requirements
3.5.1.1 There shall be a documented procedure for the approval and monitoring of suppliers of
services and equipment. Such services, as appropriate, shall include (but not be limited to):
• pest control
• laundry services
• contracted cleaning (both storage and vehicles)
• contracted servicing and maintenance of equipment
• equipment providers (e.g. of racking, pallets)
• use of consultants.
The approval and monitoring process shall be risk-based and take into consideration
compliance with any specific legal requirements or potential risks to the security of products
(i.e. risks identified in the product fraud vulnerability and defence assessments).
30 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
3.5.1.2 Specifications or contracts shall exist between the company and the supplier to define the
service provided and ensure that potential product safety risks associated with the service
have been addressed. They shall include key data to meet customer and legal requirements
and assist the site in the safe handling of the product. Where specifications are not formally
Part II
agreed, the company shall be able to demonstrate that it has taken steps to put a formal
agreement in place.
3.5.1.3 Specification or contract review shall be sufficiently frequent to ensure that data is current
or as a minimum every 3 years, taking into account product changes, suppliers, regulations
and other risks. Reviews and changes shall be documented.
3.5.1.4 The performance of the supplier shall be monitored, and action taken where services fail to
meet requirements.
Where activities covered by the scope of the Standard are subcontracted to a third party (e.g. distribution), the
Part III
subcontractor shall be required to work in accordance with the relevant requirements of the Standard and the
relevant legislation.
Clause Requirements
3.5.2.1 A contract or written agreement shall exist with all subcontractors, which shall, on the basis
X of risk and any specified customer contracts, define requirements for the safe handling,
storage and transport of products (e.g. temperature range, special handling requirements,
product security, segregation of incompatible products, vehicle type).
3.5.2.2 There shall be a documented process for the review and acceptance of a subcontractor who
X could potentially impact product safety, legality, quality and integrity.
The approval and monitoring procedure shall be based on risk and include either one or a
combination of:
Part IV
• a valid certification to the applicable BRCGS or GFSI-benchmarked standard. The scope
of the certification shall include the products/product categories or process steps being
subcontracted or
• an audit, with a scope to include product safety, traceability, HARA or HACCP review
and good product-handling practices, undertaken by an experienced and demonstrably
competent product safety auditor. Where the subcontractor audit is completed by a
second or third party, the company shall be able to:
• demonstrate the competency of the auditor
• confirm that the scope of the audit includes product safety, traceability, HARA or
HACCP review, and good product-handling practices
• obtain and review a copy of the full audit report or
Appendices
• where a valid risk-based justification is provided and the subcontractor is assessed as low
risk only, a completed questionnaire may be used for approval. The questionnaire shall
have a scope that includes product safety, traceability, HARA or HACCP review, and good
product-handling practices, and it shall have been reviewed at least once every 3 years and
verified by a demonstrably competent person.
brcgs.com 31
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
3.5.2.3 There shall be a documented risk-based process for the ongoing review of subcontractor
X performance, with defined performance criteria. The process shall be fully implemented,
reviewed annually, and records of the review shall be kept.
3.5.2.4 A register of suitable approved subcontractors shall be maintained, which shall include
X subcontractors required irregularly (e.g. to meet peak seasonal demand, breakdown cover).
The list or relevant components of the register shall be readily available to the appropriate
staff.
3.5.2.5 There shall be a documented procedure to define how exceptions to the subcontractor
X approval process in clause 3.5.2.2 are handled (e.g. where subcontractors are prescribed by a
customer or where information for effective approval is not available).
Where a site handles customer-branded product, the customer shall be made aware of any
relevant exceptions.
3.5.2.6 Where a site subcontracts the distribution of products, the requirements of section 5
X shall be included within the subcontracted arrangements for each distribution company.
There shall be a documented procedure for the site to verify that the activities critical to
product safety have been implemented correctly by the subcontractor, or the subcontracted
company shall be certificated to the Standard or similar GFSI-recognised scheme.
The company shall ensure that systems are in place to minimise the risk of storing and/or distributing fraudulent
or adulterated products.
Clause Requirements
3.5.3.1 The company shall develop a documented fraud vulnerability assessment plan to establish
levels of confidence in the customers for whom the company stores and/or distributes
products to reduce the risk of handling fraudulent products; the plan shall be fully
implemented. The plan may consider:
• historical trading relationships
• the nature of the products with regard to the risk of fraud
• the need for a new customer approval process (e.g. trading history, financial security,
customer profile).
3.5.3.2 Where a high risk of fraudulent product handling is identified, the fraud vulnerability
assessment plan shall include appropriate processes to mitigate the identified risks.
3.5.3.3 The fraud vulnerability assessment plan shall be kept under review to reflect any changing
circumstances that may alter the potential risks. It shall be formally reviewed annually.
32 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
3.6 Traceability
The site shall have a system of traceability with the ability to trace products through receipt, storage, dispatch and,
where applicable, distribution, and vice versa.
Clause Requirements
Part II
3.6.1 The site shall have adequate procedures to ensure products and/or pallets are labelled and/
or coded to allow product identification and traceability at all times.
As a minimum, these shall include:
• a description of how the traceability system works, including a summary of the documents
and records that capture product identification and traceability information, and the link
between them
• the documents that should be referenced during a traceability test
• a procedure for ensuring that records are maintained.
3.6.2 Inventory records for vehicles shall enable products to be tracked from loading to delivery,
including the tracking of trailers/vehicles.
Part III
3.6.3 Procedures shall ensure traceability of damaged packs and of products returned to stock or
disposal.
3.6.4 The system shall be tested at a predetermined frequency, at least annually, to ensure that
traceability can be determined, including consignor details, through the warehouse/store
and/or distribution to the final consignee and vice versa, including any quantity check and
mass balance exercises. The test shall include subcontracted storage and/or distribution
where appropriate. The results shall be retained for inspection. Full traceability should be
achievable in 4 hours.
Part IV
Appendices
brcgs.com 33
STORAGE AND DISTRIBUTION
ISSUE 4
The company shall have effective documented procedures to facilitate product withdrawals and product recalls.
Clause Requirements
3.7.1 The company shall have a documented product withdrawal and recall procedure. This shall
include, as a minimum:
• identification of key personnel who constitute the withdrawal and recall management
team, with clearly identified responsibilities
• guidelines for deciding whether a product needs to be withdrawn and/or recalled and
which records need to be maintained
• an up-to-date list of key contacts (including out-of-hours contact details) or reference
to the location of such a list (e.g. withdrawal and recall management team, suppliers,
customers, certification body, regulatory authority)
• a communication plan, including the provision of information to customers, consumers
and regulatory authorities in a timely manner, as appropriate
• a plan to handle the logistics of product traceability, recovery or disposal of affected
product, and stock reconciliation
• a plan to record timings of key activities
• a plan to conduct root cause analysis and implement ongoing improvements to avoid
recurrence.
3.7.2 The company shall ensure that systems are in place to formally notify the owner/
manufacturer of products where evidence of a product quality or safety issue becomes
apparent during the storage or distribution of their product, and to agree what action should
be taken. Documented evidence of the formal notification and agreed actions must be
retained.
3.7.3 The procedures relating to product withdrawal and product recall shall be appropriate,
formalised and capable of being operated at any time, and will take into account all stages
of stock requisition including disposal (see section 3.9). The procedures shall be regularly
reviewed and, if necessary, revised to ensure that they are current.
3.7.4 The product recall and withdrawal procedures shall be tested at least annually to ensure
their effective operation. All records supporting the recall data and results of the test shall
be retained.
The company shall have procedures in place to identify and effectively manage incidents, including contingency
planning to enable business continuity in the case of major incidents which may affect the operation.
Clause Requirements
3.8.1 The company shall provide written guidance to relevant staff regarding the type of event
that would constitute an incident, and a documented incident-reporting procedure shall be
in place.
34 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
3.8.2 Procedures shall exist to ensure that product put at risk by an incident is held pending
further investigation.
3.8.3 The owner of the product shall be informed when an incident occurs that may put the safety
Part II
or quality of their product at risk.
3.8.4 The company shall develop contingency planning for business continuity in the event of
major incidents such as:
• disruption to key services (e.g. water, energy, staff availability)
• events such as flood, fire and natural disaster
• malicious contamination or sabotage
• failure of, or attacks against, digital cyber-security.
Part III
• an up-to-date list of key contacts (including out-of-hours contact details) or reference
to the location of such a list (e.g. deputies, emergency services, suppliers, customers,
certification body, regulatory authority)
• alternative arrangements to fulfil customer expectations
• a communication plan, including the provision of information in a timely manner to
customers, consumers and, where appropriate, regulatory authorities.
3.8.6 In the event of a significant product safety incident or regulatory product safety non-
conformity (e.g. a regulatory enforcement notice), the certification body issuing the current
certificate for the site against the Standard shall be informed within 3 working days.
The site shall have documented procedures to ensure that all non-conforming product is clearly identifiable, Part IV
effectively quarantined to prevent release, and issues investigated.
Clause Requirements
3.9.1 There shall be procedures for managing non-conforming products. These procedures shall
include:
• the requirement for staff to identify and report a potentially non-conforming product
• clear identification of a non-conforming product (e.g. direct labelling or the use of IT
systems)
• secure storage to prevent accidental release (e.g. physical or computer-based isolation)
• defined responsibilities for decision-making on the use or disposal of products
Appendices
3.9.2 Where products are held pending further investigation, they shall be held in such a way as to
minimise any further deterioration or prevent contamination of other products.
brcgs.com 35
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
3.9.3 All non-conforming products shall be handled or disposed of according to the nature of the
problem and/or the specific requirements of the owner. Records shall be maintained.
3.9.4 The site shall have a defined policy for customer returns and rejections.
3.9.5 Where returns are accepted, procedures shall define, on the basis of risk, the disposition
X of returned stock (i.e. disposal, return to good stock or collection by the product owner).
Records shall be retained.
The company shall have a system for the management of complaints and complaint investigation regarding
products and/or services provided.
Clause Requirements
3.10.1 All complaints shall be recorded, adequately assessed and investigated where required. The
results of any investigations shall be documented where sufficient information is available.
Actions appropriate to the seriousness and frequency of the problems identified shall be
carried out promptly and effectively, and records shall be retained.
3.10.2 Complaint data shall be analysed to identify significant trends. Where there has been an
increase or repetition of a complaint type, root cause analysis shall be used to implement
ongoing improvements to activities affecting product safety, legality, quality and integrity to
avoid recurrence. The trend analysis shall be made available to relevant staff.
3.10.3 A system shall be in place to notify the product manufacturer, supplier or owner of the
complaint about their products where the cause of the complaint does not relate to the
activities of the site.
36 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
4 Site and building standards
4.1 Location, perimeter and grounds
The site shall be located and maintained so as to provide protection and prevent hazard to products. Safety,
Part II
legality and quality of products shall not be compromised.
Clause Requirements
4.1.1 Consideration shall be given to local activities and the environment which may have a
XR potentially adverse impact on products, and measures shall be taken to prevent product
contamination. Where measures have been put into place to protect the site from any
potential contaminants, these shall be regularly reviewed to ensure they continue to be
effective.
4.1.2 All grounds within the site shall be finished and maintained to an appropriate standard.
Where grass and other planted areas are located near buildings, they shall be regularly
tended and maintained.
Part III
4.1.3 The building fabric shall be maintained to minimise the potential for pest entry (e.g. sealing
gaps around pipes). A clean and unobstructed area shall be in place along external walls of
buildings used for the storage of products.
4.1.4 Sites shall be adequately drained. Where natural drainage is inadequate, additional drainage
shall be installed.
4.1.5 Where undertaken, external storage shall be minimised, and items protected from
X contamination and deterioration.
4.2.2 Access to the site by employees, contractors and visitors shall be controlled and a visitor
Appendices
brcgs.com 37
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
4.2.3 The company shall have documented site security procedures. Staff shall be trained in the
site security procedures and encouraged to question or report unidentified or unknown
visitors.
4.2.4 Contractors and visitors, including drivers, shall be made aware of all procedures for access
to premises and the requirements of the areas they are visiting, with special reference to
hazards and potential product contamination. Contractors working in product storage areas
shall be the responsibility of a nominated person.
4.3 Layout, product flow and segregation – product intake, handling, storage and dispatch areas
The design and layout of the premises shall provide a working environment that prevents the risk of product
damage and facilitates product safety, legality, quality and integrity.
Clause Requirements
4.3.1 There shall be a current map or plan of the whole site (including internal and external
storage areas, and yard) which defines:
• access points for personnel
• travel routes for personnel and product
• staff facilities
• routes for the removal of waste
• process flows
• storage areas (ambient, chilled and frozen areas)
• chemical-handling areas (e.g. battery storage areas).
4.3.2 Premises shall allow sufficient working space to enable all operations to be carried out
XD properly under safe hygienic conditions and prevent the risk of product damage.
4.3.3 Adequate segregated storage facilities shall be available to enable incompatible products
to be effectively segregated, where required, to minimise the risk of taint or cross-
contamination.
4.3.4 The positioning of machinery, equipment, site facilities and services, where provided, shall
XD not jeopardise the integrity of the product, and shall prevent product contamination and
damage.
4.3.5 Suitable and sufficient extraction methods shall be provided in areas where fumes may build
XD up (e.g. battery-charging areas). These areas shall also be segregated from product storage
areas.
4.3.6 Appropriate storage facilities shall be provided for the control and storage of cleaning and
maintenance chemicals, and sited so they shall not compromise the safety, legality, quality
and integrity of the product.
4.3.7 Cleaning facilities (e.g. for tray-washing) shall, where appropriate, be adequately segregated
X from product handling and storage.
38 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
4.3.8 Where products are susceptible to weather damage, vehicles shall be loaded and unloaded
in covered bays so as to protect the product, or other effective measures shall be put in
place.
Part II
4.3.9 Temporary structures constructed during building work or refurbishment shall be designed
and located to avoid pest harbourage, and ensure the safety and integrity of products.
Construction and maintenance of product-handling and storage facilities shall be commensurate with the
activities being undertaken by the site and shall not have a detrimental effect on product.
Clause Requirements
4.4.1 Walls, floors, ceilings and pipe work shall be maintained in good condition and shall be
XD capable of being kept clean.
Part III
4.4.2 Floors shall be designed to meet the demands of the operation and, where appropriate,
XD withstand cleaning materials and methods. They shall be impervious and maintained in good
repair.
4.4.3 Where there is a need for drainage, it shall be designed and maintained to minimise risk of
XD product damage or contamination, and not compromise product safety, quality, legality or
integrity.
4.4.4 All water supplies used for cleaning or in connection with any operation in the storage of
XD products (including hand-washing) shall be potable at the point of use or pose no risk of
contamination according to applicable legislation. The water shall be either drawn from
mains supply or suitably treated according to its source.
4.4.5 Building voids shall be accessible for inspection and, where appropriate, cleaning. Part IV
XD
4.4.6 Adequate lighting shall be provided for all work areas. Suitable and sufficient lighting shall
X be provided so as to permit effective inspection of product and effective cleaning.
4.4.7 All bulbs and strip lights that are vulnerable to breakage, including those on electric fly killer
XD units, shall be protected by shatterproof plastic diffusers, sleeve covers or a shatterproof
protective coating. Where full protection cannot be provided, the glass-management system
shall take this into account.
4.4.8 Where there is a risk of contamination from glass window breakage, glass windows shall be
XD protected against breakage or the product shall be adequately protected.
Appendices
brcgs.com 39
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
4.4.9 Buildings shall be suitably proofed against the entry of all pests. This shall include, as
XD appropriate:
• the screening of windows that are designed to be open for ventilation
• the provision of external doors that are close-fitting or adequately proofed
• where external doors to storage areas are kept open due to the design of the building or
operational requirements, the site shall adopt suitable precautions to prevent pest ingress
when these doors are in use (and be closed when not in use)
• the fitting of screens and traps to drains to prevent pest entry
• the protection of canopies from bird roosting and nesting.
4.4.10 The condition of the building fabric shall be monitored through documented audits. Repairs
XD and improvements identified shall be scheduled.
Staff facilities shall be sufficient to accommodate the required number of personnel, and designed and operated
to minimise the risk of product contamination. Such facilities shall be maintained in good and clean condition and
meet any applicable legal requirements.
Clause Requirements
4.5.1 All toilets shall be provided with hand-washing facilities comprising:
• basins with soap and water at a suitable temperature
• adequate hand-drying facilities
• hand-wash signs.
4.5.2 Suitable and sufficient hand-cleaning facilities based on risk shall be provided and easily
X accessible to staff and, where applicable, vehicle drivers. Hand-washing shall be performed
at an appropriate frequency to minimise the risk of product contamination.
4.5.3 Facilities shall be provided for the safe storage of personal items so that such items are not
XD taken into storage areas.
4.5.4 The position of catering facilities, including vending machines where provided, shall not
X jeopardise the safety, legality and quality of the product.
40 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
5 Vehicle operating standards
5.1 Vehicle standards
All vehicles used for the transportation of product shall be suitable for the purpose, maintained in good repair
Part II
and in hygienic condition.
Clause Requirements
5.1.1 The load-carrying area shall be free from loose items, damaged panels or projections which
could present a risk of damage to products.
5.1.2 The load-carrying area shall be maintained in a suitable condition to prevent the ingress of
rain or dampness during transport where the product is vulnerable to weather damage.
5.1.3 The load-carrying area shall be maintained in a condition which facilitates ease of cleaning.
5.1.4 The load-carrying area shall be inspected prior to loading to ensure it is fit for purpose. This
shall ensure that (as a minimum):
Part III
• it is in a clean condition
• the walls, ceiling and floor are in a good condition, with no exposed insulation
• the door seal is intact
• there is no evidence of pests or pest activity
• the drain holes (if present) are clean and designed to prevent pest entry
• the polar/strip curtains (if present) are clean and intact
• the internal lights (if present) are intact
• it is free from strong odours which may cause taint to products
• it is free from excess humidity which may cause growth of moulds.
Records of inspections shall be retained.
5.1.5 Load supports, lashing points, load lock strips and fastenings shall be maintained in good
XS condition and adequate in number to allow loads to be stabilised effectively during
transport. Fastenings for curtain-sided vehicles shall be in good condition and secure. Part IV
5.1.6 Rear door shutters and tail lifts (where fitted) shall be in good working order.
XS
5.1.7 Where vehicles are equipped with transfer hoses and pumps for the loading or unloading
X of tankers, these shall be in good condition, with the hoses capped and securely contained
during transport. Any associated product filters shall be maintained in good condition.
5.1.8 Where bulk tankers are used for transporting food or other vulnerable products, the
X company shall ensure compliance with relevant safety, legislative and scheme-specific
requirements. Records of the vehicle load history and cleaning interventions shall be
maintained and available to customers as required.
Appendices
brcgs.com 41
STORAGE AND DISTRIBUTION
ISSUE 4
Procedures shall be in place to ensure product/load is held under secure conditions during transport and, where
appropriate, during loading and unloading to prevent theft or malicious contamination.
Clause Requirements
5.2.1 A documented risk assessment (threat assessment) shall be undertaken to identify any
XS potential risks (both internal and external) to the security of the load during transportation,
when using drop-offs, or accepting returns on the same vehicle. Appropriate controls shall
be implemented to reduce the risks.
The threat assessment shall be reviewed at an appropriate frequency or, as a minimum,
annually. It shall also be reviewed whenever:
• a new risk emerges (e.g. a new threat is publicised or identified)
• an incident occurs, where product security or product defence is implicated.
5.2.3 Procedures for maintaining the security of the vehicle shall be documented and understood
XS by drivers and delivery staff.
5.2.4 The company shall have procedures for the transport of products, which shall include
X (where appropriate):
• the types of products that will be handled, including returns
• exceptions, including any restrictions on mixed loads and waste handling
• segregation controls to avoid cross-contamination, mixing of sorts, or taint.
This information shall be available and understood by the driver.
5.2.5 Where vehicle load areas are fully enclosed, doors shall be locked when vehicles have been
XS loaded. Where seals are used, these shall be checked for integrity before unloading.
5.2.6 Where locks or seals are not fitted to vehicles, alternative security arrangements shall be
XS employed, in accordance with risk, together with inspection procedures. The system shall be
sufficient to ensure that if access to the load-carrying area of the vehicle has occurred, this
would be evident, and action taken to ensure the safety of the products.
5.2.7 Procedures shall be in place for mitigating any potential risk to product safety if there is
evidence of an incident (either before or at the point of loading/unloading). These shall
include details of:
• appropriate controls to ensure the correct reporting of incidents both internally and
externally (to the customer and relevant authorities)
• how to manage any contamination risk to products.
42 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
5.3 Vehicle management
The management of vehicles shall be organised to ensure that legal requirements are met and that there is
minimal risk of disruption to the service provided.
Clause Requirements
Part II
5.3.1 Procedures shall be in place to ensure that road vehicles are maintained in a roadworthy
XS condition to reduce the risk of vehicle breakdown and consequent failure to meet customer
requirements.
5.3.2 Where legally required, vehicle operators shall be registered with the appropriate authority.
X
5.3.3 Procedures shall be in place in the case of vehicle breakdown, accident or incident. The
XS procedures shall ensure that product safety, legality and quality are maintained and shall
include:
• clear instructions and emergency contact numbers for the drivers
• instructions on how to preserve any specific temperature or other environmental controls
Part III
appropriate to the load
• checks required to be made and recorded on the load before continuing the journey.
Where environmental control of product (e.g. temperature or controlled atmosphere) is critical to product safety,
legality, quality and integrity, the operating limits shall be clearly specified and adequately controlled, monitored
and recorded.
Clause Requirements
5.4.1 The company shall have a system of validation and ongoing verification in place for the
X vehicle and equipment employed (within the vehicles) to demonstrate that they are
Part IV
capable of consistently maintaining specified product temperature requirements in all
weather conditions, including the warmest and coolest months. The company shall take into
consideration:
• the effect of maximum and minimum loads
• the risks during loading and unloading operations, including those at delivery points.
5.4.2 Automatic temperature and time-recording equipment shall be used to monitor and record
X the temperature of the load-carrying area to ensure that the product temperature remains
within specification throughout the journey. Where a real-time temperature monitoring
system is used, temperature records shall be readily accessible.
In the absence of such equipment, manual checks shall be carried out and recorded at an
appropriate frequency that allows for intervention before product temperatures exceed the
Appendices
defined limits for the safety, legality, quality or integrity of products. Records of inspections
shall be maintained.
brcgs.com 43
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
5.4.3 Where settings can be adjusted, measures shall be in place to verify the temperature
X settings of vehicles prior to loading and dispatch. Vehicles transporting chilled and frozen
products shall be at a suitable temperature before loading, or the required air temperature
shall be achieved within a defined time of loading that is commensurate with maintaining
the specified product temperature. These adjustments shall be completed and verified by
trained staff.
5.4.4 Loading and unloading operations shall be undertaken in such a way as to maintain product
X temperature within the specified limits.
5.4.5 A system shall be in place to enable the driver to be made aware if the temperature of the
X load-holding area varies from the specified limits.
5.4.6 In the case of equipment failure, procedures shall be in place to establish the safety and
X quality status of the product and to determine the actions to be taken prior to release to the
customer.
44 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
6 Facility management
6.1 Equipment
Equipment shall be suitably designed for the intended purpose and shall be used so as to minimise the risk of
Part II
damage to, or contamination of, product.
Clause Requirements
6.1.1 Roll cages, pallet lifts and forklift trucks shall be maintained in a good working condition to
XD prevent damage to product.
6.1.3 All diesel-powered handling equipment, where used, shall incorporate an appropriate
XD exhaust filter system for the removal of particulates that can pose a contamination risk to
product.
Part III
6.1.4 Where physical automation systems (including vertical lifts, retrieval systems, conveyor
X systems, robotics, etc.) are used for product-handling activities, a documented risk
assessment shall be completed to identify potential risks to product safety, legality, quality
and integrity (including from spillage and damage), while maintaining traceability at all
times. The risk assessment shall form the basis for defining a procedure for the acceptance,
operation, maintenance, calibration, testing and validation of the system, as appropriate.
6.1.5 Where appropriate, procedures shall be in place to monitor the condition of wooden pallets
XD and plastic trays to prevent the risk of contamination or damage to products.
6.1.6 Knives or other tools provided shall be used in such a way as to prevent damage to products.
Snap-off blade knives shall not be used.
Part IV
6.2 Maintenance
A system of planned maintenance shall be in place covering all items of equipment which are critical to product
safety, legality and quality.
Clause Requirements
6.2.1 A documented planned maintenance schedule or condition monitoring system shall be
X in place which includes all plant and equipment. The maintenance requirements shall be
defined when commissioning new equipment.
Appendices
6.2.2 The site shall ensure that the safety, legality or quality of a product is not jeopardised during
maintenance operations.
brcgs.com 45
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
6.2.3 All third-party contractors and engineers shall be aware of and adhere to the site’s
X operating standards. Where appropriate, this shall include the site’s hygiene standards and
contamination control policies.
6.2.4 Cleaning or replacing light fittings and glass shall be done in a manner so as to minimise the
potential for product contamination.
6.2.6 Temporary repairs/modifications shall only be permitted in emergencies and where product
contamination is not at risk. Such modifications shall be subject to a time limit and shall be
recorded and scheduled for permanent repair.
Measuring equipment used to monitor critical control points (CCPs) and product safety and legality shall be
identified. The identified measuring equipment shall be calibrated and adjusted or its accuracy verified.
Clause Requirements
6.3.1 The site shall identify and control measuring equipment used to monitor CCPs and product
X safety, legality and quality. This shall include, as a minimum:
• a documented list of equipment and its location
• an identification code and calibration due date
• prevention from adjustment by unauthorised staff
• protection from damage, deterioration or misuse.
6.3.2 The company shall check measuring and monitoring devices at a predetermined frequency
X based on risk assessment and, where necessary, adjust the devices to ensure accuracy
within agreed parameters. Where adjustment is not possible, inaccurate equipment shall be
replaced.
6.3.3 Equipment shall be readable and of a suitable accuracy for the measurements it is required
X to perform. Equipment specified to measure CCPs or product safety, legality and quality shall
be traceable to a recognised national standard.
6.3.4 Reference measuring equipment shall be calibrated and traceable to a recognised national
X or international standard and records maintained. When equipment is used to assess critical
limits, any uncertainty in calibration must be considered.
6.3.5 Procedures shall be in place to record the actions to be taken when the prescribed
X measuring devices are found not to be operating within specified limits. Where the safety
or legality of products is based on equipment that is found to be inaccurate, action shall be
taken to ensure that at-risk product is not offered for sale, and the owner/manufacturer of
the product shall be notified to agree actions (where appropriate).
46 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
6.3.6 Procedures shall be in place to calibrate, verify or, where necessary, adjust self-calibrating
X devices (including robotics sensors) to ensure accuracy within agreed parameters at a
predetermined frequency (as identified in clause 6.1.4). Where adjustment is not possible,
inaccurate equipment shall be replaced.
Part II
6.4 Housekeeping and hygiene
Housekeeping and cleaning systems shall be in place which ensure that appropriate standards of hygiene are
maintained at all times and that risk of contamination is minimised.
Clause Requirements
6.4.1 The premises and equipment shall be maintained in a clean and hygienic condition.
6.4.2 Documented cleaning schedules shall be in place and implemented for the building,
vehicles, plant and all equipment. The frequency and depth of cleaning shall be based on
Part III
risk. Cleaning procedures shall include, where applicable:
• responsibility for cleaning
• the item/area to be cleaned
• frequency of cleaning
• method of cleaning
• cleaning chemicals and concentrations
• cleaning materials to be used
• cleaning records and responsibility for verification.
6.4.3 Cleaning practices shall be completed so as to maintain a suitable environment for the
storage and distribution of products. Practices shall minimise risk of contamination to the
product. Where cleaning procedures are part of a defined prerequisite plan to control the
risk of a specific hazard, the cleaning and disinfection procedures and their frequency shall
be validated, and records maintained.
Part IV
6.4.4 Where clean in place (CIP) systems are in use for cleaning tankers, these shall be designed
X and operated to ensure effective cleaning, commensurate with the products transported. To
ensure effective operation, the following shall be in place:
• validation, confirming the correct design and operation of the system
• an up-to-date schematic diagram of the system layout
• where rinse solutions are recovered and re-used, an assessment of the risk of cross-
contamination (e.g. due to the re-introduction of allergen).
Alterations or additions to the CIP system shall be authorised by a suitably competent
individual before changes are made. A record of changes shall be maintained.
The system shall be revalidated at a frequency based on risk and following any alteration or
Appendices
addition.
6.4.5 Adequate staff, facilities and equipment shall be provided to allow cleaning to be
undertaken at a level commensurate with the activities being undertaken by the site.
brcgs.com 47
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
6.4.6 Records shall be maintained of the cleaning undertaken. These shall include any cleaning
of vehicles carried out by subcontractors (e.g. tanker cleaning) and, where required by
customers, cleaning certificates.
6.4.7 Where appropriate, the effectiveness of the cleaning and sanitation procedures shall be
verified and recorded.
There shall be adequate systems for the collection, collation and disposal of waste material.
Clause Requirements
6.5.1 Systems shall be in place to minimise the accumulation of waste in handling and storage
areas. Bins shall be emptied at appropriate frequencies and maintained in an adequately
clean condition.
6.5.2 External waste collection containers and compactors shall be managed in such a manner as
X to contain products and not attract pests. Containers holding food products or packaging
shall be covered or closed.
6.5.3 Products that require specific conditions for disposal shall be separated and disposed
X of using licensed contractors and in compliance with any legal requirements. Records of
removal shall be maintained and available.
6.5.4 In the event that substandard trademarked materials are transferred to a third party for
X destruction or disposal, that third party shall be in the business of secure product or waste
disposal and shall provide records of material destruction or disposal.
6.5.6 Where customer-branded products which do not meet specification are sold to staff or
X passed on to charities or other organisations, this shall be with the prior consent of the
brand owner. Processes shall be in place to ensure that all products are fit for consumption
and meet legal requirements. Records shall be maintained.
48 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
6.6 Pest management
The company shall be responsible for minimising the risk of pest infestation on the site.
Clause Requirements
Part II
6.6.1 Employees shall understand the signs of pest activity and be aware of the need to report any
evidence of pest activity to a designated manager.
6.6.2 All products shall be stored so as to minimise the risk of infestation. Where stored-
XD product pests are considered a risk, appropriate measures shall be included in the control
programme.
6.6.3 In the event of evidence of pest activity, immediate action shall be taken to identify at-
XD risk products and to minimise the risk of product contamination. Any potentially affected
products shall be subject to the non-conforming product procedure.
The presence of any infestation on site shall be documented in pest control records and be
part of an effective pest management programme to eliminate or manage the infestation so
that it does not present a risk to products.
Part III
6.6.4 The company shall either contract the services of a competent pest control organisation or
XD shall have trained personnel for the regular inspection and treatment of premises, in order to
deter and eradicate infestation.
The frequency of inspections shall be determined by risk assessment and documented. The
risk assessment shall be reviewed whenever:
• there are changes to the buildings or processes which could have an impact on the pest
management programme
• there has been a significant pest issue.
Service provision (regardless of the source) shall meet with all applicable regulatory
requirements.
6.6.5 Where the services of a pest control contractor are employed, the service contract shall be Part IV
XD clearly defined and reflect the activities of the site.
6.6.6 Pest management documentation and records shall be maintained. As a minimum, these
XD shall include:
• an up-to-date plan of the whole site, identifying pest control devices and their locations
• identification of the baits and/or monitoring devices on site
• clearly defined responsibilities for the site management and the contractor
• details of pest control products used, including instructions for their effective deployment
and action to be taken in the case of emergencies
• any observed pest activity
• details of pest control treatments undertaken.
Appendices
Records may be on paper (hard copy) or controlled in an electronic system (e.g. an online
reporting system).
brcgs.com 49
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
6.6.7 Where a site undertakes its own pest management, it shall be able to effectively
XD demonstrate that:
• pest management operations are undertaken by trained and competent staff with
sufficient knowledge to select appropriate pest control chemicals and proofing methods
and understand the limitations of use, relevant to the biology of the pests associated with
the site
• staff undertaking pest management activities meet any legal requirements for training or
registration
• sufficient resources are available to respond to any infestation issues
• there is ready access to specialist technical knowledge when required
• legislation governing the use of pest control products is understood and complied with
• dedicated locked facilities are used for the storage of pesticides.
6.6.8 Results of pest management inspections shall be assessed and analysed for trends on a
XD regular basis. As a minimum, results of inspections shall be analysed annually or in the event
of an infestation.
The analysis shall include results from trapping and monitoring devices to identify problem
areas. The analysis shall be used as a basis for improving the pest management procedures.
6.6.9 Records of pest management inspections, pest proofing, hygiene recommendations and
XD actions taken shall be maintained. It shall be the responsibility of the site to ensure that all
of the relevant recommendations made by its contractor or in-house expert are documented
and carried out in a timely manner.
50 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
7 Good operating practices
7.1 Receipt of goods
Goods acceptance procedures shall be in place to ensure products are within specification before acceptance.
Part II
Clause Requirements
7.1.1 Where specific measurable conditions, such as temperature, are critical to the safety, legality,
X quality or integrity of products, processes shall be in place to ensure requirements are
fulfilled before acceptance.
7.1.2 There shall be a procedure for inspection of loads on arrival to ensure that products are free
XD from pest infestation, contamination or damage and are in a satisfactory condition.
7.1.3 Procedures shall also be in place to ensure that the loads or products have been held under
XD secure conditions before acceptance.
7.1.4 Where products are marked with a durability code, the residual shelf life shall be checked to
Part III
XD ensure that this meets any specified customer requirement as a minimum, and assist in stock
rotation.
Product handling and movement shall be carried out to minimise the risk of product damage.
Clause Requirements
7.2.1 Personnel shall be aware of any products requiring specific handling conditions and be
trained in appropriate procedures. The procedures shall include, as appropriate:
• instructions for handling different product types
• segregation of products where necessary to avoid cross-contamination (physical, chemical, Part IV
microbiological or allergenic), mixing of sorts, or taint
• specific handling requirements to prevent product damage.
7.2.2 The loading of vehicles or shipping containers shall be carried out in a manner which
prevents damage, and loads shall be secured to prevent movement during transit.
7.2.3 Where products are repacked onto pallets for storage or further distribution, the packing
X configuration shall prevent the risk of damage (e.g. overhanging cases). Where required,
repacked pallets shall be band-wrapped to prevent damage in storage or distribution.
7.2.4 Products shall be stored off the floor either on pallets or racking.
XD
Appendices
brcgs.com 51
STORAGE AND DISTRIBUTION
ISSUE 4
Where the storage environment (e.g. temperature or controlled atmosphere) is critical to product safety, legality
and quality, this shall be adequately controlled, monitored, recorded and verified during handling and storage.
Clause Requirements
7.3.1 Monitoring shall be carried out in accordance with product specification requirements and/
X or specified procedures.
7.3.3 Facilities shall be adequate to maintain products within the temperature range detailed in
X the product specification.
7.3.4 Where temperature control is required, process parameters critical to product safety
X (including product handling and scheduling of transfer operations) shall be monitored to
maintain temperature control.
Procedures shall be established which clearly define acceptable and unacceptable criteria so
that appropriate actions can be taken. The procedures shall take into account:
• maximum limits for the period of time that particular types of product may remain outside
a temperature-controlled environment, including at loading, unloading and staging areas
• the effect of local seasonal temperature variations (e.g. temperature, condensation,
humidity).
7.3.5 In the case of equipment failure, procedures shall be in place to establish, in conjunction
X with the product owner, the safety status and effect on the quality of the product prior to
release to distribution. Records shall be maintained.
7.3.6 In circumstances where a controlled atmosphere is critical to product safety, quality, legality
X or integrity, manual or automatic gas proportioning and/or time-recording equipment shall
be used to monitor (at an appropriate frequency) the gas proportions in the controlled
atmosphere. Changes to the equipment settings shall only be completed by trained and
authorised staff and, where applicable, controls shall be password-protected or otherwise
restricted.
7.3.7 Where temperature, humidity or controlled-atmosphere stores are used, the level of
X uniformity of the environmental condition under control (e.g. temperature distribution)
shall be established, validated and verified at a frequency based on risk or where necessary
restrictions on product placement have been identified.
7.3.8 In the event of changes to equipment, the company shall, where appropriate, re-establish
X the performance capability within the storage area.
52 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
7.4 Physical and chemical product contamination risk
Appropriate facilities and procedures shall be in place to control the risk of physical or chemical contamination
of product.
Clause Requirements
Part II
7.4.1 Glass or other brittle materials in product-handling areas shall be excluded or protected
against breakage or the product shall be adequately protected. Procedures for handling glass
and other brittle materials (other than product packaging) which pose a contamination risk in
identified areas shall include:
• a list of those items, detailing their location, number, type and condition
• recorded checks of the condition of these items, carried out at a specified frequency that
is based on the level of risk to the product
• details on cleaning or replacing these items to minimise the potential for product
contamination.
7.4.2 All spillages or breakages that pose a risk of product contamination shall be recorded in an
incident report.
Part III
7.4.3 Processes shall be in place to manage the use, storage and handling of chemicals to prevent
chemical contamination. These shall include, as a minimum:
• an approved list of chemicals for purchase
• availability of material safety data sheets and specifications
• confirmation of suitability for use
• avoidance of strongly scented products
• the labelling and/or identification of containers of chemicals at all times
• a designated storage area with restricted access by authorised personnel
• use of chemicals by trained personnel only.
Clause Requirements
7.5.1 Receipt documents and/or product labelling shall facilitate correct stock rotation.
7.5.2 An effective system shall be in place for identifying the location of stock within the storage
XD area to facilitate stock rotation.
7.5.3 Product shall be handled with due regard to the stated shelf life for onward sale, and shall
XD be in compliance with the minimum specified shelf life on delivery where this is specified by
customers.
Appendices
brcgs.com 53
STORAGE AND DISTRIBUTION
ISSUE 4
The company shall ensure that product is not released unless all release procedures have been followed.
Clause Requirements
7.6.1 Where products require positive release, procedures shall be in place to ensure that the
XD release does not occur until all release criteria have been met and the release has been
authorised. Records shall be retained.
7.6.2 In circumstances where release of product is authorised by the owner of the products or
XD legal clearance (e.g. customs), the management shall have systems in place to ensure that the
authority for release has been provided prior to dispatch. Evidence of authorisation shall be
retained.
The site shall have a system for the management of allergenic materials which minimises the risk of allergen
contamination of products.
Clause Requirements
7.7.1 The company shall have a procedure in place to ensure that the potential risk of allergenic
X contamination of products is minimised. This shall take into account the particular packaging
formats of products that are at an increased risk of damage, along with the physical state of
any allergen-containing products (i.e. powder, liquid, particulate).
7.7.2 A documented allergen management plan shall be established to mitigate the cross-
X contamination risk to products. Control measures shall consider:
• spillage controls
• specific handling procedures to reduce product damage
• any additional controls requested by the customer/product owner (e.g. segregation control
based on manufacturing guidance/specifications).
7.7.3 Spillage procedures shall be designed to remove or reduce to acceptable levels any
X potential cross-contamination by allergens. The cleaning methods shall be validated and
routinely verified for their effectiveness.
54 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
8 Personnel
8.1 Training and competency
The company shall ensure that all employees are adequately trained, instructed and supervised to a degree
Part II
commensurate with their activity and are demonstrably competent to carry out their activity.
Clause Requirements
8.1.1 All personnel, including employment agency or temporary personnel and contractors, shall
be appropriately trained prior to commencing work and adequately supervised throughout
the working period.
8.1.2 The company shall have documented training procedures and training records to
demonstrate that the training is appropriate and effective.
8.1.3 Records of all training shall be available. These shall include, as a minimum:
• the name of the trainee and confirmation of attendance
Part III
• the date and duration of the training
• the title or course contents, as appropriate
• the training provider
• for internal courses, a reference to the material, work instruction or procedure that is used
in the training.
Where training is undertaken by employment agencies on behalf of the company, records of
the training shall be available.
8.1.4 Where personnel are engaged in activities relating to critical control points (CCPs), they
X shall receive specific training relevant to the CCPs. Where personnel carry out activities
which could affect product safety, legality and quality, the company shall ensure that
personnel have been trained in the best-practice operating principles for the particular task.
8.1.5 The company shall routinely review the competencies of staff and provide relevant training
as appropriate. This may be in the form of training, refresher training, coaching, mentoring or Part IV
on-the-job experience.
The site’s personal hygiene standards shall be documented and adopted by all personnel, including agency staff
and visitors to the location, with due regard to the risk of product contamination.
Clause Requirements
8.2.1 The site’s personal hygiene standards shall include policy for the following:
Appendices
brcgs.com 55
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
8.2.2 The requirements for personal hygiene shall be communicated to all personnel, agency staff,
contractors and visitors. Compliance with the requirements shall be checked regularly.
8.2.3 Smoking (including the use of electronic cigarettes), where permitted under law, and eating
and drinking shall only be permitted in designated areas and shall not be permitted in
storage and product-handling areas. Adequate arrangements for dealing with smokers’ waste
shall be provided at smoking facilities.
8.2.4 Where workwear is provided, this shall be maintained in a good and clean condition.
XR
8.2.5 All cuts and grazes on exposed skin shall be covered by an appropriately coloured plaster
that is site-issued and monitored.
8.2.6 Processes and written instructions for staff shall be in place to control the use and storage
of personal medicines so as to minimise the risk of product contamination.
8.2.7 Where permitted by law, visitors and contractors shall be required to fill in a health
X questionnaire or otherwise confirm that they are not suffering from any symptoms which
may put product safety at risk, prior to being allowed into storage areas.
8.2.8 There shall be a procedure for the notification by employees, including temporary
X employees, of the details of any relevant infectious disease or condition with which they
may have come into contact or from which they may be suffering. Expert medical advice
shall be sought where required.
56 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
9 Handling of open food products
The Standard applies primarily to the storage and distribution of packaged products which are already protected;
however, there are permitted exceptions (as specified in Part I under ‘Scope of applicable products), and this section
applies to the activities surrounding open food products.
Part II
Where a site handles open food products, all the relevant requirements from sections 1 to 8 of the Standard must be
fulfilled in addition to the requirements listed here.
• open boxes and trays of fruit and vegetables – this includes a small amount of order-picking from trays of fruit and
vegetables to smaller quantities to fulfil customer orders (e.g. for food service customers)
• trays of raw fish/crustaceans/other sea food
• carcasses of meat.
To be covered by the Standard, only the open food products listed above shall be received into storage and released
for distribution without any further preparation (including cutting and trimming) or processing.
For all other open food product handling and processing operations, the Global Standard for Food Safety shall be
Part III
used.
The site shall be able to demonstrate that facilities and controls are suitable to prevent pathogenic contamination
of open food products.
Clause Requirements
9.1.1 The map of the premises (clause 2.8) shall include those areas where the product is at
different levels of risk from contamination. The map shall show:
• open food product handling areas
• pre-packed food product handling areas. Part IV
These areas shall be considered when determining the prerequisite programmes for
reducing the risk of cross-contamination.
9.1.2 Where open food products that are prone to microbial growth (clause 2.9) are handled,
a documented risk assessment shall be completed to determine the risk of pathogenic
cross-contamination during storage and transportation, and appropriate controls shall
be implemented. The risk assessment shall take into account the potential sources of
microbiological contamination and include:
• the nature of the products
• the flow of products, packaging (where applicable), equipment, personnel and waste
• air quality
Appendices
brcgs.com 57
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
9.2.1 Suitable and sufficient hand-washing facilities shall be provided at access points to open
food product handling areas. Such hand-washing facilities shall provide, as a minimum:
• advisory signs to prompt hand-washing
• a sufficient quantity of water at a suitable temperature
• liquid/foam soap
• single-use towels or suitably designed and located air driers.
9.2.2 Where open food products are stored and handled, toilets shall not open directly into the
storage areas, and hand-washing facilities cannot be located within the toilets.
9.2.3 Where separate changing facilities are required, the site shall provide documented
X instructions on the following:
• protective clothing required to be worn
• clear instructions for the order of changing into and out of dedicated protective clothes to
prevent the contamination of clean clothing
• a hand-washing routine during the changing procedure to prevent contamination of the
clean clothing.
Clause Requirements
9.3.1 Where products come into direct contact with water, steam, ice, air, compressed air or other
X gases, the microbiological and chemical quality of the product shall be regularly monitored
based on risk assessment. The gases, water or ice shall present no risk to product safety or
quality and shall comply with relevant legal regulations.
9.4 Maintenance
Clause Requirements
9.4.1 Food grade lubricants shall be used and be of a known allergen status.
58 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
9.5 Housekeeping and hygiene
Clause Requirements
9.5.1 Risk-based limits for acceptable and unacceptable cleaning performance shall be defined
X for food contact surfaces. These limits shall be based on the potential hazards relevant
Part II
to the product or handling operations. Therefore, acceptable levels of cleaning may be
defined by visual appearance, microbiological testing, allergen testing or chemical testing as
appropriate.
The site shall define the corrective action to be taken when monitored results fall outside
the acceptable limits.
9.5.2 Where cleaning and disinfection procedures are part of a defined prerequisite plan to
control the risk of a specific hazard, the procedures and their frequencies shall be validated.
Manufacturers’ instructions must be followed and records maintained.
Part III
Clause Requirements
9.6.1 A documented risk assessment shall be completed to determine what protective clothing
is required to be worn by employees to control contamination risk to open food product.
Where risk assessment has determined that protective clothing is not required, it shall be
fully justified, documented and not pose a contamination risk to the product.
9.6.2 The company shall document and communicate to all employees (including agency and
temporary personnel), contractors and visitors the rules regarding the wearing of protective
clothing in specified areas. This shall also include policies relating to the wearing of
protective clothing away from the product-handling area (e.g. removal before entering toilets
and the use of canteen and smoking areas).
9.6.3 Protective clothing shall be laundered on a regular basis. A system shall be in place to
ensure the effectiveness of the laundering process. Part IV
9.6.4 Disposable protective clothing, if used, shall be subject to adequate control to avoid product
X contamination.
9.6.6 All cuts and grazes on exposed skin shall be covered by a contrasting-coloured plaster that
is site-issued and monitored.
Appendices
brcgs.com 59
STORAGE AND DISTRIBUTION
ISSUE 4
Wholesale module
10 Wholesale requirements
For the purpose of the Standard, wholesalers are defined as companies that purchase (take legal title to) product for
resale to other businesses (i.e. not to the final consumer). The Standard can only be applied to wholesalers that have
storage facilities under their direct control, where purchased product is received, and they either deliver this product
to customer businesses or allow customer businesses to collect. Where a company sells product online directly to
the consumer, section 12 relating to e-commerce shall be included within the scope of its certification.
Where the company applies for certification to the wholesale module, the whole of section 10 shall be assessed to
decide on the applicability of sections 10.2 and/or 10.3, according to the nature of the products handled. All relevant
requirements from the Standard (sections 1–9) must be fulfilled in addition to the applicable requirements outlined
in this module. Although certification to this module is voluntary, where a company handles wholesale operations
and decides to exclude these activities from the scope of certification, this would be a stated exclusion on its
certificate and report. Distribution networks, including postal, courier and pallet network or less-than-load type
operations, are excluded from the scope of this module.
To gain certification to the wholesale module, companies must meet the requirements of section 10.1 and the
relevant requirements of sections 10.2 and/or 10.3. The sections can be summarised as follows:
• 10.1 General requirements applicable to all wholesalers These requirements are applicable to all products
purchased for resale by the wholesalers.
• 10.2 Branded products These requirements are applicable to the purchase and wholesaling of branded products.
• 10.3 Wholesaler-own, wholesaler-exclusive and/or customer-exclusive branded products These requirements are
applicable to wholesalers who sell:
• own-label branded products under the wholesaler’s name
• branded products under a label exclusive to the wholesaler
• customer-exclusive branded products developed to the customer’s/wholesaler’s specification.
10.1.1 Traceability
The wholesaler shall be able to trace all product lots back to the last manufacturer and forward to the customer
of the company.
Clause Requirements
10.1.1.1 The company shall maintain a traceability system for all batches of product which identifies
the last manufacturer or, in the case of primary agricultural products, the packer or place
of last significant change to the product. Records shall also be maintained to identify the
recipient of each batch of product from the company.
60 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
10.1.1.2 The company shall test the traceability system at least annually to ensure that traceability
can be determined back to the last manufacturer and forward to the recipient of the product
from the company. This shall include identification of the movement of the product through
the chain from dispatch by the manufacturer to receipt by the company (including each
Part II
movement and intermediate place of storage).
The traceability test shall include the reconciliation of quantities of product received by the
company for the chosen batch or product lot. Traceability shall be achievable within 4 hours
(1 day when information is required from external parties).
The wholesaler shall have a plan and system in place to enable the withdrawal and recall of products should this
be required.
Clause Requirements
10.1.2.1 The company shall have a documented product withdrawal and recall procedure. This shall
Part III
include, as a minimum:
• identification of key personnel constituting the recall management team, with clearly
identified responsibilities
• guidelines for deciding whether a product needs to be recalled or withdrawn, and the
records which need to be maintained
• an up-to-date list of key contacts (including out-of-hours contact details) or reference
to the location of such a list (e.g. recall management team, emergency services, suppliers,
customers, certification body, regulatory authority)
• a communication plan, including the provision of information to customers, consumers
and regulatory authorities in a timely manner, as applicable
• details of external agencies providing advice and support as necessary (e.g. specialist
laboratories, regulatory authorities and legal experts)
• a plan to handle the logistics of traceability, recovery or disposal of affected product, and
stock reconciliation. Part IV
The procedure shall be operable at any time.
10.1.2.2 The product recall and withdrawal procedures shall be tested, at least annually, in a way
that ensures their effective operation. Results of the test shall be retained and shall include
timings of key activities. The results of the test and of any actual recall shall be used to
review the procedure and implement improvements as necessary.
10.1.2.3 In the event of a product recall being initiated by the wholesaler, the certification body
that issued the current certificate for the site against the Standard shall be informed within
3 working days of the decision to issue a recall.
Appendices
brcgs.com 61
STORAGE AND DISTRIBUTION
ISSUE 4
The company shall have systems in place to ensure that branded products which are purchased for resale are safe,
legal and meet customers’ expectations of quality.
The wholesaler shall operate procedures for the approval and monitoring of its suppliers of purchased product.
Clause Requirements
10.2.1.1 The company shall have a documented supplier approval procedure which shall be risk-
based and clearly define the criteria to be met. The approval process shall consider the type
of product and manufacturing facility, where the product was manufactured, and potential
risks in the supply chain to the point of receipt of the goods by the wholesaler. Supplier
approval shall include one or more of the following:
• enforceable warranties from the supplier
• historical trading relationship and brand reputation
• where product is purchased from any company that is not the manufacturer, packer or (for
bulk products) the consolidator (e.g. an agent or broker), information is required to enable
the approval of these companies. This shall be obtained from the agent/broker, unless
they themselves are certificated to a BRCGS standard (e.g. Global Standard for Agents and
Brokers) or a standard benchmarked by GFSI
• a valid certification to the applicable BRCGS or GFSI-benchmarked standard. The scope of
the certification shall include the products purchased
• a supplier audit, with a scope to include product safety, traceability, HARA or HACCP
review, and good manufacturing practices, undertaken by an experienced and
demonstrably competent product safety auditor. Where the supplier audit is completed by
a second or third party, the company shall be able to:
• demonstrate the competency of the auditor
• confirm that the scope of the audit includes product safety, traceability, HARA or
HACCP review, and good manufacturing practices
• obtain and review a copy of the full audit report
or
• where a valid risk-based justification is provided and the supplier is assessed as low
risk only, a completed supplier questionnaire may be used for initial approval. The
questionnaire shall have a scope that includes product safety, traceability, HARA or
HACCP review, and good manufacturing practices, and it shall have been reviewed and
verified by a demonstrably competent person.
10.2.1.2 There shall be a documented process for the ongoing assessment of approved suppliers
based on risk and defined performance criteria, including complaints. The process shall be
fully implemented, and a formal review completed at least annually. Records of the review
shall be kept.
10.2.1.3 The procedures shall define how exceptions are handled (e.g. the purchase of products
where auditing or monitoring has not been undertaken).
62 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
10.3 Wholesaler-own, wholesaler-exclusive and/or customer-exclusive products
The wholesaler shall operate procedures for the approval and monitoring of the manufacturers and packers of
own-label and exclusive brand products.
Part II
Clause Requirements
10.3.1.1 The company shall have a documented supplier approval procedure which identifies the
process for the initial and ongoing approval of suppliers and manufacturers/processors of
each product traded. The requirements shall be based on the results of a documented risk
assessment that shall include consideration of:
• the nature of the product and associated risks
• customer-specific requirements
• legislative requirements in the country of sale or importation of the product
• source or country of origin
• potential for adulteration or fraud.
Part III
10.3.1.2 The approval and monitoring procedure shall be based on risk and include one or a
combination of:
• certification (e.g. to a BRCGS or other GFSI-recognised scheme). The scope of the
certification shall include all materials purchased
• supplier/third-party audits, with a scope to include product safety, traceability, HARA or
HACCP review, and good manufacturing practices, undertaken by an experienced and
demonstrably competent product safety auditor. Where the supplier audit is completed by
a second or third party, the company shall be able to:
• demonstrate the competency of the auditor
• confirm that the scope of the audit includes product safety, traceability, HARA or
HACCP review, and good manufacturing practices
• obtain and review a copy of the full audit report
or
• where a valid risk-based justification is provided and the supplier is assessed as low Part IV
risk only, a completed supplier questionnaire may be used for initial approval. The
questionnaire shall have a scope that includes product safety, traceability, HARA or
HACCP review, and good manufacturing practices, and it shall have been reviewed and
verified by a demonstrably competent person.
Where approval is based on questionnaires, these shall be re-issued at least every 3 years
and suppliers will be required to notify the site of any significant changes in the interim.
The site shall have an up-to-date list of approved suppliers.
10.3.1.3 There shall be a documented process for the ongoing assessment of approved suppliers
based on risk and defined performance criteria, including complaints. The process shall be
fully implemented, and a formal review completed at least annually. Records of the review
Appendices
shall be kept.
10.3.1.4 There shall be a documented procedure to define the use of exceptions or emergency
supplier approval processes. Where a site handles customer-branded product, the customer
shall be made aware of the relevant exceptions.
brcgs.com 63
STORAGE AND DISTRIBUTION
ISSUE 4
The wholesaler shall ensure that any customer-specific policies or requirements are understood, implemented
and clearly communicated to the relevant staff and the relevant suppliers of products and services.
Clause Requirements
10.3.2.1 The company shall have a system for identifying whether customers have specific
X requirements. Where there are such requirements, they shall be made known to the relevant
staff within the company and kept up to date.
10.3.2.2 Where specific customer policies need to be enacted by the manufacturing, processing
X or packing site, the company shall have effective processes to communicate them to the
relevant suppliers of products and services (e.g. product specifications, contracts with
suppliers/service providers or codes of practice). Records shall be available to demonstrate
that where the company has been notified of such requirements, these have been
communicated to the relevant immediate suppliers, and there is supporting documentation
to confirm that the suppliers have understood and implemented the requirements.
10.3.2.3 Where required by the customer, the company shall provide information to enable the last
X manufacturer or processor of the product to be approved. This shall include the identity of
the manufacturer or processor.
The wholesaler shall ensure that systems are in place to minimise the risk of purchasing fraudulent or adulterated
products.
Clause Requirements
10.3.3.1 The company shall have processes in place to access information on historical and
developing threats to the supply chain that may present a risk of adulteration or substitution
of products. Such information may come from:
• trade associations
• government sources
• private resource centres.
10.3.3.2 A documented vulnerability assessment shall be carried out on all products to assess the
potential risk of adulteration or substitution. This shall take into account:
• historical evidence of substitution or adulteration
• economic factors which may make adulteration or substitution more attractive
• ease of access to product through the supply chain
• sophistication of routine testing to identify adulterants
• nature of the raw materials.
The vulnerability assessment shall be kept under review to reflect changing economic
circumstances and market intelligence which may alter the potential risk. It shall be formally
reviewed on an annual basis.
64 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
10.3.3.3 Where products are identified as being at particular risk of adulteration or substitution,
appropriate assurance and/or testing processes shall be in place to reduce the risk.
Part II
10.3.4 Product design/development
The wholesaler shall ensure that the development and product approval process results in products that are safe
and legal, and that a hazard analysis study is undertaken.
Clause Requirements
10.3.4.1 There shall be a procedure for the assessment and approval of products to be sold as
wholesaler own-brand or exclusive brands which includes:
• a project brief defining the requirements for the products to be developed
• a process for reviewing product samples against the brief
• a formal product approval process.
Part III
10.3.4.2 The wholesaler shall, where appropriate, ensure that suppliers undertake factory trials
and carry out thorough product conformity checks to verify that product formulation and
manufacturing processes are capable of producing a safe and legal product.
10.3.4.3 The wholesaler shall have a process to ensure that the product label is legal for the known
designated country of sale and in accordance with the appropriate product specification.
Depending on the legislation, this shall include information to allow the safe handling,
display, storage, preparation and use of the product within the supply chain or by the
customer. There shall be a process to verify that labelling of ingredients, allergens and
allergen cross-contamination is correct based on the product recipe.
10.3.4.4 Wholesalers shall have processes in place to ensure that they are notified of changes in
product formulation or process and that any such changes have been adequately assessed
for safety and legality.
Part IV
10.3.4.5 Product shelf life shall be established, taking into account product formulation, packaging,
factory environment and subsequent storage conditions. The shelf life shall be approved by
the wholesaler.
10.3.4.6 The wholesaler shall ensure that shelf-life trials are undertaken using documented
protocols, and results documented and retained. Where shelf-life trials prior to production
are impractical, for example for some long-life products, a documented science-based
justification for the assigned shelf life shall be produced.
Appendices
brcgs.com 65
STORAGE AND DISTRIBUTION
ISSUE 4
10.3.5 Specifications
The company shall ensure that appropriate specifications exist for all wholesaler own-brand, wholesaler-exclusive
and/or customer-specified exclusive products.
Clause Requirements
10.3.5.1 Specifications shall be adequate, accurate and ensure compliance with relevant safety and
legislative requirements. These shall include key data to meet legal requirements and assist
the consumer in the safe usage of the product. These may be in the form of a printed or
electronic document, or part of an online specification system.
10.3.5.2 Specifications shall be reviewed whenever products change (e.g. ingredients, processing
methods) or at least every 3 years to ensure adequacy and status. The date of review and the
approval of any changes shall be recorded.
The wholesaler shall undertake or subcontract product inspection and analyses that are critical to confirm
product safety, legality and quality, using appropriate procedures, facilities and standards.
Clause Requirements
10.3.6.1 Monitoring of incoming products for compliance to specification shall be based on risk
assessment. Inspection methods, frequency of inspection and procedures shall be specified
and documented. Suppliers of incoming materials, as appropriate, shall provide evidence of
guarantees, certifications/declarations of analysis or certificates of conformity.
10.3.6.2 Where claims are made about products handled or the raw materials used, including
the provenance, chain of custody and assured or ‘identity preserved’ status, supporting
information shall be available from the supplier or independently to verify the claim.
10.3.6.3 Where the wholesaler undertakes analyses that are critical to product safety or legality,
the laboratory or subcontractors shall have gained recognised laboratory accreditation or
operate in accordance with the requirements and principles of ISO 17025.
10.3.6.4 Personnel undertaking product testing and analyses shall be suitably qualified and/or
trained, and be competent to carry out the analyses required.
66 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Cross-docking module
11 Cross-docking requirements
Part II
For the purpose of the Standard, cross-docking is defined as the process of unloading products from incoming
vehicles, and sorting, staging and loading products onto the outbound vehicles at locations different from the main
certificated facility. Products are not formally put away into storage at a cross-docking facility.
Where cross-docking occurs at the certificated site, this activity will be covered under the main certification audit
and this module is not applicable.
Where the company applies for certification to the cross-docking module, cross-docking facilities shall either
be under the direct control of, or have a legal or contractual relation to, the main certificated site, and all relevant
requirements from the Standard (sections 1–9) must be fulfilled in addition to the requirements outlined in this
module.
The audit protocol for the cross-docking module is explained in Part III, section 1.6.
Part III
Distribution networks, including postal, courier and pallet network or less-than-load type operations, are excluded
from the scope of this module. Similarly, repacking, labelling or other secondary packing operations (on packed
products) are not covered under the scope of this module.
The main certificated site shall be able to demonstrate authoritative control over product movement through
cross-docking facilities.
Clause Requirements
11.1.1 The main certificated site shall manage and maintain interactions with the cross-docking
facilities for the activities, products and processes/process steps related to the scope of
Part IV
certification.
11.1.2 The main certificated site shall have authoritative control of the product safety management
system of all cross-docking facilities and shall be responsible for issuing, maintaining and,
where appropriate, retaining relevant documentation related to the cross-docking activity.
11.1.3 There must be an internal audit programme for all cross-docking facilities under the control
of the main certificated site. A risk-based approach shall be taken based on products
handled and activities undertaken; however, all facilities shall be audited at least annually.
11.1.4 Internal audit reports shall be reviewed by the main site which includes addressing any non-
conformities raised.
Appendices
brcgs.com 67
STORAGE AND DISTRIBUTION
ISSUE 4
The cross-docking facility shall be able to trace movement of products through the operation, including any
returns and vice versa.
Clause Requirements
11.2.1 The facility shall maintain a traceability system for all batches of product which are cross-
docked, including vehicle information and any returns.
11.2.2 The facility shall test the traceability system across the range of product groups to ensure
traceability can be determined from order through to delivery to customer and vice versa,
including quantity check/mass balance tests. The traceability test shall include a summary of
the documents that shall be referenced during the test, and clearly show the links between
them.
11.2.3 The test shall occur at a predetermined frequency, at a minimum annually, and results shall
be retained for inspection. Traceability shall be achieved within 4 hours of notification.
The cross-docking facility shall operate to procedures and/or work instructions that ensure the handling of
consistently safe and legal product with the desired quality characteristics, in compliance with the HARA or
HACCP plan.
Clause Requirements
11.3.1 Documented process specifications and/or work instructions shall be available for the
key process steps involved in the handling of products (including during transportation)
to ensure product safety, legality and quality. The process specifications and/or work
instructions (as appropriate) shall include:
• special handling requirements for incompatible products
• restrictions on mixed loads
• temperature limits and handling requirements for temperature-sensitive products
• damages/reject criteria
• any additional prerequisites or control points identified in the HARA or HACCP plan.
The process specifications and/or work instructions shall be understood and made available
to the relevant staff.
11.3.2 The procedure for product return shall be documented and understood by relevant staff,
including drivers. The facility shall investigate all returned product to ensure that any out-
of-specification product is effectively managed to prevent unauthorised release.
11.3.3 Information on product returns shall be used to analyse significant trends and, where
possible, instigate preventive action to reduce the occurrence of product safety issues and
to implement ongoing improvements to product safety, legality and quality.
68 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
11.4 Environmental controls
Where the environmental conditions (e.g. temperature or controlled atmosphere) are critical to product safety,
legality and quality during handling and transportation, they shall be adequately controlled, monitored, recorded
and verified.
Part II
Clause Requirements
11.4.1 The process parameters critical to product safety shall be validated, adequately controlled,
X monitored at a suitable frequency, and recorded to ensure product safety, legality and
quality at all times. These shall include (where appropriate):
• managing temperature-sensitive product handling and transfer between temperature-
controlled and ambient areas
• scheduling of the removal of temperature-sensitive products prior to loading
• segregation controls (including on vehicles)
• managing unforeseen delays
• the effects of local variation (e.g. temperature, condensation, humidity).
Limits of acceptable and unacceptable criteria must be clearly defined, and procedures shall
be in place to establish the safety status and quality of product to determine what action
Part III
should be taken.
Part IV
Appendices
brcgs.com 69
STORAGE AND DISTRIBUTION
ISSUE 4
E-commerce module
12 E-commerce requirements
For the purpose of the Standard, e-commerce is defined as companies selling finished goods or products online
to other businesses and/or the final consumer. This module can only be applied to companies that have storage
facilities under their direct control and where products (in the scope of the Standard) are received, sorted, packed
to order and delivered either to customer businesses or directly to the consumer. Online sale activity is not in the
scope of the module.
Where the company applies for certification to the e-commerce module, all relevant requirements from the
Standard (sections 1–9) must be fulfilled in addition to the applicable requirements outlined in this module.
Where the company purchases products for resale which are covered under the wholesale module (section 10) and
intends to use them for e-commerce activities, the site must include section 10 within the scope of its certification.
Where repacking, labelling or other secondary packing operations (on packed product) are completed, the main
certificated site must include section 15 of the contracted services module within the scope of its certification.
Although certification to this module is voluntary, where a company handles e-commerce operations and decides to
exclude these activities from the scope of certification, this would be a stated exclusion on its certificate and report.
Note that distribution networks, including postal, courier and pallet network or less-than-load type operations, are
included within scope of this module, but their applicability is limited to the final mile of delivery operations only.
The site’s senior management shall demonstrate that they are fully committed to the implementation of the
requirements of this module which are critical to product safety, legality and quality.
Clause Requirements
12.1.1 The company shall be aware of legislation and codes of practice relating to the safe delivery
of products ordered via the internet (including e-commerce) to the customer in the country
where the product is sold and in the country where the product is to be delivered.
70 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
12.2 Customer contractual agreement
The site’s senior management shall ensure that processes are in place to determine the customer’s expectations,
define the requirements according to the legislation in the country of sale and country of delivery, and ensure that
these requirements are understood and fully implemented by the relevant personnel.
Part II
Clause Requirements
12.2.1 Contracts or formal agreements shall exist between the company and customer which
clearly define service expectations and ensure that potential risks associated with the
service have been addressed.
These shall include information on (where appropriate):
• delivery periods
• specific product-handling instructions
• change/cancellation options
• substitution policy
• returns policy
• contact details.
Part III
12.2.2 Where product information is displayed online, the company shall have documented
procedures to verify the accuracy and legality of the product information at the point of
display. These shall include, as applicable:
• labelling information
• allergen information
• compliance with relevant legal compositional requirements
• compliance with quantity or volume requirements.
Where such responsibilities are undertaken by an external service provider, this shall be
clearly stated in the service contract, as stated in clause 3.5.1.2.
Clause Requirements
12.3.1 The site shall test the traceability system across the range of product groups sold online
to ensure traceability can be determined from the customer’s order through to delivery to
the customer and vice versa, including quantity check/mass balance tests. The traceability
test shall include a summary of the documents that shall be referenced during the test, and
clearly show the links between them.
12.3.2 The test shall occur at a predetermined frequency, at a minimum annually, and results shall
Appendices
brcgs.com 71
STORAGE AND DISTRIBUTION
ISSUE 4
The site shall operate to procedures and/or work instructions that ensure the handling of consistently safe and
legal product with the desired quality characteristics, in compliance with the HARA or HACCP plan.
Clause Requirements
12.4.1 Documented process specifications and/or work instructions shall be available for the key
process steps involved in the packaging of products to ensure product safety, legality and
quality. The specifications and/or work instructions (as appropriate) shall include:
• special handling requirements for incompatible products
• restrictions on mixed loads
• temperature limits for temperature-sensitive products
• managing unforeseen delays
• special packaging formats and the packaging material to be used
• damages/reject criteria
• labelling instructions
• coding and shelf-life marking
• any additional prerequisites/control points identified in the HARA or HACCP plan.
The process specifications and/or work instructions shall be made available and understood
by the relevant staff.
12.4.2 Procedures for product return shall be documented and understood by the relevant staff,
including drivers. The site shall investigate any returned product to ensure that any out-
of-specification product is effectively investigated and managed to prevent unauthorised
release.
12.4.3 Information on product returns shall be used to analyse significant trends and, where
possible, instigate preventive action to reduce the occurrence of product safety issues and
to implement ongoing improvements to product safety, legality and quality.
72 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
12.5 Packaging system performance – testing and validation
Packaging systems must be tested, validated and inspected to demonstrate that they are capable of maintaining
product safety, legality, quality and integrity under transport conditions.
Clause Requirements
Part II
12.5.1 All packaging systems used shall be designed and constructed to ensure effective operation.
The company shall undertake a validation study to confirm the correct design and operation
of the packaging system to identify potential risks to product safety, legality, quality and
integrity and establish its suitability across products or product types for intended use.
This validation study shall take into account the potential impact of, where applicable:
• the shipping environment
• distribution channel
• product dimensions
• multiple-product packing
• product fragility
• external climatic conditions
• handling and storage (including spillage and leakage risk)
Part III
• effectiveness of packing (including minimum and maximum loads)
• re-usage of any component of the packaging system
• potential risks to the security of the products
• any risks associated with the above steps that are subject to legislative control.
Consideration shall also be given to quality of the final product delivered to the customer.
12.5.2 Where validation of the packaging system is provided by the supplier, the level of
confidence in its effectiveness to maintain the correct temperature shall be supported by
conducting an independent transit test in a real operating environment.
12.5.3 The packaging system used to carry temperature-sensitive products shall be designed and
X constructed to ensure effective operation. Full details of the packaging system, including the
packaging material and the cooling media used, shall be defined. This shall include (where
applicable): Part IV
• an up-to-date schematic diagram of the packaging system with key control points
• a validation study which shall consider (in addition to the requirements stated in clause
12.5.1):
• the product-loading arrangement
• the location of the cooling media.
12.5.4 The output from this assessment (clause 12.5.1) shall enable the site to establish the most
suitable packaging system configuration per product or product type for its intended use.
Full details of the packaging system, including the packaging material, product types and
any critical parameters (temperature limits), shall be defined and documented in the form of
process specifications (clause 12.4.1). These specifications shall be made readily available to
Appendices
relevant staff.
brcgs.com 73
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
12.5.5 The validation study (clause 12.5.1) shall form the basis of acceptance and be used to
determine the frequency of ongoing testing and the verification procedure for the various
packaging systems used. The procedure shall be reviewed at least annually or when:
• there is a change in packaging material (including cooling media)
• there is a significant increase in the number of complaints
• a new risk emerges
• a product is recalled or withdrawn.
Records of the results shall be maintained.
12.5.6 Alterations or additions to the packaging system shall be authorised by the HARA or
HACCP team leader before changes are made, and a record of the changes shall be
maintained.
12.5.7 Where any component of the packaging system is re-used (e.g. cooling media or packaging
material), a documented procedure needs to be established, detailing the actions to be
taken (e.g. additional cleaning) where cross-contamination risks are identified (e.g. due to the
introduction of allergens).
12.5.8 A periodic inspection of the components that are re-used (e.g. cooling media or packaging
materials) shall be completed to ensure any damaged items are removed.
12.6 Use of the distribution network for final mile deliveries only
Procedures shall be in place to ensure that where distribution networks (including postal, courier and pallet
network or less-than-load type operations) are used for distributing products, they do not present a risk to the
safety, security or quality of the products.
Clause Requirements
12.6.1 There shall be a documented procedure for the approval and monitoring of suppliers of
distribution network services. This procedure shall be risk-based and take into consideration
compliance with any specific legal requirements or potential risks to the security of products
(as identified in clause 12.5.1).
12.6.2 Contracts shall exist between the company and the suppliers of distribution network
services to define the nature of the service provided and ensure that any potential product
safety risks associated with the service have been addressed.
12.6.3 A contract review shall be sufficiently frequent (or at a minimum annual) to ensure that
data is current, taking into account service changes, regulations and other risks. Reviews and
changes shall be documented.
12.6.4 The performance of the supplier shall be monitored, and action taken where services fail to
meet requirements.
74 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Contracted services modules
Storage and distribution operators sometimes provide additional contracted services to their clients as well as the
storage and/or distribution of products. To gain certification for a particular scope of contracted services, companies
must meet the requirements of both section 13 (contractual arrangements) and those of the applicable services, as
Part II
follows:
• product inspection
• contract packing (repacking, assembly packing)
• quantity control inspection
• contract chilling/freezing/tempering/defrost and high-pressure process operations
• contract cleaning of baskets, roll cages and other distribution containers
• waste recovery and recycling.
Where the services directly relate to product, the Standard shall only be applied to pre-packed food products and
fully assembled consumer products.
Where such services are provided for open food products (other than the permitted exclusions to the scope of the
Standard in section 9), the Global Standard for Food Safety shall be used.
Part III
Where services include the assembly of components to make a consumer product, this operation shall be assessed
against the Global Standard for Consumer Products.
Where the company applies for certification to the contracted services module, all relevant requirements from the
Standard (sections 1–9) must be fulfilled in addition to the applicable requirements outlined in this module.
Although certification to this module is voluntary, where a company handles any of the contracted services
operations and decides to exclude these activities from the scope of certification, this would be a stated exclusion
on its certificate and report.
Clause Requirements
13.1 The company shall enter into formal contractual arrangements with the customer, specifying
the requirements of the service undertaken to satisfy their customer’s specific needs.
13.2 The company shall review the service specification to ensure that it has the resources and
suitable equipment to undertake the service to the specification required.
13.3 The company shall ensure that the services are included within the site’s HARA or HACCP
Appendices
plan. New products or service components shall be assessed to identify any additional
potential risks and appropriate controls.
brcgs.com 75
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
13.4 The company shall be able to trace products through the operations undertaken and, where
appropriate, the completion of a quantity check/mass balance test.
13.5 The procedures to undertake the service shall be documented and understood by the staff
responsible for undertaking the work.
13.6 Staff shall receive training as required to deliver the services to the specification agreed.
13.7 Appropriate recorded checks shall be undertaken to ensure that the contracted service is
delivered to the customer-specified limits.
76 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
14 Product inspection
Where a product inspection service is provided to ensure the quality or legality of products, this shall be
undertaken using appropriate procedures, facilities and standards.
Part II
Clause Requirements
14.1 Where inspection is undertaken on behalf of a customer, the service requirements shall be
clearly defined and include:
• any specific handling requirements for the materials being inspected (e.g. temperature
controls)
• sort criteria (rejection/acceptance criteria)
• sampling rate
• reporting protocol
• instructions on the action to be taken with defective/rejected product.
14.2 The company shall undertake a contract review before accepting the work to ensure that it
has the facilities, resources and competence to undertake the inspection service required.
Part III
14.3 The company shall carry out a risk assessment before undertaking work to identify any
potential risks to other products handled or stored (e.g. resulting from damage or spillage
during inspection). Appropriate controls shall be implemented to prevent or reduce to
acceptable levels any risk identified.
14.4 Inspection methodology and procedures shall be documented and clearly understood by
staff undertaking the work.
14.5 Where equipment is used as part of the inspection process, this shall be calibrated and its
operation verified to ensure the effectiveness of the inspection process.
brcgs.com 77
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
15.1 A risk assessment shall be carried out of the proposed packing operation to establish
potential risks to product safety and quality and establish suitable controls to mitigate the
risk.
15.2 Product and packaging materials shall be stored under conditions to prevent the risk of
contamination and deterioration. Any part-used product or packaging materials shall be
effectively protected before being returned to storage.
15.4 The setting of, and amendments to, the printer parameters (e.g. the input of, or changes to,
date codes) shall only be completed by an authorised member of staff.
15.5 Documented checks of the line shall be carried out before commencement of packing and
following changes of product. These shall ensure that areas have been suitably cleared
and are ready for the next packing run. Documented checks shall be carried out at product
changes to ensure that all products and packaging from the previous packing run have been
removed from the line before starting the next packing run.
15.6 Documented procedures shall be in place to ensure that products are packed into the
correct packaging and correctly labelled. These shall include checks:
• at the start of the packing run
• during the packing run
• when changing batches of packaging materials
• at the end of each packing run.
The checks shall also include verification of any printing carried out at the packing stage,
including:
• date coding
• batch coding
• quantity indication
• pricing information
• bar coding
• country of origin.
78 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Clause Requirements
15.7 Where online vision equipment is used to check product labels and printing, procedures
shall be in place to ensure that the system is correctly set up and capable of alerting or
rejecting product when packaging information is out of specification.
Part II
As a minimum, testing of the equipment shall be completed at:
• the start of the packing run
• the end of the packing run
• a frequency based on the site’s ability to identify, hold and prevent the release of any
implicated materials should the equipment fail (e.g. during the packing run or when
changing batches of packaging materials).
The site shall establish and implement procedures (e.g. a documented and trained manual
checking procedure) in the event of a failure in the online verification equipment.
15.8 Records shall be maintained to ensure full traceability of all component parts and of the
finished packed product. The system shall be regularly tested to ensure that traceability can
be determined.
Part III
15.9 Where rework or any reworking operation is performed, this shall be taken into account with
respect to the traceability system.
15.10 Where weights of the final packed products are checked, this shall be in accordance with
specification and the legal requirements in the country of sale. Records of checks shall be
maintained.
15.11 Where used, the site shall establish procedures for the operation and testing of online/
offline check weighers. As a minimum, these shall include:
• consideration of any legal requirements
• responsibilities for testing the equipment
• operating effectiveness and any variations for particular products
• methods and frequency of testing the check weighers
• records of the test results. Part IV
15.12 Inventories shall be maintained of components, packed product and waste. The disposal
of unused components and waste shall be in accordance with the requirements of the
customer.
15.13 Finished product checks shall be carried out in accordance with the customer’s
requirements and records maintained.
15.14 The organisation shall identify, verify, protect and safeguard customer property provided
for use or incorporation into the product. If any customer property is lost, damaged or
otherwise found to be unsuitable for use, this shall be reported to the customer and records
maintained.
Appendices
brcgs.com 79
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
16.1 The frequency and methodology of quantity checking shall meet the requirements of
legislation governing quantity verification, irrespective of the nature of the pre-pack (e.g.
minimum weight, average quantity, average weight, measuring container or quantity).
16.2 If the company undertakes quantity control on imported pre-packed material intended
for sale, it shall be able to demonstrate compliance with the legal requirements where the
product is available to the ultimate consumer.
16.3 Where the quantity of the product is not governed by legislative requirements (e.g. bulk
quantity), the product must conform to the customer’s specification requirements.
16.4 All equipment used for quantity measurement shall be legally acceptable and regularly
calibrated.
16.6 Where used, the site shall establish procedures for the operation and testing of online/
offline check weighers. As a minimum, these shall include:
• consideration of any legal requirements
• responsibilities for testing the equipment
• operating effectiveness and any variations for particular products
• methods and frequency of testing the check weighers
• records of the test results.
16.7 Records shall be maintained of the quantity checks and shall be in a format which is legally
acceptable in the country where the products will be sold.
80 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
17 Contract chilling/freezing/tempering/defrosting and high-pressure
process operations
Where the site undertakes contract chilling/freezing/tempering/defrosting or high-pressure process operations
on pre-packaged product, it shall undertake such operations in accordance with specifications provided by the
Part II
owner of the product, and ensure that the processes are monitored and that product safety, legality and quality
are not compromised.
Clause Requirements
17.1 The site shall operate procedures to verify that the processes and equipment employed are
capable of meeting the specified requirements of the customer.
17.2 Process validation shall be undertaken in accordance with the requirements of the owner of
the product.
17.3 The process shall be monitored by the use of real-time temperature-recording equipment
linked to an automatic failure alarm system or, where appropriate, manual checks at a
suitable frequency which allows for intervention before product temperatures exceed
Part III
defined limits for the safety, legality, quality or integrity of products.
17.4 In the case of equipment failure or process deviation, procedures shall be in place to
immediately advise the owner of the product and to take any action as required by the
owner.
Part IV
Appendices
brcgs.com 81
STORAGE AND DISTRIBUTION
ISSUE 4
Clause Requirements
18.1 The cleaning area shall be suitably segregated from product storage and handling areas to
prevent any risk of contamination of products.
18.2 The layout of the cleaning area shall ensure the segregation of clean from unclean items.
18.4 Ventilation shall be adequate to prevent any risk of condensation forming in product storage
areas.
18.5 Equipment used for cleaning shall be well maintained and serviced at a frequency to ensure
optimum performance.
18.6 Where automatic equipment is used, specified limits shall be established for optimum
operating performance (e.g. detergent dosing levels, wash/rinse/drying temperatures,
operating speed). Performance shall be monitored to ensure that these are achieved.
18.7 The site shall operate procedures to verify that the processes and equipment employed are
capable of meeting the specified requirements of the customer.
82 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
19 Waste recovery and recycling
Where the site undertakes to back-haul waste materials/packaging for recycling or disposal on behalf of a
customer, this shall be carried out in a safe hygienic manner in accordance with legal requirements.
Part II
Clause Requirements
19.1 The company shall clearly specify the types of materials that will be handled and any
exceptions. This information shall be available to the driver.
19.2 The layout of the receiving area for waste materials shall ensure adequate segregation from
product receipt, handling and storage areas.
19.3 Where company-owned or contracted vehicles are used for the collection of waste materials
from the customer (either at drop-offs or at the end of the trip), procedures shall be in place
which clearly define controls to reduce the risk of contamination from (where applicable):
• the types of materials that will be handled and any exceptions
• adequate segregation controls from products being transported to prevent contamination
of product and its packaging (including returns)
Part III
• waste-handling and spillage control requirements, including the cleaning methods and
materials to be used
• additional cleaning requirements for vehicles before their re-use for transporting
products.
This information shall be made available to, and understood by, the driver.
19.4 The handling of materials received for waste/recycling shall be carried out in a manner which
prevents the risk of contamination of products.
19.5 Waste/recycled materials shall be stored in a manner which does not attract or present
harbourage for pests.
19.6 Where specifications exist from the customer for the waste materials (e.g. levels of purity for
materials for recycling), there shall be processes in place to ensure these are achieved. Part IV
19.7 Where the ultimate disposal of materials is governed by legal requirements, these shall be
understood and the site and waste contractors licensed as appropriate.
Appendices
brcgs.com 83
STORAGE AND DISTRIBUTION
ISSUE 4
84 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Part III
Audit protocol
. Non-conformities and corrective action
Introduction
Part II
. Grading of the audit
. Audit reporting
1 General protocol – audit . Certification
. Ongoing audit frequency and recertification
preparation
. Selection of an audit option
. Self-assessment and preparation
5 Unannounced audit protocol:
. Selection of a certification body Option 2 (two-part audit)
. Scope of audit . Audit planning
. Head office and multi-site operations . Duration of audit visit
. Cross-docking . The on-site audits
. Auditor selection . Non-conformities and corrective action
. Grading of the audit
2 Announced audit protocol: . Audit reporting
Part III
. Certification
Option 1 (1 in 3 unannounced) . Ongoing audit frequency and recertification
. Audit planning
. Duration of audit visit
. The on-site audit
6 General protocol – post audit
. Non-conformities and corrective action . Communication with certification bodies
. Grading of the audit . Extension to scope
. Audit reporting . Certification withdrawal
. Certification . Appeals
. Ongoing audit frequency and certification . Surveillance of certificated companies
. BRCGS logos
. The BRCGS Directory
3 Announced audit protocol:
Option 2 (blended two-part Part IV
audit)
. Selection of Option : the blended audit
. Duration of the blended audit
. Part : The off-site remote audit
. Part : The on-site audit
. Non-conformities and corrective action
. Grading of the audit
. Audit reporting
. Certification
. Ongoing audit frequency and recertification
Part III
Audit protocol
Introduction
This audit protocol provides the specific requirements for auditing and certification to the Global Standard for
Storage and Distribution. It shall be used by the certification bodies undertaking certification and provides the basis
for accreditation bodies when carrying out their own audit and surveillance work of certification bodies seeking
accreditation to operate the Standard. The protocol also provides guidance for companies seeking certification on
the audit and certification process to help them prepare and organise for the audit.
Every effort has been made to ensure that the content of the requirements and the audit protocol are accurate at
the time of issue. However, the audit protocol may be subject to minor change, and reference shall be made to the
BRCGS website (brcgs.com) for any changes to the protocol. The website will also provide any further interpretations
or updates of the Standard should this become necessary during the life of this issue.
Most companies using the Standard wish to be independently assessed to demonstrate that they meet the
requirements of the Standard and obtain certification to the BRCGS scheme. This assessment takes the form of an
audit visit which is carried out by an independent certification body registered with BRCGS. BRCGS does not carry
out audits directly itself. Certification will be granted following a successful site audit and the completion of action
to address any non-conformities to the satisfaction of the certification body.
The process by which a site gains and maintains certification is summarised in Figure 1, and details of the key process
steps for the four audit options are provided in sections 2, 3, 4 and 5.
To gain and maintain certification to the Standard, the company must be committed to ensuring and maintaining
compliance with its requirements at all times. It is the responsibility of the site to maintain certification; the
certification body may assume responsibility for maintaining the ongoing audit programme.
86 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
O Visit brcgs.com
Learn
O Review any appropriate guidelines
Part II
O Ensure information and appropriate personnel are available for the audit, even if the
audit is unannounced
Audit
O Provide information to certification body for audit preparation
planning
O Define audit date (or parameters if unnanounced) and agree audit duration based on
audit duration calculator
O Opening meeting
O Inspection of site/storage facility (where applicable)
Part III
O Document review
O Traceability exercise and check of associated records and documentation
On-site O Vehicle audit (where applicable)
audit O Final review of findings by auditor
O Closing meeting – review audit findings and confirm any non-conformities
Note that there is no requirement for the auditor to carry out the audit in the order
listed above, but the audit must include all applicable elements.
O Carry out corrective action (and provide evidence) for any non-conformities
identified within 28 days (90 days for an initial audit) or revisit depending on number Part IV
Non-conformities and and nature
corrective action O Certification body reviews evidence in 14 days
O If corrective action deemed satisfactory, certificate, audit report and corresponding
grade issued within 42 days of the audit date (104 days for initial audits)
brcgs.com 87
STORAGE AND DISTRIBUTION
ISSUE 4
The audit date is agreed with the certification body in advance and all the requirements of the Standard are audited
during the audit visit. For the unannounced audit that occurs once every 3 years, the certification body will notify
and agree this within 3 months of the previous audit to ensure that the site is aware that an unannounced audit will
take place in the coming year.
Successful sites are awarded a certificate with the grade of AA, A, B, C or D, depending on the number and
type of non-conformities identified, while the sites undergoing a mandatory unannounced audit will receive an
unannounced grade of AA+, A+, B+, C+ or D+, depending on the number and type of non-conformities identified.
There are two options for announced audits, which allow companies to decide the one best suited to their business
requirements:
• Option 1 Full audit The whole Standard is audited on a single visit, typically lasting 1–2 days. The audit will be
announced or unannounced, based on the audit cycle. This option is available for both existing certificated sites
and those new to certification.
• Option 2 Blended audit The audit visit is split into a remote visit followed by an on-site visit, each typically
lasting 1–2 days. The first visit, which is remote and planned, looks predominantly at the documented systems and
records using ICT (information and communication technology), while the second visit is an announced on-site
audit. This approach allows companies to ensure that appropriate managers are available to assist with the audit of
documentation and the on-site visit. This option is only available for recertification announced audits and not for
initial or unannounced audits.
The blended audit is only offered by the certification body following a risk assessment. More details on the
announced audit programmes can be found in sections 2 and 3.
The conducting of an independent, unannounced review of the production facilities, systems and procedures under
this scheme provides a site’s customers with added confidence in the site’s ability to consistently maintain standards.
This may influence the frequency of customer audits, where conducted, and other performance measures applied by
the customer.
There are two options for unannounced audits, which allow companies to decide the one best suited to their
business requirements:
• Option 1 Full audit The whole Standard is audited on a single unannounced visit, typically lasting 1–2 days.
• Option 2 Two-part audit The audit is split into two separate visits, each typically lasting 1–2 days. The first visit,
which is unannounced, audits predominantly site and vehicle operating standards. The second visit, which is
planned, looks mainly at the documented systems and records. This approach allows companies to ensure that
appropriate managers are available to assist with the audit of documentation.
88 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
The grading and reporting for each option is the same. The unannounced audit process for Options 1 and 2 is
summarised in Figure 2. More details on the unannounced audit programme options can be found in sections 4
and 5.
Part II
website (brcgs.com).
The Standard should be read and understood and a preliminary self-assessment should be conducted by the
company against the Standard to prepare for the audit. Any areas of non-conformity should be addressed by the site.
Further information, guidance and training to ensure compliance with the Standard, including a downloadable
self-assessment tool, is available at brcgs.com. BRCGS also has a full range of guidelines and supporting materials
available through its website and via the BRCGS Participate subscription service.
An optional on-site pre-assessment may be carried out by the selected certification body in preparation for the
audit to provide guidance to the site on the process of certification. It should be noted, however, that under the rules
for accredited certification, consultancy cannot be provided by the certification body that will later undertake the
certification audit.
Part III
Units that are newly built or commissioned must ensure that the systems and procedures in place are compliant
before an initial BRCGS audit is undertaken. It is at the discretion of the company whether it wishes to invite
a certification body to carry out an audit; however, it is unlikely that full compliance would be satisfactorily
demonstrated at an audit undertaken less than 3 months from commencement of operation. This is likely to be the
situation even where the site for certification uses quality systems developed by other certificated companies in the
group.
• a copy of the audit report and any subsequent certificate or audit result shall be supplied to BRCGS and may also
be supplied to the accreditation body in the agreed format for the standard used. Other documents in relation to
the audit shall be made available to BRCGS upon request. All documents submitted to BRCGS shall be copies of
original documents. Documents provided to the BRCGS will be treated as confidential. Where agreements are in
place, BRCGS may make audit reports and certificates available to customers of sites or the authorities for earned
Appendices
recognition purposes. Sharing can be removed by the site at any time through the BRCGS Directory mechanism
• the auditor(s) may be accompanied by other personnel for training, assessment or calibration purposes. This
activity may include:
• training of new auditors by the certification body
• routine certification body shadow audit programmes
brcgs.com 89
STORAGE AND DISTRIBUTION
ISSUE 4
Unannounced Unannounced
scheme (Option 1) scheme (Option 2)
Audit report and certificate grade issued based on number and type of non-conformities issued
90 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
• witness audits by accreditation bodies
• witness audits by BRCGS.
The BRCGS team reserves the right to conduct its own audit or visit to a site, once certificated, in response to
complaints or as part of the routine BRCGS compliance activity to ensure the integrity of the scheme. Such visits
may be announced or unannounced.
Part II
The BRCGS team may contact the site directly in relation to its certification status, for feedback on the certification
body’s performance, or investigation into reported issues.
The Standard sets out the requirements against which both certificated and uncertificated sites will be audited.
Contracts between the certification body and the site shall include a clause acknowledging these obligations. The
contract will be formulated by the certification body.
Non-compliance with any of these contractual obligations may affect the status of certification of the site.
Part III
until the registration fee and the certification body’s audit fees have been received, irrespective of the outcome of
the certification process.
In order to define the activities to be audited and the scope for certification, the certification body will need Part IV
to clearly understand the company and the activities it undertakes. This may be carried out via questionnaire,
discussion or pre-audit meeting with the company’s management. This planning process shall include establishing a
full understanding of the company’s activities including, where applicable:
• the operational management structure of the company (i.e. where more than one facility is involved, the role of
head office or regionalised systems in meeting requirements of the Standard)
• the location of the company’s sites and, where the company operates from more than one location, the
interrelationships between different locations and the site(s) to be audited
• any subcontracting arrangements (e.g. for distribution vehicles)
• any limitations on distribution activities imposed by customers (e.g. where loading or unloading is not carried out
by the distribution company)
• any product transfer activities undertaken during distribution
Appendices
• the nature of any additional contracted services to be included within the scope
• the range of products handled and any particular special handling requirements
• any activities that occur only for limited periods each day (e.g. order picking and loading).
brcgs.com 91
STORAGE AND DISTRIBUTION
ISSUE 4
The scope of the audit and subsequent certificate shall generally cover all the activities and product categories
permitted within the scope of the Standard. By exception, certain activities or products may be excluded from the
scope where this is agreed before the audit. Any exclusions that apply shall be clearly stated on the report and
certificate.
The wording of the scope and the product groups shall be verified by the auditor during the site audit, and shall
enable a recipient of the report or certificate to clearly identify whether the products supplied have been included.
The report shall give a description of the processing activities undertaken at the site, including any activities covered
by the additional voluntary modules that fall within the scope of the Standard, to provide clarity to the user of the
report or certificate.
The exclusion of product categories handled at a site will only be acceptable where:
• the excluded product categories can be clearly differentiated from the product categories within scope and
• the product categories within scope are stored in a physically segregated area of the factory.
Where exclusions are requested, these shall be agreed with the certification body in advance of the audit and
considered in the contract review process. Exclusions shall be clearly stated on the audit report and certificate, and
the justification recorded on the audit report.
The certification of products must include an audit of the entire process (e.g. from goods intake to delivery to
customer). It is not possible to exclude parts of the process undertaken. Where exclusions are accepted, the auditor
shall assess any hazards presented by excluded areas or product categories (e.g. the introduction of allergens or
foreign-body risks) and non-conformities may be raised relating to the excluded area where this poses a risk to the
product categories within the audit scope.
Where a company operates wholesale, e-commerce, cross-docking or contracted services activities, these may be
excluded as they are additional voluntary modules of the Standard. However, this information must be clearly stated
on the audit report and certificate. Where such exclusions are stated, it doesn’t affect a site’s ability to use the
BRCGS logo.
• the product categories handled (e.g. chilled food, frozen food, ambient food, packaging materials, textiles, electrical
products, etc.)
• the service activities carried out (i.e. storage, distribution, transport only, wholesale, e-commerce, cross-docking,
identified contracted services)
• exclusions from scope (i.e. any products handled or activities undertaken at the site but not included in the audit
scope; this also applies to additional voluntary modules). Where there are no exclusions, the report and certificate
shall say ‘none’.
92 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
1.4.4 Exclusion of requirements
The requirements of the Standard would be expected to be met in full for a typical storage and distribution
operation handling food products. It is possible that where some lower-risk consumer products are handled, some
requirements of the Standard may be excluded on the basis of risk. Where requirements are excluded, the site shall
provide a documented risk assessment justifying the exclusion. The risk assessment shall be assessed by the auditor
and any accepted exclusions itemised on the audit report.
Part II
Where a company provides one of the additional voluntary modules (except cross-docking in section 11) and decides
to exclude these activities from the scope of certification, it would be a stated exclusion on its certificate and report;
however, this would not impact its ability to use a BRCGS logo.
Where companies operate only storage facilities and the distribution is managed by a third party not under the
company’s direct control, then many of the vehicle requirements in Part II, section 5 (vehicle operating standards)
would not apply. If, however, the site subcontracts the distribution, then the requirements of section 5 shall be
included within the subcontracted arrangements with each distribution company.
Where companies operate only distribution activities, some elements of Part II, section 4 (site and building
standards) may not apply.
The auditor shall assess whether a clause is applicable and will indicate this in the report.
Part III
1.5 Head office and multi-site operations
A storage or distribution operator may have the added complexity of multiple locations, with the head office
managing some audit requirements.
In order to complete the audit process and be in a position to issue a certificate, the auditor shall assess all
applicable requirements of the Standard. This may necessitate separate audit visits to a head office and the site to be
certificated to complete the audit, or it may be possible to access documentation held at head office from the site.
Where a company has several storage/distribution sites seeking certification, all of which are operating to a
centralised system managed at a head office, it is normal for a separate audit of the head office function to
be undertaken. Figure 3 provides an example of an audit process flow for a head office with multiple storage/
distribution sites.
In such circumstances the certification body will develop a full audit plan that includes the activities of the head Part IV
office and all its participating sites. The initial audit shall be of the head office, and any non-conformities identified
shall be corrected to the satisfaction of the certification body before undertaking the site audits. Any uncorrected
non-conformities shall be carried over and included in subsequent site audit reports.
The site audit reports shall provide a complete commentary on how the requirements of the Standard are met,
including those activities audited at the head office.
The head office of the company shall be visited annually. Re-audits of individual sites under the head office’s control
are performed at a frequency dependent on the previous audit performance of that particular site.
Certificates cannot be issued for head office operations. Separate reports and, where appropriate, individual
certificates shall be issued for each site.
Appendices
For the unannounced audit, the head office audit may be completed as an announced audit while other storage and
distribution site audits must be completed as unannounced audits.
brcgs.com 93
STORAGE AND DISTRIBUTION
ISSUE 4
or
Not acceptable
Acceptable
Site audits
Figure 3 Audit process flow for a head office with multiple sites
94 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
1.5.1 Defining the limits of a site
Audit reports and certificates must be site-specific. In practice, however, a company may own several storage
facilities/warehouses at different locations all operated under common management as a single operation.
For the purposes of the Standard, the separate buildings may be classed as a single ‘site’ where all of the following
criteria are satisfied. All locations shall:
Part II
• be managed by the same management team
• operate to the same site quality management system
• be within 50 km of the location of the site management team.
All locations classified as part of a single site shall be audited at each audit. The addresses of all locations shall be
included on the certificate or on an addendum to this and shall be identified in the audit report.
Where trans-shipment activities are conducted, the location for these activities must meet the requirements defined
in the site standards (section 4) and be included in the audit programme.
Part III
certification process of the hub depot where all of the following criteria are satisfied:
• only products from the hub are received into the satellite depot
• management systems for the satellite depot are the same as for the hub
• management responsibility for the satellite depot rests with a manager of the hub depot.
Where these circumstances are met, the satellite depot shall receive an audit visit but as part of the hub depot audit
and may therefore be included within the report and certificate of the hub depot.
Where these circumstances are not met, the satellite shall receive its own full audit and receive a separate audit
report and certificate, where applicable. Satellite depots may also choose to be audited and certificated as separate
sites.
1.6 Cross-docking
Applicable to Part II, section 11 only. Part IV
The main site shall be audited by the certification body before the cross-docking facilities. If necessary, a small
number of multi-site cross-docking facilities may be audited prior to the audit of the main site; however, this shall
be subject to agreement with the BRCGS team.
In the event of non-conformities being identified when auditing a sample of the multi-site cross-docking facilities
which cause concern regarding the conformity of the organisation, the certification body shall increase the sample
Appendices
brcgs.com 95
STORAGE AND DISTRIBUTION
ISSUE 4
• Single audit for each cross-docking facility Every cross-docking facility shall be audited separately, and receive its
own report and corrective action plan. The audit of the main site shall always take place before any audits of the
cross-docking facilities.
• Sampling plan for the multi-site audit of all cross-docking facilities Cross-docking facilities can be subject to a
risk-based sampling plan that includes a minimum sample size.
The sampling plan shall base its minimum sample size on the number of facilities, as shown in Table 1.
• 25% of the sample sites shall be selected at random from the sites that were not audited in the previous year
• 75% of the sample sites shall be selected by taking into account:
• results of internal audits and reviews
• previous audit performances of that site
• records of complaints and other relevant aspects of corrective and preventive actions
• complexity of product types handled at the site (e.g. ambient, chilled, frozen products)
• modifications since the last audit
• newly opened sites.
Where a multi-site sampling plan is devised, the certification body’s audit sampling programme shall be reviewed,
and audits completed annually against a defined sample size.
96 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
The certification body has the right to expand the number of sites to be audited (within the sampling programme)
where required.
Part II
(see Appendix 5 for a template of the cross-docking annex).
If a facility fails its audit, the company in turn will fail to gain certification to the cross-docking module. Where
certification has previously been awarded, the certification body shall withdraw and re-issue the certificate without
the cross-docking module being included in the scope.
The certification body will conduct a review to determine whether the new facility can be included within the
current scope or whether a visit prior to the next audit cycle is required. The review shall be based on:
• results of internal audits and reviews (where available) conducted by the main certificated site
Part III
• complexity of product types handled at the facility (e.g. ambient, chilled, frozen products).
The certification body, auditors and the site must be aware of the need to avoid conflicts of interest when arranging
for auditors to visit the site. The site may decline the services of a particular auditor offered by the certification body.
The same auditor is not permitted to undertake audits on more than three consecutive occasions at the same site.
Where the audit is not being carried out by the auditors in the native language of the site, an appropriate translator
shall be provided who has knowledge of the technical terms used during the audit.
Part IV
2 Announced audit protocol: Option 1 (1 in 3 unannounced)
This is a full announced audit with one mandatory unannounced audit every 3 years.
With this change in the announced scheme, every site must have at least one unannounced audit at least every
3 years. For sites with annual (12-month) audits, this will result in at least every third audit being unannounced.
Sites that receive a grade C or D at any of their audits will still be expected to undergo an unannounced audit every
3 years, but there will obviously be a larger number of announced audits in the interim.
Sites that have opted into the fully unannounced audit programme are not affected by this change, and will continue
to follow the unannounced audit protocol outlined in Part III, sections 4 and 5. Where a site chooses to revert to the
announced audit programme then these requirements will apply.
Appendices
brcgs.com 97
STORAGE AND DISTRIBUTION
ISSUE 4
Before any audit, the site is required to review the Standard and make any necessary amendments or improvements
to its own operations and systems. The site may also be required to provide the certification body with background
information by completing either a pre-audit questionnaire or a pro-forma information sheet. The site shall provide
the certification body with any information that would assist the auditor in preparing an effective audit, such as
HARA or HACCP documentation, details of its organisational structure and site plan, and any relevant performance
data. The site is also required to make the previous audit report available to the auditor and certification body.
There is a requirement to plan carefully for the audit, to have appropriate documentation for the auditor to assess,
and to have relevant staff available at all times during the audit. The site shall ensure that where key activities occur
only at particular times of day, the certification body is made aware of this to enable it to plan the audit activity
accordingly.
The site shall ensure that the activities undertaken at the time of the audit represent the activities included within
the scope. Where possible, the widest range of these activities shall be in operation for the auditor to assess. Where
the range is large or diverse, the auditor has the discretion to continue the audit until sufficiently satisfied that the
intended scope of the certification has been assessed.
For the mandatory unannounced audit, the certification body will discuss audit options with the site, and notify
it of the year when an unannounced audit will take place (the actual date of the unannounced audit will not be
communicated to the site). This discussion shall occur within 3 months of the previous audit to ensure that the site
is aware.
The company shall make the previous year’s audit report and certificate available to the certification body where this
is a contract with a new certification body.
98 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
For the information required for the unannounced audit, see section 4.1.3.
Part II
The unannounced audit will replace the normal scheduled (announced) audit. It can occur at any stage within the
last 4 months of the certification cycle, including the last 28 days before the audit due date (i.e. unannounced audit
within the 4 months prior to the audit due date). The audit shall only take place during normal site operations, unless
other arrangements have been agreed in advance with the site.
The site must not be notified of the proposed audit date in advance.
Compliance with the Standard is expected to be maintained at all times and the site should therefore always be
‘audit ready’. However, there may be dates when an audit genuinely cannot take place, for example, when there is a
planned customer visit. Therefore, a site may nominate up to 10 days when it is not available for an audit. Sites on
a 6-month audit schedule (e.g. sites certificated to the Standard with grades C or D) may nominate a maximum of
Part III
5 days.
Days when the site is not operating (e.g. public holidays or site holidays) are not included with the 10 days (or 5 days).
Any such non-operational days must be notified to the certification body. The dates and reasons must be provided
to the certification body at least 4 weeks in advance. The certification body may challenge the reason where this
does not appear appropriate, and at its discretion accept these nominated dates. Certification bodies are expected to
operate discretion in the case of emergencies.
It is a condition of the unannounced audit that the auditor shall be granted access to the site for the audit on arrival.
If access is denied, the site will be liable for the auditor’s costs and it will revert to the announced audit scheme. At
the discretion of the certification body, the existing certificate may also be suspended or withdrawn.
Although it is recognised that the duration of an audit is typically 1 working day, certain factors may necessitate
an increase or decrease in the duration of the audit. These factors will require careful consideration, both upon
confirmation of the expected duration of the audit and during the audit itself. Please note that the audit duration
cannot be less than 1 day (i.e. the minimum duration is 1 day).
In some cases, certification bodies may request documentation for review prior to the audit visit. The time required
to assess this documentation is in addition to the duration of the audit visit.
• more than one location, with separate office and storage sites
• any need to witness the unloading of vehicles or to accompany drivers
• the use of contracted services
• a large, widely dispersed site
brcgs.com 99
STORAGE AND DISTRIBUTION
ISSUE 4
The audit covers both systems and their implementation. A significant proportion of the audit (typically no less than
30% of the audit duration) will be spent in and around the storage area reviewing operations, inspecting vehicles and
interviewing staff.
Where distribution is included within the scope, the certification body must be satisfied that adequate evidence
is available to confirm that the activities undertaken during the transportation of products (e.g. security of loads,
control of temperature) are being met. If the requirements cannot be satisfactorily verified without the need
to accompany a vehicle, then an accompanied vehicle inspection shall be required as part of the assessment
programme.
In the event that the audit against the Standard includes modules or is intended to be combined with other
standards, the total audit time will need to be appropriately extended. Details of combined audits shall be specified
on the audit report.
Before the audit takes place, the certification body shall indicate the approximate duration of the audit. Confirmation
of the duration of the audit shall be made by an appropriately authorised employee of the certification body, with
reference to the factors specified above.
Deviation from the expected audit timeframe must be justified and specified on the audit report.
100 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
• traceability exercise and check of associated records and documentation – this will be a vertical audit, as specified
within the BRCGS guidance document on auditing techniques
• final review of findings – conducted by the auditor in preparation for the closing meeting
• the closing meeting – to review audit findings with the site. (Note that non-conformities are subject to subsequent
independent verification by the certification body management.)
Part II
The auditor shall allocate sufficient time to ensure that appropriate attention is given to the document review and
the site and vehicle inspection. The site and vehicle inspection process, which includes interviewing staff, observing
processes and reviewing the documentation in operational areas with the relevant staff, shall typically take a
minimum of 30% of the audit duration to complete.
It is expected that, at the opening and closing meetings, those attending on behalf of the site will be senior
managers who have the appropriate authority to ensure that corrective action can be progressed in the event of non-
conformities being found.
During the audit, detailed notes shall be made regarding how the site conforms to the Standard and any non-
conformity identified. These notes will be used as the basis for the audit report. The auditor will assess the nature
and significance of any non-conformity and discuss this with the accompanying manager at the time. At the
Part III
closing meeting, the auditor shall present their findings and discuss all non-conformities that have been identified
during the audit. The site shall receive clear instructions on the type of evidence that will need to be provided
to demonstrate the correction of any non-conformities and the timescale for the presentation of the evidence.
The auditor is not permitted to provide specific advice on the corrective action to be taken as this constitutes
consultancy work. A written summary of the non-conformities discussed at the closing meeting shall be provided
either at the closing meeting or within 1 working day of completion of the audit.
At the closing meeting, the auditor shall provide the site with an explanation of the BRCGS Directory (which allows
both the client and its nominated customers secure access to audit data) and the BRCGS compliance programme
(including the feedback systems available to communicate with the certification body and the BRCGS team).
The decision to award certification and the grade of the certificate will be determined independently by the
certification body management, following a technical review of the audit report and the closing of non-conformities
in the appropriate timeframe. The company will be informed of the certification decision following this review.
Part IV
2.3.2 Unannounced audit
For the mandatory unannounced audit, please see section 4.3.
2.4.1 Non-conformities
The level of non-conformity assigned by an auditor against a requirement of the Standard is an objective judgement
with respect to severity and risk and is based on evidence collected and observations made during the audit. The
level assigned is verified by the certification body management.
• Critical Where there is a critical failure to comply with a product safety or legal compliance issue
• Major Where there is a substantial failure to meet the requirements of a statement of intent or any clause of
the Standard, or where a situation is identified which would, on the basis of available objective evidence, raise
significant doubt as to the conformity of the product or services being supplied
• Minor Where a clause has not been fully met but, on the basis of objective evidence, the conformity of the
product is not in doubt.
brcgs.com 101
STORAGE AND DISTRIBUTION
ISSUE 4
As the objective of the audit is to provide a true reflection of the standard of operation and level of conformity
against the Standard, consideration should therefore be given to awarding a single major non-conformity where
minor non-conformities are repeatedly raised against a particular clause of the Standard. The clustering of a
significant number of minor non-conformities against a clause and recording this as a single minor non-conformity is
not permitted. The certification body shall justify a high number (more than 20) of minor non-conformities where no
more than one major non-conformity is given. This shall be detailed on the audit report.
All identified non-conformities must be corrected to the satisfaction of the certification body before a certificate
can be issued. In circumstances where it is not possible to effect a permanent solution within the timescale for
certification, a temporary solution may be accepted by the certification body.
The process for ‘closing out’ non-conformities depends upon the level of non-conformity and the number of non-
conformities identified.
The grading of non-conformities will be reviewed by the independent certification process of the certification body
as soon as possible after the audit. Where the review confirms that a certificate cannot be awarded, the site will be
required to undertake another full audit before assessment for certification.
Due to the nature and number of non-conformities, it is unlikely that these non-conformities can be addressed and
fully effective improvements implemented and established within a 28-day period – although there may be some
exceptions. Therefore, the re-audit shall not take place any earlier than 28 days from the audit date.
It is a requirement of some customers that they shall be informed when their suppliers have a critical non-
conformity identified or fail to gain certification. In such circumstances the company shall immediately inform its
customers and make them fully aware of the circumstances. Information on the corrective actions to be taken in
order to address the non-conformities will also be provided to customers where required.
For each non-conformity raised, the site shall, in addition to undertaking the necessary immediate corrective action,
undertake a review of the underlying cause (root cause) of the non-conformity. The root cause shall be identified
and an action plan to correct this, including timescale, shall be provided to the certification body. The proposed
preventive action shall be included in the audit report.
102 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Close-out of non-conformities can be achieved either by objective evidence being submitted to the certification
body, such as updated procedures, records, photographs or invoices for work undertaken, or by the certification body
undertaking a further on-site visit.
Where the audit would result in a grade of C or C+ (with two major non-conformities) or a D or D+ being awarded,
the closure of non-conformities shall be by means of a further site visit to review the action taken. This visit shall be
Part II
within 28 calendar days of the audit if a certificate is to be issued.
If satisfactory evidence is not provided within the 28 calendar-day period allowed for submission following the
audit, certification will not be granted. The site will then require a further full audit in order to be considered for
certification.
Non-conformities from the audit shall also be checked during the next site audit to verify effective close-out of the
non-conformities and their root causes. Where the correction has been ineffective then a non-conformity shall be
raised against clause 1.1.11 in Part II Requirements.
The certification body will review objective evidence of the corrective action completed prior to awarding a
certificate.
Part III
The purpose of the certification grading system is to indicate to the user of the report the commitment of the site
to continual compliance, and will dictate the future audit frequency. The grade is dependent on the number and
severity of the non-conformities identified at the time of the audit. Non-conformities are verified by a technical
review process by the certification body management. If the review results in a change in the number and/or severity
of non-conformities, the site shall be notified.
Table 2 specifies the grades, the levels of non-conformity and the audit frequency that may result from an audit.
Certification and grading are awarded according to the following circumstances:
• For initial audits Satisfactory corrective action shall be taken and this shall be reviewed and a decision taken on
its acceptability within 90 calendar days of the audit date in order for a certificate to be issued. If this timescale
cannot be met, a full re-audit will be required before a certificate can be issued.
• For certificated sites Satisfactory corrective action shall be taken and this shall be reviewed and a decision taken
on its acceptability within 28 calendar days of the audit date in order for a certificate to be issued. If this timescale
cannot be met, a full re-audit will be required before a certificate can be issued. Part IV
Sites having an unannounced audit as part of the announced scheme have a plus symbol added to their grade (e.g.
AA+, A+, B+, C+ or D+), similar to the sites within the voluntary unannounced audit programme.
Appendices
brcgs.com 103
STORAGE AND DISTRIBUTION
ISSUE 4
B B+ 1 10 or fewer
C C+ 17–24 Objective evidence 6 months (12 months
within 28 calendar for existing certificated
C C+ 1 11–16 days (90 days for sites handling consumer
C C+ 2 10 or fewer initial audits) products only)
2.5.1 Revisits
Where a revisit is required to review the action taken in response to the non-conformities identified at the audit,
this will be scheduled to be completed within the timescales for certification (i.e. 28 calendar days for certificated
sites, and 90 calendar days for initial audits). The visit will primarily review the effectiveness of the corrective
actions taken; however, if new non-conformities are identified during the course of the visit, these must also be
satisfactorily resolved before a certificate can be issued. The action taken to correct the non-conformity will be
recorded on the final audit report.
104 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
The audit report must inform the reader and be easy to understand. It shall include the following sections:
• audit details
• audit summary
• any non-conformities, corrective actions taken, and plans to correct the root causes (preventive actions)
• explanation of the clauses assessed as being non-applicable
Part II
• checklist of compliance with each clause
• product safety controls in place
• improvements since the last audit.
The audit details, non-conformity and corrective action summaries shall be written in English to enable the report to
be uploaded to the BRCGS Directory. This information may also be presented in another language where requested.
The audit summary section shall be in open-text format and shall provide a comprehensive summary of how the site
complies with the requirements of each section of the Standard.
The certification body shall retain records showing how sites have complied with each clause of the Standard; while
this information does not have to be reproduced in full in the final report, it shall be retained and made available on
request.
Part III
The report shall be prepared and dispatched to the site and a copy uploaded to the BRCGS Directory within a period
typically no longer than 42 calendar days after the audit date (104 calendar days for initial audits). Audit reports shall
remain the property of the company commissioning the audit and shall not be released, in whole or part, to a third
party unless that company has given prior consent (unless otherwise required by law). Consent may be given either
by a consent form, by authorising access directly to the BRCGS Directory, or it may be contained within a contract
between the site and the user or between the site and the certification body.
The certification body will retain a copy of the audit report. The audit report and associated documentation shall be
stored safely and securely for a period of 5 years by the certification body.
2.7 Certification
After a successful outcome of the audit process, a certificate shall be issued by the certification body. Certificates
shall be prepared and dispatched to the site typically within 42 calendar days of the audit date (104 calendar days for
initial certification). The certificate shall conform to the format shown in Appendix 3. Logos used on certificates (e.g.
the BRCGS and accreditation body logos) shall comply with their respective usage rules. Part IV
In some instances a company may own several storage facilities at different addresses within a town, or a sub-depot
may have been included within the audit programme for the main depot (see Part III, section 1.5.1). In the event that
one or more premises are audited as one site, the report and the certificate shall clearly indicate the locations which
have been audited and are included, and any locations not audited and excluded.
The users of certificates shall validate their authenticity on the BRCGS Directory website (brcgsdirectory.com)
and ensure that the scope and the information on the certificate are clearly stated and assessed against their own
requirements.
The certificate is issued to the site; however, it remains the property of the certification body and is subject to
control regarding its use and display.
Appendices
brcgs.com 105
STORAGE AND DISTRIBUTION
ISSUE 4
Subsequent audits of certificated sites shall be carried out either 6, 12 or 18 months after the previous audit due date
according to the number and type of non-conformities identified at that audit (see Table 2). If it is an announced
audit, it shall be scheduled to occur within a 28 calendar-day time period up to the next audit due date. This
allows sufficient time for corrective action to take place in the event of any non-conformities being raised, without
jeopardising continued certification. Table 3 provides worked examples in accordance with the announced and
mandatory unannounced recertification audits.
It is the responsibility of the site to maintain certification. Where an audit is delayed beyond the due date, except
in justifiable circumstances (see section 2.8.3), this shall result in a major non-conformity being awarded at the next
audit. Justifiable circumstances shall be documented in the audit report.
For scheduling the mandatory unannounced audit, see section 2.1.3. The unannounced audit shall only take place
during normal site operations, unless other arrangements have been agreed in advance with the site. The site must
not be notified of the proposed audit date in advance.
The unannounced audit certificate will supersede the existing certificate. It will be issued within 42 days of the audit
(assuming that certification is achieved based on the number and severity of the non-conformities and completion
of corrective actions). The certificate will have an expiry date based on the expiry date of the previous certificate plus
6 or 12 months (depending on grade).
The site shall be responsible for maintaining valid certification, while the certification body assumes responsibility
for maintaining the ongoing audit programme.
Where a site cannot be certificated because of the number or level of non-conformities identified during the audit,
the site will require a further full audit before certification can be considered. Once the site has addressed the
non-conformities that were raised, the new audit can be arranged. The re-audit shall not take place any earlier than
28 calendar days from the audit date.
If the audit was a mandatory unannounced audit, the re-audit may be announced. The re-audit will be completed by
the same certification body, unless a concession is granted by BRCGS to change the certification body during this
period.
It should be noted that the site must have at least one unannounced audit every 3 years, and this frequency is not
expected to change as a result of the failed audit.
106 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Table 3 Worked examples of an initial audit followed by announced and unannounced recertification audits
Announced/unannounced Audit date Audit due date
Initial audit at site (announced) 1–2 June 2020 1 June 2021
Re-audit (announced) 20–21 May 2021 (audit within 28 days prior to audit due date) 1 June 2022
Part II
Re-audit (1 in 3 unannounced) 1–2 March 2022 (audit in 4 months prior to audit due date) 1 June 2023
Re-audit (announced) 20–21 May 2023 (audit in 28 days prior to audit due date) 1 June 2024
Re-audit (announced) 20–21 May 2024 (audit in 28 days prior to audit due date) 1 June 2025
Re-audit (1 in 3 unannounced) 10–11 March 2025 (audit in 4 months prior to audit due date) 1 June 2026
If the site chooses to change certification body, this does not change the requirement for the site to receive an
unannounced audit where this has already been notified to the site. Therefore, the site must ensure that the new
Part III
certification body is aware that the site is already certificated, that the next audit was scheduled to be unannounced,
and provide the date of its last unannounced audit. The certification body will also require evidence of the site’s
audit history (e.g. a copy of the most recent audit report) so that the 3-year cycle can be maintained. (Note that
sharing the last audit report is a mandatory requirement of the BRCGS audit protocol, section 2.1.2).
Certification bodies are advised to ensure that the previous audit report forms part of the contractual process with
the site. Where a site fails to share its last report in a timely manner, the new certification body will have access to
the last audit report via the BRCGS Directory.
If a site fails to have an unannounced audit within the 3-year period, its final audit may be refused by BRCGS and the
site will become uncertificated until such a time as an unannounced audit is completed.
• situated in a specific country or an area within a specific country where there is government advice not to visit and
there is no suitable local auditor
• within a statutory exclusion zone that could compromise product safety
• in an area that has suffered a natural or unnatural disaster, rendering the site unable to produce or the auditor
unable to visit
• affected by conditions that do not allow access to the site or restrict travel (e.g. heavy snow).
Moving the audit date to a more ‘acceptable’ later date for reasons of combining audits, lack of personnel or
undertaking building work are not acceptable reasons for missing the due date.
Appendices
It is not a justifiable reason to delay audits where sites are not in full operation; however, audits must be undertaken
while activities are taking place.
brcgs.com 107
STORAGE AND DISTRIBUTION
ISSUE 4
If the renewal of the certificate is prevented due to exceptional circumstances, the customer may still decide to
take products or procure services from that site for an agreed time, as customers may be able to demonstrate legal
compliance by other means, such as risk assessment and complaints records, to show that the site is still competent
to continue operation until another audit can be arranged.
Liability for the auditor’s time shall be covered by the certification body’s contract with the site.
2.8.5 Non-availability of key staff at the opening or closing meeting or during the audit
The Standard requires the most senior operation managers (i.e. those who are responsible for the ‘hands on’ running
of the site) to be present at the opening and closing meetings. Some managers may be absent on the day of the
audit due to other commitments; however, there shall always be a nominated deputy available. For example, in the
Standard:
• clause 1.1.8 requires the senior operation manager to attend opening and closing meetings
• clause 1.3.3 requires clear documentation regarding who deputises in the absence of the responsible person.
Where a key member of staff (e.g. the technical manager) is away on the day of the audit, this will not be accepted as
a reason to prevent the audit going ahead. It is expected that there will be cover for managers in their absence.
Liability for the auditor’s time shall be covered within the certification body’s contract with the site.
In some circumstances it is possible to undertake the audit earlier than this due date (e.g. to allow a combined audit
with another scheme). Where an audit date is brought forward, the following rules shall apply:
• the audit report will detail the reasons why an audit has been brought forward
• the audit due date will be ‘reset’ to occur 12 months from this audit date
• the certificate shall be issued with an expiry date of 12 months (or 18 months, depending on the products being
handled) + 42 days from the ‘new’ audit date.
108 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
3 Announced audit protocol: Option 2 (blended two-part audit)
This is a blended audit split into a remote visit followed by an on-site visit.
The Option 2 blended audit scheme divides the audit requirements into two separate audits, comprising an off-
site remote assessment using ICT (information and communication technology) followed by an on-site audit. The
Part II
first audit is predominantly based on a review of documentation and records and can be planned to ensure that the
appropriate management staff are available to retrieve and discuss the records. The second audit mainly considers
the site operating practices, such as hygiene and product handling.
The certification body shall have a documented process for undertaking blended audits which shall ensure
compliance to IAF MD4:2018.
Part III
3.1.1 Confidentiality, security and data protection (CSDP)
The certification body shall consider local data protection and privacy laws (as stated in IAF MD4:2018, clause 4.1).
It is important that, if ICT (such as video) is utilised, the relevant consents have been sought from the individuals
involved to ensure compliance with local privacy regulations.
To prepare for the use of ICT, all certification (legal and customer requirements related to confidentiality, security
and data protection) must be identified and actions taken to ensure their effective implementation. Evidence of
agreements related to CSDP must be available. The CSDP criteria must be acknowledged by all participants, and
measures to ensure confidentiality and security must be confirmed during the opening meeting.
Where documented information is analysed, it must be shared in a secure and agreed system, such as a cloud-based,
virtual private network or other file-sharing system utilising CSDP guidelines. Once the audit is complete, the auditor
must delete from their system, or remove access to, any documented information and records not required to be
retained as objective evidence.
Part IV
Auditors must not take screenshots of auditees as audit evidence. Any screenshots of documents or records or any
other kind of evidence must be previously authorised by the company being audited. In the case of non-fulfilment of
these measures or non-agreement of information security and data protection measures, the certification body shall
not use the blended audit option.
• historical audit performance of the site, including the risks from complaints and recalls
• availability of documentation and records in electronic form and a willingness to share these remotely (including
any limitations)
Appendices
• capability of the certification body to conduct the remote audit (e.g. trained auditors, technical access to an IT
system that both the certification body and the company will be able to use)
• capability of the site staff to utilise technologies used in remote audit techniques, including on-site video (e.g. in
operational areas and meetings).
brcgs.com 109
STORAGE AND DISTRIBUTION
ISSUE 4
Any limitations on document and record sharing shall be understood before the audit. The pre-audit risk assessment
is not included in the calculation of the audit duration.
Where audit teams are used, the audit report shall be clear on whether each auditor has completed remote and/or
on-site activities.
If a technical expert is used during the assessment, then the documents shared by the site shall also be made
accessible to the expert. Where different auditors are used for the remote and on-site audits, there shall be a clear
handover process in place prior to the on-site audit to ensure that the auditor has all the necessary information to
fully complete the audit and that all the requirements of the Standard are fully covered, either remotely or on site.
The total audit duration at the site should be divided evenly between the review of documentation and the on-site
operating practices. If additional storage facilities, locations or head office assessments are included within the audit
process, then additional time shall be allocated for this.
The total audit duration does not include time spent on audit planning, the risk assessment, report writing or
reviewing documentary evidence. However, the remote audit duration shall not exceed more than the 50% of the
total audit duration in any case.
The time allocated for the on-site audit may be adjusted based on the findings from the remote audit; for instance,
more time may be required if there are a large number of non-conformities with corrective actions to review
following the remote audit.
For the head office or central function, the remote audit can be completed using the colour-coding of the relevant
clauses of the Standard. In some situations, this may mean that the auditor does not need to visit the head office as
all clauses are appropriate for remote audits. If the head office contains a mixture of clauses (i.e. some that require
on-site audit and others that may be remote), the site may elect to have:
The expected audit duration shall be notified to the site by the certification body in advance of the audit. Deviation
from the expected audit timeframe must be justified and specified on the audit report.
110 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
3.3 Part 1: The off-site remote audit
Part II
facilitate this process.
The on-site audit shall be conducted within 28 days of the remote audit, giving the site enough time for the closure
of any non-conformities raised by the remote audit (although it is recommended that remote and on-site audits
should be as close to each other as possible). The certification body should be able to issue a certification decision
within 42 days of the on-site audit.
• The certification body shall set up the technical requirements for the remote audit (e.g. internet access via LAN
cable or wi-fi, software such as WebEx/Go to Meetings/Skype/Zoom/Teams etc. , and hardware such as monitors,
webcams, cameras and microphones).
• BRCGS recommends that the certification body test the compatibility of the ICT platform with the site, especially
Part III
prior to the first blended audit at the site and when new ICT platforms will be used. Ideally, a trial meeting using
the same media platforms will be conducted to ensure that the scheduled remote audit can be performed as
planned. Use of webcam/cameras shall be agreed.
• If testing reveals issues that cannot be rectified, then the audit shall be completed as a full on-site audit.
• Assigning work to audit team members, including technical experts, should take into consideration their ability to
utilise remote technologies.
• The remote audit shall be facilitated in quiet environments wherever possible to avoid background noises and
interference. The use of noise-cancelling technology such as ‘mufflers on microphones’ or headsets should be
considered.
• If it is not possible to maintain satisfactory conditions during the scheduled time of the remote audit, the auditor
may decide to terminate the audit. This shall be recorded in the report. The remote audit may continue at a later
date agreed between the two parties within the period as described above. A complete and thorough audit of the
requirements of the Standard is vital.
• In the event of the technology failing during the remote audit, the certification body and site can reschedule,
providing this occurs within the 28-day window. The site may be liable to pay for the lost audit day where this is a Part IV
site issue, and this should be covered in the contract.
• When no agreement is reached for the use of ICT for a remote audit, the audit will revert to a full on-site audit.
Ultimately, if the audit cannot be completed remotely, then the auditor will need to go back on site to complete the
audit of the records and documentation.
The remote audit may also include a live video check of the manufacturing process, fabrication and hygiene of the
site, if required. Any video shall not be recorded, but a record shall be kept of the duration of the live video and what
was covered. This is to be recorded in the audit report.
brcgs.com 111
STORAGE AND DISTRIBUTION
ISSUE 4
A feedback meeting shall happen at the end of the remote audit to conclude the audit findings and confirm the
on-site audit activities.
The site shall fully assist the auditor at all times. It is expected that the opening and closing meetings will be
attended by the site’s senior managers (or their nominated deputies) who have the appropriate authority to ensure
that corrective actions can be progressed if any non-conformities are found.
Information on the process and timescales for the company to provide evidence for the closure of any non-
conformities must be given. A written summary of the non-conformities discussed at the closing meeting will be
documented by the auditor either at the closing meeting or within 1 working day after completion. Note that any
non-conformities are subject to subsequent independent verification by the certification body management.
If a critical non-conformity and/or the number and level of non-conformities would result in the failure to achieve
a certificate, the existing certificate for the site shall be immediately withdrawn. A new audit shall be arranged which
shall be fully on-site. (This process is identical to the protocol for on-site audits, which is documented in section 2).
Sufficient information shall have been provided to the certification body to allow for the selection of an auditor with
the correct product category qualifications and to allow plenty of time for the audit.
The on-site audit shall be conducted within 28 days of the remote audit during the audit-due window of the current
certificate (i.e. during the 28 days prior to the audit due date). It is recommended that the time between remote and
on-site audits should be as short as practicable. In exceptional (but justifiable) circumstances, the certification body
may ask BRCGS for an extension up to a maximum of 90 days.
The on-site audit shall include (as a minimum) an inspection/physical verification of good product-handling
practices, verification of the product safety management system (including HARA or HACCP activities), and the
traceability challenge.
It is strongly recommended that the on-site audit should be carried out by the same auditor who carried out the
remote audit in order to have consistency. If this cannot be arranged, there shall be a clear handover process in place
prior to the on-site audit to ensure that the auditor has all the necessary information to fully complete the audit, and
112 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
that all the requirements of the Standard are covered, either remotely or on site. All auditors shall be qualified in the
appropriate product categories (i.e. the same auditor category requirements apply to both the remote and on-site
audits).
Part II
• opening meeting – to confirm the scope and process of the audit
• site facility inspection – to review the practical implementation of the systems, including observing product
changeover procedures, and interview of personnel
• requirements identified for on-site audit during the risk assessment
• inspection of site or storage facilities (where applicable) – to review the practical implementation of the systems,
and interview of personnel to verify good operational practices
• vehicle audit (where applicable) of a sample number of vehicles – to review the practical implementation of the
systems, and interview of personnel
• traceability exercise and check of associated records and documentation – this is a vertical audit, as specified
within the BRCGS guidance document on auditing techniques
• verification of the product safety management system (including the HARA or HACCP plan)
• review of the documentation needed to complete the audit trail
• final review of findings by the auditor – preparation for the closing meeting
• closing meeting.
Part III
The site shall fully assist the auditor at all times. It is expected that the opening and closing meetings will be
attended by the site’s senior managers (or their nominated deputies) who have the appropriate authority to ensure
that corrective actions can be progressed if any non-conformities are found.
Detailed notes shall be made during the audit regarding the site’s conformities and non-conformities against the
Standard and these will be used as the basis for the audit report. The auditor shall assess the nature and severity of
any non-conformity.
At the closing meeting the auditor shall present their findings and reconfirm all the non-conformities that have
been identified during the audit, but shall not make comment on the likely outcome of the certification process.
Information on the process and timescales for the company to provide evidence to the auditor of the corrective
action needed to close any non-conformities must be given. A written summary of the non-conformities discussed
at the closing meeting will be documented by the auditor either at the closing meeting or within 1 working day after
completion. Part IV
At the closing meeting, the auditor shall provide the site with an explanation of the BRCGS Directory (which allows
both the client and its nominated customers secure access to audit data) and the BRCGS compliance programme
(including the feedback systems available to communicate with the certification body and the BRCGS team).
The decision to award certification and the grade of the certificate will be determined independently by the
certification body management, following a technical review of the audit report and the closing of non-conformities
from both audits in the appropriate timeframe. The company will be informed of the certification decision following
this review.
scheme. Evidence of the action taken to correct any non-conformities shall be submitted to the certification body
within 28 days of the on-site audit.
brcgs.com 113
STORAGE AND DISTRIBUTION
ISSUE 4
Verification of the preventive actions and implementation of the corrective action plan may take various forms
(including further on-site assessment or the scrutiny of submitted evidence through ICT). Verification must be
carried out by technically competent personnel of the certification body using appropriate methods. If a critical non-
conformity and/or the number and level of non-conformities identified at either the remote or on-site audit would
result in the failure to achieve a certificate, the existing certificate for the site shall be immediately withdrawn.
The audit report shall clearly identify the extent to which any ICT has been used in carrying out the audit and the
effectiveness of ICT in achieving the audit objectives. The audit report shall include all the summarised information
and findings of both the remote and on-site audits so that a single report can be uploaded to the BRCGS Directory.
The report shall also reference the dates and the duration of the two audits, including the records of the people who
attended them. The requirements assessed during the remote assessment shall be identified by placing an asterisk at
the beginning of the information.
The final report will not be produced until after completion of the on-site audit.
3.8 Certification
The certification requirements are the same as for the announced audit scheme (see section 2.7).
The design and information on the certificate are the same as for all audits of the Standard, except that the
certificate shall state at the beginning: ‘Blended announced audit’. The dates of both audits (remote and on-site)
shall be included on the certificate.
This certificate will supersede any existing certificate. It shall be issued within 42 days of the on-site audit and will
have an expiry date based on the expiry date of the previous certificate (plus 6, 12 or 18 months, depending on the
scope of the audit and the grade achieved).
114 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
4 Unannounced audit protocol: Option 1 (single visit)
This voluntary option involves a single unannounced audit against all of the relevant requirements of the Standard.
The date of the audit shall not be notified to the site in advance of the audit. The audit will be unannounced and
Part II
replace the normal scheduled audit. Although this may occur at any stage between months 3 and 12 of the audit due
date, it shall typically be within the last 4 months of the certification cycle.
Part III
Success at an unannounced audit relies upon the ability of the site to share information and knowledge within the
site, to have effective deputies to cover in the absence of a particular manager, and a shared responsibility within the
management team for product safety and compliance with the Standard.
The site shall make the previous year’s audit report and certificate available to the certification body where this is a
contract with a new certification body.
As the audit will be unannounced, it is likely that the certification body will also require additional information to
plan for the logistics of the audit process. This may include:
brcgs.com 115
STORAGE AND DISTRIBUTION
ISSUE 4
Sufficient information shall be provided to the certification body to allow for the selection of an auditor with the
correct category qualifications and to allow plenty of time for the audit.
Days when the site is not operating (e.g. weekends, public holidays, planned shutdowns for site holidays or
maintenance) are not included within the 15 days. Any such days shall be notified to the certification body when
opting into the unannounced scheme.
It is a condition of joining the unannounced scheme that the auditor shall be granted access to the site on arrival. If
access is denied, the site will be liable for the auditor’s costs and will revert to the announced audit scheme. At the
discretion of the certification body, the existing certificate may also be suspended or withdrawn.
The typical duration of an audit is 1 day at the site. Factors that may lengthen the duration of the audit include:
The expected audit duration shall be notified to the site by the certification body in advance of the audit. Deviation
from the expected audit timeframe must be justified and specified on the audit report.
116 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
4.3 The on-site audit
Sites opting for the unannounced scheme shall be obliged to accommodate the auditor and allow the audit to start
immediately on arrival at the site. The audit process will follow the same procedures as outlined for an announced
audit. After a brief opening meeting the audit will always begin with a site inspection, and this will be expected to
commence within 30 minutes of the auditor arriving on site.
Part II
The on-site audit consists of the following stages:
Part III
The site shall fully assist the auditor at all times. It is expected that the opening and closing meetings will be
attended by the site’s senior managers (or their nominated deputies) who have the appropriate authority to ensure
that corrective actions can be progressed if any non-conformities are found.
During the audit, detailed notes shall be made regarding the site’s conformities and non-conformities against the
Standard and these will be used as the basis for the audit report. The auditor shall assess the nature and severity of
any non-conformity and shall discuss this with the accompanying manager at the time.
At the closing meeting, the auditor shall present their findings and reconfirm all the non-conformities that have
been identified during the audit, but shall not make comment on the likely outcome of the certification process.
Information on the process and timescales for the site to provide evidence to the auditor of the corrective action
needed to close any non-conformities must be given. A written summary of the non-conformities discussed at
the closing meeting will be documented by the auditor either at the closing meeting or within 1 working day after
completion of the audit.
Part IV
At the closing meeting, the auditor shall provide the site with an explanation of the BRCGS Directory (which allows
both the client and its nominated customers secure access to audit data) and the BRCGS compliance programme
(including the feedback systems available to communicate with the certification body and the BRCGS team).
The decision to award certification and the grade of the certificate will be determined independently by the
certification body management, following a technical review of the audit report and the closing of non-conformities
in the appropriate timeframe. The company will be informed of the certification decision following this review.
The process for grading is the same as for the announced audit scheme (see section 2.5).
The site shall either be certificated or not certificated based on the number of non-conformities and the ability
to close them out. The grade awarded shall be based on the number and level of non-conformities, as outlined in
Table 2. Note that the grade will have the addition of a plus symbol after the grade (i.e. AA+, A+, B+, C+ or D+).
brcgs.com 117
STORAGE AND DISTRIBUTION
ISSUE 4
4.7 Certification
The certification requirements are the same as for the announced audit scheme (see section 2.7); however, the
certificate shall state ‘unannounced Option 1’.
This certificate will supersede any existing certificate. The certificate shall be issued within 42 days of the audit
and will have an expiry date based on the expiry date of the previous certificate plus 12 months, providing the site
remains within the unannounced audit scheme. If the site decides to return to the announced audit programme,
the certificate expiry date will be based on the date of the unannounced audit. This ensures that where the audit
occurs before the expiry of the current certificate and the site remains within the unannounced scheme, it is not
disadvantaged by a shorter certificate life and increased frequency of audits.
If the site wishes to remain in the Option 1 programme, the next audit will be unannounced. The audit may occur at
any stage from 3 months after the last audit date through to 42 days prior to the certificate expiry date; however, this
shall typically be within the last 4 months of the certification cycle. This allows sufficient time for corrective action
to take place in the event of any non-conformities being raised without jeopardising continued certification.
It is the responsibility of the certification body to ensure that the audit is undertaken within the certification window.
If the site opts to move to the unannounced Option 2 programme, the rules for that programme will apply and the
announced systems audit will occur within the 28-day window based on the initial audit date.
If the site wishes to withdraw from the unannounced audit programme, the next audit will be scheduled to occur
within the 28 days up to and including the anniversary of the last audit date; this ensures that the maximum time
between audits is not more than a year.
This option divides the audit requirements into two separate parts. The first part looks predominantly at the
issues considered to be site operating practices, such as hygiene and product handling, and is carried out as an
unannounced audit. The second part is mainly concerned with reviewing documentation and records and can be
planned to ensure that the appropriate management staff are available to retrieve and discuss the records.
The planned second part allows the review of the documentation and records to be combined with other planned
certification audits where these are used to reduce audit costs.
118 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
5.1 Audit planning
Part II
The unannounced Part 1 audit shall occur at any stage between months 6 and 10 of the audit cycle (i.e. 2 to 6 months
before the audit due date). This allows sites to correct any non-conformities identified at the audit to enable these
to be reviewed during Part 2.
The Part 2 audit of documentation and records shall be planned to occur in the 28 days up to and including the
anniversary of the last audit date (i.e. in the same time window as an announced audit). The date for this audit is
agreed with the site in advance of the audit.
Part III
The actual audit date for the unannounced audit of the site operating practices will not be provided by the
certification body and it is therefore important that the site has arrangements in place to receive an auditor and
facilitate the audit process.
Success at an unannounced audit relies upon the ability of the site to share information and knowledge within the
site, to have effective deputies to cover in the absence of a particular manager, and a shared responsibility within the
management team for product safety and compliance with the Standard.
The site shall ensure that the activities at the time of the audit cover those for the intended scope of the Part IV
certification. Where possible, the widest range of activities shall be undertaken for the auditor to assess. Where a
product category or activity was not viewed at the time of the Part 1 unannounced audit, then every effort should be
made to ensure this activity takes place for the Part 2 audit.
Where a significant activity is only undertaken at a certain time of year, a further separate audit will be required to
assess that activity.
Sufficient information shall be provided to the certification body to allow for the selection of an auditor with the
correct product category qualifications and to allow plenty of time for the audit.
Appendices
brcgs.com 119
STORAGE AND DISTRIBUTION
ISSUE 4
Days when the site is not operating (e.g. weekends, public holidays, planned shutdowns for site holidays or
maintenance) are not included within the 10 days. Any such non-activity days shall be notified to the certification
body when opting into the unannounced scheme.
It is a condition of joining the unannounced scheme that the auditor shall be granted access to the site on arrival. If
access is denied, the site will be liable for the auditor’s costs and will revert to the announced audit scheme. At the
discretion of the certification body, the existing certificate may also be suspended or withdrawn.
The typical total audit duration is 1 day at the site with the time divided evenly between the Part 1 and Part 2 audits.
If additional storage facilities, locations or head office assessments are included within the audit process, then
additional time shall be allocated for this.
Additional time will be required for the review of any documentary evidence provided and completion of the final
audit report.
The expected audit duration shall be notified to the site by the certification body in advance of the audit. Deviation
from the expected audit timeframe must be justified and specified on the audit report.
Note that any non-conformities are subject to subsequent independent verification by the certification body
management.
120 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
• site inspection and vehicle audit (where applicable) – to review the standards and in particular the corrective
actions taken in response to non-conformities identified during the Part 1 audit
• document review – a review of the documented hazard and risk analysis and quality management systems
• traceability exercise and check of associated records and documentation – this is a vertical audit, as specified
within the BRCGS guidance document on auditing techniques
• final review of findings by the auditor – preparation for the closing meeting
Part II
• closing meeting – to review audit findings with the site.
Note that any non-conformities are subject to subsequent independent verification by the certification body
management.
Detailed notes shall be made regarding the site’s conformities and non-conformities against the Standard and these
will be used as the basis for the audit report. The auditor shall assess the nature and severity of any non-conformity.
At the closing meeting, the auditor shall present their findings and reconfirm all non-conformities that have
Part III
been identified during the audit, but shall not make comment on the likely outcome of the certification process.
Information on the process and timescales for the company to provide evidence to the auditor of the corrective
action needed to close any non-conformities must be given. A written summary of the non-conformities discussed
at the closing meeting will be documented by the auditor either at the closing meeting or within 1 working day after
completion of each part of the audit.
At the closing meeting, the auditor shall also provide the site with an explanation of the BRCGS Directory (which
allows both the client and its nominated customers secure access to audit data) and the BRCGS compliance
programme (including the feedback systems available to communicate with the certification body and the BRCGS
team).
The decision to award certification and the grade of the certificate will be determined independently by the
certification body management, following a technical review of the audit report and the closing of non-conformities
in the appropriate timeframe. The company will be informed of the certification decision following this review.
Part IV
5.4 Non-conformities and corrective action
Non-conformities and corrective actions are the same as for the announced audit scheme (see section 2.4).
Evidence of the action taken to correct non-conformities identified at the Part 1 audit shall be submitted to the
certification body within 28 days of the Part 1 audit and will be subject to further review at the Part 2 audit.
If a critical non-conformity and/or the number and level of non-conformities identified at the Part 1 audit would
result in the failure to achieve a certificate, the existing certificate for the site shall be immediately withdrawn.
the grade will have the addition of a plus symbol after the grade (i.e. AA+, A+, B+, C+ or D+).
The grade awarded is based on the combination of non-conformities identified at the Part 1 and Part 2 audits.
Although the non-conformities identified during the Part 1 audit should have been corrected before the Part 2 audit,
these shall be included in calculating the grade.
brcgs.com 121
STORAGE AND DISTRIBUTION
ISSUE 4
The full audit report will include information and non-conformities identified at both the Part 1 and Part 2 audits.
The final report will not be produced until after completion of the Part 2 audit.
5.7 Certification
The certification requirements are the same as for the announced audit scheme (see section 2.7). However, the
certificate shall state ‘Unannounced Option 2’.
This certificate will supersede any existing certificate. It shall be issued within 42 days of the Part 2 audit and have an
expiry date based on the expiry date of the previous certificate plus 12 months, providing the site remains within the
unannounced audit scheme. If the site decides to return to the announced audit programme, the certificate expiry
date will be 6, 12 or 18 months (depending on the scope of the audit).
If the site wishes to remain in the Option 2 programme, the audits will be undertaken as indicated by the audit
planning rules above. If the site opts to move to the unannounced Option 1, the rules for that programme will apply
and the full unannounced audit will occur between 3 and 12 months after the initial audit date.
If the site wishes to withdraw from the unannounced audit programme, the next audit will be scheduled to occur
within the 28 days up to and including the audit due date (as indicated on the certificate).
It is the responsibility of the certification body to ensure that the unannounced Part 1 audit is undertaken within the
audit window. It is the responsibility of the company to ensure that the announced Part 2 audit takes place within
the certification window to avoid a non-conformity to clause 1.1.10.
The certification body in turn shall take appropriate steps to assess the situation and any implications for the
certification, and shall take any appropriate action.
122 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Information shall be provided to the certification body by the site on request so that an assessment can be made as
to the effect on the validity of the current certificate.
Part II
• suspend certification pending further investigation
• require further details of corrective action taken by the site
• undertake a site visit to verify the control of processes and confirm continued certification
• withdraw certification
• issue a new certificate with the new owner’s details.
Changes to the certification status of a site shall be recorded in the BRCGS Directory.
Part III
Where an extension to scope is required shortly before the certificate is due to expire, it may be more appropriate to
undertake a full audit and issue a new certificate. This option should be agreed between the certification body and
its client prior to undertaking the extension to scope audit.
When a revisit is considered necessary, the duration of this visit will vary depending on the aspects to be examined
for the required extension to scope. The site visit should be conducted along the same principles as the original
audit (i.e. including an opening meeting, inspection of the operation of the process, documentation trails and closing
meeting). The revisit should be announced, irrespective of whether the site is certificated to the announced or
unannounced scheme.
Identified non-conformities shall be documented and actioned within the normal protocol of the Standard (i.e. the
company has 28 days to provide appropriate evidence of close-out and the certification body should review the
information and confirm the certification decision in the normal manner). The additional non-conformities raised at
the site visit will affect neither the current certificated grade nor continued certification. However, if practices are
seen that give the certification body cause to doubt continued certification (e.g. the identification of a critical non- Part IV
conformity) then the certification body shall arrange a full re-audit of the site. In these circumstances the current
certificate shall be withdrawn.
A visit report should be documented, but shall not be in the format of a standard BRCGS audit report. A short
explanation of the nature of the visit, what was audited and the conclusions should be given. The visit report should
document which controls are in place and confirm the effectiveness of these controls. It should be clear in the
report which aspects were looked at and which were excluded.
The site’s current certificate will be superseded by any new certificate issued. The certificate must use the same
expiry date as detailed on the original certificate. The due date of the next full audit will therefore remain the same
and this should be made clear to the supplier by the certification body when arranging extension-to-scope visits.
The grade shall also remain the same.
Appendices
The certificate should include identification that it was a scope extension and the date of the visit.
brcgs.com 123
STORAGE AND DISTRIBUTION
ISSUE 4
• evidence that the site no longer complies with the requirements of the Standard, raising significant doubt over its
operating standards and product safety
• failure to implement adequate corrective action plans within appropriate timescales
• evidence of falsification of records.
6.4 Appeals
The company has the right to appeal the certification decision made by the certification body and any appeal should
be made in writing to the certification body within 7 calendar days of receipt of the certification decision.
The certification body shall have a documented procedure for the consideration and resolution of appeals against
the certification decision. These investigative procedures shall be independent of the individual auditor and
certification manager. Individual certification bodies’ documented appeals procedures will be made available to the
site on request. Appeals will be finalised within 30 calendar days of receipt. A full written response will be given
after the completion of a full and thorough investigation into the appeal.
In the event of an unsuccessful appeal, the certification body has the right to charge costs for conducting the appeal.
Any non-conformities identified at a visit must be corrected and closed out within the normal protocol (i.e. within
28 days of the visit), and reviewed and accepted by the certification body. If there is no intention on behalf of the
site to take appropriate corrective actions or the corrective actions are deemed inappropriate, certification shall
be withdrawn. The ultimate decision to suspend or withdraw certification remains with the certification body. Any
change in certification status shall be notified to BRCGS by the certification body and the status in the BRCGS
Directory amended accordingly.
In the event that certification is withdrawn or suspended by the certification body, the company shall immediately
inform its customers and make them fully aware of the circumstances relating to the withdrawal or suspension.
Information on the corrective actions to be taken in order to reinstate certification status should also be provided to
customers.
If a site is no longer certificated because of certificate expiry, withdrawal or suspension, it shall no longer use the
logo or certificate claiming certification.
The BRCGS logo is not a product certification mark and shall not be used on products or product packaging. Any
certificated site found to be misusing the mark will be subject to the BRCGS complaints/referral process (see Part IV)
and may risk suspension or removal of its certification.
The BRCGS logo may not be used by companies that do not include all products within the audit scope.
124 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
6.7 The BRCGS Directory
The BRCGS Directory (brcgsdirectory.com) is the database of all audits conducted against a BRCGS standard, all
certification bodies, and all auditors and their recognised audit categories.
The directory holds full copies of all audit reports and certificates in read-only PDF format. This includes archived
audit documents from 2008 onwards.
Part II
Certification bodies are responsible for maintaining site details, including site name, address, audit content and
certificate status. All certification bodies are assessed and graded by BRCGS according to how quickly and accurately
they update audit data.
The directory also features a publicly accessible search function which displays certification data only. The public
directory only lists currently certificated sites, not those expired or withdrawn.
Sites wishing to be excluded from public listing should contact their certification body.
Part III
authenticate the validity of any certificate.
A site code is created when a site is audited for the first time and remains unchanged, regardless of subsequent
auditing certification bodies or audit status.
Site codes are located on the top right-hand corner of the first page of the audit report and on the corresponding
certificate.
The listing for any certificated site can be located in the public directory by adding the site code to the ‘site code’
search field. If no results are returned for a search, contact BRCGS to confirm certification authenticity.
An audit owner can cancel sharing at any time. All sharing changes take immediate effect.
Audit documents shared in the directory cannot be edited or doctored by the audit owner. As such, audits obtained
via the directory can be considered as complete and authenticated.
Notifications are via automated email and can be turned off if not required.
For further information on the directory or audit sharing, contact the BRCGS Directory Services team via
[email protected].
brcgs.com 125
STORAGE AND DISTRIBUTION
ISSUE 4
126 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Part IV
Management and governance
Requirements for certification
Part II
bodies
Achieving consistency –
compliance
Part III
Calibrating auditors
Feedback
Complaints
Part IV
Appendices
STORAGE AND DISTRIBUTION
ISSUE 4
Part IV
Management and governance
Requirements for certification bodies
The Global Standard for Storage and Distribution is a process and product certification scheme. In this scheme,
businesses are certificated upon completion of a satisfactory audit by an auditor employed by an independent third
party – the certification body. The certification body in turn shall have been assessed and judged as competent by a
national accreditation body.
In order for a business to receive a valid certificate on completion of a satisfactory audit, the organisation must
select a certification body approved by BRCGS. BRCGS lays down detailed requirements that a certification body
must satisfy in order to gain approval.
As a minimum, the certification body must be accredited to ISO/IEC 17065 by a national accreditation body affiliated
to the International Accreditation Forum and recognised by BRCGS.
Further details are available in the document Requirements for Organisations Offering Certification against the
Criteria of BRCGS, available from BRCGS on request.
Companies looking to become certificated to the Standard should assure themselves that they are using a genuine
certification body approved by BRCGS. A list of all certification bodies approved by BRCGS is available on the
BRCGS Directory: brcgsdirectory.com.
BRCGS recognises that in certain circumstances, such as for new certification bodies wishing to commence auditing
against the Standard, accreditation may not yet have been achieved. This is because the accreditation process itself
requires some audits to have been completed which will then be reviewed as part of the accreditation audit of the
certification body. The certification body must be able to conduct audits as part of achieving accreditation and so
some unaccredited audits will be performed. This will be permitted where the organisation can demonstrate:
• an active application for accreditation against ISO/IEC 17065 from an approved national accreditation body
• that accreditation will be achieved within 12 months of the date of application and the experience and
qualifications of the auditors in the relevant product category are consistent with those specified by BRCGS
• that a contract is in place with BRCGS and all other contracted requirements have been met.
The acceptability of audit reports generated by certification bodies awaiting accreditation but meeting the above
criteria is at the discretion of individual specifiers.
128 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Supporting
documentation
International
accreditation
forum and ISO/IEC 17011
regional General requirements for
accreditation accreditation bodies
Part II
forums
National
Part III
accreditation
body
ACCREDITATION
ISO/IEC 17065
Requirements for
Certification
body
certification bodies offering Part IV
certification against the
criteria
of BRCGS
CERTIFICATION
BRCGS website
brcgs.com
Appendices
brcgs.com 129
STORAGE AND DISTRIBUTION
ISSUE 4
The functions of the advisory boards are to provide strategic advice on the development and management of BRCGS
and the activities to ensure the effective management of the certification bodies and audit process.
The TAC is made up of senior technical managers representing the users of the Standard and includes
representatives of retailers, food service companies, wholesalers, storage and distribution operators, certification
bodies and independent technical experts.
The Standard is reviewed periodically to assess the need for updating or producing a new issue. This work is
undertaken by the TAC, which is expanded for the purpose to include other available expertise.
The TAC also reviews auditor competence requirements, proposed training materials and supplementary technical
documents supporting the standards.
BRCGS executive
130 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Achieving consistency – compliance
The maintenance of a high and consistent standard of audit and certification, and the ability of the certificated
sites to maintain the standards achieved at the audit, are essential to confidence in the scheme and to the value of
certification. BRCGS therefore has an active compliance programme to supplement the work of accreditation bodies
and ensure high standards are maintained.
Part II
The BRCGS scheme may only be certificated by certification bodies registered and approved by BRCGS and
accredited by a BRCGS-recognised accreditation body. All auditors undertaking audits against the Standard must
meet the BRCGS auditor competency requirements and shall be registered with BRCGS. The qualifications, training
and experience requirements for auditors who conduct audits against the Standard are detailed in Appendix 2. All
audits undertaken against the Standard shall be uploaded to the BRCGS Directory, which provides BRCGS with an
oversight of the activity of the certification bodies and the opportunity to review the quality of the reports produced.
To support the Standard, BRCGS operates a compliance programme which reviews the performance of the
certification bodies, samples the quality of audit reports, assesses levels of understanding of the scheme
requirements and investigates any issues or complaints. As part of this programme, BRCGS provides feedback on the
performance of each certification body through a key performance indicator (KPI) programme.
As part of the compliance programme, BRCGS audits the offices of certification bodies and accompanies auditors on
audits at sites to observe the performance of auditors. BRCGS may also undertake independent visits to certificated
Part III
sites to ensure standards of product safety and quality are being maintained in line with its certification status and
that the audit and reporting process is to the expected standard.
Calibrating auditors
A key component of the scheme is the calibration of the auditors to ensure a consistent understanding and
application of the requirements. All certification bodies are required to have processes to calibrate their own
auditors. An essential element of the training and calibration of auditors is the witnessed audit programme. Auditors
are observed during an audit and provided with feedback on the performance of the audit. In order to ensure
consistency between certification bodies and for the purposes of accreditation, an audit may be witnessed by a
BRCGS representative or accreditation body auditor. Guidelines apply to these activities to ensure that sites are
not disadvantaged by the presence of two auditors. This process forms an essential part of the scheme and sites are
obliged to permit witnessed audits as part of the conditions for certification.
Feedback
Companies audited against the Standard may wish to provide feedback to the certification body or BRCGS on the Part IV
performance of the auditor. Such feedback sent to BRCGS will be considered in confidence. Feedback provides a
valuable input to the BRCGS monitoring programme for certification body performance.
Complaints
BRCGS has implemented a formal complaint process, which is available to organisations involved with the global
standards. This is available on the website (brcgs.com).
From time to time, failure to apply the principles and criteria of BRCGS at certificated sites may be reported to
BRCGS by, for example, retailers and companies conducting their own audits. In this event, BRCGS will conduct an
investigation as appropriate and may undertake announced or unannounced visits to a certificated site.
Appendices
brcgs.com 131
STORAGE AND DISTRIBUTION
ISSUE 4
132 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Appendices
Appendix 1
Other global standards by BRCGS
Part II
Appendix 2
Registration, qualifications, training and experience
requirements for auditors
Appendix 3
Certificate template
Appendix 4
Products included within the scope of the Standard
Appendix 5
Part III
Cross-docking annex to the main site certification
Appendix 6
Glossary of terms
Appendix 7
Acknowledgements
Part IV
Appendices
STORAGE AND DISTRIBUTION
ISSUE 4
Appendix 1
Other global standards by BRCGS
BRCGS has developed a range of global standards which set out the requirements for the wide range of activities
undertaken in the production of food, consumer goods and packaging, as well as this standard for storage and
distribution.
The Global Standard for Food Safety is an auditing standard which is applicable to food. This is the most mature
of the global standards and is extensively used in the food industry worldwide. The Standard applies wherever
processes are undertaken which involve open or unpackaged food products. These products fall outside the scope
of the Global Standard for Storage and Distribution.
The Global Standard for Packaging Materials is an auditing standard that lays down the requirements for the
manufacturing of packaging materials used for food and consumer products. The Global Standard for Storage and
Distribution applies only where no processing activities occur.
The Global Standard for Consumer Products is an auditing standard that sets out the requirements for businesses
that produce consumer products or are involved in the preparation of products as components for supply as retailer-
branded (own-label) products or branded products. This standard can only be used at manufacturing or packing sites.
It also applies where companies are assembling component parts to produce a single saleable package. The Global
Standard for Storage and Distribution may only be used where such assembly is carried out on components which
are fully finished saleable products in their own right.
The Global Standard for Agents and Brokers is an auditing standard which enables companies to be audited and
certificated where they buy and sell products or provide services to other parties, but are unable to gain certification
to the production or storage and distribution standards because there is no product present to be audited.
134 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Appendix 2
Registration, qualifications, training
and experience requirements for
Part II
auditors
All auditors conducting audits against the Global Standard for Storage and Distribution are required to be registered
with BRCGS. The registration process identifies that auditors have undergone the required training, and it identifies
the product categories in which auditors have expertise. Evidence of auditors’ qualifications, experience and training
has to be submitted to BRCGS prior to them carrying out audits. All registered auditors receive a unique registration
number, which is included on the audit report and is automatically cross-checked against their competence before
the certification is accepted onto the BRCGS Directory.
It is the responsibility of the certification body to ensure processes are in place to assess, monitor and maintain the
competence of the auditor to the level required by BRCGS.
Part III
BRCGS publishes a detailed guide for registered certification bodies on the auditor competency requirements,
expectations of the initial assessment of an auditor’s competence, ongoing training and assessment procedures. This
is reviewed and updated periodically by the technical advisory committee. The following outlines the requirements
of auditors who may be registered to audit against the Standard.
Education
The auditor ideally shall have a degree in a food, science, technology or logistics discipline or, as a minimum, have
successfully completed a higher education course in a food, science, technology or logistics-related discipline.
Work experience
The auditor shall have a minimum of 5 years’ post-qualification experience related to the food, packaging, logistics
or consumer product industries. This shall involve work in quality assurance or product safety functions within
manufacture, retailing, storage and distribution, inspection or enforcement; and the auditor shall be able to
demonstrate an understanding and knowledge of specific product categories of audit for which they are approved. Part IV
The verification to carry out work within specific product categories will be carried out by the certification body and
information provided in the auditor registration with BRCGS.
Qualifications
The auditor shall have:
• successfully passed a registered QMS Lead Assessor course (e.g. IRCA) or a BRCGS-recognised equivalent course
with an exam
• successfully completed (as evidenced by examination) a training course in HACCP or hazard analysis principles of
at least 2 days’ duration based on the principles of Codex Alimentarius, and be able to demonstrate competence
in the understanding and application of HACCP principles. It is essential that this training course is recognised by
the industry sector (and its stakeholders) as being appropriate and relevant
Appendices
• successfully completed an official Global Standard for Storage and Distribution auditor training course and exam
for Issue 4 of the Standard delivered by a BRCGS-approved trainer.
brcgs.com 135
STORAGE AND DISTRIBUTION
ISSUE 4
Audit experience
Auditors must have practical auditing experience of product certification schemes or quality management systems
and must have successfully completed supervised training audits at a variety of organisations against the Global
Standard for Storage and Distribution.
Certification bodies must be able to demonstrate that every auditor has appropriate training and experience for the
particular categories of audit for which they are considered competent.
Personal attributes
The auditor shall exhibit professional conduct at all times, be objective, have good communication skills and
maintain the integrity of themselves, their employer and the Standard.
The certification body is required to have a system in place to evaluate the personal attributes of all auditors (e.g. by
supplier feedback forms) and maintain records of competence and training as appropriate.
Certification bodies must establish training programmes for each auditor, which will incorporate:
• a period of initial training covering product safety, HACCP/risk assessment and prerequisite programmes, and
access to relevant laws and regulations
• a period of supervised training to cover quality management systems, audit techniques and specific category
knowledge
• assessment of knowledge and skills for each category
• documented sign-off after the satisfactory completion of the training programme.
Each auditor’s training programme shall be managed and approved by a technically competent person within the
certification body who can demonstrate technical competence in the categories in which training is given.
Full detailed training records of the individual shall be maintained by the certification body throughout the term
of employment and retained for a minimum period of 5 years after the auditor has left the employment of the
certification body.
The auditor must be kept up to date with ‘category best practice’, and have access to (and be able to apply) relevant
laws and regulations, with records of updated training held by the certification body.
Audit categories
It is recognised that the auditors shall have appropriate product knowledge of the categories of products that the
site to be audited is storing or distributing. The categories have been defined on the basis of risk according to the
following chart.
136 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Product category
1 Chilled and frozen food
2 Ambient food
3 Packaging and packaging materials
Part II
4 Consumer products
The Standard covers a wide range of products. It is the responsibility of the certification body to identify the
products handled by the site being audited, and in particular to identify any products with specific handing
requirements. Where such products are identified, the auditor must be made aware in advance of the audit in order
to plan for the visit.
Part III
Part IV
Appendices
brcgs.com 137
STORAGE AND DISTRIBUTION
ISSUE 4
Appendix 3
Certificate template
Auditor number CERTIFICATION BODY NAME OR LOGO
[Certification body name, certification body number] certifies that, having conducted an audit
Product categories:
At COMPANY NAME
BRCGS SITE CODE
AUDIT SITE ADDRESS
Audit programme: [announced, unannounced (1 in 3), blended announced audit, unannounced Option 1,
unannounced Option 2, re-issued after extension to scope]
Date(s) of audit: [include two dates for blended announced, and unannounced Option 2. If an extension to
scope, include original audit date and visit date]
Accreditation BRCGS
body logo logo
Authorised by
138 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Appendix 4
Products included within the scope of
the Standard
Part II
Contract
Product groups Storage Distribution Wholesale
packing
Food products
9 9 9
Part III
Carcasses of meat – unwrapped No
Live animals No No No No
Packaging materials
Consumer products
Part IV
Electricals 9 9 9 9*
Toys 9 9 9 9*
No No No No
containers
Motor vehicles No No No No
brcgs.com 139
STORAGE AND DISTRIBUTION
ISSUE 4
Appendix 5
Cross-docking annex to the main site
certification
Insert the certificate traceability reference number of the main site
Location
Cross-docking facility 1
Site address
Post code
Cross-docking facility 2
Site address
Post code
Cross-docking facility 3
Site address
Post code
Cross-docking facility 4
Site address
Post code
Cross-docking facility 5
Site address
Post code
Cross-docking facility 6
Site address
Post code
140 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Appendix 6
Glossary of terms
Part II
In relation to terms used within this document, the following words shall have the following meanings.
accreditation Procedure by which an authoritative body gives formal recognition of the competence
of a certification body to provide certification services against a specified standard.
agent A company that facilitates trade between a site or company and their raw material or
packaging suppliers or their customers through the provision of services, but does not at
any point own or take title to the goods.
allergen A known component of food which causes physiological reactions due to an
immunological response (e.g. nuts and others identified in legislation relevant to the
country of production or sale).
announced audit An audit where the company agrees the scheduled audit day in advance with the
certification body.
Part III
annual Within 12 months since the action was last conducted.
assembled package Includes the product to be shipped, the insulated shipper/container, all the necessary
auxiliary and/or associated components, and the ancillary packaging components such
as the temperature-stabilising medium, the secondary packaging, partitions, bubble wrap,
data loggers and/or other temperature-monitoring units.
assembly packing A process that assembles a collection of two or more market-ready finished products
into outer packaging for sale as single product. Companies undertaking this process
do not manufacture any of the component products, but are supplied with them for
assembly into the final pack.
audit A systematic examination to substantiate whether activities and related results
comply with planned arrangements and whether these arrangements are implemented
effectively and are suitable to achieve objectives.
Part IV
auditor A person possessing the appropriate competence and skills to carry out an audit.
authenticity Ensuring that food or raw materials purchased and offered for sale are of the nature,
substance and quality expected.
back-haul To collect a load following delivery of products for return to the distribution depot or
warehouse.
brand owner The owner of a brand logo or name who places the said logo or name onto retail
products.
branded product Products bearing the logo, copyright or address of a company that is not primarily a
retailer.
Appendices
broker A company which purchases or ‘takes title to’ products for resale to businesses (e.g.
manufacturers, retailers or food service companies) but not to the ultimate consumer.
brcgs.com 141
STORAGE AND DISTRIBUTION
ISSUE 4
business continuity A framework that enables an organisation to plan and respond to incidents of business
interruption in order to continue business operations at an acceptable predetermined
level.
calibration Set of operations that establish, under specified conditions, the relationship between
values of quantities indicated by measuring instruments or measuring systems, or values
represented by a material or reference material, and corresponding values realised by
standards.
certification Procedure by which accredited certification bodies, based upon an audit and assessment
of a site’s competence, provide written assurance that a site conforms to a Standard’s
requirement.
certification body Provider of certification services, accredited to do so by an authoritative body and
registered with BRCGS.
certification suspension Where certification is revoked for a given period pending remedial action on the part of
the site.
certification withdrawal Where certification is revoked. Certification may only be regained following successful
completion of the full audit process.
clause A specific requirement or statement of intent that a site must comply with in order to
achieve certification.
cleaning in place (CIP) The process of cleaning and sanitising food-processing equipment in its assembled
position without the need for dismantling and cleaning the individual parts.
Codex Alimentarius A body responsible for establishing internationally recognised standards, codes of
Commission practice and guidelines, of which HACCP (hazard analysis and critical control points) is
one standard.
company The entity with legal ownership of the site which is being audited against the BRCGS
standard.
competence Demonstrable ability to apply skill, knowledge and understanding of a task or subject to
achieve intended results.
compliance Meeting the regulatory or customer requirements concerning product safety, legality
and quality.
consumer The end-user of the finished product, commodity or service.
consumer products Non-food products normally bought by or supplied to private consumers for personal or
household use.
contractor or service A person or organisation providing services or materials.
provider
control To manage the conditions of an operation to maintain compliance with established
criteria, and/or the state wherein correct procedures are being followed and criteria are
being met.
control measure Any action or activity that can be used to prevent or eliminate a product safety hazard or
reduce it to an acceptable level.
142 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
controlled document A document which is identifiable and for which revisions and removal from use can
be tracked. The document is issued to specified individuals and their receipt of the
document is recorded.
correction (corrective Action to eliminate the cause of a detected non-conformity.
action)
Part II
critical control point A step at which control can be applied and that is essential to prevent or eliminate a
(CCP) product safety hazard or reduce it to an acceptable level.
cross-docking Material is unloaded at a facility separate from the main certificated site and handled,
but not formally put away into storage. The inbound materials at the cross-docking
facility are sorted, consolidated and temporarily stored until the outbound shipment is
complete and ready to ship.
customer A business or person to whom a product or service has been sold, or on whose behalf
product is collected, stored or delivered.
customer focus A structured approach to determining and addressing the needs of an organisation
to which the company supplies products and which may be measured by the use of
performance indicators.
Part III
distribution The transportation of goods within any container (goods on the move) by road, rail, air or
ship.
e-commerce A business selling finished goods or products online to other businesses and/or the final
consumer.
final mile delivery Movement of products from a certificated site to a final destination (e.g. another
business or consumer).
flow diagram A systematic representation of the sequence of steps or operations for safe product
handling.
food Products as defined by the EU Food Hygiene Regulations 178/2002.
fraud Fraudulent and intentional substitution of a product or misrepresentation of the
product for the purpose of financial gain, by increasing the apparent value of the
product. Part IV
fraud vulnerability A risk assessment designed to examine processes and supply chains for potential
assessment product fraud. BRCGS has developed a guideline to assist sites with vulnerability
assessments.
Global Food Safety Managed by the Consumer Goods Forum, a project to harmonise and benchmark
Initiative (GFSI) international food safety standards (mygfsi.com).
good handling practice Implemented procedures and practices undertaken using best-practice principles.
hazard An agent of any type with the potential to cause harm or which would render products
unacceptable.
hazard analysis and A system to identify, evaluate and control hazards which are significant for product
Appendices
brcgs.com 143
STORAGE AND DISTRIBUTION
ISSUE 4
hub depot A storage and distribution site receiving products from external companies and
supplying products to other depots within the company’s own distribution network (see
satellite depot).
incident An event that has occurred resulting in the production or supply of unsafe, illegal or
non-conforming product.
initial audit The BRCGS audit at a company/site which is not in possession of a valid BRCGS
certificate. This may be the first audit at a site or a subsequent audit of a site whose
certification has lapsed.
inspection Targeted verification (often a visual check against a ‘tick list’ for fabrication, environment
and equipment) to ensure operation to safe expected levels.
integrity Once a product is received at a storage and distribution facility, its integrity is based
upon the site’s ability to contain, protect and preserve the product during its intended
use.
integrity (in relation to Products that are of the nature, substance and quality expected (e.g. not substituted or
product fraud or product misrepresented).
defence)
internal audit General process of audit for all the activities of the company. Conducted by or on behalf
of the company for internal purposes.
job description A list of the responsibilities for a given position at a company.
key staff Those staff whose activities affect the safety, legality and quality of the finished product.
legality Meeting all relevant legislation in the country (or countries) where the product(s) is/are
intended to be supplied or sold.
location The geographical area within which individual premises reside in order to be classed as
a single site for auditing purposes (i.e. a radius of 1 hour or 50 km from the usual place of
work of the management team).
loose/open food Food ingredients or finished products that are unwrapped or not stored in packaging
that is designed to protect the product when it is sold to the consumer, e.g. trays of fresh
produce, meat carcasses.
malicious contamination Deliberate contamination of a product or raw material with the intention to cause harm
to the consumer or damage to the company or brand owner.
manufacturer A company that produces product from raw material components, and packs the product
into retail units or supplies product in bulk to a packing site to pack the product into
retail units. A packer who packs product into retail units from bulk-supplied material can
also be classed as a ‘manufacturer’.
may Indicates a requirement or text which provides guidance but is not mandatory for
compliance with the Standard.
mitigation strategies Controls to remove, or reduce to an acceptable level, an identified risk, vulnerability or
threat. It is often used in food defence where controls are needed to prevent potential
threats from occurring.
monitoring A planned sequence of observations or measurements of defined control parameters to
assess whether predefined limits are being met.
144 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
non-conformity The non-fulfilment of a specified product safety, legal or quality requirement or a
specified system requirement.
original copy A document, whether in electronic or printed form, that has been legally obtained and
does not infringe any copyright.
Part II
packaging system Based on product type, the equipment, material and processes employed by the
company to service the packaging needs of its various customers.
For temperature-sensitive products, the packaging system is used to maintain the
product in the temperature-controlled environment of an assembled package. The
system may use pre-conditioned coolant in the form of chilled or frozen gel packs,
phase change materials, dry ice or others. See also assembled package.
performance indicators Summaries of quantified data that provide information on the level of compliance
against agreed targets (e.g. customer complaints, product incidents, laboratory data).
positive release Ensuring a product or material is of an acceptable standard prior to release for use.
potable water Water that is safe to drink, free from pollutants and harmful organisms, and conforms to
local legal requirements.
premises A physical building or place owned by the company and audited as part of a site.
Part III
pre-packaged products Products in their final packaging that is designed for sale to the consumer.
prerequisite The basic environmental and operational conditions in a business that are necessary for
safe product handling. These control generic hazards covering good hygiene practices
and shall be considered within the HARA or HACCP plan.
preventive action Action to eliminate the fundamental, underlying cause (root cause) of a detected non-
conformity and prevent recurrence.
procedure Agreed method of carrying out an activity or process which is implemented and
documented in the form of detailed instructions or process description (e.g. a flowchart).
processed food A food product which has undergone any of the following processes: aseptic filling,
baking, battering, blending, bottling, breading, brewing, canning, coating, cooking, curing,
cutting, trimming, dicing, distillation, drying, extrusion, fermentation, freeze drying, Part IV
freezing, frying, hot filling, irradiation, microfiltration, microwaving, milling, mixing,
being packed in modified atmosphere, being packed in vacuum packing, packing,
pasteurisation, pickling, roasting, slicing, smoking, steaming or sterilisation.
product defence Procedures adopted to ensure the safety of products from malicious contamination.
product integrity Products that are of the nature, substance and quality expected (e.g. not substituted,
diluted, adulterated or misrepresented).
product recall Any measures aimed at achieving the return of an unfit product from final consumers.
product safety culture The attitudes, values and/or beliefs which are prevalent at the site, relating to the
importance of product safety and the confidence in the product safety systems,
processes and procedures used by the site.
Appendices
product withdrawal Any measures aimed at achieving the return of an unfit product from customers, but not
from final consumers.
protective clothing Clothing designed to protect the product from potential contamination by the wearer.
brcgs.com 145
STORAGE AND DISTRIBUTION
ISSUE 4
146 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Standard, the The Global Standard for Storage and Distribution, Issue 4.
subcontractor A company or organisation to which the main storage and distribution site subcontracts
an activity that is otherwise covered by its scope of certification (e.g. subcontracted
storage or distribution of product).
Part II
supplier The person, firm, site or other entity to which a site’s purchase order to supply is
addressed.
suspension Where certification is revoked for a given period, pending remedial action on the part of
the company.
threat assessment A risk assessment designed to examine site processes for potential product security and
product defence issues.
traceability Ability to trace and follow raw materials, components and products, through all stages of
receipt, production, processing and distribution and vice versa.
trans-shipment A direct transfer of goods from one vehicle or container to another.
trend An identified pattern of results.
unannounced audit An audit undertaken on a date unknown to the company in advance.
Part III
user The person or organisation (customer of the site) that requests information from the site
regarding certification.
utilities Commodities or services, such as electricity or water, that are provided by a public body.
validation Confirmation through the provision of objective evidence that the requirements for the
specific intended use or application have been fulfilled.
vehicle Any device used for the conveyance of product that is capable of being moved upon
highways, waterways or airways. Vehicles can be motorised (e.g. a lorry), or non-motorised
(e.g. container or rail truck).
verification Confirmation through the provision of objective evidence that specified requirements
exist.
where appropriate In relation to a requirement of the Standard, the site will risk assess the actual Part IV
requirement of the Standard and, where applicable, put in place systems, processes,
procedures or equipment to meet the requirement. The site shall be mindful of legal
requirements, best-practice standards, good manufacturing practice and industry
guidance, and of any other information relating to the manufacture of safe and legal
product.
wholesaler A distributor or middleman who purchases products to sell mainly to retailers,
institutions or other companies rather than to consumers.
wholesaler exclusive Products not bearing the wholesaler’s logo but produced with a brand exclusively for
products sale and distribution by the wholesaler.
wholesaler own brand Products bearing a wholesaler’s logo, copyright and address that are legally regarded as
Appendices
brcgs.com 147
STORAGE AND DISTRIBUTION
ISSUE 4
Appendix 7
Acknowledgements
BRCGS is grateful to the following people who supported and assisted in the preparation of this document.
148 brcgs.com
STORAGE AND DISTRIBUTION
ISSUE 4
Part I
Joanne Meyer McLane
Kris Middleton Bureau Veritas Certification North America
Nadia Narine Lumar Foods Safety Services
Leon Nesbitt-Hancock The Billington Group
Part II
Nisarg Patel Walmart
Bizhan Pourkomailian McDonald’s
Harrison Power Sierra Pacific Warehouse Grp
Wei Que Costco
Bradley Reynolds Sysco
Denise Rion BFFF
Stance Ristevska Walmart
Jyoti Sahasrabudhe Sahasrabudhe & Associates Inc.
Part III
Derick Scott United States Cold Store
Pauline Shaw Culina Group
Tom Southall Cold Chain Federation
Laurel Stoltzner OSI Group
Tom Thornton ASDA
Melissa Trezza Merieux NutriScience
Zoi Trianti Pepsico
Marta Vaquero UKAS
Steve Vlock Conagra
Chris Webb Kroger Part IV
Petro Zapata Yum! Brands Inc
We would also like to say thank you to all who downloaded the consultation document and provided feedback as it
has been invaluable in the development of the Standard.
Appendices
brcgs.com 149
Storage and
Distribution
BRCGS To learn more about the BRCGS certification programme please visit ISBN 978-1-78490-422-7
Floor 2 brcgs.com
7 Harp Lane
To learn more about the BRCGS online publication service for
London EC3R 6DP
certificated sites, please visit brcgsparticipate.com
T: +44 (0)20 3931 8150 To purchase printed copies or PDFs from the full range of BRCGS
E: [email protected] publications please visit brcgsbookshop.com 9 781784 904227