0% found this document useful (0 votes)
84 views23 pages

Process Design and Reengineering

Uploaded by

Majid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views23 pages

Process Design and Reengineering

Uploaded by

Majid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

CHAPTER 62

Process Design and Reengineering


JOHN TAYLOR
TARSHA DARGAN
BEN WANG
Florida Agricultural & Mechanical University
Florida State University

1. INTRODUCTION 1696 4.3.3. Conduct Project


1.1. Definitions 1696 Planning 1707
4.3.4. Determine External
1.2. Assumptions 1697 Process Customer
1.3. Steps 1697 Requirements 1708
4.3.5. Set Performance
2. THE EVOLUTION OF PDR 1699 Goals 1708
2.1. Backdrop 1699 4.4. Diagnose 1708
2.2. Implementation 1700 4.4.1. Document Existing
2.3. Postimplementation 1700 Process 1708
2.4. Failure Reasons 1700 4.4.2. Analyze Existing
Process 1709
2.5. The Second Wave 1701
4.5. Redesign 1709
2.6. State of the Art 1701 4.5.1. Define and Analyze
3. TOOLS FOR REENGINEERING 1702 New Process
Concepts 1709
3.1. Benchmarking 1703 4.5.2. Prototype and Detailed
3.2. Modeling and Analysis Tools 1703 Design of New
3.3. Simulation 1703 Process 1709
4.5.3. Design Human
3.4. Activity-Based Costing (ABC) 1704 Resource Structure 1710
4. IMPLEMENTATION 1704 4.6. Reconstruct 1710
4.1. Preplanning 1704 4.6.1. Reorganize 1710
4.2. Envision 1705 4.6.2. Implement 1711
4.2.1. Establish Management 4.6.3. Train Users 1711
Commitment and 4.7. Evaluate 1711
Vision 1705 4.7.1. Evaluate Process
4.2.2. Discover Performance 1711
Reengineering 4.7.2. Link to Continuous
Opportunities 1705 Improvement
4.2.3. Identify Information Programs 1712
Technology Levers 1706
4.2.4. Select the Process 1706 5. CASE STUDIES 1712

4.3. Initiate 1706 5.1. Corning Asahi Video 1712


4.3.1. Inform Stakeholders 1706 5.2. Uarco, Inc. 1713
4.3.2. Organize 5.3. D2D, Ltd. 1713
Reengineering Teams 1707 5.4. Fortune 500 Insurance
Company 1713
Handbook of Industrial Engineering: Technology and Operations Management, Third Edition. 1695
Edited by Gavriel Salvendy Copyright © 2001 John Wiley & Sons, Inc.
1696 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

6. LESSONS LEARNED 1714 8. REFERENCES 1715


7. FUTURE OUTLOOK 1714 ADDITIONAL READING 1717

1. INTRODUCTION
Process design and process reengineering have received increased attention over the last decade as
companies, responding to increased competition, have struggled to become more customer focused
and price competitive. There has been substantial debate over precise definitions of process, business
process, and process reengineering (Love et al. 1998a). There is a desire to arrive at a uniform set
of definitions so that the case studies can be effectively evaluated. Aside from the debate over labels,
process design and reengineering (PDR) has offered companies new ways of assessing their opera-
tions and most importantly, improving them by large orders of magnitude. While simple in concept,
PDR has proven difficult to implement successfully. Some possible reasons are:

• It is not so much a scientific theory as it is a paradigm (Weicher et al. 1995).


• It ‘‘is a messy, complex process which requires strong leadership, the application of special
skills and methodologies, and an ongoing commitment to process improvement’’ (Caudle 1995).
• Because companies and processes are different, seemingly similar PDR projects are vastly dif-
ferent in execution (Caudle 1995).
• It is not ‘‘universally applicable’’ (Coombs and Hull 1997).

However, the benefits are lucrative, and therefore companies will continue to attempt to reengineer
their processes.
1.1. Definitions
A process may be defined as a ‘‘sequence of pre-defined activities executed to achieve a pre-specified
type or range of outcomes’’ (Lee and Dale 1998) or a ‘‘sequence of activities, which are performed
across time and place’’ (Bal 1998). It is a set of activities that transform a set of inputs into a set of
outputs. Furthermore, a process may be classified as ‘‘(1) the sort that starts when necessary and
finished some time in the future; or (2) the sort that is constantly running’’ (Bal 1998).
A business process is ‘‘a collection of related, structured activities—a chain of events—that
produces a specific service or product for a particular customer or customers’’ (Caudle 1995). They
may be classified as ‘‘mission or external customer-facing processes, support processes, and man-
agement processes’’ (Caudle 1995). There are also two critical characteristics of a business process:
(1) it has external or internal customers, and (2) it crosses organizational boundaries (Malhotra 1998).
A representative illustration of a business process is shown in Figure 1. Note that it spans across
functions and that it has internal and external customers.
Business process redesign and business process reengineering are synonymous with PDR. The
terms were introduced, respectively, by Davenport and Short (1990) and Hammer (1990). Each refers
to ‘‘a systematic, disciplined approach for achieving dramatic, measurable performance improvements
by fundamentally reexamining, rethinking, and redesigning the processes that an organization uses

Business Process

Internal E C
Customers x u
I
t s
n
p e t
u A1 A2 An r o
t n m
s a e
Internal l r
Customers s
f1 f2 fm
Activities 1 to n
Functional Organizations 1 to m

Figure 1 Business Process.


PROCESS DESIGN AND REENGINEERING 1697

to carry out its mission’’ (GAO 1995). Since that time, several additional definitions have been
contributed by various authors. Because of the multiple definitions in circulation, it has been sug-
gested that ‘‘the reengineering label appears simply to be related to the notion of taking an organi-
zation apart and putting it back together again, more efficiently, less expensively and with fewer
personnel’’ (Buchanan 1998). While this statement is essentially correct, it oversimplifies the activity
and challenges it involves as well as the results realized. To illustrate the different thoughts involved
with PDR, consider Figure 1. Before PDR, if a person were queried about the processes present in
the company, he or she would invariably answer along the lines of f1, f2, or marketing, sales, and
production. Note that these are descriptions of functions within the organization and not necessarily
processes. Reengineered processes are usually described in terms of the beginning and end states—
for example, purchasing, which is not really a process but a function within the organization. The
process would be aptly described as ‘‘requisition to delivery.’’ The difference may seem trivial, but
as a starting point for PDR it forces thought towards the activities taking place between the endpoints.
In summary, the following characteristic definition regarding redesign or reengineering emerges:
‘‘[PDR] focuses on business process, adoption of information technology, taking fundamental analysis
and radical redesign, and aims to achieve dramatic improvement in a short time delivery’’ (Choi and
Chan 1997). It has been contrasted with TQM in that, while both center on the concept of improve-
ment, PDR stresses radical improvement in a short time while TQM relies on incremental improve-
ment over an indefinite period (Jarrar and Aspinwall 1999).
Finally, business process management (BPM) is the natural resultant of PDR. While some defi-
nitions include PDR as a subset of BPM, it is obvious that if processes have been radically altered,
the method of managing them must be altered as well, including performance metrics, monitoring,
training, and, in some cases, the organizational structure itself (Pritchard and Armistead 1999). To
this end, BPM is defined as ‘‘a systematic, structured approach to analyze, improve, control and
manage processes with the aim of improving the quality of products and services’’ (Lee and Dale
1998).
1.2. Assumptions
The fundamental assumptions underlying PDR are (Biazzo 1998):

1. The organization is a collection of processes that can be reengineered ‘‘scientifically’’ and


systematically.
2. The nature of change is revolutionary and consists of:
• The passage from functional units to process teams
• A move from simple tasks to multidimensional work
• Changes in power relations towards worker empowerment
• Change from a ‘‘bureaucratic’‘ culture to one based on customer satisfaction
• Changes in managerial behavior from supervisors to trainers

3. Planning for this change is top-down.


1.3. Steps
There are a variety of opinions regarding the actual steps involved in process reengineering. A typical
outline of the phases is listed below. It represents a consensus view from a survey of practitioners
(Kettinger et al. 1997).

1. Envision:
• Establish management commitment and vision.
• Discover reengineering opportunities.
• Identify information technology (IT) levers.
• Select process.
2. Initiate:
• Inform stakeholders.
• Organize reengineering teams.
• Conduct project planning.
• Determine external process customer requirements.
• Set performance goals.
3. Diagnose:
• Document existing process.
• Analyze existing process.
1698 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

4. Redesign:
• Define and analyze new process concepts.
• Create prototype and detailed design of a new process.
• Design human resource structure.
• Analyze and design information systems (IS).
5. Reconstruct:
• Reorganize.
• Implement.
• Train users.
• Process cut-over.
6. Evaluate:
• Evaluate process performance.
• Link to continuous improvement programs.

There are critical aspects to each of the phases as well as the elements represented within. These
will be discussed in the implementation section of this chapter. The six-phase process represents a
logical approach to a reengineering project and is illustrated in Figure 2.
Deceptively simple, this framework implies that PDR is simply a matter of going through a
sequence of steps. However, beneath this framework lies the question of how to implement the process
of change. In that respect, PDR ‘‘still remains a mystery with few rules and methods to guide firms
through their endeavor’’ (Crowe and Rolfes 1998). There is a great deal to be learned from the
experience of others, but that experience must be continually evaluated against the culture of the firm
that is considering reengineering.
Finally, the following general observations may be made about reengineering (Caudle 1995):

The Steps of Process Design

Evaluate Envision

6 1

Reconstruct 5 2 Initiate

4 3

Redesign Diagnose

and Reengineering
Figure 2 The Steps of Process Design and Reengineering.
PROCESS DESIGN AND REENGINEERING 1699

1. Be aggressive about ambitions.


2. Recognize that while a lot can be done within single departments and agencies, a lot more
can be accomplished through cross-departmental integration of effort.
3. Get the policy—which in private enterprise equals strategy—clear at the top.
4. Finally, always keep in mind the hidden reefs of politics.
5. Get it done fast.

2. THE EVOLUTION OF PDR


2.1. Backdrop
A variety of factors led companies to begin to experiment with changes that eventually developed
into the process reengineering paradigm. Half of the Fortune 500 companies listed 20 years ago are
not on that list today. The missing ones failed to see the future in terms of customer needs, evolving
technology impacts, and competition (Dickie 1995). Most, if not all, were based on the management
and operational structure that developed at the beginning of the twentieth century and thus had been
developed for companies in stable, expanding marketplaces.
That structure performed remarkably well through the first two-thirds of the century. Unfortu-
nately, task-oriented work required the development of functional hierarchies for supervision and
control in the workplace. As the hierarchies grew, a silo mentality grew as well. Management focused
on the performance of their particular function alone, making it difficult or impossible to include
internal and external customers into the decision-making process. Also, efforts directed at suboptim-
izing the performance of a function often had little effect on the performance of the entire system.
Increased competition forced companies to improve their productivity, but that effort was frustrated
by the very organizational structures that once worked so well (Lucier and Torsilieri 1999). Figure
3 illustrates the inherent problems with the hierarchical structure. Note that the communication bar-
riers that form between the functional organizations and that optimization attempts are performed
vertically and do not necessarily enhance the product flow. Furthermore, as the hierarchy grows, the
command-and-control nature inherent to the organization means that the distance between the decision
maker and the decision point increases.
The pyramid hierarchical organization had been rendered invalid or inoperable in most cases (Love
et al. 1998a). The division of labor no longer worked either (Lucier and Torsilieri 1999). TQM
programs, which helped companies rediscover the customer, also introduced an incremental change
paradigm, which likewise was ‘‘no longer considered to be adequate for acquiring a competitive
advantage in the marketplace’’ (Love et al. 1998a). The internal workings of a company had to be
redefined.

Traditional Hierarchy Structure


for Business Management
Barriers
Barriers

Communication
Communication
Optimization

Product and Service Flow to Customer


Figure 3 Hierarchical Organization Schematic.
1700 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

There is now a ‘‘perceived linkage between strategy and organizational structures’’ (Coombs and
Hull 1997). The advent of the concept of a business process has permitted companies to examine
how they do their work, what they do, and why they do it. ‘‘Critical business processes are the basic
means to support a company’s strategic objectives according to set priorities’’ (Dervitsiotis 1999).
The new process focus facilitates improvements that allow businesses to determine which activities
are value-adding ones (Guimaraes and Bond 1996).

2.2. Implementation
The concept of process reengineering went mainstream in 1993 when Michael Hammer and James
Champy’s Reengineering the Corporation was published. The concept was eagerly embraced because
it offered breakthrough changes in performance. Process reengineering held promise because it en-
compassed three previously unconnected components: information technology, business processes,
and a greenfield or blank sheet approach to change (Davenport 1996). While none of these compo-
nents was new, there were inherent dangers in using them individually. These are shown in Fig-
ure 4.
The information technology piece allowed companies to imagine previously impossible scenarios
of executing work. This, in concert with a process view of work, formed the foundation for the
improvement of process reengineering. The last component, which is sometimes referred to as the
blank sheet concept of change, promised that there would be no legacy components from an old
system unless they were critical to the new process. In theory, designers would be able to design it
right the first time and overcome the inertia of status quo. Figure 5 illustrates the results of using
these components in tandem.

2.3. Postimplementation
As companies began to implement process reengineering programs and data were gathered, it became
apparent that breakthrough performance gains were more elusive than previously thought. Estimates
of failed ‘‘process reengineering’’ programs range anywhere from 50–70%. The failures were not
merely isolated to flat responses in productivity. One of the direct consequences of a reengineered
process without an increase in market demand is surplus labor. Displaced workers soon began to be
referred to as ‘‘reengineered’’ workers. By 1996, process reengineering had come under attack as a
damaging fad with ‘‘ruthless objectives and unclear methodology’’ (Buchanan 1998). Debate contin-
ues, and four main lines of thought have emerged. The prophets continue to recommend process
reengineering in its original form. The disciples strive to achieve the gains of classical reengineering
with more practical implementation strategies. The revisionists declare the shortcomings of classical
process reengineering to be a lack of human focus and thus try to reengineer around those shortcom-
ings. The last group, the skeptics, attack the concepts and methodology entirely (Buchanan 1998).

2.4. Failure Reasons


Several possible reasons for the high failure rate of process reengineering have been discussed in the
literature. Harrington proposes five (Harrington 1998a):

1. The methodology was misused and the reported results were misleading.
2. Process reengineering’s negative impact on the organization was poorly defined and not con-
sidered in its implementation package.
3. The creative part of process reengineering was not understood.
4. The cycle time from start of project to reaping results was too long.

Change Agent Result

Information Institutionalized
Technology Processes

Process Incremental
Orientation Change

Blank Lack of
Sheet
Direction

Figure 4 The Components of Reengineering: Separate.


PROCESS DESIGN AND REENGINEERING 1701

Information
Technology

Reduced Reduced
Cycle Time Waste

Process
Strategically Design Increased
Aligned & Quality
Processes Reengineering

P
Or roc an
k
ien es Bl heet
tat s
ion S

Figure 5 The Components of Reengineering: Together.

5. It produced too good a result—the methodology failed to consider anything other than per-
formance in developing alternatives.

Another factor that contributes to less-than-desired results in process reengineering is that newly
engineered processes are often implemented in traditional functional management structures (Love
et al. 1998a). This can create conflict within the system (Lucier and Torsilieri 1999)—or worse, the
process can revert to its old state via work-arounds (Fisher 1997). The functional management par-
adigm must change along with the process. The blank sheet approach has also been criticized in that
it can create impractical solutions that conflict with organizational priorities (Buchanan 1998). Ap-
parently not all of the linkage to the old process is negative. There are times when certain aspects
of a given process exist for economic, political, or other good reasons, none of which may be obvious
to the casual observer. These and other negative dimensions of process reengineering are changing
the methodology by which it is done. The process of PDR continues to evolve as experience is gained
(GAO 1995).
2.5. The Second Wave
Due in large part to the shortcomings of the original attempts at reengineering, the concept of the
second wave of reengineering has developed. The companies in this wave will benefit from the
experience of those who participated in the first wave. This wave will focus on ‘‘growing the top
line rather than cutting costs’’ (Dickie 1995). Figure 6 illustrates this trend graphically. It has three
basic principles (Moeller et al. 1996):

1. Enhance the value for cost to the customer. Rather than reengineering in order to cut or
maintain the cost to the customer, attempt to increase the value to the customer.
2. Realign the processes and business systems for growth. While classical reengineering produced
short-term optimization in terms of costs, the second wave will make assessments in terms of
the short and long term.
3. Refocus on the soft side of capabilities development. Management vision and strategy must
be transformed to reflect the values of the second wave. Measurement and reward systems will
need to be revisited to ensure that they promote growth. Training and management development
investments will increase, and human resource processes will need modification.
2.6. State of the Art
It appears that reengineering is poised to make a comeback (Bartholomew 1999). This wave will
have the wealth of experience of the first wave to draw upon. As mentioned above, it will have
significantly different goals and will attempt to shore up the weaknesses of previous attempts. While
1702 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

PDR First Wave PDR Second Wave

ed Va ed Va
eiv l eiv l

ue

ue
c

c
Per

Per
Cost of Cost of
Products & Products &
Services Services

Re

Re
gi gi
on on

Focus: Reduce Costs Focus: Expand Value

Figure 6 PDR: First to Second Wave.

IT was one of the major components of the first wave, more focus will be applied to change man-
agement in the second wave (Guha et al. 1997). The surplus problem associated with the implemen-
tation of PDR’s original form drove fear into, rather than out of, the organization. As a result, people
are less willing to put their heart and soul into a project that could very well cost them their jobs.
As a remedy to this, some firms have implemented policies to protect personnel from layoff (Caudle
1995). The effectiveness of measures such as these remains to be seen, but the very fact that they
are being attempted underscores the potential value PDR holds for companies.

3. TOOLS FOR REENGINEERING


A variety of tools are available to aid in reengineering efforts. The benefits that reengineering tools
provide range from process visualization and analysis to process costing to competitive analysis.
When selecting reengineering tools, it is best to give consideration to those tools that are easy to
learn and easy to use. If a tool requires a long learning period, its value may be diminished. When
comparing tools, proportionally discount the value of a given tool relative to the time required to
learn to use it. Obtain reference data from other users about a given tool and its features. Also,
consider the in-house training aspects. The rest of the reengineering team must be able to learn to
use the tool effectively as well (Manganelli and Klein 1994).
A reengineering tool should have at least one of the following characteristics:

1. It must be usable by the reengineering team.


2. It must provide a return on investment (ROI).
3. It must aid in clarifying the vision.
4. It must tie top-level corporate goals to subsystem goals.
5. It must integrate into the existing infrastructure.

Reengineering tools should perform at least one of the following tasks (Roberts 1994):

1. Recording or data structuring


2. Decision support
3. Process flow diagramming
4. Flow path determination
5. Process measure determination
6. Path optimization
7. Modeling
8. Simulating
9. What-if analysis
10. Constraint isolation
11. Reporting / plotting
12. Planning / tracking
PROCESS DESIGN AND REENGINEERING 1703

Reengineering tools include benchmarking, modeling and analysis tools, simulation, and activity-
based costing.
3.1. Benchmarking
Benchmarking is defined as ‘‘. . . the search for the best practices that will lead to superior perform-
ance of a company . . . and [that will] allow a manager to compare his or her function’s performance
to the performance of the same function in other companies’’ (Camp 1989). The desired result of a
benchmarking effort is a comparison to external but similar measures of system performance, such
as quality and cost and productivity (Grover et al. 1995).
Typical benchmarking steps are:

1. Determine objectives and define the scope of the benchmark study.


2. Gain support from within the organization.
3. Select a benchmarking approach to use.
4. Determine who the benchmarking partners are.
5. Retrieve benchmark data via research, surveys, and benchmarking visits.
6. Using the results, determine the necessary practices or principles that are absent within the
current system.
7. Choose the principles or practices to implement.
8. Implement.

There are four broad categories of benchmarks that provide the most valuable insight into the per-
formance of a company: business results, cycle time, quality assurance, and asset. Business results
are typically financial ratios, cycle time deals with task completion, quality assurance deals with
customer-related measures, and asset benchmarks range from inventory turns to human asset measures
(Schwartz, 1998).
The information necessary for benchmarking may be found in public domain, technical papers,
and panel discussions, as well as, information exchange (benchmarking partnership). A benchmarking
partnership allows each party to gather information about the other with the goal of creating better
processes. Previous benchmarking studies of related industries, libraries, conferences, databases and
suppliers are also key opportunities for gathering information for benchmarking (Stork 2000).
3.2. Modeling and Analysis Tools
Modeling tools allow the process to be diagrammed. Process modeling is crucial because it depicts
the business, the relationships, and the flow of information. With this information, the impact or
potential ripple effect of changes can be determined (Morris and Brandon 1993). In process modeling,
activities and their connecting links are labeled and assigned to all necessary levels (Roberts 1994).
Modeling tool-selection issues are methodology, alternative views, form of input, simulation, and
standardization. Process modeling may be done with flowcharts, tree diagrams, fishbone diagrams,
hierarchy charts, computer-simulated models, and mathematical models. One of the most popular
methods is flowcharting. Flowcharts graphically illustrate the steps of an activity. Descriptive symbols
are used for each step and arrows indicate the flow. The flowcharting steps are:

1. Define steps and sequence.


2. Identify all relationships and decisions.
3. Draw straight-line representation of all work steps.

Process analysis tools are used to enter, view, and track the process inputs. These tools, like
modeling tools, must show different views of the results. Most process analysis tools are packaged
with modeling tools. Process analysis tool selection considerations are basically the same as those
of modeling tools. Typically, process modeling and analysis tools: (Yu and Wright 1997):

1. Provide system visualization through system diagrams


2. Are PC based
3. Are easy to learn to use and scalable
4. Provide analysis and performance measures of static system
5. Provide modeling of dynamic behaviors of system
3.3. Simulation
Simulation tools, while not specifically designed for PDR, provide additional methods to analyze the
dynamic nature processes. ‘‘Fundamental to the re-engineering effort is the ability to simulate the
1704 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

changes that are being proposed’’ (Morris and Brandon 1993). Simulation is dynamic process mod-
eling. Simulation allows the user to predict the behavior of a system under certain circumstances
without actually building the system. Simulation is just an approximation of the physical system, but
it allows changes to be rapidly incorporated and tested under a variety of conditions. Through com-
puter simulation, process fluctuations, optimal settings, and the effect of various inputs may be
determined. Basic simulation inputs are task time, resources, and demand, while the outputs are cost,
throughput, cycle time, utilization, and bottlenecks (Petrozzo and Stepper 1994).
3.4. Activity-Based Costing (ABC)
The need of reengineering teams for accurate information regarding the consumption of resources by
processes led to renewed interest in activity-based costing (ABC). ABC is an accounting methodology
in which costs are assigned to activities, as opposed to products or services. ABC more accurately
distributes the applicable costs to those products and services that consume them. ‘‘The precision of
ABC is useful in establishing the true costs of the component and the compound process outputs’’
(Grover et al. 1995). ABC provides necessary information as to where the money is going or where
certain costs lie. An example of activity-based costing is shown in Figure 7.
In ABC, costs are assigned to activities based on resource consumption. Cost is then assigned to
elements such as products or customers. This information provides the foundation for deciding on
issues such as outsourcing and corporate spending. Often, when traditional accounting systems are
used for costing, cost is overallocated to high-volume production and underallocated to low-volume
production on a per-unit basis. To portray the value of proposed systems over current ones accurately,
it is imperative that accurate methods be employed for costing.
ABC is used by reengineering teams to perform cost-benefit analysis on proposed systems in-
cluding the segmented delivery of products and services. ABC will determine the cost and viability
of a product / process / system, both before and after reengineering. The steps for ABC are (Maluso
1997):

1. Use a process map to identify the major business processes and key activities of the organi-
zation.
2. Attach the cost to these key activities. Financial data may be gathered from existing data,
including information on labor and capital equipment expenses, budget, general ledger, and
supplier invoices.
3. Link activities to processes and identify the cost drivers.
4. Summarize the total costs for each process.
5. Do this as well for the reengineering process.

4. IMPLEMENTATION
4.1. Preplanning
As mentioned in the introduction, a framework exists for conducting PDR activities. Not explicitly
noted in the outline is the necessity for training and planning before any large-scale reengineering
effort begins. Ultimately, the entire organization will be required to think in terms of process. This
is one of the primary challenges of process management (Lee 1996). For reengineering to flow
smoothly in the planning and design stages, management and staff will need to know its function,

Traditional ABC

Wages $150.00 # Units


Supplies $ 50.00 Clean Bathroom 6 $150.00
Insurance $ 30.24 Vacuum 3 $21.00
Transportation $ 10.00 Dust 3 $15.00
Change Linen 3 $12.00
Profit $ 59.76 Empty Trash 6 $12.00
Clean Kitchen 3 $90.00
Cost $300.00 $300.00

Figure 7 ABC vs. Traditional Costing.


PROCESS DESIGN AND REENGINEERING 1705

its implications, and how it fits into the scope of improvement efforts (Caudle 1995). The vision for
change must be articulated over and over again. Management and staff will need to be educated in
the concepts of process and reengineering. The design team should thoroughly understand the design
process (Feather 1998) and be cognizant of its linkage with organizational structure (Gappmaier
1997). Spending time, effort, and money on educating people before beginning the reengineering
process pays back by eliminating misunderstanding and indecision.
For most companies, the process view of work is a new one (Lee 1996). Before making the
decision to reengineer along process lines, management must be firmly committed to that end as well
as the necessary changes it entails (Caudle 1995). They must have in mind a target performance level
that they wish the new structure to achieve (Love et al. 1998a) and a measurement system must be
in place in order to let them know whether the reengineered system is, in fact, performing to expec-
tations. This requires that employees be educated on performance measures and uses (Caudle 1995).
Lastly, management must assess the culture of the organization and determine its propensity
towards change. This has proven to be a major stumbling block in a majority of the reported PDR
efforts (Corrigan 1997). It is apparent from the literature that some organizational cultures have a
greater capacity for accepting and processing change than others (Love et al. 1998b). Organizations
that have the ability to accept change readily have been referred to as learning organizations and are
‘‘characterized by the ability to adapt and improve, to build internal and external knowledge, and to
achieve higher levels of learning that may be critical to successful [PDR]’’ (Guha 1997). Commu-
nicating early and throughout can help overcome resistance to change (Feather 1998) and is viewed
as a critical success factor to PDR projects (Andrews 1996a).
Figure 8 provides a summary of the steps involved in preplanning.
4.2. Envision
4.2.1. Establish Management Commitment and Vision
A prerequisite to successful implementation of a BPR project is unequivocal support from upper
management (Ho 1999). The vision must be communicated to and embraced by the entire organi-
zation, but this communication is especially important in dealing with midlevel and functional man-
agers who are affected by the changes (Guha 1997). As the implications of change are realized, risk
aversion and uncertainty can develop, creating an atmosphere where less than optimal solutions are
developed (Morris et al. 1999). In these cases, management’s commitment is tested. The case for
change and the vision of the future state must be coupled with a strategy for achieving change.
Successful organizations require and practice hands-on senior management’s aggressive ownership
of process improvement through personal responsibility, involvement, and decision making. Most
often this is seen in the use of executive committees, steering groups, and the assignment of process
owners (Caudle 1995).
4.2.2. Discover Reengineering Opportunities
The breakthrough improvements available from reengineering can come in one of two forms. Reen-
gineering a process can take away the inefficiencies present in terms of cost and time to process but
leave the general value adding sequences the same. This is accomplished by removing organizational

Preplanning Checklist
Ramifications of Process Viewpoint Understood
PDR as Continuous Improvement Understood
Upper Management Commitment
Location and Magnitude of Expected Gains Known
Current Measures for Targeted Processes
Corporate Culture Capable of Required Change

Figure 8 Preplanning Step Checklist.


1706 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

issues, archaic rules, and legacy procedures that are counterproductive to the overall goal (Barthol-
omew 1999). Companies gain from examining their processes in this way, but not every instance will
yield the same ‘‘opportunity for dramatic breakthrough’’ (Bal 1998). The most significant improve-
ments are realized when entirely new processes are developed for bringing existing products and
services to customers. The following three characteristics describe efforts of this sort (Feather 1998):

1. New opportunities in markets, products, and services where value is created in the business
process are discovered and exploited.
2. New ways of thinking about the process using design principles and process benchmarks are
utilized.
3. Innovative core processes that encourage people to behave differently are developed.

Being creative is one of the most demanding aspects of PDR. One of the features of PDR that
has allowed companies to be more creative with their process thoughts is information technology.

4.2.3. Identify Information Technology Levers


The strategic importance of information was always known, but until recent times nothing could be
done to exploit it. Modern technology, however, has served to erase the geographic barriers that once
stood in the way of information flow. Likewise, it has permitted the lag time that existed between
information collection, data entry, and report to be reduced. Real-time information processing is a
reality. Realizing this in process design permits processes to be developed that behave and perform
drastically different than their predecessors. ‘‘Successful [PDR] involves the coalescence of ‘IT’ and
business best practice, whereby IT plays a supportive, but not always commanding role that is linked
to the business case for [PDR]’’ (Guha et al. 1997).
The specific roles played by IT in PDR are many and vary from case to case. It may be used to
enhance communications at the customer interface through electronic data interchange, software train-
ing systems, and distributed product / service specifications and performance data. It can facilitate the
distribution of information across and outside of the organization through centralized, shared data-
bases, networks, and wireless communications. It enables companies to provide services economically
at remote locations with expert systems. The rapid increase in computing power has allowed com-
panies to eliminate the batch mentality altogether. No longer are strategic decisions made in concen-
trated groups at specific points in time. Plans can update in real time and data models can provide
revised forecasts instantly. Accurate snapshots concerning production and distribution data are ac-
cessible with electronic tracking and identification. Customer orders can be monitored and accurate
lead times can be quoted. Internal organizational performance can be monitored as well. All of these
innovations typically provide the backbone of redesigned processes. They all have the common trait
of providing the necessary information to the necessary destination in a usable form at the time it is
needed.
While it is generally agreed that IT is the enabler for paradigm shifts required for reengineering,
it has also been pointed out that its misuse can prevent PDR projects from succeeding by institu-
tionalizing old concepts and processes (Hammer and Champy 1993). Simply automating the old
systems is not reengineering and should not be confused with it. The fundamental concept in suc-
cessfully utilizing IT in PDR is that it is used to change the way things are currently done or even
eliminate the need for them, not merely to optimize them.

4.2.4. Select the Process


There is much to be said about selecting a process for reengineering. To achieve the greatest gain,
processes selected for reengineering must have strategic importance. ‘‘A fact often overlooked is that
processes exist to support specific strategic goals considered vital for survival and success’’ (Dervit-
siotis 1999). Companies should begin by evaluating their business strategy and then determining
which processes are critical to the strategy (Bartholomew 1999). Failure to do this has been cited as
a contributor to implementation failure (Peltu et al. 1996). All processes must be reviewed so that
the interdependence among them may be fully understood (Guha et al. 1997).
Figure 9 provides a summary of the envision step activities.

4.3. Initiate
4.3.1. Inform Stakeholders
Everyone associated with the process must be informed of the need for and intent of the reengineering
effort. Management, customers, suppliers, employees, and labor unions are included in this group.
The sharing of information from the outset decreases the possibility of misunderstanding and in-
creases the possibility of success (Lee 1996). From the customer’s perspective, this enhances the
channels of communication regarding their service level needs. From the employee’s perspective, this
PROCESS DESIGN AND REENGINEERING 1707

Envision Step Checklist


Upper Management Support Fostered Through
Process Ownership
Steering Committee Representation
Overall Vision Articulated and Embraced by Organization
Competitive Forces
Desire to be "Best" in Class
Customer Demand
Reengineering Opportunities Isolated Through
Process Benchmarks
Focus on/Development of Value-Added Services
Information Technology Levers
Networked, Centralized Databases
Realtime Communication
Automation
Potential Processes Selected and Ranked from among
Processes that Serve/Impact External Customers
Strategy Supporting Processes

Figure 9 Envision Step Checklist.

allows them the opportunity to buy into the process as opposed to having predetermined solutions
forced upon them.
4.3.2. Organize Reengineering Teams
The actual size and number of teams for a given project may vary. It is essential that the team
members, especially the design members, be trained to work in a team environment. The members
responsible for design must also have a background of experience or training in process design, as
well as some knowledge of the current technologies available for use in reengineered processes. This
is where consultants are sometimes used to add missing skills to a team. Some process reengineering
experts recommend that the PDR team be split into two parts: a design team and an execution team
(Weicher et al. 1995). Others have suggested that the team be split into a documentation and an
analysis team. The purpose of splitting the documentation and analysis functions is to maintain
objectivity in the analysis. It has been reported that documenting ‘‘as-is’’ conditions causes the prac-
titioners to become emotionally invested in the current system, thereby reducing their ability to see
opportunities for improvement (Andrews 1996b). Separating the two neutralizes the effects of this
phenomenon.
4.3.3. Conduct Project Planning
The challenges facing the project planning team are similar to those facing other large-scale project
management teams. Beginning and end dates must be established. Aggressive but realistic timeframes
must be incorporated. Levels of measurable accomplishment must be defined for all stages. Individ-
uals should be made accountable for specific outcomes (Feather 1998). Resources must be made
available to the team as well as the project. These may be financial but will most certainly take the
form of personnel and time. Inadequate staffing at critical points in the project can lead to unsuc-
cessful attempts at reengineering (Ho 1999). Scope creep is an ever-present danger in any project.
This is doubly so in reengineering efforts. Processes are complex and difficult to visualize (Bal 1998).
This can lead to the inclusion of unrelated processes into the design of the process of interest. The
hazard that is peculiar to reengineering efforts is cultural change. In some cases, the process concept
is so new that time to assimilate and understand the concept must be factored in. In all cases, the
change itself must ‘‘proceed at a pace which can be accommodated by the organization’’ (Peltu et
al. 1996).
1708 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

4.3.4. Determine External Process Customer Requirements


There are a variety of methods for determining customer requirements. Quality function deployment
models use the voice of the customer as an integral component in process design. Focus groups and
benchmark data also provide valuable insight. Placing customer representatives on the actual process
design team has been done with great success. Surveys can also derive information from customers.
The informal nature of surveys, however, places them in a ‘‘general’’ data-gathering category.

4.3.5. Set Performance Goals


Performance goals are frequently established using the gap between the customer requirements and
the performance of the current process. Likewise, benchmarking data can provide the performance
goals for the new process. The metrics depend on the process being measured, but the firm can use
measures that it is already familiar with. Examples include queue time, flow days, and backlog. A
key element is making sure the measures cross-over from the old process to the new (Caudle 1995).
It is imperative to be able to gauge the performance of the new process against the old.
Figure 10 summarizes the initiate step activity.

4.4. Diagnose
4.4.1. Document Existing Process
Many PDR proponents suggest skipping this step because they believe it limits the vision of the
design team and that there is nothing to be gained from such a task. The problem of limited vision
was addressed previously. The amount of information to be gained from this step is addressed here.
Practitioners have suggested that only if the processes are laid out end to end do the impacts of the
process become apparent (Lee 1996). It is equally important to document the cross-departmental
aspects of the process (Fisher 1997). The dynamic relationships inherent in the process yield the
greatest understanding of the organization and how it functions (Ould 1997). The level of technology
used for this process depends on the team itself. There are a variety of examples in the literature,
ranging from ‘‘sticky notes’’ on the wall to data flow diagrams to sophisticated computer programs
(Bartholomew 1999). Essentially, all of these methods describe the task, the owner and customers,
and the information inputs and outputs.

Initiate Step Checklist


All Impacted Internal/External Entities Informed
Reengineering Teams Formed
Trained or Experienced in TEAM Environment
Trained or Experienced in Process Design
Knowledge of Current Technological Capabilities
Plan for Handling Documentation vs. Analysis
Project Planned
Scope
Duration
Resources
Implementation
Customer Voice
Integrate Customer into Design and Analysis Functions
Performance Goals Established
Current Metrics and Values Captured
Specific Improvements Quantified

Figure 10 Initiate Step Checklist.


PROCESS DESIGN AND REENGINEERING 1709

4.4.2. Analyze Existing Process


Two aspects of the existing process must be assessed. The first is the performance of the process as
compared to customer expectations (the external performance of the process). The second is in regard
to the value added / non-value added components of the current process (the internal performance of
the process). This step is critical in the delivery of bottom-line benefits (Ho 1999). Much insight into
the external performance of the system was gained in the initiate stage, where the performance goals
were set. In the internal performance evaluation, tasks are evaluated as value adding or non-value
adding. Using manufacturing terms, tasks such as transportation and rework are non-value adding,
while machining and painting are value adding. What is found typically ‘‘is that 65% to 70% of the
tasks are non-value [tasks]. At the lowest level of detail, you find massive amounts of waste’’ (Bar-
tholomew 1999).
Figure 11 summarizes the activity involved with the diagnose step.

4.5. Redesign
4.5.1. Define and Analyze New Process Concepts
Much has been said about the missing element in the reengineering prescription. Establishing the
future-state solution is a difficult, creative process. Hammer and Champy (1993) point this out when
they say, ‘‘[T]here are no seven or ten step procedures that will mechanically produce a radical new
process design.’’ They do, however, provide some characteristics of reengineered processes: (1) sev-
eral jobs are combined into one, (2) workers make decisions, (3) the steps in the process are performed
in a natural order, (4) processes have multiple versions, (5) work is performed where it makes the
most sense, (6) checks and controls are reduced, (7) reconciliation is minimized, (8) hybrid
centralized / decentralized operations are prevalent. Insight is gained in the reengineering effort when
the conventional thinking is challenged. Policies and rules, whether written or not, can often be the
reason a process exists in its current form (Bartholomew 1999).

4.5.2. Prototype and Detailed Design of New Process


The detailed design effort can take several months. The new process will require new skills, thinking,
and behavior from those who are a part of it. The process will not exist in isolation. It will exist
among all of the other processes within a company, demanding input and providing output. Many of
the inputs come from shared resources. ‘‘When designing a process there needs to be both technical
and social inputs, as well as the infrastructure and architecture to support the process. If incremental,
dramatic or step performance improvements are sought then the technical and social inputs must
have a degree of congruence’’ (Love et al. 1998a).
Whenever possible, new process concepts, if not the entire process, should be prototyped first.
There is valuable information to be gained from such activity (Feather 1998). Even in the event that
the process does not perform as expected, lessons gained from the experience can be applied to the
next iteration of prototype design.

Diagnose Step Checklist


Tools Selected for Data Capture and Modeling
Document "As-Is" Process
Physical Form
Information Form
Performance Measures
Analyze Current Process
Correlate Output Weakness with Internal Characteristics
Summarize Value-Added vs. Non Value-Added Content
Challenge Assumptions Implicit in Current Form
Review Product/Service Characteristics

Figure 11 Diagnose Step Checklist.


1710 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

4.5.3. Design Human Resource Structure


‘‘Among the variety of reasons for the failure of reengineering processes, one of the most serious is
not providing a human-performance system to support each and every performer in the organization’’
(Fisher 1997). ‘‘The significant factor that determines the performance of an organization is its
people’’ (Frohman 1997). To get the people to work in concert with the new process, there is a need
to develop and link reward and recognition systems to the process (Pritchard and Armistead 1999).
The adage ‘‘Show me how I’m measured and I’ll show you how I perform’’ still holds true. In order
to drive home the message of process, these systems must be altered to support the new process.
This may involve organizational changes (Love et al. 1998a).
Figure 12 summarizes the activities involved with the redesign step.
4.6. Reconstruct
4.6.1. Reorganize
One of the most hotly debated topics concerning reengineering is the surplus of employees that it
can create. In a majority of the case studies, the employees no longer required by the new processes
were laid off. Although cost cutting was arguably not one of the original primary goals of reengi-
neering, it quickly became one as companies realized they had a surplus. Research performed since
then indicates that wholesale workforce reduction may not be the correct choice of action for the
following reasons:

• Stock market gains realized after the cuts are usually not long lasting (Harrington 1998b).
• Productivity either stayed the same or deteriorated after the layoff (Guimaraes and Bond 1996).
• The company cuts its capacity for future growth (Weicher et al. 1995).
• Those who are left are fearful and uncooperative (Strassman 1994).

Some companies have gone to the other extreme, guaranteeing at the outset of a reengineering effort
that no jobs will be lost (Willets 1996). This is done in an effort to solidify the cooperation necessary

Redesign Step Checklist


New Process Concepts
Jobs Combined Where Possible (Training & IT)
More Decision Authority at Job
Processes Capable of Custom Configurations
Automated Error Checking/Review
Wait Times Minimized
Detail Design
Impact on Other Processes Assessed
Impact on Organization(s) Assessed
Customer Requirements Satisfied
Concepts Tested
Education/Training Needs Identified
Cost/Benefit Analysis
Human Resource Structure Identified
Workforce Estimates
Process Measures and Human Performance Measures Linked
Management Structures Aligned with Process

Figure 12 Redesign Step Checklist.


PROCESS DESIGN AND REENGINEERING 1711

for genuine innovation within the workplace. While this may not be the correct answer either, there
is one guiding principle to use in the event that the surplus must be reduced: Don’t eliminate the
full number of surplus employees provided by estimates. First, no amount of planning can accurately
gauge the headcount required by the new process (Macdonald 1998). Second, the knowledge and
skill lost in the workforce reduction will naturally impede the performance of the new process until
those skills are reacquired. This aspect is rarely modeled in workforce estimates.
4.6.2. Implement
Implementation problems are bound to develop. The interactions are too numerous and the complexity
too great for this not to be expected. While it is impossible to foresee every issue that might develop,
case history does provide some clues (Guimaraes and Bond 1996). Examples include (1) commu-
nication barriers between functional areas, (2) lack of leadership, (3) strategies being formed outside
the company’s ability to implement, (4) difficulty having the changes accepted by the employees
affected, (5) unexpected enormity of the undertaking and disruption to the company, (6) difficulty
balancing the incentives of traditional performance measures against what really needs to be done,
(7) faltering of some projects because nervous corporate backers pull out at the first sign of difficulty,
(8) executives many times being unsure whether it is a worthwhile undertaking, (9) information
systems infrastructure in most large organizations being a major impediment to achieving immediate
benefits, (10) the tough problems of elimination of positions and worker anxiety over losing jobs,
(11) management reluctance to commit resources, (12) major training costs to make the transition
and management frustration with slow results.
4.6.3. Train Users
As mentioned previously, process thinking is new to most organizations. Users must be given the
opportunity to learn the implications of process thought. They must reorient their thinking towards
the customer and learn to evaluate their job in terms of how it supports the customer. Also, the
process may introduce new technologies and skill requirements. The users must be given the oppor-
tunity to acquire the tools necessary to perform their new job.
Figure 13 summarizes the activities involved with the reconstruct step.
4.7. Evaluate
4.7.1. Evaluate Process Performance
The evaluation of the new process will be in accordance with the process measures developed pre-
viously. If new measures were developed, they should have been implemented while the old process
was still operating. It is important to realize that early measures of the new process may not reflect
its true performance potential. This can be due to the disruption caused by cut-over. In the case
where new measures are being used, it may reflect the need to refine the measures.

Reconstruct Step Checklist


Envision
Reorganization
Plan for Dealing with Potential Surplus of Labor
Plan for Dealing with Customer Implications of
Elimination/Reduction of Products/Services
Implementation
Management Requirements
Disruption Estimated and Anticipated
Training
Specific Skills Related to New Process
General Process Thinking

Figure 13 Reconstruct Step Checklist.


1712 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

Several successful organizations are now creating assessment programs to evaluate process-
improvement successes and failures and share lessons learned (Caudle 1995). This would be a system
of measuring the reengineering process itself, enabling the organization to develop its own set of
best practices and spread the knowledge across the organization.

4.7.2. Link to Continuous Improvement Programs


In the final analysis, PDR is an improvement program within the realm of TQM. As such, companies
are compelled to constantly reevaluate themselves and their performance. The TQM framework makes
the customer the absolute measure of performance and PDR makes the process the item to be mea-
sured. Including PDR in the category of improvement tools implies that the reengineering process is
not a static, one-time event but rather another improvement tool that can be used as necessary to
improve the products of an organization.
Figure 14 summarizes the evaluation step activities.

5. CASE STUDIES
5.1. Corning Asahi Video (Manganelli and Klein 1994)
Corning Asahi Video (CAV) is a business unit of Corning, Inc., and manufactures glass for televisions.
The company had performed in the red during the period from 1987–1991. Customer dissatisfaction
was high relating to lead times and order placement, and management was frustrated with its infor-
mation system because the inventory and order status information was difficult to extract. To rectify
this situation, the company set out to reengineer its order-fulfillment process. The overall goals of
the project were to:

• Restore profitability by improving efficiency within the process


• Minimize rework and error
• Strengthen internal communications and provide process-wide access to customer information.

Initially, a cross-functional team was formed to redesign the process and implement the changes.
The customer service manager was appointed as the head of this team. Customer interviews and
internal studies were conducted to target inefficiencies and determine their root causes. The resulting
information was shared with all of the 1200 employees at CAV.
Several changes were implemented based on study findings. To incorporate new technology, CAV
adopted an existing Corning process for new product development that facilitated communication
with top management to support the identification, selection, and adoption of process supporting
technology. Disjointed systems of information flow were replaced with an integrated database-driven
system. Customer service was consolidated into one location, and the role of customer service was
expanded to allow better service. Throughout the project, employees were kept apprised of the project
effort.
The project was completed in 15 months at a price of $570,000. As a result of reengineering,
rework and cost overruns have been reduced by $1.6 million annually. Per order costs have decreased
by 75%. Personnel costs have been reduced by $400,000 annually. Order fulfillment time has been
reduced by 50% from 180 days to 90 days. The number of tasks required in the order-fulfillment
process was reduced from 250 steps to 9.

Evaluation Step Checklist


Process Measurement at Inception and Evaluated Frequently
Continuous Improvement Links
Review Other Processes
Periodic Benchmarks of New Process

Figure 14 Evaluation Step Checklist.


PROCESS DESIGN AND REENGINEERING 1713

5.2. Uarco, Inc. (Weston 1997)


Uarco, Inc., is a company that prints purchase order forms and other business documents. It has 14
manufacturing and service call centers located across the United States. Its annual revenues are in
excess of $550 million. In 1995, the company analyzed its processes and identified $100 million in
costs associated with its order-fulfillment process. This was its single most expensive process. Upon
closer inspection, it found unexpected costs in their order management systems. An exorbitant amount
of time was spent taking and quoting orders. Since each job is, in effect, a custom solution, each
aspect of the customer specification had to be looked up to determine the cost component in order
to deliver the quote to the customer. The specification components were contained in a 1000-page
manual that had to be consulted for each order and change order. The process could take hours.
Updating the manual was time consuming as well because change pages had to be mailed to all of
the service outlets. It was determined that 60–80% of the sales force’s time was spent administering
orders.
As part of the solution, older mainframe units with isolated PCs were replaced with Windows
NT servers and networked PCs. Client / server software was purchased along with application software
that allowed the company to share database information among its geographically dispersed offices.
Shared, replicated databases provided a more streamlined, real-time update process. Electronically
stored specifications allowed quicker access and thus quicker order fulfillment.
With the new systems in place, the cost to provide 213,500 quotes annually has decreased from
$16 million to $10 million. The capital investment by the company was $21 million. Their net profits
have increased by $25 million annually. Much of the change is due to the changed nature of the
workload of the salesperson. Under the old systems, a salesperson would spend 80% of his or her
time administering orders and only 20% selling. Those figures have reversed under the new systems.
5.3. D2D, Ltd. (Gadd and Oakland 1995)
D2D, Ltd. is a manufacturing subsidiary of International Computers Ltd. (ICL), a systems integrator.
In the mid-1980s, the IT industry underwent dramatic change. At the pinnacle of mainframe manu-
facturing, ICL had profit margins of over 80%. By 1994, margins were 3–4% (typical of the industry).
Material costs typically accounted for 80% of the cost of finished goods. Traditional performance
measures were no longer significant.
ICL faced the prospect of outsourcing its manufacturing operations in order to remain competitive.
Instead, they chose to improve their operations with investments in automation, JIT, flexible assembly
cells, MRP systems, EDI, and surface-mount lines. These investments enabled the company to remain
competitive but put it in an under-capacity condition. Restructuring within ICL and establishing
outside strategic alliances reduced the demand for goods from the manufacturing division. This
provided the foundation for radical change within D2D. Extra capacity for ICL’s manufacturing
subsidiary, D2D, would have to be found outside the company. Given P&L accountability, the sub-
sidiary had to transform itself from the inward-looking one it had always been into a market-led and
customer-facing organization.
As a starting point, the division determined its core competencies and added a sales and marketing
function. It also determined other services that were intrinsic to its culture that it could market. To
help in the transformation, a customer care training program was developed. All existing employees
went through the program, and all subsequent new employees now do as well. The investment in
technology, particularly the manufacturing technology, enabled a flatter infrastructure with a more
empowered workforce—one that was more devoted to the customer. EDI provided a connection
among D2D, its vendors, and its customers that, because of its prevention-based nature, reduced order
and material mistakes, thus making the supply chain more efficient. EDI created a process view that
is pulled by the customer.
BPR has become an integral part of the culture at D2D. It has provided the perspective necessary
to undertake the bold changes that were necessary because of the change in charter. By 1993, D2D’s
profits were 57% higher than in 1992. The cost associated with defects had dropped significantly as
a percent of revenue. By 1995, non-ICL revenue was 50% of total revenue.
5.4. Fortune 500 Insurance Company (Feather 1998)
A Fortune 500 insurance company decided to reengineer its death claims process in order to reduce
cycle time, cost, and customer dissatisfaction. Initially, a design team was formed and customer and
process data were analyzed. Two important discoveries were made in this phase that would have
significant bearing on the final solutions that were developed. First, a mismatch was discovered
between the actual cycle time of the claim process and the cycle time deemed acceptable to the
customer. Second, because of the inability of the company to provide customer data visibility to all
units of the company, many opportunities—totaling hundreds of millions of dollars—were not being
captured by the company.
1714 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

In preparation for the reengineering effort, a design team was selected and trained in reengineering
design principles. A four-stage methodology was introduced to help guide them through the effort.
The methodology emphasized the discovery of new opportunities to create value in business pro-
cesses, new ways of thinking in terms of process, the design of innovative, value-creating business
processes encouraging different behavior, and attention to implementation details. The team used
simulation exercises to familiarize themselves with design principles and encourage new thought.
The design team was separated into three subteams. The first team mapped the existing work-
flow. The results of their work revealed a death claims process made up of 200 steps, with only 18%
of those steps deemed as value added. The second team was responsible for analyzing the cycle time
of the process, while the third team conducted focus groups with beneficiaries and agents. The
beneficiary focus groups provided priceless information in terms of acceptable time frames for con-
tact, as well as typical needs of clients.
The insurance company saw tremendous opportunity in what it learned. It found that when a
beneficiary needs investment counsel after receiving a death claim, it would be advantageous for the
company to be able to provide options to the beneficiary coincident with the time of payout, thereby
increasing the probability that the assets would be retained in the insurance company’s accounts. This
would effectively link the payout of benefits to the reinvestment of those benefits.
The team quickly realized that they would need to bring in technology expertise. A technology
team was formed to work on information flow issues that developed through redesign efforts. It was
also determined that agent and claim site personnel representation on the design team would be
necessary in order to make the ideas and concepts that were beginning to develop coalesce. Design
options were developed in several sessions involving all of the necessary personnel and classified
into three categories: workflow, organization, and technology.
With the design options in hand, the team formed into two subteams to create the new design.
This was done in order to facilitate creativity. The eventual design was a consensus design between
the two teams. The features of the new design were more methods available to the beneficiary to
initiate a claim and the ability to segment claims between those requiring high or low administration.
The most significant change in the process was the way that company viewed it. No longer was the
payment of the death claim viewed as the end of the process. With the incorporation of the correct
data-recording processes and technology, the payment was now viewed as a follow-up opportunity
to provide reinvestment options to the beneficiaries.
The results of the effort yielded a process with 50% fewer steps. The segmenting process at the
front end of the claim permitted 65% of the claims to be processed within two days. Costs associated
with handling claims were reduced by 28%, and cycle time was reduced by 56%.

6. LESSONS LEARNED
The literature points to several areas that can be considered providing advice for future practitioners.
PDR is a reasoning process applied to a highly complex set of systems to produce a process. The
systems include employees, customers, equipment, policies, and strategies, to name a few. The very
nature of the systems—their variability—ensures that no two PDR projects will behave in the same
fashion. Small differences on the input side lead to large differences on the output side (Ferrie 1995).
Because of this, PDR will never be a one-size-fits-all technique. PDR, being highly situational, will
require solutions to be developed on a case-by-case basis, requiring the imagination and intellect of
the entire design team, if not the entire organization. As a heuristic approach, there is no one ‘‘best’’
answer. However, all actions planned or deployed must be considered in regard to their impacts and
outcomes.
Another key point to remember is that the scope of reengineering should be limited. Despite the
title of their book, Hammer and Champy never intended that the corporation be reengineered on all
fronts simultaneously. Select the strategically important processes, rank them, and focus attention on
the most critical ones. Only one or two processes should be reengineered at a time (Harrington 1998).
The people issues will continue to be a part of PDR since very few ‘‘lights-out’’ systems require
reengineering. The critical aspect here is to remember to reengineer not in spite of the human aspects
of the system, but in congruence with them. The key contribution of the process comes from its
people rather than its hardware or systems (Frohman 1997). The first formal definition of industrial
engineering, as established by the American Institute of Industrial Engineers in 1955, recognized the
inseparability of people from the systems of interest to the profession. ‘‘Successfully integrating
people within a system will always be the ultimate design challenge’’ (Ferrie 1995).

7. FUTURE OUTLOOK
There are diverse opinions concerning the future of reengineering. Some feel that ‘‘knowledge man-
agement, employee empowerment, adoption of new information technology, and shared vision’’ will
lead to greater reengineering success (Kettinger and Grover 1995). Others feel that taxonomy will
improve the success rate, while still others feel that the key is the integration of organizational theory
PROCESS DESIGN AND REENGINEERING 1715

and control and MIS (Malhotra 1998). It is predicted that reengineering projects will be undertaken
more often to keep up with a dynamic business environment and that success will be based upon
how quickly a company seizes the moment. The reengineering project time will continue to decrease.
Regardless of exactly how it will evolve, it is safe to assume that reengineering will continue to be
used within organizations as a tool for improvement.

REFERENCES
Andrews, D. (1996a), ‘‘BPR: Dialog, Not Just Design,’’ Enterprise Reengineering, July 1996.
Andrews, D. (1996b), ‘‘The Pros and Cons of As-Is Modeling,’‘ Enterprise Reengineering, May
1996.
Bal, J. (1998), ‘‘Process Analysis Tools for Process Improvement,’’ TQM Magazine, Vol. 10, No. 5,
pp. 342–354.
Bartholomew, D. (1999), ‘‘Process Is Back,’’ Industry Week, Vol. 248, No. 20, pp. 31–34.
Biazzo, S. (1998), ‘‘A Critical Examination of the Business Process Reengineering Phenomenon,’’
International Journal of Operations and Production Management, Vol. 18, Nos. 9 / 10, pp. 1000–
1016.
Buchanan, D. (1998), ‘‘Representing Process: The Contribution of a Re-Engineering Frame,’’ Inter-
national Journal of Operations and Production Management, Vol. 18, No. 12, pp. 1163–1188.
Camp, R. (1989), Benchmarking: The Search for Industry Best Practices That Leads to Superior
Performance, ASQC Quality Press, Milwaukee.
Caudle, S. L. (1995), Reengineering for Results: Keys to Success from Government Experience,
National Academy of Public Administration, Washington, DC.
Choi, C. F., and Chan, S. (1997), ‘‘Business Process Re-Engineering: Evocation Elucidation and
Exploration,’’ Business Process Management Journal, Vol. 3, No. 1, pp. 39–63.
Coombs, R., and Hull, R. (1997), The Wider Research Context of Business Process Analysis, Man-
chester School of Management, Centre for Research on Organizations, Management and Technical
Change, Manchester, UK.
Corrigan, S. (1997), Human and Organizational Aspects of Business Process Reengineering, Institute
of Work Psychology, University of Sheffield, Sheffield, UK.
Crowe, T. J., and Rolfes, J. D. (1998), ‘‘Selecting BPR Projects Based on Strategic Objectives,’’
Business Process Management Journal, Vol. 4, No. 2, pp. 114–136.
Davenport, T. H. (1996), ‘‘The Fad That Forgot People,’’ Fast Company, November 1996, pp. 70–
74.
Davenport, T. H., and Short, J. (1990), ‘‘The New Industrial Engineering: Information Technology
and Business Process Redesign,’’ Sloan Management Review, Vol. 31, No. 4, pp. 11–27.
Dervitsiotis, K. N. (1999), ‘‘How to Attain and Sustain Excellence with Performance Based Process
Management,’’ Total Quality Management, Vol. 10, No. 3, pp. 309–326.
Dickie, B. N. (1995), ‘‘The C.E.O. Agenda,’‘ Strategy and Business, No. 1.
Feather, J. J. (1998), ‘‘The Upside of Process Improvement,’‘ IIE Solutions, Vol. 30, No. 12, pp. 39–
42.
Ferrie, J. (1995), Business Processes: A Natural Approach, International Manufacturing Centre, Uni-
versity of Warwick, Warwick, UK.
Fisher, J. (1997), ‘‘Improving Human Performance in a Process Management Environment,’’ CMA
Management, Vol. 71, No. 5, pp. 21–24.
Frohman, A. L. (1997), ‘‘Igniting Organizational Change from Below,’’ Organizational Dynamics,
Vol. 25, No. 3, pp. 39–53.
Gadd, K. W., and Oakland, J. S. (1995), ‘‘Re-Engineering a Total Quality Organization,’’ Business
Process Re-engineering and Management Journal, Vol. 1, No. 2, pp. 7–27.
Gappmaier, M. (1997), ‘‘Process Prototyping—A Methodology for Participatory Business Process
Design,’’ in IDIMT’97: Proceedings of the 5th Interdisciplinary Information Management Talks,
Oldenbourg, Munich, pp. 63–76.
General Accounting Office (GAO) (1995), Business Process Reengineering Assessment Guide, GAO,
Washington, DC.
Grover, V., et al. (1995), Business Process Change: Reengineering Concepts, Methods and Technol-
ogies, IDEA Group, Harrisburg, PA.
Guha, S., Grover, V., Kettinger, W. J., and Teng, J. T. C. (1997), ‘‘Business Process Change and
Organizational Performance: Exploring and Antecedent Model,’’ Journal of Management Infor-
mation Systems, Vol. 14, No. 1, pp. 119–154.
1716 MANAGEMENT, PLANNING, DESIGN, AND CONTROL

Guimaraes, T., and Bond, W. (1996), ‘‘Empirically Assessing the Impact of BPR on Manufacturing
Firms,’’ International Journal of Operations and Production Management, Vol. 16, No. 8, pp.
5–28.
Hammer, M. (1990), ‘‘Reengineering Work: Don’t Automate, Obliterate,’’ Harvard Business Review,
Vol. 68, July–August 1990, pp. 104–112.
Hammer, M., and Champy, J. (1993), Reengineering the Corporation: A Manifesto For Business
Revolution, HarperCollins, New York.
Harrington, H. J., (1998a), ‘‘Performance Improvement: The Rise and Fall of Reengineering,’’ TQM
Magazine, Vol. 10, No. 2, pp. 69–71.
Harrington, H. J. (1998b), ‘‘Performance Improvement: The Downside to Quality Improvement (The
Surplus People Problem),’’ TQM Magazine, Vol. 10, No. 3, pp. 154–160.
Ho, S. J. K., (1999), ‘‘The Implementation of Business Process Reengineering in American and
Canadian Hospitals,’‘ Health Care Management Review, Vol. 24, No. 2, pp. 19–31.
Jarrar, Y. F., and Aspinwall, E. M. (1999), ‘‘Integrating Total Quality Management and Business
Process Reengineering: Is It Enough?’’ Total Quality Management, Vol. 10, Nos. 4 / 5, pp. 584–
593.
Kettinger W. J., and Grover, V. (1995), ‘‘ Special Section: Toward a Theory of Business Process
Change Management,’’ Journal of Management Information Systems, Vol. 12, No. 1, pp. 9–30.
Kettinger, W. J., Teng, J. T. C., and Guha, S. (1997), ‘‘Business Process Change: A Study of Meth-
odologies, Techniques and Tools,’’ Management Information Systems Quarterly, Vol. 21, No. 1,
pp. 55–80.
Lee, C. R. (1996), ‘‘Process Re-engineering at GTE: Milestones on a Journey Not Yet Completed,’’
Strategy and Business, No. 5.
Lee, R. G., and Dale, B. G. (1998), ‘‘Business Process Management: A Review and Evaluation,’’
Business Process Management Journal, Vol. 4, No. 3, pp. 214–225.
Love, P. E. D., Gunasekaran, A., and Li, H. (1998a), ‘‘Putting an Engine into Re-engineering: Toward
a Process-Oriented Organization,’’ International Journal of Operations and Production Manage-
ment, Vol. 18, Nos. 9 / 10, pp. 937–939.
Love, P. E. D., Gunasekaran, A., and Li, H. (1998b), ‘‘Improving the Competitiveness of Manufac-
turing Companies by Continuous Incremental Change,’’ TQM Magazine, Vol. 10, No. 3, pp. 177–
185.
Lucier, C. E., and Torsilieri, J. D. (1999), ‘‘Beyond Stupid, Slow and Expensive: Reintegrating Work
to Improve Productivity,’‘ Strategy and Business, No. 17.
Macdonald, J. (1998), ‘‘The Quality Revolution—In Retrospect,’’ TQM Magazine, Vol. 10, No. 5,
pp. 321–333.
Malhotra, Y. (1998), ‘‘Business Process Redesign: An Overview,’’ IEEE Engineering Management
Review, Vol. 26, No. 3.
Maluso, N. (1997), ‘‘Activity Based Costing: What Is It and How Can Reengineering Teams Use
It?’’ Reengineering Business Case Series, ProSci.
Manganelli, R. L., and Klein, M. M. (1994), The Reengineering Handbook: A Step-by-Step Guide to
Business Transformation, AMACOM, New York.
Moeller, B., Tucker, J. S., and Devereaux, J. (1996), ‘‘The Next Wave: Re-engineering for Growth,’’
Strategy and Business, No. 5.
Morris, D., and Brandon, J. (1993), Reengineering Your Business, McGraw-Hill, New York.
Morris, J. R., Cascio, W. F., and Young, C. E. (1999), ‘‘Downsizing after All These Years: Questions
and Answers About Who Did It, How Many Did It, and Who Benefited from It,’’ Organizational
Dynamics, Vol. 27, No. 3, pp. 78–97.
Ould, M. A., ‘‘Designing a Reengineering Proof Process Architecture,’’ Business Process Manage-
ment Journal, Vol. 3, No. 3, 1997, pp. 232–247.
Peltu, M., Clegg, C., and Sell, S. (1996), Business Process Re-engineering: The Human Issues,
International Manufacturing Centre, University of Warwick, Warwick, UK.
Petrozzo, D. P., and Stepper, J. C. (1994), Successful Reengineering, Van Nostrand Reinhold, New
York.
Pritchard, J. P., and Armistead, C. (1999) ‘‘Business Process Management—Lessons from European
Business,’’ Business Process Management Journal, Vol. 5, No. 1, pp. 10–32.
Roberts, L. (1994), Process Reengineering: The Key to Achieving Breakthrough Success, ASQC
Quality Press, Milwaukee.
Schwartz, K. D. (1998), ‘‘Benchmarking for Dollars,’’ Datamation, Vol. 4, No. 2, pp. 50–57.
Stork, K. (2000), ‘‘Confusion Still Lingers on How to Benchmark,’’ Purchasing, September 21.
PROCESS DESIGN AND REENGINEERING 1717

Strassman, P. A. (1994), The Politics of Information Management, Information Economics Press, New
Canaan, CT.
Weicher, M., Chu, W. W., Ching, W., Le, L. V., and Yu, D. (1995), Business Process Reengineering,
Baruch College, City University of New York, New York.
Weston, R. (1997), ‘‘Overhaul Helps Chicago Printer,’’ ComputerWorld, February 17.
Willets, L. G. (1996), ‘‘The Best Ways to Survive Reengineering: Expert Tips on How to Reinvent
Your Attitude,’’ Enterprise Reengineering, September.
Yu, B., and Wright, D. T. (1997), ‘‘Software Tools Supporting Business Process Analysis and Mod-
eling,’’ Business Process Management Journal, Vol. 3, No. 2, pp. 133–150.

ADDITIONAL READING
Bhaskaran, K., and Lueng, Y. T., Manufacturing Supply Chain Modeling and Reengineering, Sad-
hanna, Vol. 22, 1997. pp. 165–187.

You might also like