Rule For High Speed Craft
Rule For High Speed Craft
Rule For High Speed Craft
CONTENTS
-Ⅰ-
Part 4 REQUIREMENTS FOR GENERAL ARRANGEMENT
-Ⅱ-
2.7 Girders .................................................................................................................................................................. 70
2.8 Hat-type Construction ........................................................................................................................................... 71
2.9 Pillars.................................................................................................................................................................... 72
2.10 Rudders ............................................................................................................................................................... 72
2.11 ..................................................................................................................................................... 72
Shaft Brackets
Chapter 3 DIRECT CALCULATIONS ........................................................................................................................... 73
3.1 General ................................................................................................................................................................. 73
Chapter 4 BUCKLING CONTROL ................................................................................................................................ 74
4.1 General ................................................................................................................................................................. 74
Chapter 5 FATIGUE CONTROL .................................................................................................................................... 75
5.1 General ................................................................................................................................................................. 75
-Ⅲ-
2.3Buoyancy and Stability in the Displacement Mode following Damage .................................................................. 98
Chapter 3 REQUIREMENTS FOR CARGO CRAFT .................................................................................................. 100
3.1 General ................................................................................................................................................................. 100
3.2 Buoyancy and Stability in the Displacement Mode following Damage ................................................................. 100
-Ⅳ-
8.13 Steam Piping Systems and Condensate Systems ................................................................................................. 131
8.14 Feed Water Systems for Boilers .......................................................................................................................... 131
8.15 Exhaust Gas Piping Arrangement ....................................................................................................................... 132
Chapter 9 STEERING GEARS ...................................................................................................................................... 133
9.1 General ................................................................................................................................................................ 133
9.2 Performance and Arrangement of Steering Gears .................................................................................................. 133
9.3 Controls ............................................................................................................................................................... 134
9.4 Materials, Constructions and Strength of Steering Gears ....................................................................................... 134
Chapter 10 WINDLASSES AND MOORING WINCHES ............................................................................................ 135
10.1 General ............................................................................................................................................................... 135
Chapter 11 REFRIGERATING EQUIPMENT ............................................................................................................. 136
11.1 General............................................................................................................................................................... 136
11.2 Design of Refrigerating Machinery ..................................................................................................................... 136
Chapter 12 AUTOMATIC AND REMOTE CONTROL ............................................................................................... 137
12.1 General ............................................................................................................................................................... 137
12.2 System Design .................................................................................................................................................... 137
12.3 Automatic and Remote Control of Main Propulsion Machinery or
Controllable Pitch Propellers.............................................................................................................................. 137
12.4 Automatic and Remote Control of Boilers .......................................................................................................... 137
12.5Automatic and Remote Control of Electric Generating Sets ................................................................................ 137
12.6 Automatic and Remote Control of Auxiliary Machinery ..................................................................................... 137
Chapter 13 SPARE PARTS, TOOLS AND INSTRUMENTS ....................................................................................... 138
13.1 General ............................................................................................................................................................... 138
13.2 Spare Parts, Tools and Instruments ..................................................................................................................... 138
-Ⅴ-
Chapter 5 ADDITIONAL REQUIREMENTS FOR ELECTRIC PROPULSION PLANTS ...................................... 158
5.1 General ................................................................................................................................................................. 158
-Ⅵ-
2013 Rules for High Speed Craft (Part 1 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
1 The survey, construction, installation, material and equipment of the high speed craft (hereinafter referred to as
craft in the Rules) to be registered in accordance with the Regulations for the Classification and Registry of
Ships and to be defined in 2.1.2, Part 1 of the Rules are to be as prescribed in the Rules notwithstanding the
requirements prescribed in the Rules for the Survey and Construction of Steel Ships unless otherwise specified
elsewhere in each Parts of the Rules.
2 The survey, construction, installation, material and equipment of the craft which is excluded from the definition
of the high speed craft in 2.1.2 of this Part are to be deemed appropriate by the Society.
3 Notwithstanding preceding -1, craft flying specified nationality are to comply with the requirements in other
Rules of NIPPON KAIJI KYOKAI (hereinafter referred to as the Society in the Rules).
4 The Rules applies to the craft defined in 2.1.2 of this Part and engaged in the restricted voyages as follows:
(1) passenger craft which do not proceed in the course of their voyage more than 4 hours at 90% of the maximum
speed from a place of refuge when fully laden; and
(2) cargo craft which do not proceed in the course of their voyage more than 8 hours at 90% of the maximum speed
from a place of refuge when fully laden.
5 The high speed craft not engaged on international voyage and that comply with the requirements of IMO
Resolution MSC.97(73) THE INTERNATIONAL CODE OF SAFETY FOR HIGH SPEED CRAFT, as may be
amended, are to be deemed to be in compliance with the requirements stipulated in Part 3 to Part 13 of this Rules
regardless of any of the requirements given in the Rules. However the matters not stipulated in the Code are to be
according to the requirements of the Rules.
1.1.4 Stability
The requirements in the Rules are framed for craft having appropriate stability in all conceivable conditions. The
Society emphasizes that the special attention is to be paid to the stability by the builders in design and construction
stage and by the craft owners and craft masters while in service.
-1-
2013 Rules for High Speed Craft (Part 1 Chapter 1)
1.1.6 Equivalency
Alternative hull construction, equipment, arrangement and scantlings will be accepted by the Society, provided
that the Society is satisfied that such construction, equipment, arrangement and scantlings are equivalent to those
required in the Rules.
1.2.1 General
For craft complying with additional requirements and/or those exempted from any requirements related to the
subjects specified in the following paragraphs in accordance with the provisions of this Rules, an appropriate notation
is affixed to the Classification Characters in accordance with the provisions of Chapter 2 of the Regulation for the
Classification and Registry of Ships as follows;
NS* ((1)) ((2), (3)) ((4))
(1) Restricted services specified in 1.2.2
(2) Structural materials for main hull specified in 1.2.3
(3) Hull construction and equipment specified in 1.2.4
(4) Compliance with the special requirements for international voyages specified in 1.2.5
-2-
2013 Rules for High Speed Craft (Part 1 Chapter 1)
-3-
2013 Rules for High Speed Craft (Part 1 Chapter 2)
Chapter 2 DEFINITIONS
2.1 General
2.1.1 Application
The definitions of terms which appear in this Rule are to be as specified in this Chapter and Part A of the Rules
for the Survey and Construction of Steel Ships, unless otherwise specified elsewhere.
-4-
2013 Rules for High Speed Craft (Part 1 Chapter 2)
2.1.18 Superstructure
The superstructure is the decked structure on the freeboard deck, extending from side to side of the craft or
having its side walls at the position not farther than 0.04 B f from the side of the craft. Superstructures are classified
-5-
2013 Rules for High Speed Craft (Part 1 Chapter 2)
as follows.
(1) A bridge is a superstructure which does not extend to either the forward or after perpendicular.
(2) A poop is a superstructure which extends from the after perpendicular forward to a point which is aft of the
forward perpendicular. The poop may originate from a point aft of the after perpendicular.
(3) A forecastle is a superstructure which extends from the forward perpendicular aft to a point which is forward of
the after perpendicular. The forecastle may originate from a point forward of the forward perpendicular.
(4) A full superstructure is a superstructure which, as a minimum, extends from the forward to the after
perpendicular.
-6-
2013 Rules for High Speed Craft (Part 1 Chapter 2)
2.1.26 Stern Tube Shaft Kind 1 and Stern Tube Shaft Kind 2
1 Stern tube shaft Kind 1 is a stern tube shaft which is effectively protected against corrosion by sea water with a
means approved by the Society or which is made of corrosion resistant materials approved by the Society. In this case,
such shaft to which the water-lubricated bearing is adopted is categorized in stern tube shaft Kind 1A and such shaft
to which the oil-lubricated bearing is adopted is categorized in stern tube shaft Kind 1B.
2 Stern tube shaft Kind 2 is a stern tube shaft other than those specified in -1.
-7-
2013 Rules for High Speed Craft (Part 1 Chapter 2)
(3) either open at both ends, or open at one end and provided with adequate natural ventilation effective over their
entire length through permanent openings in the side plating or deckhead or from above.
2.1.45 Tanker
A tanker is a cargo craft constructed or adapted for the carriage in bulk of liquid cargoes of flammable nature
except craft carrying liquefies gases in bulk and craft carrying dangerous chemicals in bulk.
2.1.49 IMO
IMO means the International Maritime Organization.
-8-
2013 Rules for High Speed Craft (Part 1 Chapter 2)
-9-
2013 Rules for High Speed Craft (Part 2 Chapter 1)
Chapter 1 GENERAL
1.1 Surveys
-10-
2013 Rules for High Speed Craft (Part 2 Chapter 1)
1.2.1 Notification
When a craft is to be surveyed in accordance with the Rules, it is the responsibility of the applicants of surveys
to notify the Surveyor at the place where they wish to undergo the survey. The Surveyor is to be advised of the survey
a reasonable time in advance so that the survey can be carried out at the proper time.
-11-
2013 Rules for High Speed Craft (Part 2 Chapter 1)
-12-
2013 Rules for High Speed Craft (Part 2 Chapter 2)
2.1.1 General
In the Classification Survey during construction, the hull and equipment, machinery, fire protection and
detection, means of escape, fire extinction, electrical installation, stability and load lines are to be examined in detail
in order to ascertain that they meet the relevant requirements in this Rule.
-13-
2013 Rules for High Speed Craft (Part 2 Chapter 2)
-14-
2013 Rules for High Speed Craft (Part 2 Chapter 2)
ii) Data
1) Explanation of electric propulsion system
2) Investigation table of electrical power
3) List of particulars of high voltage electrical equipment (including test voltage for dielectric
strength)
(3) Other plans and documents
In addition to the plans and documents as listed in (1) and (2), other plans and documents may be required where
deemed necessary by the Society.
2 The plans mentioned in -1 are to indicate in detail the quality of materials used, scantlings and arrangements of
structural members, their attachments, clearance between the bottom of boilers and the top of floors, and other
particulars necessary for examination of proposed construction.
3 A stability information booklet required in 1.7.2, Part 8 of this Rule is to be submitted for approval of the
Society, in addition to the plans and documents as listed in -1.
4 For craft to be provided with the loading manual in accordance with the requirements of 1.4.2, Part 6 of this
Rule, the loading manual including the conditions for loading and other necessary information is to be submitted for
approval of the Society, in addition to the plans and documents as listed in -1.
5 For craft to be provided with a loading computer in accordance with the requirements of 1.4.3, Part 6 of this
Rule, lines (provided with offset table), light load hydrostatic curves, tank capacity plan (finished plan), and the
results of inclining tests are to be submitted to the Society, in addition to the plans and the documents specified in -1.
However, part or whole of these plans and documents may be omitted in cases where the requirements are separately
provided by the Society.
6 Notwithstanding the requirements specified in -1 and -2, submission of the plans and documents specified in -1
and -2 may be omitted in accordance with the provisions specified otherwise by the Society, in the case where a craft
or machinery is intended to be built at the same manufacturer s work based on the plans and documents which have
been approved for other craft.
-15-
2013 Rules for High Speed Craft (Part 2 Chapter 2)
-16-
2013 Rules for High Speed Craft (Part 2 Chapter 2)
-17-
2013 Rules for High Speed Craft (Part 2 Chapter 2)
2.2.1 General
1 In the Classification Survey of craft not built under the Society s survey, the actual scantlings of main parts of
the craft are to be measured in addition to such examination of the hull and equipment, machinery, fire protection and
detection, means of escape, fire extinction, electrical installations and stability as required for the special survey
corresponding to the craft s age in order to ascertain that they meet the relevant requirements in the Rules. For craft
required to be marked with load, the freeboards are to be assigned and load lines corresponding to the assigned
freeboards are to be marked.
2 When it is intended to build a craft to the classification with the Society in accordance with the manner
prescribed in -1, plans and documents as required in 2.1 of this Part are to be submitted for the approval of the
Society.
3 In addition to the plans and documents as listed in -2, for craft to be provided with the loading manual and the
loading computer in accordance with the requirements of 1.4.2 and 1.4.3, Part 6 of this Rule, the loading manual
including the specific loading conditions and relative plans and documents for the installation of the loading
computer are to be submitted for approval of the Society.
-18-
2013 Rules for High Speed Craft (Part 2 Chapter 2)
newly repaired, main steam pipes, and air tanks of which interior can not be inspected, and tests for gas leakage of
refrigerating machinery on board, tests and trials may be dispensed with at the discretion of the Society.
(1) Double bottoms, both peaks, tanks, cofferdams and chain lockers located abaft the collision bulkhead, watertight
bulkheads and shaft tunnels are to be tasted as specified in Table 2.2.1.
(2) Hydrostatic, leakage or airtight tests are to be carried out as specified in each chapter in relation to the kind of
machinery.
-19-
2013 Rules for High Speed Craft (Part 2 Chapter 2)
2.4 Docking
2.4.1 Docking
Every craft is recommended to be dry docked within six months after launching.
2.5 Alterations
-20-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
3.1 General
3.1.1 General
1 All craft classed with the Society are to be subjected to the following Periodical Surveys:
(1) Annual Surveys
(2) Intermediate Surveys
(3) Special Surveys
(4) Propeller Shaft and Stern Tube Shaft Surveys
2 All craft classed with the Society are to be subjected to Planned Machinery Surveys.
3 All examinations and tests in accordance with the requirements in this Chapter are to be carried out to the
satisfaction of the Surveyor.
3.1.2 Docking
For Periodical Surveys, Annual, Intermediate or Special Surveys, the craft is to be dry docked or placed on
slipways and to be placed on blocks of sufficient height and proper staging, except where in-water survey is
requested by the owner and approved by the Society as substitution for surveys in dry docks or on slipways. Any
consecutive in-water survey is not accepted.
3.2.1 General
1 A Periodical Survey is to be considered as completed when the relevant Periodical Surveys both for hull and for
machinery have been completed, unless the special arrangement is made with the Society.
2 Expect as amended at the discretion of the Society, the intervals of Periodical Surveys are specified in 3.2.2 to
3.2.6.
3 At the request of the owner, Periodical Surveys may be carried out before their due date.
4 Intermediate and Annual Surveys may be carried out at the request of the owner before the due date. In this case,
one or more additional Periodical Surveys are to be carried out as specified otherwise.
-21-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
anniversary date of the date crediting a Classification Survey or the previous Special Survey.
2 Where both the Annual Survey and Intermediate Survey or Special Survey are due at the same time, only the
Intermediate Survey or Special Survey is to be carried out.
-22-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
(6) Coamings and closing appliances of ventilators led to spaces below the freeboard deck or spaces within enclosed
superstructures are to be examined.
(7) Air pipes and sounding pipes on weather decks together with closing appliances are to be examined.
(8) Watertight doors, penetrations, stop valves on watertight bulkheads and closing appliances in superstructure end
bulkheads are to be examined. The operation tests of watertight doors on watertight bulkheads and closing
appliances in superstructure end bulkheads are to be carried out.
(9) Bulwarks, shutters of freeing ports in bulwarks or guard rails are to be examined.
(10) The arrangements of structural fire protection and means of escape are to be examined and operation tests are to
be carried out.
(11) Watertight bulkhead penetration.
(12) Permanent gangways or other equivalent means of access are to be examined.
(13) For craft required to be marked with load lines corresponding to the assigned freeboard, load line marks are to
be verified.
(14) The stability information booklet approved by the Society is to be confirmed to be kept board.
(15) For craft required to be provided with the loading manual in accordance with the requirement of 1.4.2, Part 6 of
this Rule, filing of the loading manual on board the craft for ready use is to be checked.
(16) For craft required to be provided with the loading computer in accordance with the requirement of 1.4.3, Part 6
of this Rule, it is to be confirmed that a loading computer having the performance and functions as deemed
appropriate by the Society is installed on board.
(17) For craft required to be marked with the ship s identification number, general condition of the marking is to be
examined.
2 Drainage, mooring and anchoring arrangements and their accessories are to be examined.
3 Fire extinguishing arrangements are to be examined and tested and placed in good order, attention being paid to
the following as well as general examinations of the condition of the fire extinguishing arrangements:
(1) Fire control plans kept on board are to be examined.
(2) Operation tests of fixed fire detection and fire alarm systems (including manually operated call points) are to be
carried out.
(3) Operation tests of fire pumps (including emergency fire pumps), fire main, hydrants, fire hoses, nozzles, etc. are
to be carried out.
(4) Operation tests of fixed pressure water-spraying fire-extinguishing systems are to be carried out.
(5) Conditions of maintenance of the fixed fire fighting systems, semi-portable and portable fire extinguishers are to
be examined.
(6) Operation tests of ventilation systems for the release of smoke are to be carried out.
(7) Conditions of maintenance of the fireman s outfits are to be examined.
4 The operation tests prescribed in -1(8), however, may be dispensed with at the discretion of the Surveyor.
-23-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
3.5.2 Requirements for Special Survey No.1 (for craft up to 5 years old)
1 At the Special Survey No.1, the followings are to be complied with:
(1) All items specified in 3.4.1-1 of this Part are to be thoroughly examined and tested.
(2) All compartments and following tanks are to be examined internally.
(a) Ballast tanks
(b) Peak tanks
(c) Cargo tanks
(3) Where compartments are to be fitted with insulation or close ceilings, compartments including their structural
members, piping systems, etc., are to be examined after removing a sufficient amount of insulation or close
ceiling as required by the Surveyor.
(4) For drainage, mooring and anchoring arrangements and their accessories, the items specified in 3.4.1-2 of this
Part are to be thoroughly examined and tested.
2 For fire extinguishing arrangements, all items specified in 3.4.1-3 of this Part are to be thoroughly examined and
tested.
3.5.3 Requirements for Special Survey No.2 (for craft between 5 and 10 years old)
At the Special Survey No.2, all the requirements specified in 3.5.2 of this Part and the following requirements
are to be complied with:
(1) Fuel oil tanks within the cargo length areas and fresh water tanks are to be examined internally. However, fuel
oil tanks and fresh water tanks need not all be examined internally, provided, after an external examination and
from an internal examination of each one selected tank, the Surveyor is satisfied with the condition of the tanks.
Notwithstanding the above, peak tanks are to be examined internally.
(2) Hydrostatic tests for shell plating, watertight bulkheads, shaft tunnels and watertight doors are to be carried out
where considered necessary by the Surveyor.
-24-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
3.5.4 Requirements for Special Survey No.3 (for craft between 10 and 15 years old)
At the Special Survey No.3, all the requirements specified in 3.5.3 of this Part are to be complied with.
Furthermore, fuel oil tanks are to be examined internally. However, fuel oil tanks need not all be examined internally,
provided, after an external examination and from an internal examination of two selected tanks within the cargo
length areas (including one or more deep tank if present) and one selected tank within the engine rooms, the Surveyor
is satisfied with the condition of the tanks. Notwithstanding the above, peak tanks are to be examined internally.
3.5.5 Requirements for Special Survey No.4 and after (for craft over 15 years old)
At the Special Survey No.4, all the requirements specified in 3.5.4 of this Part are to be complied with.
Furthermore, fuel oil and lubricating oil tanks are to be examined internally. However, fuel oil tanks need not all be
examined internally provided that, after external examinations and the internal examinations of half of the tanks (in
no cases less than two tanks) selected from those within the cargo length areas and one selected tank within engine
rooms, the Surveyor is satisfied with the condition of such tanks. Not all lubricating oil tanks need to be examined
internally provided that, after external examinations and the internal examinations of one selected tank, the Surveyor
is satisfied with the condition of such tanks. Notwithstanding the above, peak tanks are to be examined internally.
3.5.6 Thickness Measurements for the Craft having Metal Hull Construction
1 For craft constructed in metal, at each Special Survey, thickness measurements are to be carried out in
accordance with the requirements specified in this paragraph.
2 When thickness measurements are carried out, following are to be observed.
(1) Thickness measurements are to be carried out using an appropriate ultra-sonic gauging machines or other
approved means. The accuracy of the equipment is to be proven to the surveyor as required.
(2) Thickness measurements are to be carried out within twelve months prior to completion of the survey in
question under the supervision of the surveyor, except where approved by the Society. The surveyor may
re-check the measurements as deemed necessary to ensure acceptable accuracy.
(3) A thickness measurement record is to be prepared and submitted to the Society.
3 The Surveyor may extend thickness measurements as deemed necessary by the result of thickness
measurements.
4 For craft constructed in steel, the following requirements of thickness measurements for each Special Survey are
to be complied with.
(1) Special Survey No.1 (for craft up to 5 years old)
(a) In cargo holds where high-corrosive cargoes to steel have been loaded, lower parts of webs (most thin parts
of web in case of built-up type frame) and tank side brackets of 3 hold frames at least at forward, middle
and aft part of each cargo hold on both sides and 1 lowest strake plates at least of each transverse watertight
bulkhead.
(b) Both ends and middle part (including face plate) of 1 transverse ring or corresponding main structural
members in one each tank selected arbitrary from the deep tanks used as the permanent ballast tanks.
(c) Other parts as deemed necessary by the Surveyor.
(2) Special Survey No.2 (for craft between 5 and 10 years old)
(a) Following portions of structural members within 0.5L amidships;
i) Each plate in 1 section of the strength deck plating for the full beam of the craft.
ii) Each strength deck plate in way of water ballast tanks, if any.
(b) In cargo holds where high-corrosive cargoes to steel have been loaded, lower and upper parts of web (most
thin parts of web in case of built-up type frame) of appropriate number (total to be of 1/3 at least of whole
number frames in each cargo hold) of hold frames and their end brackets at forward, middle and aft parts of
each cargo hold on both sides and all lowest plates of each transverse watertight bulkhead.
(c) In cargo holds other than (b) above, structural members specified in (1)(a) above.
(d) Both ends and middle part of each hatch side and end coaming.
(e) Both ends and middle part (including face plate) of approximately half the number of transverse rings or
corresponding main structural members and at least 1 plate of upper and lower ends of each bulkhead in
one each tank selected arbitrary from the deep tanks used as the permanent ballast tank.
(f) Both ends and middle part of 1 transverse ring or corresponding main structural members (including face
plate) in all remaining deep tanks used as the permanent ballast tanks except those specified on (e) above.
-25-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
-26-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
(Pressure tests of these tanks may be dispensed with, in cases where deemed appropriate by the Society.)
-27-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
ii) Automatic shut-off devices and alarm devices in case of loss or low pressure of the lubricating oil
iii) Automatic shut-off devices in case of abnormally low pressure of the main condenser vacuum for
main steam turbines
(b) Boilers, thermal oil heaters and incinerators
Operation tests for the safety devices, alarm devices and pressure indicators specified in Chapter 9, Part D
of the Rules for the Survey and Construction of Steel Ships are to be carried out. Calibration records for
the pressure indicators of boilers are to be ascertained. Where deemed necessary by the Surveyor, the
control records of the boiler water and thermal heater oil are required to be presented for review.
(c) Monitoring devices
Operation tests for pressure indicators, thermometers, ammeters, voltmeters and revolution meters are to be
carried out.
(d) Automatic control devices and remote control devices
Operation tests for automatic control devices and remote control devices used for auxiliary machinery
essential for main propulsion and auxiliary machinery for the manoeuvring and the safety are to be carried
out.
-28-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
3.9.1 General
At each Propeller Shaft and Stern Tube Shaft Survey, corresponding to the type and kind of shafts, the
requirements which are specified in this section, are to be complied with.
-29-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
years from the date of completion of the Partial Survey provided that the Partial Survey specified in 3.9.4-1 or -2
is carried out respectively at a time prescribed above.
(2) Ordinary Surveys for Propeller shafts Kind 2 specified in 2.1.24, Part 1 or stern tube shafts Kind 2 specified in
2.1.26, Part 1 (hereinafter referred to as shafts Kind 2 in this Chapter) are to be carried out at the following
times;
(a) Concurrently with Special Surveys
(b) Within 36 months from the date of completion of the Classification Survey or the previous Ordinary Survey
However, the part of the construction of the shaft in the stern tube bearing corresponds to the shaft Kind 1
and the construction of the shaft between the stern tube and the shaft bracket bearing corresponds to the
shaft Kind 2, the shaft may be surveyed at the intervals prescribed in -1(1), provided that examination for
the construction part corresponding to the Kind 2 is carried out at times prescribed in (a) and (b).
-30-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
-31-
2013 Rules for High Speed Craft (Part 2 Chapter 3)
will perform a general examination yearly on every item including review of the condition monitoring data and
the maintenance records in order to ascertain that the machinery and equipment covered are placed in good order.
Where it is regarded that satisfactory maintenance has not been carried out for any of the machinery and
equipment, an open-up examination of the item in the presence of the Surveyor may be required. The planned
overhaul inspections and maintenance method is to be required where the condition monitoring maintenance
method is not applied.
-32-
2013 Rules for High Speed Craft (Part 3 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
1 The requirements in this Part apply to rolled steels, aluminium alloys and FRP which are intended to be used for
hull structures, and their welding or moulding.
2 Rolled steels, aluminium alloys, FRP or other materials which are not specified in this Part may be used subject
to the design approval with regard to the application of those materials.
3 Materials which are used for hull structures of craft registered under classification character, affixed with
Smooth Water Service are to be at the discretion of the Society.
-33-
2013 Rules for High Speed Craft (Part 3 Chapter 2)
2.1.1 General
In principle, rolled steels or aluminium alloys intended to be used for hull structure are to comply with the
requirements in Part K of the Rules for the Survey and Construction of Steel Ships, and similarly, FRP is to
comply with the requirements of the Rules for the Survey and Construction of Ships of Fibreglass Reinforced
Plastics.
2.1.4 FRP
1 FRP and their raw materials are to be those specified in Chapter 4 of the Rules for the Survey and
Construction of Ships of Fibreglass Reinforced Plastics.
2 Mechanical properties of FRP are to comply with the following (1) to (4), but excluding gelcoats (See paragraph
1.3.4, Chapter 1 of the Rules for the Survey and Construction of Ships of Fibreglass Reinforced Plastics);
(1) Tensile strength: 98 N/mm2 min.
(2) Modulus of tensile elasticity: 6,867 N/mm2 min.
(3) Bending strength: 147 N/mm2 min.
(4) Modulas of bending elasticity: 6,867 N/mm2 min.
3 Moulding of FRP is to comply with the requirements in Chapter 5 of this Part.
-34-
2013 Rules for High Speed Craft (Part 3 Chapter 3)
3.1 General
3.1.1 Application
Welding of rolled steels for hull is to comply with the requirements in Part M of the Rules for the Survey and
Construction of Steel Ships.
-35-
2013 Rules for High Speed Craft (Part 3 Chapter 4)
4.1 General
4.1.1 Application
Welding of aluminium alloys for hull structure is to be in accordance with the requirements in Part M of the
Rules for the Survey and Construction of Steel Ships, otherwise specified in this Chapter.
-36-
2013 Rules for High Speed Craft (Part 3 Chapter 4)
-37-
2013 Rules for High Speed Craft (Part 3 Chapter 4)
tabs, joint of beads, or the like are to be welded particularly with care by deliberating of the position of arc starts, or
by the method of the crater filler or the like, or an appropriate countermeasure are to be taken such as continuing the
welding beads by fully removing the craters, and the welding beads are to be examined as found necessary.
2 When the fillet welding is carried out on only one side, the end part is in principle to be welded with boxing. The
length of boxing is to be about 20 mm.
-38-
2013 Rules for High Speed Craft (Part 3 Chapter 5)
5.1 General
5.1.1 Moulding
Moulding of FRP is to be in accordance with the requirements in Chapter 5 of the Rules for the Survey and
Construction of Ships of Fibreglass Reinforced Plastics.
5.1.2 Workshops
Workshops intending to manufacture FRP craft and their facilities are to be in accordance with the requirements
in Chapter 3 of the Rules for the Survey and Construction of Ships of Fibreglass Reinforced Plastics.
-39-
2013 Rules for High Speed Craft (Part 4 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
The requirements in this Part apply to the general arrangement of craft.
-40-
2013 Rules for High Speed Craft (Part 4 Chapter 2)
2.1.1 General
1 All craft are to have following watertight transverse bulkheads.
(1) Collision bulkheads
(2) Machinery space bulkheads
(3) Hold bulkheads
2 The watertight transverse bulkheads are to extend from side to side and from the bottom to the bulkhead deck of
the craft in general.
-41-
2013 Rules for High Speed Craft (Part 4 Chapter 2)
machinery space bulkheads may be used as an after peak bulkhead subject to the approval of the Society.
2 Notwithstanding preceding -1, where it is impracticable and incompatible to arrange after peak bulkheads due to
the design and proper working of the craft, after peak bulkheads may be omitted to arrange subject to the approval of
the Society.
2.2.1 General
Watertight doors are to be provided for all access openings in the watertight bulkheads in accordance with the
requirements in following 2.2.2 to 2.2.6.
-42-
2013 Rules for High Speed Craft (Part 4 Chapter 3)
3.1 General
3.1.1 Terminology
The deep tank is a tank used for carriage of water, fuel oil and other liquids, forming a part of the hull in holds or
tween decks. The deep tanks used for carriage of oils are designated as deep oil tank , if necessary.
3.1.2 Application
Where the bulkhead of deep tank partly serves as a watertight bulkhead, the part of the bulkhead is to be in
accordance with the requirements in Chapter 2 of this Part.
3.2.2 Cofferdams
1 Oiltight cofferdams are to be provided between the tanks for carrying oils and those for carrying fresh water
such as that for living use, boiler feed water, etc., which may cause any trouble when oil mixes therein.
2 Water closets and sanitary spaces are not to be located directly above the tanks for carrying fresh water for living
use. Where water closets and sanitary spaces are located above such tanks inevitably, these spaces are to be separated
from such tanks by cofferdams of water-tight construction with a sufficient clearance.
-43-
2013 Rules for High Speed Craft (Part 4 Chapter 4)
4.1.1 General
1 A double bottom is to be fitted in accordance with following extent as far as this is practicable and compatible
with the design and proper working of the craft:
(1) In craft of 50 m and upwards but less than 61 m in length, a double bottom is to be fitted at least from the
machinery space to the fore peak bulkhead, or as near thereto as practicable.
(2) In craft of 61 m and upwards but less than 76 m in length, a double bottom is to be fitted at least outside the
machinery space, and is to be extend to the fore and aft peak bulkheads, or as near thereto as practicable.
(3) In craft of 76 m in length and upwards, a double bottom is to be fitted amidships, and is to extend to the fore and
aft peak bulkheads, or as near thereto as practicable.
2 Where a double bottom is required to be fitted, its depth is to the satisfaction of the Society and the inner bottom
is to be continued out to the craft s sides in such a manner as to protect the bottom to the turn of the bilge. Such
protection will be deemed satisfactory if the line of intersection of the outer edge of the margin plate with the bilge
plating is not lower at any part than a horizontal plane passing through the point of intersection with the frame line
amidships of a transverse diagonal line inclined at 25o to the base line and cutting it at a point one-half the craft s
moulded breadth from the middle line.
3 Small wells constructed in double bottom in connection with drainage arrangements of watertight spaces are not
to extend in depth more than necessary. The depth of the well is in no case to be more than the depth less than 460
mm of the double bottom at the centre line, nor is to the well extend below the horizontal plane referred to in
preceding -2. A well extending to the outer bottom may, however, be permitted at the after end of the shaft tunnel of
the craft subject to the approval of the Society.
4 A double bottom need not be fitted in way of watertight compartments of moderate size used exclusively for the
carriage of liquids, provided the safety of the craft, in the event of bottom or side damage, is not, in the opinion of the
Society, thereby impaired.
5 Notwithstanding the requirements in -1 to -4, with respect to craft which have sufficient survival capability
accepted by the Society in the case where a double bottom is omitted, or craft which are not engaged in international
voyages and are for restricted service, a double bottom may be omitted.
4.2.1 General
1 A double bottom is to be fitted extending from the collision bulkhead to the aft peak bulkhead, as far as this is
practicable and compatible with the design and proper working of the craft.
2 Where a double bottom is required to be fitted, its depth is to be to the satisfaction of the Society and the inner
bottom is to be continued out to the craft s side in such a manner as to protect the bottom to the turn of the bilge.
3 Small wells constructed in double bottom in connection with drainage arrangements of watertight spaces are not
to extend in depth more than necessary. A well extending to the outer bottom may, however, be permitted at the aft
end of the shaft tunnel of the craft subject to the approval of the Society.
4 A double bottom need not be fitted in way of watertight compartments of moderate size used exclusively for the
carriage of liquids, provided the safety of the craft, in the event of bottom or side damage, is not, in the opinion of the
Society, thereby impaired.
5 Notwithstanding the requirements in -1 to -4, with respect to craft which have sufficient survival capability
accepted by the Society in the case where a double bottom is omitted, or craft which are not engaged in international
voyages and are for restricted service, a double bottom may be omitted.
-44-
2013 Rules for High Speed Craft (Part 4 Chapter 5)
5.1.1 General
1 Crew accommodation spaces and passenger spaces are not to be arranged within the following areas:
(1) The area at any level more than 1.8 m below designed maximum load line.
(2) The area forward of the collision bulkhead.
2 Crew accommodation spaces and passenger spaces are not to be directly adjacent to the tanks for carriage of fuel
oil. Such compartments are to be separated from the fuel oil tanks by cofferdams which are well ventilated and
accessible. Where the top of fuel oil tanks has no opening and is coated with incombustible coverings of 38 mm and
over in thickness, the cofferdam between such compartments and the top of fuel oil tanks may be omitted.
-45-
2013 Rules for High Speed Craft (Part 5 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
The definitions and characters that appear in this Part are to be as specified in this Chapter, unless otherwise
specified elsewhere.
1.2 Definitions
-46-
2013 Rules for High Speed Craft (Part 5 Chapter 1)
-47-
2013 Rules for High Speed Craft (Part 5 Chapter 2)
2.1 Application
2.1.1 Application
The design loads detailed in 2.2 through 2.5 are to be applied to monohull craft of which length are less than 50
m and which are operated in the displacement mode.
-48-
2013 Rules for High Speed Craft (Part 5 Chapter 2)
Rule, is to be the obtained bottom impact load and is not to be less than the value obtained from the
following formula.
V S1 = Fm gLs (m/sec)
Fm : As obtained from the following formula.
Fm = 0.8761 A f - 0.0565 A f - 0.0677 / A f - 0.4726
l : The wave length as obtained from the following formula.
l = (0.7174 + 1.101Fm - 0.009 Fm2 ) LS (m)
H w : The significant wave height as obtained from the following formula.
H w = l / 20 (m)
X : Distance from the middle of craft length L S , assuming it positive toward the bow.
V wz : The vertical velocity of wave as obtained from the following formula.
Vwz = wH w / 2 (m/sec)
A f : The designed vertical acceleration at forward end specified by the builder. However, the value of A f
is not to be less than the minimum value specified in Table 5.2.1 corresponding to the intended service
area and the type of the craft,
q : The slope angle of bow line as obtained from the following relation.
tan q = tan a tan b
F : The factor to be necessary for converting a peak value of bottom impact load to the mean effective
pressure, and is selected from the following (a) through (c), according to the value of x . In case
where the value of S0/Y exceeds 1, the value of S0/Y is to be taken as 1.
(a) In case of x £ 20 o ;
F = 0.172 + (0.03 - 0.064 / x - 0.0008x ) /( S 0 / Y )
-(0.1 - 0.1 / x + 0.008x )( S 0 / Y ) - 0.366 / x +
0.03x
(b) In case of x > 20 o ;
F = 1.653 - (0.02 - 0.504 / x - 0.0002x ) /( S 0 / Y )
-(0.41 + 0.788 / x - 0.008x )( S 0 / Y ) - 15 / x -
0.007x
(c) However, if the value obtained from (a) or (b) above exceeds 1, it shall be regarded as 1.
S 0 : Spacing (m) as follows ;
For plating and stiffeners: Spacing of stiffeners
For bottom girders: Breadth of the area supported by the girder
For bottom transverses: Spacing measured from the cross point of base line and centreline to upper
edge of the bottom shell plating to be considered.
Y : Half of the distance from bottom centre to the chain or the bottom plating end to be considered (See
Fig.5.2.1). However, for bottom transverses, the distance from the bottom centre to the chin or the
bottom plating end to be considered.
(2) Where the transverse section considered is positioned outside of the range of the strengthened bottom forward:
The designed load for bottom construction for the aft end of the range of the strengthened bottom forward (P0) is
to be obtained by the requirement in preceding (1), and the designed load for bottom construction for the aft end
of Ls is to be taken as P0/2. The intermediate value of the design loads for bottom construction is to be obtained
by linear interpolation as shown in Fig. 5.2.2.
(3) Notwithstanding the requirements of the preceding (1) and (2), any PB are not to be less than the minimum
value of PB obtained from the following formula.
min
PB min
= 10 (d + H w + f h B ) (kN/m2)
where:
H w : As specified in (1).
f h : Coefficient corresponding to the kinds of the craft as follows ;
Passenger craft : 0.13
-49-
2013 Rules for High Speed Craft (Part 5 Chapter 2)
Note:
1. 0 and L S on the horizontal axis mean the aft and forward end of L S respectively.
2. The coloring part in this figure is to be in accordance with 2.2.1(1) in this Chapter.
-50-
2013 Rules for High Speed Craft (Part 5 Chapter 2)
Note:
0 and Ls on the horizontal axis mean the aft and forward end of Ls respectively.
-51-
2013 Rules for High Speed Craft (Part 5 Chapter 2)
-52-
2013 Rules for High Speed Craft (Part 5 Chapter 2)
-53-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
1.1 General
1.1.1 Application
The requirements of this chapter apply to the craft constructed in steel aluminium alloy.
1.2 Definition
1.2.1 Application
The definitions and characters that appear in this Chapter are to be as specified in this Chapter, unless otherwise
specified elsewhere.
Table 6.1.1 Yield Point or Proof Stress of Rolled Steels for Hull Structure
Symbols of materials Yield point or proof stress (N/mm2)
KA, KB, KD, KE 235
KA32, KD32, KE32, KF32 315
KA36, KD36, KE36, KF36 355
KA40, KD40, KE40, KF40 390
-54-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
Table 6.1.2 Grades and Proof Stress of Aluminium Alloys for Hull Structures
Grades and symbols of Temper condition Thickness t (mm) Proof stress (N/mm2)
aluminium alloys
5000 series 5083P O, H112 t £ 50 125
H116, H321 t £ 50 190
5083S O, H112 t £ 50 110
H111 t £ 50 165
5086P O t £ 50 95
H112 t £ 12.5 125
12.5<t £ 50 105
H116 t £ 50 165
5086S O, H111, H112 t £ 50 95
5754P O t £ 50 80
6000 series 6005AS T5, T6 t £ 50 115
6061P T6 t £ 6.5 115
6061S T6 t £ 50 115
6082S T5, T6 t £ 50 115
1.3.3 Scantlings
1 Unless otherwise specially specified, the section modules of members required by this Part are those including
the plates with the effective breadth of 0.1l on either side of the members. However, the breadth of 0.1l is not to
exceed one-half of the spacing of member. l is the length specified in the relevant requirements.
2 Where flat bars, angles or flanged plates welded to form beams, frames or stiffeners for which section modules
are specified, they are to be of suitable depth and thickness in proportion to the section modulus specified in this Part.
3 The flanging inner radius is not to be less than two times but not greater than three times thickness of plates.
4 Tripping brackets are to be provided at an suitable interval so as to support girders.
1.3.5 Brackets
1 The thickness of brackets is to be suitably increased where the depth of brackets at throat is less than two-thirds
of that of the bracket.
2 Where lightening holes are cut in brackets, the distance from the circumference of hole to the free flange of
bracket is not to be less than the diameter of lightening hole.
-55-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
3 Where the length of the longer arm exceeds 800 mm, the free edges of brackets are to be stiffened by flanging or
by other means, except where tripping brackets or the like are provided.
1.3.8 Workmanship
1 The workmanship is to be of the best quality. During construction, the builder is to supervise and inspect in
detail every job performed in shed and yard as well.
2 The connection of structural parts of hull is to be fair and sound.
3 The edges of plates are to be accurate and fair.
4 Where frames or beams pass through watertight deck or bulkhead, the deck or bulkhead is to be constructed
watertight without using wooden materials or cement.
5 The details of welded joints and their workmanship are to be as specified in Part 3 of this Rule.
-56-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
(2) Results of calculation of longitudinal still water bending moment and still water shearing force corresponding to
the loading conditions.
(3) Allowable limits of local loads applied to hatch covers, deck, double bottom construction, etc., where deemed
necessary by the Society.
-57-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
1.5 Plating
1.5.1 General
1 All openings in the shell plating where provided, are to have their corners well rounded and to be compensated
as necessary.
2 In cases where the recesses are provided in the shell plating for sea suction or discharge, the shell plating around
recesses are to be suitably reinforced as necessary.
3 The shell platings which are likely to contact with an anchor or anchor chain cables are to be increased in
thickness or to be doubled as necessary.
4 The shell plating fitted with water jet propulsion systems are to be increased in thickness or to be doubled as
necessary.
Note:
f s : Coefficient obtained from the following formula.
235 / s Y
s Y : Yield point or proof stress of steels used (N/mm2)
f a : Coefficient obtained from the following formula.
128 / s P
s p : Proof stress of aluminium alloys used in the unwelded condition. However, it is to be less
than 70% of its tensile strength (N/mm2).
-58-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
-59-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
1.7 Girders
-60-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
Note:
s y is yield point or proof stress of the material used (N/mm2)
1.8 Pillars
-61-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
1.9 Rudders
1.9.1 Applications
1 The requirements in this section apply to the hanging type of a rudder which has no bearing part below the neck
bearing.
2 Rudders other than rudders specified in preceding -1 will be considered in each case by the Society.
1.9.2 Materials
The rudder stock is to be made of steel forgings. However, steel castings may be used for the material of the
rudder stock subject to the approval of the Society.
-62-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
-63-
2013 Rules for High Speed Craft (Part 6 Chapter 1)
Notes:
(1) The position at End 1 and 2 means the part for 0.2l from each end. And, Mid Span means the part for 0.6l amidships.
(2) Fixed means a case where the scantlings (sectional areas, section modulus and sectional moment of inertia) of
girder adjacent to the girder concerned are larger than those of the girder concerned. When the scantlings of the
girder concerned are larger than those of adjacent girder, the boundary conditions should be Supported .
(3) In case where boundary conditions are considered as intermediate values of fixed and supported , the severer
condition is be selected.
1.10.1 General
Shaft brackets are to be of ample strength and to be strongly connected to the main hull structures.
1.11.1 General
Scantling determination of the engine girders and floors will be considered appropriate by the Society taking
into account of the concentration of the heavy load and the vibration generated by the main engines, etc.
-64-
2013 Rules for High Speed Craft (Part 6 Chapter 2)
2.1 General
2.1.1 Application
1 The requirements in this Chapter are applied to FRP craft moulded by hand lay-up method or spray lay-up
method, using fibreglass reinforcements and unsaturated polyester resins. Wooden craft only covered with FRP or the
craft of similar construction are not regarded as FRP craft.
2 The requirements in this Chapter are applied to FRP craft of less than 35 m in length of normal form and
proportion. The requirements for FRP craft of more than 35 m in length will be considered in each case by the
Society.
2.2 Definitions
2.2.1 Application
The definitions and characters that appear in this Chapter are to be as specified in this Chapter, unless otherwise
specified elsewhere.
2.2.3 Resins
The resins are liquid unsaturated polyester resins for laminating and gelcoat.
2.2.4 Laminating
Laminating is an operation of laying succeeding glass fibre reinforcements impregnated with resin before curing
or before the preceding layer advances in cure.
2.2.5 Bonding
Bonding is an operation of connecting the FRP already advanced in cure with other FRP members, timbers, hard
plastic foams, etc. by means of impregnating fibreglass reinforcements with resin.
2.2.6 Moulding
Moulding is an operation of manufacturing FRP products with definite form, strength, etc., by means of
laminating or bonding.
-65-
2013 Rules for High Speed Craft (Part 6 Chapter 2)
2.3.1 Scantlings
1 Scantlings required in this Chapter are specified for FRP craft moulded with fibreglass reinforcements
composed of chopped mats or roving cloths and moulded with FRP having the strength specified in 2.1.4 in Part 3.
2 In cases where the scantlings of laminates of sandwich construction are calculated, the modulus of bending
elasticity of the inner or outer layer of FRP of laminates of sandwich construction may be obtained from the material
tests specified in 4.4.4 of the Rules for the Survey and Construction of Ships of Fibreglass Reinforced Plastics.
3 In calculating the sectional modulus of structural members, the actual FRP laminates of 150 mm on either side
of the web are to be included.
4 In cases where hat-type girders or stiffeners are used for hull construction, spacing for girders, stiffeners and
plate panel for scantling determination are to be measured in accordance with following (1) through (3) respectively
(See Fig. 6.2.1).
(1) Spacing for girders is to be measured from centre to centre on the girders.
(2) Spacing for stiffeners is to be measured from centre to centre on the stiffeners.
(3) Spacing for plate panel is to be measured between inner webs of hat-type girders or stiffeners which support
-66-
2013 Rules for High Speed Craft (Part 6 Chapter 2)
plate panel.
-67-
2013 Rules for High Speed Craft (Part 6 Chapter 2)
2.5 Plating
2.5.1 General
1 All openings in the shell platings where provided, are to have their corners well rounded and to be compensated
as necessary.
2 The shell platings which are likely to contact with an anchor or anchor chain cables are to be increased in
thickness or to be doubled as necessary.
3 The shell plating fitted with water jet propulsion systems are to be increased in thickness or to be doubled as
necessary.
-68-
2013 Rules for High Speed Craft (Part 6 Chapter 2)
22.4S P
s all
where:
S : Spacing of longitudinals or stiffeners
P : Design load specified in Table 6.1.2 corresponded to a kind of plating. Design loads specified in Table
6.1.2 are to be in accordance with Part 5 of this Rule (kN/m2).
s all : Allowable stress specified in Table 6.2.1 (kN/m2).
-69-
2013 Rules for High Speed Craft (Part 6 Chapter 2)
the thickness of inner and outer layers is less than 0.8, the construction will be specially considered by the Society.
5 The cores may be reckoned in the strength at the discretion of the Society.
2.6.1 General
Connection of ends of longitudinals and stiffeners is to be in accordance with the requirements specified in 1.6.1
through 1.6.3 and 1.6.5 in this Part.
2.7 Girders
-70-
2013 Rules for High Speed Craft (Part 6 Chapter 2)
1 The minimum thickness of webs and faces of girders, beams, frames, floors, etc.; of hollow hat-type or hat-type
with cores for moulding are not to be less than that obtained from the following formulae:
Thickness of web: 0.034d 0 K (mm)
-71-
2013 Rules for High Speed Craft (Part 6 Chapter 2)
2.9 Pillars
2.9.1 Application
Construction of pillars is to be in accordance with 1.8, Chapter 1 of this Part.
2.10 Rudders
2.10.1 Application
Construction of rudders is to be in accordance with 1.9, Chapter 1 of this Part.
2.11.1 Application
Construction of shaft brackets is to be in accordance with 1.10, Chapter 1 of this Part.
-72-
2013 Rules for High Speed Craft (Part 6 Chapter 3)
3.1 General
3.1.1 General
1 Notwithstanding the regulations of 1.7 in this Part, the scantlings of hull structural members may be determined
based upon the direct calculations subject to the approval of the Society.
2 In case the direct calculations are used, structural model, loads, allowable stress and others are to be Society s
desecration.
3 When direct strength calculations in preceding -1 were executed for determination of scantlings, necessary
documents and information are to be submitted.
-73-
2013 Rules for High Speed Craft (Part 6 Chapter 4)
4.1 General
4.1.1 General
Detailed assessment of buckling strength may be required as deemed necessary by the Society.
-74-
2013 Rules for High Speed Craft (Part 6 Chapter 5)
5.1 General
5.1.1 General
Detailed assessment of fatigue strength may be required as deemed necessary by the Society.
-75-
2013 Rules for High Speed Craft (Part 7 Chapter 1)
Chapter 1 EQUIPMENT
1.1.1 General
1 All craft, according to their equipment numbers, are to be provided with anchors, chain cables and mooring lines
which are not less than given in Table 7.1.1.
2 Anchors, chain cables and mooring lines for craft having equipment numbers not more than 50 or more than
1,670 are to be as determined by the Society.
3 Anchors, chain cables, wire ropes and fibre ropes are to be in compliance with the requirements in Chapter 2,
Chapter 3, Chapter 4 and Chapter 5, Part L of the Rules for the Survey and Construction of Steel Ships.
4 The reduction of requirements in this chapter may be specially considered at the request of Owner and at the
discretion of the Society.
-76-
2013 Rules for High Speed Craft (Part 7 Chapter 1)
1.1.3 Anchors
1 The mass of individual bower anchors may vary by 7% of the mass given in Table 7.1.1, provided that the
total mass of bower anchors is not less than that obtained from multiplying the mass per anchor given in the table by
the number installed on board. Where, however, an approval by the Society is obtained, the anchors which are
increased in weight by more than 7% may be used.
2 Where high holding power anchors are used, the mass of each anchors may be 0.75 times the table mass for
ordinary stockless bower anchors.
3 Where super high holding power anchors are used, the mass of each anchors may be 0.5 times the mass for
ordinary stockless bower anchors. However, the mass of super high holding power anchor is generally not to exceed
1,500kg.
4 For the craft affixed with classification character Coasting service , the mass of one bower anchor is to be not
less than the values given in Table 7.1.1, another bower anchor may be 0.85 times the table mass.
5 For the craft affixed with classification character Smooth water service , the mass of bower anchors may be
reduced by one column of the equipment number given in Table 7.1.1.
-77-
2013 Rules for High Speed Craft (Part 7 Chapter 1)
4 The length of individual mooring lines may be reduced by up to 7% of the length given in Table 7.1.1, provided
that total length of the stipulated number of mooring lines is not less than that obtained from multiplying the length
by number respectively given in Table 7.1.1.
1.1.6 Miscellaneous
1 All craft are to be provided with suitable appliances for handling of anchors.
2 Chain cable and wire ropes are to be stored in chain lockers or on the drums. The inboard end of a chain cable is
to be secured to the hull through a strong eye plate by means of shackle or other equivalent means.
3 Bower anchors are to be located on the suitable position to prevent any damage on hull structures in the cases of
anchoring operation. If necessary, anchor bell mouths are to be fitted for this purpose.
4 The arrangements for anchoring, towing and berthing and the local craft structure and the design of the anchor,
towing and berthing arrangements and the local craft structure are to be such that risks to persons carrying out
anchoring, towing or berthing procedures are kept to a minimum.
5 All anchoring equipment, towing bitts, mooring bollards, fairleads, cleats and eyebolts are to be so constructed
and attached to the hull that, in use up to design loads, the watertight integrity of the craft will not be impaired.
6 Under any operating load up to the breaking strength of the anchor cable or mooring lines, the loads on the bitts,
bollards, etc., is not to result in any damage to the hull structure that will impair its watertight integrity. A strength
margin of at least 20% above the resultant load based on the minimum specified breaking strength of the relevant
cable or warp shall be required.
-78-
2013 Rules for High Speed Craft (Part 7 Chapter 2)
2.1 General
2.2 Hatchways
2.2.1 Application
The construction and the closing means of cargo and other hatchways are to be comply with the requirements in
Chapter 20, Part C or Chapter 19, Part CS of the Rules for the Survey and Construction of Steel Ships, unless
otherwise specified in this chapter.
Table 7.2.1-1 Minimum Height of Hatchway Coamings and Minimum Sill Height of Doorways ( L ³ 30m )
Service area Position Hatchway Small weathertight Access openings Access openings Machinery
coamings (mm) hatchway coamings in superstructure in companinoways space
A B end bulkheads/ (mm) openings
(mm) (mm) deck house (mm) (mm)
Others I 600 450 380 380 600 600
II 450 380 230 380 380 380
Coasting I 600 450 380 380 450 600
service II 450 380 230 300 300 380
Smooth water I 450 380 230 300 300 300
service II 300 230 180 100 100 150
-79-
2013 Rules for High Speed Craft (Part 7 Chapter 2)
Table 7.2.1-2 Minimum Height of Hatchway Coamings and Minimum Sill Height of Doorways ( L < 30m )
Service area Position Hatchway Small weathertight Access openings Access openings Machinery
coamings (mm) hatchway coamings in superstructure in companinoways space
A B end bulkheads/ (mm) openings
(mm) (mm) deck house (mm) (mm)
Others I 600 450 380 380 600 600
II 450 380 230 380 380 380
Coasting I 450 380 230 300 300 300
service II 300 230 180 150 150 150
Smooth water I 300 230 150 150 150 300
service II 150 150 100 100 100 150
Notes:
A : Hatchways, area of which is smaller than 1.5m2, and which are fitted with closing means of other than B stated below.
B : Hatchways, area of which is smaller than 0.45m2, and which are fitted with closing means capable of operating form
inside and outside.
2.4.2 Constructions
The constructions of exposed machinery space casings, machinery space casings below the freeboard deck or
-80-
2013 Rules for High Speed Craft (Part 7 Chapter 2)
within enclosed superstructures or deckhouses will be considered in each case by the Society.
2.5.2 Companionways
1 Access openings in the freeboard deck are to be protected by enclosed superstructures, or by deckhouses or
companionways of equivalent strength and weathertightness.
2 Access openings in exposed superstructure decks or in the top of deckhouses on the freeboard deck which give
access to a space below the freeboard deck or a space within an enclosed superstructure are to be protected by
efficient deckhouses or companionways.
3 Doorways in deckhouses or companionways such as specified in preceding -1 and -2 are to be provided with
doors complying with the requirements in 2.3.1-1 of this chapter. Where, however, companionways are to be
enclosed with boundary wall fitted with closing means complying with the requirements in 2.3.1-1 of this chapter, the
external doors needs not to be weathertight.
4 The height of sills of doorways in deckhouses or companionways such as specified in preceding -1 through -3
above upper surface of deck is not less than the minimum height specified in Table 7.2.1-1 or Table 7.2.1-2
according to the length and the operating area of the craft.
5 Where the access openings in superstructures and deckhouses which protect access openings to spaces below the
freeboard deck do not have closing appliances in accordance with the requirements of 2.3.1-1., the openings to spaces
below the freeboard deck are to be considered exposed.
6 Notwithstanding the operational areas of the craft, the minimum height of sills of doorways in deckhouse or
companionways above the upper surface of deck for the craft which is engaged in international voyage is not to be
less than that required for Others specified in Table 7.2.1-1 or Table 7.2.1-2.
-81-
2013 Rules for High Speed Craft (Part 7 Chapter 3)
3.1.1 General
1 Efficient guardrails or bulwarks are to be provided around all exposed decks.
2 Guardrails specified in -1 above are to comply with the followings:
(1) Fixed, removable or hinged stanchions are to be fitted about 1.5 m apart. Removable or hinged stanchions are to
be capable of being locked in the upright position.
(2) At least every third stanchion is to be supported by a bracket or stay. Alternatively, measures deemed appropriate
by the Society are to be taken.
(3) Where necessary for the normal operation of the ship, steel wire ropes may be accepted in lieu of guardrails. The
wires are to be made taut by means of turnbuckles.
(4) Where necessary for the normal operation of the ship, chains fitted between two fixed stanchions and/or
bulwarks are acceptable in lieu of guardrails.
3.1.2 Dimensions
1 The height of bulwarks or guardrails specified in 3.1.1 is to be at least 1 metre from the upper surface of deck,
provided that where this height would interfere with the normal operation of the craft, a less height may be permitted
where the Society is satisfied that adequate protection is provided.
2 The clearance below the lowest course of guardrails on superstructure and freeboard decks is not exceed 230 mm,
and those for the other courses are not to be exceed 380 mm.
3 Guardrails fitted on superstructures and freeboard decks are to have at least three courses. In other locations,
guardrails are to have at least two courses.
3.1.3 Construction
1 Bulwarks are to be strongly constructed and effectively stiffened on their upper edges.
2 Bulwarks are to be supported by stiffened stays connected to the deck in way of beams or at effectively stiffened
positions. The spacing of these stays on the freeboard deck is not to be more than 1.8 metres.
3.1.4 Miscellaneous
1 Gangways and other openings in bulwarks are to be well clear of the breaks of superstructures.
2 Where bulwarks are cut to form gangways or other openings, stays of increased strength are to be provided at
the ends of the openings.
3 The plating of bulwarks in way of mooring pipes is to be doubled or increased in thickness.
4 At ends of superstructures, the bulwark rails are to be bracketed either to the superstructure end bulkheads or to
the stringer plates of the superstructure deck, or other equivalent arrangements are to be made so that the abrupt
change of strength may be avoided.
3.2.1 General
1 Where bulwarks on the weather parts form wells, ample provision is to be made for rapidly freeing the deck off
water.
2 Ample freeing ports are to be provided for clearing any space other than wells, where water is liable to be
shipped and to remain.
3 In craft having superstructures which are open at either or both ends, adequate provision for freeing the space
within superstructures is to be provided.
-82-
2013 Rules for High Speed Craft (Part 7 Chapter 3)
-83-
2013 Rules for High Speed Craft (Part 7 Chapter 3)
a part of collision bulkhead is to be fitted in the above superstructure. Where the craft which are not engaged in
international voyage and for are for restricted service, an inner doors may be omitted at the discretion of the Society.
3 Vehicle ramp way may be arranged for this purpose, provided that it forms a part of collision bulkhead and
satisfies the requirements for position of the collision bulkhead as stipulated in 2.1.2, Part 4 of this Rule.
4 Bow doors are to be so fitted as to ensure effective protection to inner doors.
3.4.1 General
1 No side scuttle is to be provided in such a position as its sill is below a line drawn parallel to the freeboard deck
-84-
2013 Rules for High Speed Craft (Part 7 Chapter 3)
at side and having its lowest point 0.025B f or 500 mm, whichever is greater, above the uppermost load line.
2 No side scuttle is in principle to be provided to any space solely engaged in carriage of cargoes. Where side
scuttles are provided to such spaces, the special consideration will be give by the Society.
3.4.2 Application
1 Side scuttles to spaces below the freeboard deck and those provided to sunken poop are to be class B side
scuttles complying with the requirements in Chapter 7, Part L of the Rules for the Survey and Construction of
Steel Ships or equivalent thereto.
2 Side scuttles to spaces within enclosed superstructures, those fitted up to the side and front walls of deckhouses
and companionways on the freeboard deck which have unprotected deck openings leading to spaces below the
freeboard deck inside and those exposed to direct blow of seas are to be class C side scuttles with hinged dead-light
complying with the requirements in Chapter 7, Part L of the Rules for the Survey and Construction of Steel
Ships or equivalent thereto.
3 Where an openings in the superstructure deck or in the top of deckhouse on the freeboard deck which gives
access to spaces below the freeboard deck or to a space within an enclosed superstructure is protected by the
deckhouse or companion, side scuttles fitted in spaces which give direct access to an open stairway are to be class C
side scuttles with hinged dead-light complying with the requirements in Chapter 7, Part L of the Rules for the
Survey and Construction of Steel Ships or equivalent thereto.
3.5.1 Application
1 Side scuttles to spaces within enclosed superstructures, those fitted up to the side and front walls of deckhouses
and companionways on the freeboard deck which have unprotected deck openings leadng to spaces below the
freeboard deck inside and those exposed to direct below of seas are to be class C side scuttles with hinged dead-light
complying with the requirements in or equivalent thereto.
2 Spaces which are fitted with windows applying this are not to be the reserve of buoyancy.
3.5.2 General
Rectangular windows on the surrounding of deck houses or superstructures are to be of fixed type except wheel
house windows or windows used for means of escape.
3.5.3 Construction
1 Windows are to be rigidly framed and strongly fitted on the hull structures.
2 Thickness of glass is not to be less than 6 mm or that obtained from the following formulae, whichever is the
greater.
31.3a KP / s max (mm)
where:
a : Length of shorter side of window (m).
K : As given by following formulae corresponding to the aspect ratio of window:
0.7375
1.0414 - - 0.0244L or 0.75
L
where:
L : Aspect ratio of window
P : Design loads for deck houses and superstructures as specified in 2.5, Part 5 of this Rule.
s max : Breaking stress of glass as specified in Table 7.3.2 corresponding to the materials.
3 Where materials other than those specified in -2 are used, the use of such materials and corresponding breaking
stress are to be specially considered by the Society.
-85-
2013 Rules for High Speed Craft (Part 7 Chapter 3)
3.6 Ventilators
3.6.2 Connection
Ventilator coamings are to be efficiently connected to the deck and, where their height exceeds 900 mm, are to
be specially supported.
-86-
2013 Rules for High Speed Craft (Part 7 Chapter 3)
3.7 Gangways
3.7.1 General
Satisfactory means (in the form of guardrails, life lines, gangways or under deck passages, etc.,) are to be
provided for the protection of the crew in getting to and from their quarters, the machinery space and all other parts
used in the necessary work of the craft.
-87-
2013 Rules for High Speed Craft (Part 7 Chapter 4)
4.1 Painting
4.1.1 General
1 All structural members of steel works are to be coated with a suitable paint. For structural members inside of oil
tanks, painting may be omitted.
2 Structural members of aluminium alloys works are recommended to be coated with a suitable paint.
3 Outer shell of FRP craft are to be coated with suitable gelcoat or composition having the property of low water
absorption.
4.2.1 General
1 Where two or more kinds of different metallic materials (for example, steel and aluminium alloy) are used for
structural members of a craft, different metals are to be insulated by electrical insulation having the property of anti
water absorption against galvanic corrosion.
2 Where two or more kinds of different metallic materials (for example, steel and aluminium alloy) are used for
structural members of a craft and such different metals are closed to each other in salt water, a suitable method
against galvanic corrosion is to be applied.
-88-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.3 Definitions
For the purpose of this and other chapters, unless expressly defined otherwise, the following definitions apply:
(1) Down flooding point means any opening, irrespective of size, that would permit passage of water through a
water/weathertight structure (e.g., opening windows), however excludes any opening kept closed to an
appropriate standard of water/weathertightness at all times other than when required for access or for operation
of portable submersible bilge pumps in an emergency (e.g., non-opening windows of similar strength and
weathertight integrity to the structure in which they are installed).
(2) Fully submerged foil means a foil having no lift components piercing the surface of the water in the foil borne
mode.
(3) Multihull craft means a craft which in any normally achievable operating trim or heel angle, has a rigid hull
structure which penetrates the surface of the sea over more than one discrete area.
(4) Permeability of a space means the percentage of the volume of that space which can be occupied by water.
(5) Skirt means a downwardly-extending, flexible structure used to contain or divide an air cushion.
(6) Watertight in relation to a structure means capable of preventing the passage of water through the structure in
any direction under the head of water likely to occur in the intact or damaged condition.
(7) Weathertight means that water will not penetrate into the craft in any wind and wave conditions up to those
specified as critical design conditions.
-89-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
in any of its intended modes. This reserve of buoyancy is to be calculated by including only those compartments
which are:
(1) watertight;
(2) accepted as having scantlings and arrangements adequate to maintain their watertight integrity; and
(3) situated in locations below a datum, which may be a watertight deck or equivalent structure of a non-watertight
deck covered by a weathertight structure as defined in 1.2.3(1).
2 Where a buoyant space may be subjected to increased fluid pressure in the equilibrium position after damage,
the boundaries and associated openings and penetrations of that space are to be of sufficient strength and watertight
for that pressure.
-90-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
(6) The initial metacentric height (G0M) is not to be less than 0.15 m.
1.4.1 Application
The requirements of this section and section 2.2.2 of this Part are to be applied on the assumption that any
stabilization systems fitted are fully operational.
1.6.1 Application
The requirements of this section apply to all permitted conditions of loading.
1.6.2 Permeability
For the purpose of making damage stability calculations, the volume and surface permeabilities are to be in
accordance with Table 8.1.1 in general.
-91-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
-92-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
However, where the craft is fitted with inflated skirts or with non-buoyant side structures, the transverse
1
extent of penetration are to be at least 0.12Ñ 3 into the main buoyancy hull or tank structure
Vertical extent the full vertical extent of the craft
Note:
Ñ : volume of displacement(m3) corresponding to the design water line
extent
1
Normal extent to the the depth of penetration normal to the shell is to be 0.02Ñ 3
shell
Note:
Ñ : volume of displacement(m3) corresponding to the design water line
Table 8.1.4 Extent of Bottom Damage in Areas not Vulnerable to Raking Damage
Direction Extent of Damage
Longitudinal extent 55% of the length L, measured from the most forward point of the underwater buoyant volume of each
hull
a percentage of the length L, applied anywhere in the length of the craft, is as follows.
Where L is 50m and over, equal to 35% for craft
Where L is less than 50m, equal to ( L 2 + 10) % for craft
1
Athwarth ships girth The athwartships girth of damage is to be 0.1Ñ 3
extent
1
Normal extent to the the depth of penetration normal to the shell is to be 0.04Ñ 3 or 0.5m, whichever is lesser
shell
Note:
Ñ : volume of displacement(m3) corresponding to the design water line
The penetration or girth is to under no circumstances extend above the vertical extent of the vulnerable area as stipulated
in Fig.8.1.5.
1
Stern part at the aft end, damage to the area aft of a transverse vertical plane at a distance 0.2Ñ 3 forward of the
aft extremity of the watertight envelope of the hull.
Note:
Abow = 0.0035 AmfV , however never less than 0 .04 A
Where:
Abow : the plan projected area (m2) of craft energy-absorbing structure forward of the transverse plane
-93-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
-94-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
-95-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
1 Every craft on completion of build is to be inclined and the elements of its stability determined. When an
accurate inclining in not practical, the lightship displacement and centre of gravity are to be determined by a
lightweight survey and accurate calculation.
2 On all craft, where an accurate inclining experiment is impractical owing to the height of the centre of gravity
(VCG or KG) being less than one third of the transverse metacentric height (GMT), KG may be estimated by detailed
calculation in place of an inclining experiment. In such cases, a displacement check is to be confirm the calculated
lightship characteristics, including LCG, which may be accepted if the measured lightship displacement and LCG are
respectively within 2% and 1% L relative to the estimate.
-96-
2013 Rules for High Speed Craft (Part 8 Chapter 1)
-97-
2013 Rules for High Speed Craft (Part 8 Chapter 2)
2.1 General
-98-
2013 Rules for High Speed Craft (Part 8 Chapter 2)
-99-
2013 Rules for High Speed Craft (Part 8 Chapter 3)
3.1 General
3.1.1 Application
The requirements in this Chapter apply to cargo craft except cargo craft which are not engaged in international
voyage and are for restricted service.
-100-
2013 Rules for High Speed Craft (Part 9 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Scope
1 The requirement of this Part apply to the main propulsion machinery, power transmission systems, shafting
systems, propellers, waterjet propulsion systems, prime movers other than main propulsion machinery, boilers,
thermal oil heaters, incinerators, pressure vessels, auxiliaries, piping systems and their control systems (hereinafter
referred to as machinery installations in this Part).
2 Machinery installations which are unusual and considered impracticable to meet the requirements of this Part
may be accepted provided that they are deemed by the Society to be equivalent to those specified in this Part.
3 For machinery installations with novel design features, the Society may apply the requirements of the Rules so
far as practicable and other requirements as considered necessary by the Society.
4 For machinery installations which are considered appropriate by the Society, some requirements in this Part may
be modified by taking their capacity, purposes and operating conditions into account.
5 The terms specified in this chapter are in accordance with the requirements of 1.1.6, Part D of the Rules for the
Survey and Construction of Steel Ships.
6 The drawings and data to be submitted in connection with machinery installations are to conform to the
requirements specified in each Chapter of this Part, in addition to those specified in 2.1.2 of Part 2.
1.1.2 Materials
Materials intended to be used for machinery installations are to be selected considering the purpose and
conditions of their service. Materials intended for principal components are to be of those tested and inspected in
accordance with the requirements specified in this Part.
1.2.1 General
1 The machinery installations are to be properly fixed and to be of construction and arrangement to facilitate
operation, inspection and maintenance.
2 The machinery installations are to be of a design and construction adequate for the service for which they are
intended and are to be so installed and protected as to reduce to a minimum any danger to persons on board, due
regard being paid to moving parts, hot surfaces and other hazards.
3 When the following machinery is fitted singly on board, special consideration is to be given to the reliability of
the machinery and its components. For craft in which unconventional machinery is used as the main propulsion
machinery and propulsion shafting system, provision of additional machinery capable of ensuring the ship to proceed
at navigable speed in the possible event of failure of the machinery may be requested by the Society.
(1) For diesel ships:
Diesel engines used as the main propulsion machinery, highly elastic couplings, reduction gears and propulsion
shafting systems
(2) For gas turbine ships:
Gas turbine engines used as the main propulsion machinery, compressors, combusters, reduction gears and
propulsion shafting systems
(3) For electric propulsion ships:
Propulsion motors, reduction gears and propulsion shafting systems
4 Means are to be provided whereby normal operations of main propulsion machinery can be sustained or restored
-101-
2013 Rules for High Speed Craft (Part 9 Chapter 1)
even though one of the essential auxiliaries becomes inoperative. Special consideration is to be given to the
malfunctioning of:
(1) a generator set which serves as a main source of electrical power;
(2) the fuel oil supply systems for boilers or engines;
(3) the sources of lubricating oil pressure;
(4) the sources of water pressure;
(5) an air compressor and a receiver for starting or control purposes;
(6) the hydraulic, pneumatic or electrical means for control in main propulsion machinery including controllable
pitch propellers;
However, having regard to overall safety consideration, a partial reduction in propulsion capability from normal
operation may be accepted.
5 Such information as is necessary to ensure that machinery can be installed correctly regarding such factors as
operating conditions and limitations are to be made available by the manufacturers.
6 The following machinery, are to be designed to operate under the conditions given in Table 9.1.1, as fitted in the
ship. Deviation from the angles given in Table 9.1.1 may be permitted, taking into consideration the type, size and
service conditions of the ship.
7 Machinery installations are to be fitted with adequate safety monitoring and control devices in respect of speed,
temperature, pressure and other operational functions.
8 Special consideration is to be given to the design, construction and installation of the machinery installations so
that any mode of vibrations, accelerations, shocks, etc., shall not cause undue stresses in normal operating ranges.
9 Measures are to be taken to reduce machinery noise in machinery spaces to acceptable levels as determined by
the National Regulations of the country in which the craft is registered. If this noise cannot be sufficiently reduced
the source of excessive noise is to be suitably insulated or isolated or a refuge from noise is to be provided if the
space is required to be manned. Ear protectors are to be provided for personnel required to enter such spaces, if
necessary.
10 To prime movers used for lift or attitude control arrangements, the requirements concerning to the main
propulsion machinery are to be applied.
-102-
2013 Rules for High Speed Craft (Part 9 Chapter 1)
-103-
2013 Rules for High Speed Craft (Part 9 Chapter 1)
1.2.6 Communication between Navigating Bridge and Control Stations for Speed and Direction of
Thrust of Propellers
Communication between navigating bridge and control stations for the control of speed and direction of thrust of
propellers are to comply with following requirements.
(1) At least two independent communication means are to be provided for communicating orders from the
navigating bridge to the position in the machinery space or in the control room from which the speed and
direction of thrust of the propellers are normally controlled. One of these means is to be an engine room
telegraph which provides visual indication of the orders and responses both on the navigating bridge and in such
control station mentioned above.
(2) Means of communication as deemed appropriate by the Society, are to be provided from the navigating bridge
and the engine room to any position, other than those specified in (1) above, from which the speed or direction
of thrust of the propellers may be controlled.
1.3 Tests
-104-
2013 Rules for High Speed Craft (Part 9 Chapter 1)
-105-
2013 Rules for High Speed Craft (Part 9 Chapter 1)
respectively under as far practical condition as possible. However, part of the tests may be carried out during sea
trials.
-106-
2013 Rules for High Speed Craft (Part 9 Chapter 2)
2.1 General
2.1.1 Scope
The requirements of this Chapter apply to the diesel engines used for main propulsion machinery, electric
generators and auxiliary machinery (excluding auxiliary machinery for specific use, etc., hereinafter the same in this
chapter).
-107-
2013 Rules for High Speed Craft (Part 9 Chapter 2)
-108-
2013 Rules for High Speed Craft (Part 9 Chapter 2)
and so adjusted to automatically stop the engine when the speed exceeds by more than 15% of the maximum
continuous revolutions.
-109-
2013 Rules for High Speed Craft (Part 9 Chapter 2)
through reduction gears. For twin screw craft, where four engines are coupled with the shafts
through declutchable coupling provided between engines and reduction gears
C = 3.0 For twin screw craft, where four engines are coupled with the shafts without declutchable
coupling between engines and reduction gears
(2) For non-reversible type engines using a separate reversing gear, controllable pitch propellers or waterjet
propulsion systems, 1/2 of the total number of starts specified in (1) above may be accepted.
(3) For electric propulsion craft:
Z=6+3(k-1)
where:
Z : Total number of starts
k : Number of engines and it is not necessary for the value of k to exceed 3.
3 For main propulsion engines which are arranged for starting by battery and for the starting arrangement of diesel
engines driving generators or auxiliaries, the requirements specified in 2.5.3-3 and -4, Part D of the Rules for the
Survey and Construction of Steel Ships are to be complied with.
-110-
2013 Rules for High Speed Craft (Part 9 Chapter 3)
3.1 General
3.1.1 Scope
The requirements of this Chapter apply to gas turbines of the open cycle type used for main propulsion
machinery, electric generators and auxiliary machinery (excluding auxiliary machinery for specific use, etc., herein
after the same in this chapter).
-111-
2013 Rules for High Speed Craft (Part 9 Chapter 3)
-112-
2013 Rules for High Speed Craft (Part 9 Chapter 3)
3.2.3 Alarms
1 Gas turbines (excluding emergency generator turbines) are to be provided with alarm devices which come into
action in the following conditions. In case where the shut-down devices specified in 3.2.2 are also required, the alarm
is to work before the shut-down devices come into action.
(1) Abnormal rise of turbine inlet or outlet gas temperature
(2) Drop of lubricating oil pressure
(3) Drop of fuel oil supply pressure
(4) Excessive vibration
2 In addition to the requirements specified in -1 above, gas turbines for main propulsion are to be provided with
alarm devices which come into action in the following conditions. In case where the shut-down devices specified in
3.2.2 are also required, the alarm is to work before the shut-down devices come into action.
(1) Abnormal rise of differential pressure across lubricating oil filter
(2) Abnormal rise of lubricating oil inlet temperature
(3) Abnormal rise of cooling medium temperature in case where an intercooling cycle is adopted
(4) Abnormal rise of bearing temperature or lubricating oil outlet temperature
(5) Excessive high vacuum pressure at the compressor inlet
-113-
2013 Rules for High Speed Craft (Part 9 Chapter 3)
from a gravity tank or from an auxiliary lubricating oil pump driven by the turbine.
2 The lubricating oil arrangements for main gas turbines are to be provided with the automatic temperature
controlling devices.
3 An oil sampling connection is to be provided at a proper location.
-114-
2013 Rules for High Speed Craft (Part 9 Chapter 4)
4.1 General
4.1.1 Scope
The requirements of this Chapter apply to power transmission systems which transmit power from main
propulsion machinery and prime movers driving generators and auxiliaries (excluding auxiliary machinery for
specific use etc., hereinafter the same in this Chapter).
-115-
2013 Rules for High Speed Craft (Part 9 Chapter 4)
pinions is to be such that the whirling moves of pinions and deviation of shaft centre may be minimized.
4.1.5 General Construction of Power Transmission Systems other than Gearings (e.g. highly elastic
flexible couplings, clutches, etc.)
1 The power transmission systems other than the gearings are to be of those approved by the Society in their
constructions and materials, functioning safely and reliably and having sufficient strength against transmitted power.
2 The construction of electro-magnetic slip couplings is to conform to the requirements in 2.4, Part H, of the
Rules for the Survey and Construction of Steel Ships as well as to the discretion of the Society.
3 Where the clutch of power transmission systems for main propulsion is operated with a hydraulic or pneumatic
system, a stand-by pump or compressor connected ready for use or any other appropriate unit is to be provided,
thereby to ensure that a ship can keep the navigable speed.
-116-
2013 Rules for High Speed Craft (Part 9 Chapter 5)
5.1 Shaftings
5.1.1 Scope
The requirements of this Chapter apply to propulsion shafting (excluding any part of waterjet propulsion system
and propeller) and power transmission system which transmit power from prime mover driving generators and
auxiliaries (excluding auxiliary machinery for specific use etc., hereinafter the same in this section). The torsional
vibration of shaftings are to comply with the requirements specified in 5.4.
-117-
2013 Rules for High Speed Craft (Part 9 Chapter 5)
5.2 Propeller
5.2.1 Scope
The requirements of this Chapter apply to screw propellers.
-118-
2013 Rules for High Speed Craft (Part 9 Chapter 5)
30.3 æ D P¢ ö
K1 = ç k 2 + k3
2 è P Dø
æ P¢ ö
1 + k1 ç
èDø
D : Diameter of propeller (m)
k1, k2 and k3 : Values given in Table 9.5.1
P ¢ : Pitch at radius in question (m)
P : Pitch at radius of 0.7R (m), (R = Radius of propeller (m))
K 2 : Coefficient given by the following formula
æ E ö D 2 N 02
K 2 = K - çç k 4 + k5
è t0 ø 1000
k4 and k5 : Values given in Table 9.5.1
E : Rake at tip of the blade (Measuring from face side base line, and taking positive value for backward
rake) (cm)
t 0 : Imaginary thickness of blade at propeller shaft centreline ( t0 may be obtained by producing the each
side line which connects the blade tip thickness with the thickness at 0.25R, or 0.35R for
controllable pitch propeller, in the projection of blade section along maximum blade thickness line.)
(cm)
K : Value given in Table 9.5.2
-119-
2013 Rules for High Speed Craft (Part 9 Chapter 5)
2 Where a propeller is force fitted on the propeller shaft with a key, the strength of the fitted parts are to be such
that they are sufficient for the torque to be transmitted.
3 Where a propeller is force fitted on the propeller shaft, the edge at the fore end of the tapered hole of the
propeller boss is to be appropriately rounded off.
4 Propeller bosses are not to be heated locally to a high temperature at time of forcing on or drawing out.
5.3.1 Scope
Waterjet propulsion systems are to conform to requirements in this Section, according to their design, to in
additional to the requirements in 5.1.4 through 5.1.8.
5.3.2 Terminology
The terms used in this section are defined as follows:
(1) Waterjet propulsion system is a system, including (2) to (7), that receives water through an inlet duct and
discharges it through a nozzle at increased velocity to produce propulsive thrust without recourse to a screw
propeller.
(2) Impeller is a rotating assembly provided with blades to give energy to the water.
(3) Main shaft is a shaft that transmits power to the impeller blades.
(4) Water intake duct is the portion that leads the water drawn from the water intake to the impeller inlet.
(5) Nozzle is the portion that injects the rectified water from the impeller.
(6) Deflecter is the device serving as a rudder by leading the water injected from the nozzle either to port or to
starboard.
(7) Reversers are the devices to thrust the ship to go astern by reversing the flow direction of the water injected from
the nozzle.
5.3.4 General
1 The materials of parts of the waterjet propulsion system are suitable for respective uses intended, and the
following essential components are to comply with the requirements in Part K of the Rules for the Survey and
Construction of Steel Ships:
(1) Main shaft
(2) Shaft coupling and coupling bolts
-120-
2013 Rules for High Speed Craft (Part 9 Chapter 5)
(3) Impeller
(4) Water intake duct, nozzle and impeller casing which are composing a part of shell plating
2 The construction and the strength of waterjet propulsion system are to be in accordance with deemed appropriate
by the Society.
5.4.1 Scope
The requirements of this Chapter apply to power transmission systems and shafting for propulsion (excluding a
part of waterjet propulsion system and propeller), shaftings transmitting power from main engine to generators, crank
shaft of diesel engine used for main propulsion and shaftings of generating systems using diesel engine.
5.4.2 General
1 Torsional vibration calculation sheets are to be submitted for main propulsion shaftings and shaftings for
generators (excluding those for emergency generators). However in such a case where the shafting systems are of the
same type with sufficient practical experience and can be deduced with satisfactory accuracy that no critical vibration
would exist within the service speed range, the submission of the torsional vibration calculation sheets may be
omitted.
2 Where considered necessary by the Society, measurements to confirm correctness of the estimated value by the
calculation are to be carried out.
3 The torsional vibration stresses and torques on the shaftings are to comply with the allowable limit specified in
8.2, Part D of the Rules for the Survey and Construction of Steel Ships.
4 In the case where the torsional vibration stresses or torques exceed the allowable limit t1 specified in 8.2, Part
D of the Rules for the Survey and Construction of Steel Ships, the barred speed ranges are to be imposed in
accordance with 8.3, Part D of the Rules for the Survey and Construction of Steel Ships.
-121-
2013 Rules for High Speed Craft (Part 9 Chapter 6)
6.1 Boilers
6.1.2 General
1 The boilers shown in the following (1) to (3) are to be designed to have construction and strength adequate for
the intended service and the surrounding conditions in ships.
(1) Steam boilers with design pressure not exceeding 0.1 MPa and heating surface not exceeding 1 m2
(2) Hot water boilers with design pressure not exceeding 0.1 MPa and heating surface not exceeding 8 m2
(3) Electric water heaters
2 The boilers other than -1 are to comply with 9.2 through 9.9, Part D of the Rules for the Survey and
Construction of Steel Ships.
3 Notwithstanding the requirement in -2, small boilers with design pressure not exceeding 0.35 MPa may be
required to comply with 9.11, Part D of the Rules for the Survey and Construction of Steel Ships.
6.2.1 General
1 Thermal oil heaters heated by flame or combustion gas are to comply with 6.1 (in this case the term boiler is
to be read as thermal oil heater ) as well as the following -2 and -3.
2 Safety devices, etc. of thermal oil heaters heated by flame are to comply with 9.12.2, Part D of the Rules for
the Survey and Construction of Steel Ships.
3 Safety devices, etc. of thermal oil heaters heated by combustion gas are to comply with 9.12.3, Part D of the
Rules for the Survey and Construction of Steel Ships.
6.3 Incinerators
-122-
2013 Rules for High Speed Craft (Part 9 Chapter 6)
(1) Drawings
(a) General arrangement of incinerator
(b) Arrangement of incinerator fittings
(c) Other drawings considered necessary by the Society
(2) Data
(a) Particulars
(b) Instruction manual of safety devices
(c) Operation manual of incinerator
(d) Other data considered necessary by the Society
6.3.2 General
Incinerators are to comply with 9.13, Part D of the Rules for the Survey and Construction of Steel Ships.
6.4.2 General
Pressure vessels are to comply with the requirements specified in Chapter 10, Part D of the Rules for the
Survey and Construction of Steel Ships.
-123-
2013 Rules for High Speed Craft (Part 9 Chapter 7)
7.1 General
7.1.2 Materials
1 Materials used for auxiliary machinery are to be adequate for their service conditions. The materials used for
essential parts of auxiliary machinery are to comply with the standards deemed appropriate by the Society.
2 Materials for pipes are to comply with the requirements specified in 12.1.4-2, Part D of the Rules for the
Survey and Construction of Steel Ships.
However materials which comply with a standard deemed appropriate by the Society may be accepted for pipes
o
with both a design pressure less than 1MPa and a design temperature of 230 C or less.
3 Materials for valves or cocks (hereinafter referred to as valves in this Chapter) and pipe fittings are to comply
with the requirements specified in 12.1.4-3, Part D of the Rules for the Survey and Construction of Steel Ships.
However materials which comply with a standard deemed appropriate by the Society may be accepted for the
following (1) and (2).
(1) Valves and pipe fittings used for pipes with a nominal diameter less than 100 mm.
o
(2) Valves and pipe fittings with both a design pressure less than 3MPa and a design temperature of 230 C or less.
4 Notwithstanding the requirements -2 and -3, materials for pipes, valves and pipe fittings are to comply with the
requirements of the service limitations for materials specified in 12.1.5, Part D of the Rules for the Survey and
Construction of Steel Ships.
5 Such special materials as rubber hoses, plastic pipes, vinyl pipes, aluminium alloys, etc., notwithstanding -3
above, may be used where approved by the Society taking into account safety against fire and flooding as well as
their service conditions.
Thickness of pipes is to comply with the requirements specified in 12.2, Part D of the Rules for the Survey and
Construction of Steel Ships.
Construction of valves and pipe fittings is to comply with the requirements specified in 12.3, Part D of the Rules for
the Survey and Construction of Steel Ships.
-124-
2013 Rules for High Speed Craft (Part 9 Chapter 7)
Connection and forming of piping system is to comply with the requirements specified in 12.4, Part D of the Rules
for the Survey and Construction of Steel Ships.
Construction of auxiliary machinery and storage tanks is to comply with the requirements specified in 12.5, Part D
of the Rules for the Survey and Construction of Steel Ships. In case where storage tanks for fuel oil are
manufactured with the material other than steel plating, however, minimum thickness of plating is to be deemed
appropriate by the Society.
-125-
2013 Rules for High Speed Craft (Part 9 Chapter 8)
8.1 General
8.1.1 Piping
Piping systems are to comply with the requirements specified in 13.2, Part D of the Rules for the Survey and
Construction of Steel Ships.
-126-
2013 Rules for High Speed Craft (Part 9 Chapter 8)
1 Scuppers piping sufficient in number and size to provided effective drainage are to be provided on all decks.
However the Society may permit the means of drainage to be dispensed with in any particular compartment of any
ship or class of ship if it is satisfied that by reason of size or internal subdivision of those spaces the safety of the ship
is not thereby impaired.
2 Scuppers and sanitary discharges are to comply with the requirements specified in 13.4.1-2, 13.4.1-3, 13.4.1-5,
13.4.1-6 and 13.4.2, Part D of the Rules for the Survey and Construction of Steel Ships.
1 Bilge and ballast pipings are to comply with the requirements specified in 13.5, Part D of the Rules for the
Survey and Construction of Steel Ships.
2 For multihull crafts, the breadth of the hull B used for calculating minimum required diameter of bilge main
may be the breadth of a hull at or below the design waterline (m).
3 For multihull crafts with individual bilge pumps for each hull, such bilge piping are to comply with the
requirements in -1 and -2 above. Also the total capacity Q of the bilge pumps for each hull is not to be less than 2.4
times the required capacity of the pump specified in -1 and -2 above.
4 Notwithstanding the requirements given in -1 and -3 above, where approved by the Society in consideration of
the area of the machinery spaces, at least two required bilge suctions may be arranged near the center line of the hull.
In this case, at least one of them is to be connected to direct bilge piping and others may be connected to branch bilge
piping.
Air pipes are to comply with the requirements specified in 13.6, Part D of the Rules for the Survey and
Construction of Steel Ships.
8.6.1 General
1 Where tanks which can be pumped up come under either one of the following categories, overflow pipes are to
be provided:
(1) Where total sectional area of air pipes to tanks which can be pumped up is less than 1.25 times total sectional
area of filling pipes.
(2) Where there is any opening below the open ends of air pipes fitted to the tanks; and
(3) Fuel oil settling tanks and fuel oil service tanks.
2 Overflow pipes other than those to tanks for fuel oil, lubricating oil and other flammable oils are to be led to the
open air, or alternatively, to proper positions where the overflows can be disposed of.
3 Overflow pipes are to be arranged to be self-draining.
8.6.3 Overflow Pipes to Fuel Oil, Lubricating Oil and Other Flammable Oil tanks
Overflow pipes to tanks for fuel oil, lubricating oil and other flammable oil are to comply with the requirements
specified in 13.7.3, Part D of the Rules for the Survey and Construction of Steel Ships.
-127-
2013 Rules for High Speed Craft (Part 9 Chapter 8)
8.7.1 General
1 All the tanks, cofferdams and areas the access to which is difficult are to be provided with a sounding pipe or a
liquid level indicator.
2 Name plates are to be affixed to the upper ends of sounding pipes.
8.8.1 General
1 Fuel oil in the oil tanks is not to be heated to the temperature within 10℃ below the flash point of the fuel oil,
unless considered appropriate by the Society.
2 The compartments in which fuel oil burning systems, fuel oil settling and service tanks, fuel oil purifiers, etc.,
are located are to be readily accessible and well ventilated.
3 The fuel oil system in the main propulsion machinery room and boiler room are to be carefully considered to
make maintenance and inspection easy. Due care is to be paid against oil leakage so that it may not result in fire
accidents and that it may be detected easily in case of leakage. All valves or cocks are to be capable of being operated
from above the platform.
4 Valves, cocks and other fittings fitted on fuel oil tanks are to be located in safe positions so as to be protected
from external damage.
5 Stop valves or cocks are to be fitted on both suction and delivery sides of fuel oil pumps.
6 Where pressure relief valves are provided on the delivery side of the fuel oil pumps, arrangements are to be
-128-
2013 Rules for High Speed Craft (Part 9 Chapter 8)
made so that the discharged oil may be led to the suction side of the pump.
o
7 Valves and pipe fittings with a design temperature above 60 C and a design pressure above 1 MPa are to be
suitable for a pressure of not less than 1.6 MPa. Valves and pipe fittings used for fuel oil transfer piping lines, fuel oil
suction piping lines and other low pressure fuel oil piping lines are to be suitable for a pressure of not less than 0.5
MPa.
8 Union joints used for connection of fuel oil injection pipes of diesel engines or the pipes of burning systems of
boilers are to be of rigid construction and to have metal contact capable of providing sufficient oil tightness.
9 Fuel oil pipelines including fuel oil tanks are to be segregated from ballast pipelines.
-129-
2013 Rules for High Speed Craft (Part 9 Chapter 8)
burning pumps and fuel oil heaters of sufficient total capacity to maintain the supply of oil at the maximum
evaporation rate of the boiler, and each of which has sufficient capacity to obtain navigable speed of the craft.
However, where alternative means are available to ensure the normal navigation and cargo heating with the burning
system being out of operation, only one unit of burning system will be accepted.
2 Where fuel oil is supplied to the burners by gravity, fuel oil filters capable of being cleaned without stopping the
supply of filtered oil are to be provided.
3 Where the removal of residual fuel oil in burners is conducted by means of steam or air, means are to be taken to
prevent the mixing of oil into steam or air.
8.9.1 General
1 The compartment in which lubricating oil tanks, lubricating oil purifiers and hydraulic oil tanks are located are
to be readily accessible and well ventilated.
2 Lubricating oil system and hydraulic oil system in the main propulsion machinery room and boiler room are to
be carefully considered to make maintenance and inspection easy. Due care is to be paid against oil leakage so that it
may not result in fire accidents and that it may be detected easily in case of leakage. All valves or cocks are to be
capable of being operated from above the platform.
3 Valves, cocks and other fittings fitted on lubricating oil tanks and hydraulic oil tanks are to be located in safe
positions so as to be protected from external damage.
4 Valves for lubricating oil tank suction pipes are to comply with the requirements specified in 4.2.2(3)(d), Part R
of the Rules for the Survey and Construction of Steel Ships (in this case the term fuel oil is to be read as
lubricating oil ).
5 Drip trays and drainage arrangement of lubricating oil systems and hydraulic oil systems are to comply with the
requirements specified in 13.9.4-1 and 13.9.4-4, Part D of the Rules for the Survey and Construction of Steel
Ships (in these case the term fuel oil is to be read as lubricating oil or hydraulic oil ).
6 Lubricating oil heaters are to comply with the requirements specified in 13.9.5, Part D of the Rules for the
Survey and Construction of Steel Ships (in this case the term fuel oil is to be read as lubricating oil ).
-130-
2013 Rules for High Speed Craft (Part 9 Chapter 8)
Thermal oil systems are to comply with the requirements specified in 13.11, Part D of the Rules for the Survey and
Construction of Steel Ships.
Pneumatic piping systems are to comply with the requirements specified in 13.13.1, 13.13.2, 13.13.3 and 13.13.5,
Part D of the Rules for the Survey and Construction of Steel Ships.
Steam piping systems and condensate systems are to comply with the requirements specified in 13.14, Part D of the
Rules for the Survey and Construction of Steel Ships.
-131-
2013 Rules for High Speed Craft (Part 9 Chapter 8)
navigation and cargo heating with the feed water system being out of use or that one complete spare unit of feed
pump and one set of feed check valve needle and valve seat capable of being replaced in a short period of time are
provided on board.
2 Boiler feed water pipes are not to be led through tanks which contain oil, nor are oil pipes to be led through
boiler feed water tanks.
1 Exhaust gas piping arrangement is to comply with the requirements specified in 13.16, Part D of the Rules for
the Survey and Construction of Steel Ships.
2 Exhaust gas piping is to be arranged with consideration of heat influence to hull plates.
3 Open ends of exhaust gas piping are to be arranged so that exhaust gas is prevented to flow into air intakes of
diesel engines, gas turbines, etc..
-132-
2013 Rules for High Speed Craft (Part 9 Chapter 9)
9.1 General
9.1.1 Scope
1 The requirements in this Chapter apply to power-driven steering gears.
2 Electrical equipment and cables used for steering gears are to conform to the requirements of Chapter 10 in
addition to those specified in this Chapter.
3 Manual steering gears will be considered by the Society in each case.
-133-
2013 Rules for High Speed Craft (Part 9 Chapter 9)
9.2.4 Piping
1 Hydraulic piping system is to comply with the requirements specified in 15.2.4-1 to 15.2.4-4, Part D of the
Rules for the Survey and Construction of Steel Ships.
2 A fixed storage tank having sufficient capacity to recharge at least one power actuating system including
reservoir is to be provided, where the main steering gear is operated by hydraulic power.
9.3 Controls
Controls are to comply with the requirements specified in 15.3.1-1, 15.3.1-2 and 15.3.2, Part D of the Rules for the
Survey and Construction of Steel Ships.
Materials, constructions and strength of steering gears controls are to comply with the requirements specified in 15.4,
Part D of the Rules for the Survey and Construction of Steel Ships. In this case, rudder torque TR is to be such
that defined as follows:
æ aö
T R = AV 2 cç 42.9 - 116.1
è cø
TR : Rudder torque to be used in strength calculation (Nm)
2
A : Area of rudder plate (m )
V : Craft s speed (kt)
a : Distance from forward edge of rudder to the centreline of rudder stock (m) (measured at the same
position as c below)
c : Breadth of rudder (m) (measured at centre of area of rudder plate)
-134-
2013 Rules for High Speed Craft (Part 9 Chapter 10)
10.1 General
10.1.1 Scope
1 The requirements in this Chapter apply to windlasses and mooring winches driven by electric power, hydraulic
power or steam.
2 The windlasses and mooring winches other than those specified in -1 are to be subject to approval by the
Society.
-135-
2013 Rules for High Speed Craft (Part 9 Chapter 11)
11.1 General
11.1.1 Scope
The requirements in this chapter apply to the refrigerating machinery using the primary refrigerants listed below
and forming the refrigerating cycle used for refrigeration, air conditioning, etc., as well as to the controlled
atmosphere systems for the cargo holds. However, the refrigerating machinery with compressors of 7.5 kW or less
and the refrigerating machinery using the primary refrigerants other than those listed below are to be as deemed
appropriate by the Society.
R 22 : CHClF2
R 134 a : CH2FCF3
R 404 A : R125/R143a/R134a (44/52/4 wt%)
CHF2CF3 / CH3CF3 / CH2FCF3
R 407 C : R32/R125/R134a (23/25/52 wt%)
CH2F2 / CHF2CF3 / CH2FCF3
R 410 A : R32/R125 (50/50 wt%) CH2F2 / CHF2CF3
R 507 A : R125/R143a (50/50 wt%) CHF2CF3 / CH3CF3
Design of refrigerating machinery is to comply with the requirements specified in 17.2, Part D of the Rules for the
Survey and Construction of Steel Ships.
-136-
2013 Rules for High Speed Craft (Part 9 Chapter 12)
12.1 General
12.1.1 Scope
1 The requirements in this Chapter apply to the systems of automatic or remote control which are used to control
the following machinery and equipment.
(1) Main propulsion machinery (in this Chapter, propulsion generating set in electric propulsion ships are excluded),
(2) Controllable pitch propeller
(3) Steam generating set
(4) Electric generating set (in this Chapter, propulsion generating set in electric propulsion ships are included)
(5) Auxiliary machinery associated with machinery and equipment listed in (1) to (4)
(6) Fuel oil systems
(7) Bilge systems
(8) Deck machinery
2 Where considered necessary by the Society, the requirements in this Chapter are correspondingly applied to the
systems of automatic or remote control which are used for controlling machinery and equipment not listed in -1(1) to
(8).
12.1.2 Terminology
Terms used in this Chapter are defined as the requirements specified in 18.1.2, Part D of the Rules for the
Survey and Construction of Steel Ships.
System design is to comply with the requirements specified in 18.2, Part D of the Rules for the Survey and
Construction of Steel Ships.
12.3 Automatic and Remote Control of Main Propulsion Machinery or Controllable Pitch Propellers
Automatic and remote control of main propulsion machinery or controllable pitch propellers is to comply with the
requirements specified in 18.3, Part D of the Rules for the Survey and Construction of Steel Ships.
Automatic and remote control of boilers is to comply with the requirements specified in 18.4, Part D of the Rules
for the Survey and Construction of Steel Ships.
Automatic and remote control of electric generating sets is to comply with the requirements specified in 18.5, Part D
of the Rules for the Survey and Construction of Steel Ships.
Automatic and remote control of auxiliary machinery is to comply with the requirements specified in 18.6, Part D of
the Rules for the Survey and Construction of Steel Ships.
-137-
2013 Rules for High Speed Craft (Part 9 Chapter 13)
13.1 General
13.1.1 Scope
1 The requirements in this chapter apply to spare parts, tools and instruments for the following machinery
installations.
(1) Diesel engines for main propulsion
(2) Diesel engines to drive generators or auxiliary machinery essential for main propulsion
(3) Boilers and thermal oil installations
(4) Pumps
2 Since the requirements for spare parts and tools vary depending on regulations of registered country, purpose of
ships engaged, kinds of machinery installations, navigation route and others, the requirements in this Chapter may not
be applicable in all cases. However, as a rule, spare parts and tools specified in this Chapter are to be provided in
engine room, boiler room or any other convenient places in a ship.
3 The spare parts, tools and instruments for machinery installations not specified in this Chapter are to be as
deemed appropriate by the Society.
-138-
2013 Rules for High Speed Craft (Part 9 Chapter 13)
-139-
2013 Rules for High Speed Craft (Part 10 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Scope
The requirements in this part apply to the electrical equipment and wirings for craft (hereinafter referred to as
the electrical installations ).
1.1.2 Equivalency
Electrical installations which do not fully comply with the requirements of this part may be accepted, provided
that there are unavoidable but justifiable reasons precluding the due compliance with the requirements of this part and
that the electrical installations are deemed by the Society to be equivalent to those specified in this part.
1.1.4 Terminology
Terms used in this part are defined in Chapter 2, Part 1, and additionally in 1.1.5, Part H of the Rules for the
Survey and Construction of Steel Ships.
1.2 Testing
-140-
2013 Rules for High Speed Craft (Part 10 Chapter 1)
methods, despite of the requirements in -1, may be applied subject to the approval of the Society.
3 Cables for power, lighting and internal communications are to be subjected to type test for each type of products.
4 Electrical equipment and cables having a certificate considered acceptable to the Society may be exempted
partially and wholly from the tests and inspections.
-141-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
2.1 General
2.1.1 Scope
This chapter specifies the requirements for electrical equipment and cables, and system design relating to
electricity.
-142-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
7 No electrical installations are to be installed in spaces where explosive gases are liable to accumulate or in
compartments assigned principally to accumulator batteries, in paint lockers, in acetylene stores or in similar spaces
unless the following requirements (1) to (4) are satisfied:
(1) Electrical equipment essential for operational purposes
(2) Electrical equipment of a type which will not ignite the mixtures concerned
(3) Electrical equipment appropriate to the spaces concerned
(4) Electrical equipment which is appropriately certified for safe usage in dusts, vapours or gases likely to be
encountered
8 Electrical equipment and cables are to be placed at such a safe distance from the magnetic compasses or are to
be so screened that the interfering external magnetic field is controlled to negligible extent even when circuits are
switched on and off.
2.1.4 Earthing
1 Non-current-carrying exposed metal parts of electrical equipment which are not intended to be live but which
are liable under fault conditions to become live are to be effectively earthed except the following :
(1) They are supplied at a voltage not exceeding 55 V d.c. or 55 V a.c. root mean square between conductors.
However, auto-transformers are not to be used for the purpose of achieving this voltage.
(2) They are supplied at a voltage not exceeding 250 V by safety isolating transformers supplying only one
consuming device.
(3) They are constructed in accordance with the principle of double isolation.
2 Additional safety means are to be provided for portable electrical apparatus for use in confined or exceptionally
damp spaces where particular risks due to conductivity may exist.
3 Where earthing connections are necessary, the earthing conductors are to be of copper or other approved
materials, and are to be properly protected against damage, and, where necessary, erosion. The size of the earthing
conductors is to be deemed appropriate by the Society according to the cross sectional area of the current carrying
conductors and installation of the earthing lines.
4 In case where aluminium superstructures are secured to the steel hull of the craft including insulation to prevent
galvanic corrosion between these materials, a separate bonding connection is to be provided between the
superstructure and the hull which is to be made in such a manner that galvanic corrosion is avoided and points of
connection may be readily inspected.
5 For ships whose main structure is made of non-metallic materials the following additional requirements in (1) to
(5) are also to be met.
(1) All metal parts of the craft are to be earthed to the sea water, in so far as possible in consideration of galvanic
corrosion between dissimilar metals.
The earthing of isolated components inside the structure is not generally necessary, except in fuel tanks.
(2) Each pressure refuelling point is to be provided with a means of earthing the fuelling equipment to the ship.
(3) Metallic pipes capable of generating electrostatic discharges, due to the flow of liquids and gases are to be
bonded so as to be electrically continuous throughout their length and are to be adequately earthed.
(4) Secondary conductors provided for the equalisation of static discharges, bonding of equipment, etc. are to have a
minimum cross section of 5 mm2 in copper or equivalent surge carrying capacity in aluminium.
(5) The electrical resistance between bonded objects and the basic structure is not to exceed 0.05W The bonding
path is to have sufficient cross-sectional area to carry the maximum current likely to be imposed on it without
excessive voltage drop.
-143-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
-144-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
2.3.1 General
Electrical installations of ships are to be protected against accidental overcurrents including short-circuit. The
-145-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
protective devices are to be capable of continuously serving other circuits as far as possible by breaking a fault circuit
and eliminating damage to the system and hazard of fire.
-146-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
-147-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
2.4.3 Circuit-breakers
Circuit-breakers are to comply with the requirements in 2.6.1, Part H of the Rules for the Survey and
Construction of Steel Ships.
2.4.4 Fuses
Fuses are to comply with the requirements in 2.6.2, Part H of Rules for the Survey and Construction of Steel
Ships.
2.5.1 Location
Switchboards are to be installed in dry places away from the vicinity of steam, water and oil pipes as possible.
-148-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
links or other approved means. So far as is practicable, the connection of generating sets and other duplicated
equipment are to be equally divided between the parts.
3 Cable entries of switchboards are to be so constructed that no ingress of water into the switchboard is permitted
along the cables.
4 In case where the supply circuits having different voltages are installed in the same space of a switchboard, a
section board or a distribution board, all appliances are to be so arranged that the cables of different rated voltages
can be laid without coming to contact with each other within the board.
5 The enclosures are to be of robust construction and their materials used are to be incombustible and
non-hygroscopic.
6 Insulating materials are to be durable, flame-retardant and non-hygroscopic.
7 Wiring materials are to conform to the following requirements.
(1) Insulated wires for switchboards are to be those of flame-retardant and non-hygroscopic having a maximum
o
permissible conductor temperature not less than 75 C .
(2) Ducts and straps for wiring are to be of flame-retardant materials.
(3) Insulated wires for control and instrument circuits are not to be bunched together with wires for main circuits
and not to be in the same duct. However, if the rated voltages and maximum permissible temperatures of
conductors are the same each other and no injurious effects are imposed by the main circuits, this requirement
may not be applied.
8 Except where an isolation switch is provided, circuit breakers are to be such that repairing and replacing can be
made without disconnecting them from the busbar connections and switching off the power source.
2.5.4 Busbars
① 1 Busbars are to be of copper or of copper-surrounded aluminum alloy.
2 Busbar conections are to be so made as to inhibit corrosion and oxidization.
3 Busbars and busbar connections are to be so supported as to withstand the electromagnetic force resulted from
short-circuiting.
4 Temperature rises of busbars, connecting conductors and their connections are not to exceed 45K at ambient
temperatures of 45 oC in cases where they are carrying full-load currents. However, in cases where deemed
appropriate by the Society, these requirements do not apply.
5 Clearance distances between live parts of different polarity or between live parts and earthed metals are not to be
less than the values given in Table 10.2.2.
2.5.5 Equalizer
1 The current rating of equalizer connections and equalizer switches is not to be less than a half of the rated full
load current of the generator.
2 The current rating of equalizer busbars is not to be less than a half of the rated full-load current of the largest
generator in the group.
-149-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
-150-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
2.7 Cables
2.7.1 General
Cables are to comply with IEC 60092 or equivalent thereto. Installation of cables is to comply with the
requirements in this 2.7.
-151-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
temperature higher than that permitted for the lowest temperature-rated cable in the group.
6 Cables having a protective covering which may damage the covering of other cables are not to be bunched
together with those other cables.
7 When installing cables, the minimum inside radius of bend is to be in accordance with the following:
(1) Armoured rubber insulated and PVC insulated cables: 6d
(2) Unarmoured rubber insulated and PVC insulated cables:
4d (d £ 25mm)
6d (d > 25 mm)
(3) Mineral insulated cables: 6d
(d : overall diameter of the finished cables)
8 Intrinsically safe circuits are to be installed complying with the followings;
(1) The cables for intrinsically safe circuits associated with intrinsically safe type electrical equipment are to be of
exclusive use, being installed separately from cables for general circuits.
(2) Intrinsically safe circuits associated with different intrinsically safe type electrical equipment are, as a rule, to be
wired individually using different cables. Where it is necessary to use a multi-core cable in common, a cable
which has shields by each core or each pair of cores is to be used, having such shields earthed effectively.
However, intrinsically safe circuits associated with category ia intrinsically safe type electrical equipment is
not to be contained in a cable associated with category ib intrinsically safe type electrical equipment.
9 Metallic coverings of cables are to be effectively earthed at both ends, except that in final sub-circuits earthing
may be at the supply end only. This does not necessarily apply to instrumentation cables where single point earthing
may be desirable for technical reasons.
10 Effective means are to be taken to ensure that all metallic coverings of cables are made electrically continuous
throughout their length.
11 Cables and wires are to be so supported and secured that they may not be injured by chafing or other mechanical
damage.
12 Penetration of bulkheads and decks, which are required to have some degree of strength and tightness, is to be so
carried out by means of cable glands or boxes as to ensure that the strength and tightness are not impaired.
13 Where cables pass through non-watertight bulkheads or structures, bushings or other suitable means are to be
provided in order to avoid damage to cables. If the thickness of the steel is sufficient ( ³ 6mm) and there is no risk of
damage to cables, adequately rounded edges may be accepted as the equivalent of bushing.
14 The choice of the materials for glands and bushings is to be such that there is no risk of corrosion.
15 Penetration through bulkheads and decks, which are to have some degree of fire integrity is to be so effected as
to ensure that the fire integrity is not impaired.
-152-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
2.8.1 General
1 The requirements in this 2.8.1 apply to permanently installed secondary batteries of vented type. A vented type
secondary battery means one in which the electrolyte can be replaced and which may release gas while operating on
charge and overcharge.
2 Proposals for the use of other types of secondary batteries are to be as deemed appropriate by the Society.
3 Accumulator batteries are to have performance suitable for intended services.
2.8.2 Construction
Cells of all batteries are to be so constructed and secured as to prevent spilling of the electrolyte due to craft s
motions and to prevent emission of acid or alkaline spray.
2.8.3 Location
1 Alkaline batteries and lead acid batteries are not to be installed in the same compartment.
2 Large batteries are to be installed in compartment assigned to them only. They may be installed in a box on deck
if adequately ventilated and provided with means to prevent ingress of water.
3 Engine starting batteries are to be located as close as practicable to the engine(s) served.
4 Batteries are not to be placed in the living quarters.
2.8.5 Ventilation
1 Battery compartments are to be adequately ventilated by an independent ventilating system.
2 In case where natural ventilation is employed, the ventilation ducts are to be run directly from the top of the
o
battery compartment to the open air above, with no part of the ducts more than 45 from the vertical.
3 If natural ventilation is impracticable, mechanical exhaust-ventilation is to be provided. The electric motors for
the ventilation fans are not to be placed inside the ducts. Ventilating fans are to be so constructed and to be of such a
material as to render sparking impossible in the event of the impeller touching the fan casing.
-153-
2013 Rules for High Speed Craft (Part 10 Chapter 2)
2.9.1 General
1 Explosion-protected electrical equipment is to comply with the requirements in 2.16, Part H of the Rules for
the Survey and Construction of Steel Ships.
2 Explosion-protected electrical equipment is to be provided with a certificate which is deemed appropriate by the
Society.
-154-
2013 Rules for High Speed Craft (Part 10 Chapter 3)
3.1 General
3.1.1 General
This chapter specifies the requirements for the design of installations of main source of electrical power,
emergency source of electrical power and other electrical installations on board craft.
-155-
2013 Rules for High Speed Craft (Part 10 Chapter 3)
the reserve source of electrical power or the lighting distribution panel provided on the navigation bridge (limited to
the case where two or more generating sets are provided). However, in craft with a gross tonnage less than 500 tons,
only one circuit from the main switchboard supplied from the main source of electrical power and the reserve source
of electrical power may be accepted.
4 Switches and fuses are not to be provided on the feeder circuits of navigation lights, except the switchboards and
indicator panel.
5 The navigation light indicator panel is to be placed in an accessible position on the navigation bridge.
6 In the event of the failure of navigation lights due to blown bulbs, short-circuits, etc., visual and audible alarms
are to activate on navigation light indicator panels. Such alarm devices are to be fed from the main sources and
reserve sources of power and their feeder circuits are to be independent of the feeder circuits from navigation light
indicator panels to navigation lights.
3.3.2 Not Under Command Lights, Anchor Lights and Signal Lights
Not under command lights, anchor lights and signal lights are to be power supplied from both main source of
electrical power and reserve source of electrical power.
3.4.1 General
Lightning conductors are to be fitted on each mast of ships having non metallic masts or topmasts.
3.4.2 Construction
1 Lightning conductors are to be composed of continuous copper tape or rope having a section not less than 75
mm2 which is riveted with copper rivets or fastened with copper clamps to a suitable copper spike not less than 12
mm in diameter, projecting at least 150 mm above the top of the mast. At the lower end, this copper tape or rope is to
be securely earthed to the sea water.
2 Lightning conductors are to be run as straight as possible, and sharp bends in the conductors are to be avoided.
All clamps used are to be of brass or copper, preferably of the serrated contact type, and effectively locked. No
connection is to be dependent on a soldered joint.
3 The resistance of lightning conductor between the mast top and the point on the earth plate or hull is not to
exceed 0.02 Ω.
-156-
2013 Rules for High Speed Craft (Part 10 Chapter 4)
4.1 Enclosed Cargo Holds for Carrying motor vehicles with Fuel in Their Tanks for Their Own
Propulsion and Enclosed Compartments adjoining the Cargo Holds, etc.
4.2.1 General
Electrical installations for craft carrying dangerous goods are to comply with the requirements in Chapter 19,
Part R of the Rules for the Survey and Construction of Steel Ships as well as the relevant requirements in this
part.
-157-
2013 Rules for High Speed Craft (Part 10 Chapter 5)
5.1 General
5.1.1 General
Electrical installations for electric propulsion craft are to comply with the requirements in Chapter 5, Part H of
the Rules for the Survey and Construction of Steel Ships as well as relevant requirements in this part.
-158-
2013 Rules for High Speed Craft (Part 11 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
1 The requirements in this Part apply only to cargo craft which are not engaged in international voyage and are for
restricted service.
2 A craft other than the craft specified in -1 above is to be in accordance with the requirements in Chapter 7 - Fire
Safety of IMO Resolution MSC.97(73) THE INTERNATIONAL CODE OF SAFETY FOR HIGH SPEED CRAFT, as
may be amended.
1.1.4 Equivalency
Alternative construction, equipment, arrangement and materials will be accepted by the Society, provided that
the Society is satisfied that such construction, equipment, arrangement and materials are equivalent to those required
in this Part.
1.2 Definitions
1.2.1 Application
The definitions of terms which appear in this Part are to be as specified in this Chapter, unless otherwise
specified elsewhere:
-159-
2013 Rules for High Speed Craft (Part 11 Chapter 1)
(3) They are to be so constructed as to be capable of preventing the passage of smoke and flame up to the end of the
appropriate fire protection time.
(4) Where required, they are to maintain load-carrying capabilities up to the end of the appropriate fire protection
time.
(5) They are to have thermal properties such that the average temperature on the unexposed side will not rise more
o
than 139 C above the original temperature, nor will the temperature, at any one point, including any joint, rise
o
more than 180 C above the original temperature during the appropriate fire protection time.
(6) A test of a prototype bulkhead or deck in accordance with the test procedures deemed as appropriate by the
Society, are to be required to ensure that it meets the above requirements.
1.2.8 Smoke-Tight
Smoke-tight or capable of preventing the passage of smoke means that a division made of non-combustible or
fire-restricting materials is capable of preventing the passage of smoke.
Materials which comply with the requirements in 1.2.3(2) may be used as surface materials on bulkheads, wall, and
ceiling linings including their supporting structure as considered necessary.
-160-
2013 Rules for High Speed Craft (Part 11 Chapter 2)
-161-
2013 Rules for High Speed Craft (Part 11 Chapter 2)
Fig. 11.2.1
Fig.11.2.2
Fig. 11.2.3
-162-
2013 Rules for High Speed Craft (Part 11 Chapter 2)
2.2 Construction
2.2.1 Construction
1 The hull, superstructure, structural bulkheads, decks, deckhouses and pillars are to be constructed of approved
non-combustible materials having adequate structural properties. When the materials other than non-combustible
materials are used for these structures, such materials are to be of appropriate fire-restricting materials approved by
the Society.
2 The structural fire protection times for separating bulkheads and decks specified in 2.3 in this Chapter are to be
in accordance with Table 11.2.1.
3 In using Table 11.2.1, it is to be noted that the title of each category is intended to be typical rather than
restricted. For determining the appropriate fire integrity standards to be applied to boundaries between adjacent
spaces, where there is doubt as to their classification for the purpose of this section, they are to be treated as spaces
within the relevant category having the most stringent boundary requirement.
Table 11.2.1 Structural Fire Protection Times for Separating Bulkheads and Decks
Notes:
The figures on either side of the diagonal line represent the required structural fire protection time for the protection
system on the relevant side of the division.
(1) The upper side of the decks within spaces protected by fixed fire-extinguishing systems need not be insulated.
(2) Where adjacent spaces are in the same alphabetical category and a note (2) appears, a bulkhead or deck
between such spaces need not be fitted if deemed unnecessary by the Society. For example, a bulkhead need
not be required between two store-rooms. A bulkhead is, however, required between a machinery space and a
special category space even though both spaces are in the same category.
(3) No structural fire protection requirements, however, smoke-tight non-combustible or fire-restricting material is
-163-
2013 Rules for High Speed Craft (Part 11 Chapter 2)
required.
(4) Control stations which are also auxiliary machinery spaces are to be provided with 30min. structural fire
protection.
(5) Fire-resisting divisions need not comply with 1.2.2(5) of this Part.
(6) Fire-resisting divisions adjacent to void spaces need not comply with 1.2.2(5) of this Part.
「-」 There are no special requirements for material or integrity of boundaries where only a dash appears in the
table.
2.4.1 Application
The requirements in 2.4.2 and 2.4.3 are to apply only to passenger craft, unless otherwise specified elsewhere.
-164-
2013 Rules for High Speed Craft (Part 11 Chapter 2)
-165-
2013 Rules for High Speed Craft (Part 11 Chapter 3)
3.1.2 Fixed Fire Detection and Fire Alarm Systems for Unattended Machinery Spaces
A fixed fire detection and fire alarm systems for periodically unattended machinery spaces are to comply with
the following requirements in addition to the requirements in 3.1.1-4 above.
(1) The fire detection system is to be so designed and the detectors so positioned as to detect rapidly the onset of fire
in any part of those spaces and under any normal conditions of operation of the machinery and variations of
ventilation as required by the possible range of ambient temperatures. Except in spaces of restricted height and
where their use is specially appropriate, detection systems using only thermal detectors are not to be permitted.
The detection system is to initiate audible and visual alarms distinct in both respects from the alarms of any
other system not indicating fire, in sufficient places to ensure that the alarms are heard and observed on the
navigating bridge and by a responsible engineer officer. When the operating compartment is unmanned the
alarm is to sound in a place where a responsible member of the crew is on duty.
(2) After installation, the system is to be tested under varying conditions of engine operation and ventilation.
-166-
2013 Rules for High Speed Craft (Part 11 Chapter 3)
3 The use of a fire-extinguishing medium which, either by itself or under expected conditions of use will adversely
affect the earth s ozone layer and/or gives off toxic gases in such quantities as to endanger persons is not to be
permitted.
3.3.1 General
A craft is to be provided with fire pumps and appropriate associated equipment according to the following 3.3.2
to 3.3.5 or alternative effective fire-extinguishing systems.
Note:
※1: Four buckets
3.3.4 Hydrants
Hydrants are to be arranged so that any location on the craft can be reached by the water jets from two fire hoses
from two different hydrants, one of the jets being from a single length of hose. In special category spaces and open
vehicle spaces, hydrants are be located so that any location within the space can be reached by two water jets from
two different hydrants, each jet being supplied from a single length of hose. One hydrant is to be located in the
vicinity of and outside each entrance to a machinery space.
-167-
2013 Rules for High Speed Craft (Part 11 Chapter 3)
2 In machinery spaces and boiler rooms, a set of a fire hose and a nozzle is to be provided with for each hydrant.
3 Each fire hose is to be provided with a nozzle of an approved dual purpose type (i.e. spray/jet type)
incorporating a shutoff.
3.4.1 Portable Fire Extinguishers in Control Stations, Accommodation and Service Spaces
1 Control stations, accommodation spaces and service spaces are to be provided with portable fire extinguishers of
appropriate types in accordance with Table 11.3.2.
2 In addition to -1 above, at least one extinguisher suitable for machinery space fires is to be positioned outside
each machinery space entrance.
3 Portable Fire Extinguishers are to comply with the requirements in Chapter 24, Part R of the Rules for the
Survey and Construction of Steel Ships.
no point is spaced more One for each 30m of the One for each 50m of
Corridors than approximately 15m corridor length or part At least four in the corridor length Foam, CO2 or Dry
Public spaces At least two on each deck corridor length or part - Foam or Dry
and at least four in total. thereof
-168-
2013 Rules for High Speed Craft (Part 11 Chapter 3)
-169-
2013 Rules for High Speed Craft (Part 11 Chapter 4)
-170-
2013 Rules for High Speed Craft (Part 11 Chapter 5)
-171-
2013 Rules for High Speed Craft (Part 11 Chapter 5)
ventilating capacity.
4 Arrangements are to be provided to permit a rapid shutdown and effective closure of the ventilation systems in
case of fire, taking into account the weather and sea conditions.
5 Ventilation ducts, including dampers are to be made of steel or other equivalent material.
5.2.1 General
Cargo spaces and open vehicle spaces, except open deck areas or refrigerated holds, are to be in accordance with
the provisions specified in following 5.2.2 through 5.2.5.
-172-
2013 Rules for High Speed Craft (Part 11 Chapter 5)
-173-
2013 Rules for High Speed Craft (Part 11 Chapter 6)
6.1.1 General
1 Easy, safe and quick accesses from the operating compartment to the passenger accommodation are to be
provided. In order to ensure immediate assistance from the crew in an emergency situation, the crew accommodation,
including any cabins, is to be located with due regard to easy, safe and quick access to the public spaces from inside
the craft.
2 The design of the craft is to be such that all occupants may safely evacuate the craft to the open deck and then
into survival craft under all emergency conditions, by day or by night. The positions of all exits which may be used in
an emergency, and of all life-saving appliances, the practicability of the evacuation procedure are to be suitable for
this purpose.
3 Public spaces, evacuation routes, exits, lifejacket stowage, survival craft stowage, and the embarkation stations
are to be clearly and permanently marked and illuminated.
4 Each enclosed public space and similar permanently enclosed space allocated to passengers or crew is to be
provided with at least two exits arranged in the opposite ends of the space. Exits are to be safely accessible and are to
provide a route to a normal point of boarding or disembarking from the craft.
5 Exit doors are to be capable of being readily operated from inside and outside the craft in daylight and in
darkness. The means of operation are to be obvious, rapid and of adequate strength.
6 The closing, latching and locking arrangements for exits are to be such that it is readily apparent to the
appropriate crew member when the doors are closed and in a safe operational condition, either in direct view or by an
indicator. The design of external doors is to be such as to eliminate the possibility of jamming by ice of debris.
7 The craft is to have a sufficient number of exits which are suitable to facilitate the quick and unimpeded escape
of persons wearing approved lifejackets in emergency conditions, such as collision damage or fire.
8 Sufficient space for a crew member is to be provided adjacent to exits for ensuring the rapid evacuation of
passengers.
9 All exits, together with their means of opening, are to be adequately marked for the guidance of passengers.
Clear markings, including the location of the fire control, is to be provided for the guidance of rescue personnel
outside the craft.
10 Footholds, ladders, etc., provided to give access from the inside to exits, are to be of rigid construction and
permanently fixed in position. Permanent handholds are to be provided whenever necessary to assist persons using
exits, and are to be suitable for conditions when the craft has developed any possible angles of list or trim.
11 At least two unobstructed evacuation paths are to be available for the use of each person. Evacuation paths are to
be disposed such that adequate evacuation facilities will be available in the event of any likely damage or emergency
conditions, and evacuation paths are to have adequate lighting supplied from the main and emergency sources of
power. Doors providing escape from a space are to be situated at opposite ends of the space. Where the doors
providing escape from a space are situated in the same end of the space, the distance between those doors is to be
greater than the maximum length of the space.
12 The dimensions of passages, doorways and stairways which form part of evacuation paths are to be such as to
allow easy movement of persons when wearing lifejackets. There are to be no protrusions in evacuation paths which
could cause injury, ensnare clothing, damage lifejackets or restrict evacuation of disabled persons. Requirements of
this paragraph do not apply to aisles (fore-aft passageways separating seating areas) or to spaces between adjacent
rows of seats.
13 Adequate notices are to be provided to direct passengers to exits.
14 Provision are to be made on board for embarkation stations to be properly equipped for evacuation of passengers
into life-saving appliances. Such provision are to include handholds, anti-skid treatment of the embarkation deck, and
adequate space which is clear of cleats, bollards and similar fittings.
-174-
2013 Rules for High Speed Craft (Part 11 Chapter 6)
6.1.3 Means of Escape from Special Category Spaces and Open Vehicle Spaces
1 Means of escape are to be provided at least in the fore, midship and aft part of respective special category spaces
and the open vehicle spaces. These means of escape are to be placed in both wings of respective spaces unless these
means of escape are placed at centre line of such spaces.
2 Means of escape are to be so located that no point in the space is more than 40m walking distance from the
means of escape. Where the arrangement of means of escape required by -1 above cannot comply with this
requirement, additional means of escape are to be appropriately so arranged to comply with this requirement.
3 Stairways, ladders, etc., which are part of means of escape from the special category spaces and open vehicle
spaces are to be of ample strength and to be effectively secured to the hull constructions. Raw materials which are
easily dehardening or melting such as plastics are not to be used for these equipment.
4 Where stores and lockers have only exits facing to special category spaces or open vehicle spaces, the Society
may require to provide additional means of escape which directly escape to the outside of the special category spaces
or open vehicle spaces paying due regard to dimensions and use of such spaces.
5 Special category spaces used for stowage of motor vehicles are to be provided with walkways having a width of
at least 600 mm leading to a safe means of escape.
-175-
2013 Rules for High Speed Craft (Part 12 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
Assignment of freeboard and marking of load lines are to be in accordance with the requirements in Part V of
the Rules for the Survey and Construction of Steel Ships.
-176-
2013 Rules for High Speed Craft (Part 13 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
Navigation bridge visibility is to be in accordance with the requirements in Part W of the Rules for the Survey
and Construction of Steel Ships.
-177-
2013 Rules for High Speed Craft (Part 14 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
In addition to the requirements specified in Part 1 to Part 13 of the Rules, crafts engaged on international
voyages are to be complied with the requirements of IMO Resolution MSC.97(73) THE INTERNATIONAL CODE
OF SAFETY FOR HIGH SPEED CRAFT, as may be amended, in its entirety or other technical requirements which
the Society considers to be equivalent to the said international code.
-178-
MAJOR CHANGES AND EFFECTIVE DATES
Amendments to the RULES FOR HIGH SPEED CRAFT made between 1 January 2012 and 1 January 2013 and
their effective date are as follows:
“Rules for high speed craft” has been partly amended as follows:
2.5.4 Busbars
1 Busbars are to be of copper having a conductivity of 97% or more or of copper-surrounded
aluminum alloy.
(-2 to -5 are omitted.)
1
GUIDANCE FOR HIGH SPEED CRAFT
CONTENTS
-Ⅰ-
Chapter 3 DIRECT CALCULATIONS ............................................................................................................................ 25
3.1 General ................................................................................................................................................................... 25
3.2 Analysis Methods ................................................................................................................................................... 25
3.3 Structural Models ................................................................................................................................................... 25
3.4 Design Loads .......................................................................................................................................................... 26
3.5 Allowable Stress ..................................................................................................................................................... 27
3.6 Deflection of Girders and Transverses .................................................................................................................... 27
Chapter 4 BUCKLING CONTROL ................................................................................................................................. 28
4.1 General ................................................................................................................................................................... 28
-Ⅱ-
Chapter 7 PIPES, VALVES PIPE FITTINGS AND AUXILIARIES .............................................................................. 44
7.1 General .................................................................................................................................................................. 44
7.5 Construction of Auxiliary Machinery and Storage Tanks ........................................................................................ 44
Annexes to Part 8
-Ⅲ-
2013 Guidance for High Speed Craft (Part 1 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
1 The wording to be deemed appropriate by the Society in 1.1.1-2, Part 1 of the Rules means to comply with
the IMO MSC/Circ.1054.
2 With respect to the provisions of the Rules, unless explicitly specified otherwise in the relevant requirements,
distances regarding ship length, breadth, depth, and tank length, breadth, height, etc. are to be measured by using
moulded dimensions. However, where the effects of plate thickness are not negligible, this requirement is not
applicable. For the distance between an independent cargo tank and the hull construction, such distance is to be
measured from the external face of the tank.
1.2.1 General
For the application of 1.2.1, Part 1 of the Rules, reference is to be made to A1.2 of the Guidance for the
Survey and Construction of Steel Ships.
-1-
2013 Guidance for High Speed Craft (Part 1 Chapter 2)
Chapter 2 DEFINITIONS
2.1 General
-2-
2013 Guidance for High Speed Craft (Part 2 Chapter 1)
Chapter 1 GENERAL
1.1 Surveys
-3-
2013 Guidance for High Speed Craft (Part 2 Chapter 1)
limber) and centre line part, lower parts of pillars and bulkhead, shaft tunnels and any other parts where
considered necessary by the Surveyor are to be removed.
(3) For Special Survey No.3 and after, all the requirements specified in (2) above and the followings are to be
complied with:
(a) Almost all of ceilings and linings in holds and flooring plates in machinery spaces are to removed. And,
rust of inside and outside of the craft is to be chipped off.
(b) Throughout the craft, an extensive amount of ceiling in way of single bottom, double bottom and deep
water or oil tanks are to be removed.
(c) Wood sheeting and deck composition on decks are to be removed as required by the Surveyor. Portions of
cement chocks on the craft s sides at bilges and decks are to be removed.
(d) In way of cabin accommodations, the paneling below side scuttles is to be removed, and other paneling is
to be removed as required by the Surveyor.
(e) Lubricating oil tanks are to be thoroughly cleared, cleaned and gas freed and every precaution is to be paid
to ensure safety during the survey.
4 With respect to 1.2.2-3, Part 2 of the Rules, the following items are to be agreed upon between thickness
measurement company representative and owner s representative during Intermediate or Special Survey meetings.
And, documented records of these agreements, including where and when the meeting took place and who attended,
are to be maintained.
(1) Reporting of thickness measurements on regular basis to the attending surveyor.
(2) Prompt notification to the surveyor in case of following findings:
(a) excessive and/or extensive corrosion or pitting/grooving of any significance;
(b) structural defects like buckling, fractures and deformed structures;
(c) detached and/or holed structure; and
(d) corrosion of welds.
-4-
2013 Guidance for High Speed Craft (Part 2 Chapter 2)
-5-
2013 Guidance for High Speed Craft (Part 2 Chapter 2)
ahead run to full astern run as fast as possible while the main propulsion machinery is running ahead at its
maximum continuous output. For craft with high speed machinery as its main propulsion machinery, the output
of main propulsion machinery when the astern order is issued may be reduced reasonably to such a condition
that it can proceed with the reverse operation. Further, craft with outboard engines capable of pivotting may be
tested with reduced output of engines. In all these tests, the astern operation is to be continued until the astern
speed (rotational speed in rpm) is stabilized and all machinery are to be verified to be opearable effectively.
(3) Steering test and change-over test from the main to auxiliary steering gears
The steering gears are to be subjected to the following tests. However, the tests required in (d), (f) and (g) may
be carried out when a craft is being anchored or at dockside.
(a) Tests on the steering capabilities specified in 9.2.2 and 9.2.3, Part 9 of the Rules. If the ship cannot be
tested at the load draught, alternative trial draught conditions will be specially considered.
(b) Running tests of the power units, including transfer between power units.
(c) Tests on the isolation of one power actuating system, checking the time for regaining steering capability.
(d) Tests on the hydraulic fluid recharging system.
(e) Tests on the operation of controls, including tests on the change-over between two control systems, the
change-over between the control system and the controller provided in the steering gear compartment, and
the change-over between the automatic steering and the manual steering.
(f) Tests on the means of communication between the navigating bridge and the steering gear compartment.
(g) Tests on the functioning of indicators for the alarms, rudder angle and power units required in Chapter 9,
Part 9 of the Rules.
(4) Turning test
Turning test will carried out while main propulsion engines are running with half of its maximum continuous
output to verify that steering gears operate smoothly and in order and that no serious list is occurred. In any
inclined condition throughout the turning test, no imersion of deck edge under water is acceptable.
(5) Operating test of machinery installations
Operating test of machinery installations is to be in accordance with the requirement specified in 2.3.1-1(5),
Part B of the Rules for the Survey and Construction of Steel Ships.
(6) Performance test of windlass
Performance test of windlass is to be in accordance with the requirement specified in 2.3.1-1(6), Part B of the
Rules for the Survey and Construction of Steel Ships.
(7) Performance test of automatic and remote control systems for main propulsion machinery or the controllable
pitch propellers, boilers and electric generating sets
(a) Main propulsion machinery or controllable pitch propellers
i) The main propulsion machinery or controllable pitch propellers are to be subjected to starting tests,
ahead-astern tests and running tests in the whole range of output, by means of the remote control
devices from the main control station or from the main control station on the bridge.
ii) The operation tests of the main propulsion machinery or controllable pitch propellers using the bridge
control devices are to be carried out as deemed appropriate by the Society in addition to output
increase and decrease tests.
iii) In cases where there are two or more control stations for main propulsion machinery or controllable
pitch propellers, the tests on transfer of control are to be carried out during ahead and astern operations
of the main propulsion machinery or the controllable pitch propellers. In the case where the transfer of
control of the remote control devices for main propulsion machinery or the controllable pitch
propellers are designed to be carried out in the stopping condition of main propulsion machinery, the
above mentioned tests are to be carried out in the stopping condition.
iv) After completion of the test on transfer of control specified in above iii), it is to be shown that the main
propulsion machinery or the controllable pitch propellers can be smoothly operated from the
respective control stations.
(b) Boilers
i) With respect to essential auxiliary boilers, it is to be confirmed that they can supply steam stably to the
auxiliary machinery essential for main propulsion of the ship without manual operation.
ii) In the case where an exhaust gas economizer is used as a source of steam supply to a turbine for
-6-
2013 Guidance for High Speed Craft (Part 2 Chapter 2)
driving a generator and the steam supply from a boiler is carried out automatically as in the case of a
low power condition in the main propulsion machinery, operation tests of automatic control devices
for this system are to be carried out.
(c) Electrical generating sets
In the case where generators which supply electrical power to the load necessary for propulsion of the craft
and whose motive power is relying upon the propulsion systems, the systems of automatic or remote
control of electric generating sets are to be subjected to operation tests.
(8) The accumulation test of a boiler
The accumulation test of a boiler is to be in accordance with the requirement specified in 2.3.1-1(8), Part B of
the Rules for the Survey and Construction of Steel Ships.
(9) Measurement of the torsional vibration for the shafting systems
Measurement is to be in accordance with the requirement specified in 5.4, Part 9 of the Rules.
(10) Other tests where deemed necessary by the Society
At least following tests (a) to (c) are to be included in this test
(a) In craft having multiple propellers or waterjet propulsion systems, the craft s navigating and manoeuvring
performance with one or more propellers or waterjet propulsion systems inoperative is to be verified.
(b) When the craft is provided with supplementary means for manoeuvring or stopping, performance test of
such means is to be carried out.
(c) In the case of propulsion gears where the total face width (in case of double-helical gears, the central gap is
included) exceeds 300 mm or where the ratio of the total face width to pitch circle diameter of the pinion
exceeds 2, the contact marking of the teeth is to be verified by coating with suitable paint on each teeth
flanks thinly and uniformly.
2.5 Alterations
-7-
2013 Guidance for High Speed Craft (Part 2 Chapter 2)
-8-
2013 Guidance for High Speed Craft (Part 2 Chapter 3)
3.1 General
3.1.2 Docking
The approval to the application of In-water Survey specified in 3.1.2, Part 2 of the Rules is to be subject to the
provisions specified in B6.1.2, Part B of the Guidance for the Survey and Construction of Steel Ships.
3.2.1 General
1 In cases where Special Surveys are carried out in advance of the due date of Intermediate Surveys and such
Intermediate Surveys are dispensed with in accordance with 3.2.1-3 and 3.2.3-2, Part 2 of the Rules, then such
Special Surveys are to be completed up to and including the due date of the third Annual Surveys.
2 If an Annual or Intermediate Survey is completed before the period specified in 3.2.2 or 3.2.3, Part 2 of the
Rules in accordance with 3.2.1-4, Part 2 of the Rules, due dates of subsequent Annual Surveys and Intermediate
Surveys are assigned in accordance with 3.2.2 and 3.2.3, Part 2 of the Rules respectively based on new anniversary
date. The new anniversary date is the day corresponding to the day after 3 months since the moved up Survey was
completed. In such cases, where the third new anniversary date after due dates of the Intermediate Survey comes
earlier than the expiry date of the Classification Certificate of the ship, the Intermediate Survey is to be carried out 3
months either way of the third new anniversary date.
-9-
2013 Guidance for High Speed Craft (Part 2 Chapter 3)
(7) In addition to the above, machinery, equipment, and survey items which are considered by the Society to be
outside the application of the Planned Machinery Survey for the following reasons:
(a) Newly developed machinery and equipment that are not considered to be proper for application of the
Planned Machinery Survey.
(b) Machinery and equipment to which the Planned Machinery Survey has been applied, but are not considered
to be proper due to its frequent occurrence of damages for application of the Planned Machinery Survey
any longer.
-10-
2013 Guidance for High Speed Craft (Part 2 Chapter 3)
(l) Other machinery and equipment which the Society considers to be covered by the Planned Machinery
Survey
2 Application for CMS
(1) For an application of CMS, the shipowner or its agent is to submit three copies of the document (one each for
the Society s file, and for returning to the ship and the shipowner) to the Society in the format prescribed by the
Society covering the following particulars before the first survey after the Classification Survey or the previous
Special Survey, in principle:
(a) Application for CMS
(b) CMS Program
(2) For existing ships (in such case as being subjected to the Classification Survey of ships not built under the
Society s Survey), the survey items to be examined as the Planned Machinery Survey are to be selected from
among those surveyed by another Classification Society at the Classification Survey of ships not built under the
Society s Survey, and items to be subjected to the Planned Machinery Survey thereafter are to be determined.
The procedures to be adopted after the Classification Survey are to be the same as in (1) above.
3 CMS Program
The CMS Program is to be prepared referring to the following (1) to (3). Each survey interval for all items covered
by the Planned Machinery Survey is not to exceed five years, and the Program is to be retained on board the ship so
that it can be presented to the Surveyor whenever so requested.
(1) In principle, all items for CMS are to be included.
(2) The interval between open-up examinations of each identical item is not to exceed five years.
(3) The survey schedule for each item of the machinery and equipment is to preferably be planned in such a way
that the conditions of other machinery and equipment can be assumed from the results of an open-up
examination of the machinery and equipment. In this connection, when machinery or equipment is provided in
duplicate or more, the open-up schedule of the machinery or equipment is to be such that they are subjected to
open-up examinations alternately as far as practicable.
4 Procedures for CMS
(1) Surveys under CMS are to be carried out in accordance with the CMS Program prescribed in -3 above. However,
when partial changes are made to the maintenance plan of machinery and equipment in the execution process of
the CMS Program, the Program retained on board is to be corrected, and surveys may be carried out according
to the corrected Program.
(2) When defects or failures are found on areas surveyed, a thorough examination may be required on the similar
parts despite the CMS Program prescribed in -3 above.
5 Substitution for open-up examinations
For the machinery and equipment listed below, open-up examinations may be exempted by carrying out the
following examinations, provided the satisfactory condition of these items is ascertained by examining records such
as the logbooks. However, when defects are found during the examinations, or if the maintenance condition is judged
to be questionable as a result of an examination of the logbooks or other records, open-up examinations may be
requested.
(1) Oil pumps (excluding cargo pumps) and hydraulic deck machinery
Visual examinations of general conditions by checking the fouling of the oil strainers, oil properties, etc. and
also checking the operating conditions of the pumps.
② (2) Oil tanks, F.O. coolers and oil heaters
Visual examinations of general conditions.
(3) Cooling fresh water pumps and blowers
Visual examinations under their operating conditions.
(4) Auxiliary diesel engines that are not normally used at sea and those that the total running time is less than 7,000
hrs from the last open-up examination
Visual examinations under their operating conditions. However, an open-up examination is required when the
total running hour becomes 7,000 hrs counting from the last open-up examination.
6 Confirmatory Survey
In ships deemed by the Society as maintaining their machinery and equipment well, overhaul inspections by the
shipowner (or the ship management company) may forgo the open-up examination performed in the presence of
-11-
2013 Guidance for High Speed Craft (Part 2 Chapter 3)
Surveyors by conducting the following confirmatory surveys, provided that the machinery and equipment are
overhauled as part of the ship s maintenance practices and the records from such overhauls are kept in good order. In
this case, the date of the next open-up examination is to be within a 5-year period from the date of its last overhaul
and inspection.
(1) Procedure of the confirmatory survey
(a) In case of any machinery and equipment specified in (2) below overhauled and inspected by the Chief
Engineer as a routine maintenance work, one copy of the inspection report including the items mentioned
below is to be submitted to, and reviewed by the attending Surveyor. Also, the Chief Engineer s profile is to
be confirmed by the attending Surveyor.
i) Signature of the Chief Engineer and licence number
ii) Date and place of the inspection
iii) Inspection items and their results
iv) Operating conditions before and after the inspection
(b) Parts replaced with spares or repaired are to be verified by visual examinations on them or photographs of
them.
② (c) Visual examinations are to be carried out for main propulsion machinery, and examinations under operating
conditions, as well as visual examinations are to be carried out for other machinery and auxiliary machinery,
etc.
(d) Visual examinations of lubricating oil conditions are to be carried out through open-up inspections, etc. of
the lubricating oil filters of crankshafts, main bearings, crankpin bearings, crankpin bolts, main diesel
engine camshafts and main diesel engine camshaft driving devices.
(e) Visual examinations to confirm the current conditions and lubricating oil maintenance conditions of
intermediate shafts, thrust shafts and bearings are to be carried out as far as possible.
(f) Confirmation of the open-up inspection and adjustment records of safety valves (excluding fusible plugs) is
to be carried out for air reservoirs.
(g) As a result of the confirmatory survey stipulated in (a) to (f) above, open-up examinations and/or
re-examinations may be required when deemed necessary by the Surveyor.
(2) Items applicable to the confirmatory survey
Items of machinery and equipment applicable to the confirmatory surveys are as follows:
② (a) Main diesel engines
(b) Diesel engines used for driving generators, auxiliary machinery essential for main propulsion or auxiliary
machinery for the manoeuvring and the safety of the ship
(c) Intermediate shafts, thrust shafts and bearings
(d) Auxiliary machinery (air compressors, pumps, heat exchangers, air reservoirs, deck machinery and
distilling plants)
(3) Timing of the confirmatory survey
A confirmatory survey is by the time of next periodical survey from the day the item of the machinery and
equipment intended for the confirmatory survey was overhauled and inspected at sea.
7 Cancellation of CMS
(1) Where a shipowner or its representative requests termination of CMS, the machinery and equipment are to be
subjected to all the surveys required for CMS at Special Surveys henceforth. If there are any items of machinery
or equipment whose survey intervals from their last surveys will exceed five years before the due date of the
next Special Survey, they are to be examined within five years of the last survey.
(2) When non-compliance with this Guidance is found for machinery or equipment to which CMS is applied,
application of CMS may be cancelled by the Society. The procedures to be taken henceforth are to be in
accordance with the requirements in (1) above.
(3) When the shipowner is changed, application of CMS is to, in principle, be cancelled. When application of CMS
is intended to be continued, a new application proposal as prescribed in -3 above is to be made by the new
shipowner.
-12-
2013 Guidance for High Speed Craft (Part 2 Chapter 3)
(1) In principle, PMS, applies to machinery and equipment installed in the following ships.
(a) Ships with machinery and equipment less than 15 years old at the time of application.
(b) Ships operated by a shipowner or ship management company that has an established maintenance system
and organization.
(2) PMS applies to the open-up examinations of machinery and equipment prescribed in 3.10.2-1.
2 Terms
The definitions of terms which appear in 3.10.3 are as specified in the following (1) and (2).
(1) Maintenance management system
A computer system for managing the maintenance and inspection plans of machinery and its components that
are subject to the Planned Machinery Maintenance Scheme
(2) Condition monitoring system
A system which is composed of displays for diagnosing the deterioration trend of the machinery and its
components from data continuously or periodically measured by sensors and computers for saving and
maintaining this data
3 Application Procedure for PMS
To apply for PMS, the shipowner or ship management company or representative is to submit an Application for
PMS accompanying the following documents to the Society.
(1) Documents for approval (3 sets: one for ship s file, one for shipowner s file and one for the Society s file)
(a) Machinery maintenance scheme
(b) Survey schedule table
(c) Function descriptions for maintenance management system
(d) The following documents in addition to (a) through (c) above, when applying for the condition monitoring
maintenance method
i) Function description for condition monitoring system
ii) Condition monitoring procedures and sensor lists
iii) Kinds and contents of output information
(2) Documents for reference (1 set)
(a) Sample form of machinery maintenance records
(b) Chief Engineer s profile
(c) Organization chart identifying the section and the personnel responsibility for the machinery maintenance
4 Approval of PMS
Conditions for approval of PMS are as follows:
(1) Planned maintenance method
The machinery maintenance scheme for PMS made by the planned maintenance system is to cover the
maintenance plans not only for survey items but for all machinery. It is to specify maintenance works such as
overhaul inspection, replacement of parts and general inspection with their time schedule and/or running hours
for each item of machinery and equipment including their parts. The scheme is to be prepared based on the
inspection and maintenance intervals recommended by the manufacturers of the machinery and equipment with
input from the experiences and knowledge of the shipowner and ship management company. In principle, the
inspection intervals for all items covered by PMS are to be planned not to exceed 5 years. However, for the
items whose overhaul intervals are specified on the basis of their running hours, longer intervals may be
accepted as long as the intervals are based on the manufacturer's recommendations. When the machinery
maintenance scheme is changed, the amended scheme is to be submitted to the Society for approval.
(2) Condition monitoring maintenance method
The machinery maintenance scheme is to cover the maintenance plan for all the machinery as (1) above. For
machinery, equipment and parts with a condition monitoring system which complies with the following
requirements, the inspection intervals may be prolonged until an abnormal condition is observed. In this case,
the machinery maintenance scheme for PMS is also to cover all condition monitoring functions, criteria for
judgment and procedures for monitoring, analysis and handling (including reporting observed abnormal
conditions to the Society) of the system.
(a) Condition monitoring systems are to be suitable to diagnose any deterioration of equipment or its
components on the basis of the data from sensors or centralized machinery monitoring and control systems.
-13-
2013 Guidance for High Speed Craft (Part 2 Chapter 3)
The sensors are to be subject to the tests specified in 18.7.1, Part D of the Rules for the Survey and
Construction of Steel Ships.
(b) Condition monitoring systems are to be suitable to diagnose the condition on the basis of independent or
coalesced data or their trends.
(c) Back-ups of the data can be made.
(3) Survey Schedule Table
Survey intervals of the survey items are not to exceed those specified in the machinery maintenance scheme.
The following items are, as a rule, to be opened and examined in the presence of the Surveyor. Where applied to
the condition monitoring maintenance method, the items are to be opened and examined only when an abnormal
condition is observed.
② (a) Rotors, casings, main bearings, couplings between turbine and reduction gear, nozzle valves and
manoeuvring valves for main steam turbine
(b) Auxiliary steam turbine for main generator
(c) Reduction gears for main propulsion
(d) Flexible couplings for main propulsion
(e) Other items deemed necessary by the Society.
When this survey schedule table is amended, the amended survey schedule table is to be submitted to the
Society for approval.
(4) Machinery Maintenance Records
Machinery maintenance records are to include at least the following items, and are to be programmed and
maintained by the Maintenance management system. These records are to be retained on board the ship at all
times.
(a) Date of maintenance work
(b) Signature by the Chief Engineer
(c) Details of maintenance work and results
(d) Total running hours (parts replacement intervals and overhaul intervals)
(e) Names of parts replaced
(f) Measuring data (including original design dimensions and allowable tolerance)
(g) The condition of damage and repair method
② (h) Results of visual examinations of lubricating oil conditions carried out through open-up examinations of the
lubricating oil filters, etc. of crankpins, crank journals, thrust shafts and bearings of main diesel engines (in
cases where the principle components of such engines were inspected through independent open-up surveys
conducted by chief engineers)
(5) Condition monitoring records
Condition monitoring records are to include at least the following items.
(a) Date of condition monitoring and relevant content of survey
(b) Signature of the Chief Engineer at the condition monitoring
(c) Contents and results of condition monitoring (including criteria for judgment)
(6) Chief Engineer
The Chief Engineer in charge of PMS is to be a person recommended by the shipowner or ship management
company and approved by the Society.
(7) Computer
Computers used for condition monitoring and diagnosis systems are to satisfy the following requirements
specified in (a) through (f):
(a) Computers are to be configured so that the effects of a system failure in part of the circuits or devices can
be limited to a certain range as far as possible.
(b) Each system component is to be protected against overvoltages (electrical noise) likely to enter through
input/output terminals.
(c) Central processing units and important peripheral devices are to have a self-monitoring function.
(d) Important programmes and data are not to be deleted in the event of a temporary failure of the external
source of power supply.
(e) Spare parts for important system components that require specialist services for repairs are to be supplied in
-14-
2013 Guidance for High Speed Craft (Part 2 Chapter 3)
-15-
2013 Guidance for High Speed Craft (Part 3 Chapter 4)
4.1 General
4.1.1 Application
With regard to welding of aluminium alloys, it is recommended that reference may be made to the following
standards.
(1) JIS Z 3604 Recommended Practice for Inert Gas Shielded Arc Welding of Aluminium Alloy
(2) The Standards of Japan Light Metal Welding And Construction Association
(a) LWS Q 8101 Aluminium Ship s Quality Standard
(b) LWS W 8101 Aluminium Shipbuilding Practice Standard
(3) AWS Structural Welding Code-Aluminium
-16-
2013 Guidance for High Speed Craft (Part 4 Chapter 2)
-17-
2013 Guidance for High Speed Craft (Part 4 Chapter 4)
4.1.1 General
1 The depth of a double bottom required by 4.1.1-2, Part 4 of the Rules is not less than B/16 in general.
2 The bottom to the turn of the bilge specified in 4.1.1-2, Part 4 of the Rules is the bottom to the point X shown
in Fig. 4.4.1.1-1.
3 The expression if the line of intersection of‥‥from the middle line. in 4.1.1-2, Part 4 of the Rules means
that any part of double bottoms at each frame section is not lower than the horizontal plane passing through the point
P shown in Fig. 4.4.1.1-2.
4.2.1 General
1 The depth of a double bottom required by 4.2.1-2, Part 4 of the Rules is to be referred to 4.1.1-1 of this Part.
2 The bottom to the turn of the bilge specified by 4.2.1-2, Part 4 of the Rules is to be referred to 4.1.1-2 of this
Part.
-18-
2013 Guidance for High Speed Craft (Part 5 Chapter 2)
2.1 Application
-19-
2013 Guidance for High Speed Craft (Part 5 Chapter 2)
-20-
2013 Guidance for High Speed Craft (Part 6 Chapter 1)
1.1 General
1.1.1 Application
1 Allowable stress for the transverse strength on cross deck structure of craft with twin hull are shown in Table
6.1.1.1-1.
2 Buckling strength on cross deck of craft with twin hull are to be in accordance with the requirements specified in
Chapter 4, Part 6 of the Rules.
1.9 Rudders
1.10.1 General
1 The scantling determination of shaft brackets is to be in accordance with following (1) through (3).
(1) The boss thickness of shaft brackets is not to be less than that obtained from the following formula or 25mm,
whichever is greater.
0.104 Db (m)
where:
Db :The internal diameter of boss of shaft bracket (m).
-21-
2013 Guidance for High Speed Craft (Part 6 Chapter 1)
(2) The external diameter of boss of shaft bracket is not to be less than that obtained from the following.
0.16 D p (m)
where:
D p :The diameter of a propeller (m).
(3) The boss length of shaft bracket is not to be less than that obtained from the following formula.
mDb (m)
where:
m :Coefficient as specified in following;
For the shaft bracket immediately forward of a propeller: 4
For other intermediate shaft brackets: 2
Db :As specified in preceding (1).
2 Where the arm of the shaft bracket is of a solid arm made of steel or bronze castings, the scantling of shaft
bracket arms is to satisfy with the following formula.
1 Ha
C 2t ³ k (m3)
368 RD p
where:
C : The longitudinal length of cross section of the arm (m). However, if the value exceeds 10t, the length of
the arm is to be taken as 10t. (See Fig.6.1.10.1-1)
t : The thickness of cross section of the arm (m). (See Fig. 6.1.10.1-1)
a : The lever of the arm (m). (See Fig. 6.1.10.1-1)
H : The maximum continuous output of the engine (kW).
R : The number of maximum continuous revolutions (rpm).
Dp : As specified in preceding 1.10.1-1(2).
k : Coefficient corresponding to the chip clearance as given by the following formula.
d0
log k = 1.2 - 3.62
Dp
d 0 : The chip clearance (m)
3 The scantling determination of shaft brackets having a hollow cross section and made of steel is to be in
accordance with following (1) through (3).
(1) The scantling of shaft bracket arms is to satisfy the following formula.
W Ha
2C ¢(C ¢ + 3t ¢)t¢¢ ³ k (m3)
368 RD p
where:
k , H , R and D p :As specified in preceding 1.10.1-2.
C ¢ : The longitudinal length of cross section of the arm (m). (See Fig. 6.1.10.1-2)
t ¢ : The thickness of cross section of the arm (m). (See Fig. 6.1.10.1-2)
t ¢¢ : The shell thickness of the arm (m). (See Fig. 6.1.10.1-2)
w : Coefficient as specified in following;
For the welded hollow arm: 2.69
For the seamless hollow arm: 1.00
Shaft brackets having the hollow cross section
(2) The thickness t ¢¢ of the hollow arm is not to be less than that obtained from the following formula.
18.2a (mm)
where:
a : As specified in preceding 1.10.1-2.
(3) To avoid cavitation, the connection between C ¢ / t ¢ and V is to be ranged within a safety zone shown in Fig.
6.1.10.1-3. In this case, C ¢ / t ¢ and V are as specified in preceding (1). Where V-type shaft bracket is provided,
the propeller influence on shaft bracket is to be considered.
4 Where shaft bracket arm made of aluminium alloy or aluminium castings is provided, the values obtained from
-3 are to be multiplied by 402 / s T , where s T is tensile strength of the materials used (N/mm2).
-22-
2013 Guidance for High Speed Craft (Part 6 Chapter 1)
1.11.1 General
1 The standard thickness of top plating of engine girders will be determined referring to the following formula.
S
at 0 + (mm)
C
where:
a : As shown in Table 6.1.11.1-1
t 0 : As obtained from the following formula.
æ Nö
t 0 = 1.13 ç 2.5 - H
è 20 ø
N : Numbers of cylinder.
H : The maximum continuous output of engine (kW).
S : Spacing of stiffeners (mm).
C : As specified in following.
H > 1470kW :100
-23-
2013 Guidance for High Speed Craft (Part 6 Chapter 1)
H £ 1470kW :200-H/14.7
2 The standard web thickness of engine girders will be determined referring to the following formula.
0.45tt (mm)
tt :The thickness of top plating of engine girders (mm)
3 The standard web thickness of engine floors will be determined referring to the following formula.
0.32t t (mm)
tt :As specified in preceding -2.
4 The thickness of structural members of engine girders is not to be less than that given by the following in
accordance with the materials used.
Steels: 3.0 (mm)
Aluminium alloys: 4.0 (mm)
5 Where height of engine girders or floors are specially high, the thickness of each structural members is to be
increased appropriately.
6 The tightening bolts are to be as close to the engine girders as practicable, and ribs are to be fitted suitably
around holes of the tightening bolts. (See Fig. 6.1.11.1-1)
7 The lightening hole is, in principle, not to be arranged on engine girders. Where some lightening holes are
arranged on engine girders, the size of the lightening hole is not less than 1/3 of the height of the subject engine
girder.
-24-
2013 Guidance for High Speed Craft (Part 6 Chapter 3)
3.1 General
3.1.1 General
1 In the case where scantlings of structural members of the hull are determined by direct calculations, the
requirements specified in this Chapter are to be applied.
2 In the case where scantlings of structural members of the hull are determined by direct calculations, the kinds of
members of which the scantlings can be determined as well as the ranges of application of formulae, in the Rule and
Guidance, for determining scantlings of such members are, as a rule, to be previously approved by the Society.
3 Even when the scantlings of structural members of the hull are determined by direct strength calculations, the
requirements in 1.4, Part 6 of the Rules are to be complied with.
4 Even when the plate thickness of structural members are determined by direct strength calculations, the
minimum thickness specified in the Rule are to be maintained.
3.2.1 General
1 The analysis methods and programs are to be such that the influences of bending, shearing, axial and torsional
deflections can be effectively taken into consideration.
2 The analysis methods and programs are to be such that the behaviours of plane or space structures can be
effectively expressed and or displayed under reasonable boundary conditions.
3 The analysis programs are to be such as to be recognized to have a sufficient analysing accuracy. When
considered necessary, the Society may require submission of data on the details of the analysis methods, verification
of accuracy, etc.
4 When direct strength calculations were executed for determination of scantlings, the materials and data
specifying the conditions of calculations and data summarizing their results are to be submitted to the Society.
-25-
2013 Guidance for High Speed Craft (Part 6 Chapter 3)
which can be predicted and abnormally large aspect rations of meshes are to be avoided.
3 Girders and similar members having stress gradients along their depth are to be so meshed as to enable their
discrimination.
-26-
2013 Guidance for High Speed Craft (Part 6 Chapter 3)
pressure corresponding to the actual draught in case of the hydraulic pressure test.
(2) The external loads for the bottom
(a) The external loads for the bottom are to be in accordance with 2.2, Part 5 of the Rules.
(b) The external loads for the bottom in harbours or similar quiet waters may be obtained from the following
formula.
10(d + H w / 3) (kN/m2)
where:
H w :Significant wave height specified in 2.2.1, Part 5 of the Rules
(3) The external loads for the sides
(a) The external loads for the side are to be in accordance with 2.3, Part 5 of the Rules.
(b) The external loads for the sides in harbours or similar quiet waters may be obtained from the following
formula.
10(d + H w / 3) (kN/m2)
where:
H w :Significant wave height specified in 2.2.1, Part 5 of the Rules
(4) The external loads for the exposed decks
(a) The external loads for the exposed decks are to be in accordance with 2.4.1, Part 5 of the Rules.
(b) The external loads for the exposed decks in harbours or similar quiet waters may be obtained by taking half
the value of the load required in 2.4.1, Part 5 of the Rules.
-27-
2013 Guidance for High Speed Craft (Part 6 Chapter 4)
4.1 General
4.1.1 General
Where detailed assessment of buckling strength is required, the Annex C1.1.22-2 GUIDANCE FOR
BUCKLING STRENGTH CALCULATION in Part C of the Guidance for the Survey and Construction of
Steel Ships may be applied.
-28-
2013 Guidance for High Speed Craft (Part 7 Chapter 1)
Chapter 1 EQUIPMENT
1.1.1 General
1 The wording at the discretion of the Society is the case where following conditions are fully satisfied:
(1) A craft is engaged in the specific voyage,
(2) In general, there is no case of anchorage by using bower anchors under the normal operation,
(3) Adequate system of refuge is available in cases of bad weather, and
(4) Adequate system to immediately supply spare bower anchor is available when a craft loses her bower anchor.
2 The reduction of requirements specified in 1.1.1-4, Part 7 of the Rules is the reductions within the extent as
following (1) and (2):
(1) Required number of bower anchors may be reduced to one.
(2) Steel wire ropes or synthetic fibre ropes may be used in lieu of chain cables provided that the following
conditions are satisfied.
(a) At least one length of chain is, in principle, to be fitted between the bower anchor and steel wire ropes or
synthetic fibre ropes. However, where steel wire ropes or synthetic fibre ropes can be easily connected to
the chain cable on board in cases of emergency anchorage, steel wire ropes or synthetic fibre ropes may be
stored apart from chain cables.
(b) The breaking test load for steel wire ropes or synthetic fibre ropes specified in Chapter 4 or 5, Part L of
the Rules for the Survey and Construction of Steel Ships is not less than the breaking load for chain
cables given in Table 7.1.1, Part 7 of the Rules. The breaking test load for chain cables is to be in
accordance with the requirements specified in Chapter 3, Part L of the Rules for the Survey and
Construction of Steel Ships according to the diameter. The length of steel wire ropes or synthetic fibre
ropes are to be at least equal to the length of chain cables given in Table 7.1.1 of the Rules.
-29-
2013 Guidance for High Speed Craft (Part 7 Chapter 2)
2.5.2 Companionways
Grouping into deckhouse and companion:
(1) A structure is regarded as a deckhouse where its inside is always accessible through access openings provided on
the top of the structure or through under-deck passageways, even when all access openings in the boundary
walls are closed.
(2) A structure is regarded as a companion where its inside is not accessible through any other way, when all access
openings in the boundary walls are closed.
-30-
2013 Guidance for High Speed Craft (Part 7 Chapter 3)
3.1.1 General
In 3.1.1-2(2) of the Rules, measures deemed appropriate by the Society implies that (1) and (2) below need to
be satisfied.
(1) Stanchions are to be of increased breadth as in (a) to (c) below, depending on their arrangement. The figure of
these stanchions is given in Fig.3.1.1-1.
(a) at least every third stanchion is to be of increased breadth : kbs 2.9bs
(b) at least every second stanchion is to be of increased breadth : kbs 2.4bs
(c) every stanchion is to be of increased breadth : kbs 1.9bs
kbs : increased breath of stanchion (mm)
bs : breadth of stanchion according to standards approved by the Society.(mm)
Stanchions of increased breadth are to be welded to the deck with double continuous fillet welds and a
minimum leg size of 7 mm or as specified by standards approved by the Society.
(2) Stanchions with increased breadth, as described in (1) above, are to be aligned with the members below the
deck. These members are to be a minimum of 100x12 mm flat bar welded to the deck by double continuous fillet
welds. The stanchions with increased breadth need not be aligned with under deck structures for deck plating
exceeding 20 mm.
Fig.3.1.1-1 Guardrail Stanchion (Example)
bs
o Min.500mm
kbs
-31-
2013 Guidance for High Speed Craft (Part 7 Chapter 3)
3.4.1 General
The special consideration specified in 3.4.1-2, Part 7 of the Rules is to be given provided that the following
conditions are fully satisfied.
(1) Side scuttles are to be provided in spaces where there is little possibility of damage on side scuttles by contact
with cargoes under the normal operations including loading/unloading operations whether side scuttles are
protected by suitable means against mechanical damage or not (for example, special category spaces may be
regarded as such spaces),
(2) No side scuttle is to be provided in a position below the water line at final equilibrium after flooding stipulated
in Part 8 of the Rules. For cargo craft which are not engaged in international voyage and for restricted service,
no side scuttle is to be provided in a position below freeboard deck,
(3) Side scuttles are to be of class B side scuttles of fixed type complying with the requirements in Chapter 7, Part
L of the Rules for the Survey and Construction of Steel Ships or equivalent thereto, and
(4) Such cargo spaces are to be protected by fixed fire-extinguishing systems other than fixed gas fire-extinguishing
systems.
3.6 Ventilators
-32-
2013 Guidance for High Speed Craft (Part 8 Chapter 1)
Chapter 1 GENERAL
1.1 General
-33-
2013 Guidance for High Speed Craft (Part 8 Chapter 2)
-34-
2013 Guidance for High Speed Craft (Part 8 Chapter 3)
3.1 General
3.1.4 Application
The definition of Craft for restricted service specified in 3.1.1, Part 8 of the Rules is to be referred to 2.1.4,
Part 4 of the Guidance.
-35-
2013 Guidance for High Speed Craft (Part 9 Chapter 1)
Chapter 1 GENERAL
1.2.1 General
1 The wordings navigable speed in 1.2.1-3 of the Rules means a speed at which the ship is capable of steering
and being kept navigability for an extended period of time (the period required to get the nearest port for repairs).
Normally, 7 knots or a speed corresponding to 1/2 of the speed specified in 2.1.8, Part 1 of the Rules at the ship s
full loaded draught, whichever is smaller, may be regarded as a navigable speed.
2 In connection with the wording excessive noise in 1.2.1-9, Part 9 of the Rules standards specified in IMO
Resolution A. 468 (XII) are indicated below:
(1) Limits for noise levels in machinery spaces are specified as follows;
Machinery spaces (continuously manned) 90dB (A)
Machinery spaces (not continuously manned) 110dB (A)
Machinery control rooms75dB (A)
Workshops 85dB (A)
Non-specified work spaces 90dB (A)
(2) In the case where some works are carried out in high noise level space, the noise levels and duration of exposure
(the period that persons are exposed to noise) are to be limited within the zones indicated in Fig. 9.1.2.1-1. The
zones (A) to (F) shown in the figure mean as follows;
Zone (A) :No work even with ear muffs and ear plugs is permitted.
Zone (B) :Temporary works with both ear muffs and ear plugs may be permitted.
Zone (C) :Temporary works with ear muffs or ear plugs may be permitted.
Zone (D) :Daily works with ear muffs may be permitted.
Zone (E) :Daily works with ear plugs may be permitted.
Zone (F) :No protection required.
(3) Insertion losses obtained by ear protection for overall and for individual frequencies are to be in accordance
with Table 9.1.2.1-1 and Table 9.1.2.1-2.
-36-
2013 Guidance for High Speed Craft (Part 9 Chapter 1)
Table 9.1.2.1-2 Insertion loss for individual frequencies obtained by ear protection
Type of Ear Protection Octave band centre frequency (Hz)
125 250 500 1,000 2,000 3,150 4,000 6,300
ear plugs 0 5 10 15 22 22 22 22
ear muffs 5 12 20 30 30 30 30 30
1.3 Tests
-37-
2013 Guidance for High Speed Craft (Part 9 Chapter 1)
-38-
2013 Guidance for High Speed Craft (Part 9 Chapter 2)
2.1 General
-39-
2013 Guidance for High Speed Craft (Part 9 Chapter 3)
3.1 General
-40-
2013 Guidance for High Speed Craft (Part 9 Chapter 5)
5.3.4 General
The wording deemed appropriate by the Society specified in 5.3.4-2 of Part 9 means to be in accordance with
the following. In the case of a single waterjet propulsion system fitted onboard the ship, however, the system is to be
subject to special consideration by the Society:
(1) The minimum diameter of the main shaft is to be not less than the value determined in 6.2, Part D of the Rules
for the Survey and Construction of Steel Ships or, in case of driven by high speed engines, the value
determined by the following formula:
H
d s = k3
N
where:
d s : Required diameter of main shaft (mm)
H : Maximum continuous output of main engine (kW)
N : Number of revolutions of main shaft at the maximum continuous output (rpm)
k : Values shown in Table 9.5.3.2-1
(2) The minimum diameter of the shaft coupling bolts at the joining face of the couplings is to be not less than the
value determined by the following formula
H æ 1 ö
d b = 15300 ç
N ç nDT
è b ø
where:
d b : Required diameter of shaft coupling bolt (mm)
n : Number of bolts
D : Pitch circle diameter (mm)
Tb : Specified tensile strength of bolt material (N/mm2)
(3) The thickness of the shaft coupling flange at the pitch circle is not to be less than the required diameter of shaft
coupling bolts determined by the formula in (1) above. However, it is not to be less than 0.2 times the required
diameter of the corresponding shaft.
(4) The fillet radius at the base of the flange is not to be less than 0.08 times the diameter of the shaft, where the
fillet is not to be recessed in way of nuts and bolt heads.
(5) The strength of the impeller blade at root is to be determined so that the following formula is satisfied. In this
case, the allowable stress value of the material is, in principle, to be 1/1.8 of the specified yield point (or 0.2%
proof strength).
5.8 10 5 H
S³ + 2.2 10 - 7 D 2 N 2
Lt 2 ZN
where:
S : Allowable stress of impeller material (N/mm2)
H : Maximum continuous output of main engine (kW)
N : Value obtained by dividing the number of revolutions of impeller by 100 (rpm/100)
Z : Number of impeller blades
L : Width of impeller blade at root (mm)
t : Maximum thickness of impeller blade at root(mm)
D : diameter of impeller(mm)
(6) For the torsional vibration of the main shafting systems, the requirements specified in 5.4, Part 9 of the Rules
are to be complied with. In case where the requirements, specified in (1) above is applied, the following
-41-
2013 Guidance for High Speed Craft (Part 9 Chapter 5)
-42-
2013 Guidance for High Speed Craft (Part 9 Chapter 5)
Note:
(
200 £ s y £ 400 : k = a1 - 0.1 s y - 200 )
s y > 400 : k = a2
s y : yield point or 0.2% proof strength of main shaft material (N/mm2)
-43-
2013 Guidance for High Speed Craft (Part 9 Chapter 7)
7.1 General
7.1.2 Materials
1 The wording where approved by the Society means as follows:
(1) In the case where rubber hoses, teflon hoses or nylon hoses are used for the following pipes, those approved
under the requirements of the Guidance for the Approval and Type Approval of Materials and Equipment
for Marine Use are to be used:
(a) Pipes of Group I or Group II
(b) Pipes likely to cause fire or flooding in case of their fracture
(2) In the case where plastics pipes are used, the requirements specified in the Annex D12.1.6-2 Guidance for the
Survey and Construction of Plastic Pipes are to be complied with.
(3) When aluminium alloy pipes are used, the following requirements are to be complied with:
(a) Aluminium alloy pipes are, as a rule, to be in accordance with the recognized standards deemed appropriate
by the Society, and are to be of seemless drawn pipes or seamless extruded pipes.
(b) Aluminium alloy pipes are not to be used for any of the following applications, unless deemed appropriate
by the Society:
i) Pipes with a design temperature exceeding 150 oC
ii) Any pipe used in areas where it penetrates either A class division or B class division.
iii) Piping in which use of copper alloy pipes is prohibited by Table D12.2, Chapter 12, Part D of the
Rules for the Survey and Construction of Steel Ships.
(c) The required thickness of aluminium alloy pipes subject to an internal pressure is to be determined using
the formula in 12.2.1-1, Part D of the Rules for the Survey and Construction of Steel Ships. In this case,
allowable stress (f) is to be of the minimum value of the following values. However, when the design
temperature is not in the creep region of the material, no consideration may be required for the value of f3.
R 20 E S
f1 = , f 2 = t , f3 = R
4. 0 1.5 1.6
where:
R20 : Specific minimum tensile strength (N/mm2) of the material at room temperature (less than 50 oC )
E t : 0.2% proof stress (N/mm2) of the material at the design temperature
S R : Mean value of creep breaking stress (N/mm2) of the material after 100,000 hours at the design
temperature
(4) The material not specified in (1) to (3) above are to be subject to special approval by the Society.
The wording deemed appropriate by the Society means following values corresponding to the material:
(1) for stainless steel 2.5 mm
(2) for aluminium alloy 4.5 mm
(3) other than above the value specially approved by the Society
-44-
2013 Guidance for High Speed Craft (Part 10 Chapter 1)
Chapter 1 GENERAL
1.2 Testing
-45-
2013 Guidance for High Speed Craft (Part 10 Chapter 2)
2.1 General
Rectifiers
Internal supply
-46-
2013 Guidance for High Speed Craft (Part 10 Chapter 2)
Bus
2.1.4 Earthing
1 The following exposed metal parts may not be earthed:
(1) Non-current-carrying metal pars of electrical equipment which are unlikely to be touched by persons during
their service
(2) Lamp caps
(3) Shades, reflectors and guards, supported on lampholders or luminaries constructed of, or shrouded in,
non-conducting material
(4) Metal parts or screws separated by insulators from the current-carrying part of from earthed
non-current-carrying parts which are not charged or earthed under normal service condition
(5) Bearing housing insulated to prevent circulation of current in the bearing
(6) Clips of fluorescent lighting tube
(7) Equipment power supplied at safety voltage
(8) Cable clips
2 Earthing may be made under the requirements as specified below:
(1) All earthing connections are to be made through copper or other corrosion resistant material and to be securely
installed to the hull structure. All earthing conductors are to be protected where necessary against mechanical
damage and galvanic corrosion.
(2) Where the metal frame or enclosure of electrical equipment is directly fitted to the hull structure, and the surface
in contact is clean and free from rust, scale and paint, and bolted firmly, no earthing conductors may provided.
(3) Under any circumstances, a lead cable sheath is not to be used as a sole earthing means.
(4) Nominal cross-sectional areas of all copper earthing conductors are to be as give in Table 10.2.1.4-1. In cases
where earthing conductors other than copper are used, their conductance is not be of more than that of copper
conductors given in the table.
-47-
2013 Guidance for High Speed Craft (Part 10 Chapter 2)
(5) Connections between earthing conductors and the hull structure are to be made in an accessible position, and be
secured by a screw of brass or other corrosion resistance material of diameter not less than 4 mm which is to be
used for this purpose only. In any case, the contact faces are to have a glossy metal surface when screws are
tightened.
3 In a power distribution system where one line of the system is earthed and normally of non-current carrying line,
the earthing connection is to be as specified in -2. Note, however, that the upper limit value of 70 mm2 of the
cross-sectional area of the earthing conductor given in Table 10.2.1.4-1 does not apply.
4 The non-current carrying metal parts of portable electrical appliances are to be earthed through plugs and
receptacles by means of earthing conductors provided in flexible cables or cords.
-48-
2013 Guidance for High Speed Craft (Part 10 Chapter 2)
2 The alarm set value of insulation monitoring system is to have an insulation resistance value, as a standard,
corresponding to 1/10 of that of the electric circuit in the normal condition for which monitoring is to be made.
3 In the case where the insulation monitoring system is used in common with an earthing lamp, they are to be
interlocked against each other.
2.5.1 Location
In the case where steam pipes, water pipes, oil pipes, etc., are inevitably laid in the proximity of switchboards,
flanges of these pipes are to be of welded joints or means are to be so provided that no detrimental effects would be
exerted on switchboards if a leakage occurs.
-49-
2013 Guidance for High Speed Craft (Part 10 Chapter 2)
2.5.4 Busbars
1 Busbars and the contact faces of busbars and linking conductors are to be protected against corrosion or
oxidization by means of silver plating, tin plating or dippling in a solder bath, etc.
2 Current rating of busbars may generally be determined by Table 10.2.5.4-1.
3 The wording in cases where deemed appropriate by the Society in 2.5.4-4, Part 10 of the Rules refers to cases
where documents which show that there are no adverse effects on any of the following (1) to (5) are submitted to and
approved by the Society in cases where the temperature rises of any busbars, connecting conductors and their
connections that are carrying full-load currents exceed 45K at an ambient temperature of 45 oC .
(1) Mechanical strength of the conducting material
(2) Possible effect on adjacent equipment
(3) Permissible temperature limits of the insulating materials in contact with the conductor
(4) Effect of the temperature of the conductor on the apparatus connected to busbars
(5) For plug-in contacts, the nature and surface treatment of the contact material
2.7 Cables
-50-
2013 Guidance for High Speed Craft (Part 10 Chapter 2)
(2) The splices for multi conductor cables are to be staggered in such away that the connectors for each conductor
are not contiguous to the connector of an adjacent conductor. In addition, no more than is necessary to ensure a
proper connection of the cable insulation is to be removed.
(3) Replacement insulation that has the same or a greater thickness than that of the cable insulation and the same or
better thermal and electrical properties of the cables.
(4) For screened cables, replacement screenings are to be provided and such screenings are to be secured by a
method that does not exert more pressure than necessary to establish adequate electrical contact. Screened cables
are to have at least a 13mm overlap between any replacement shielding material and the original screening
material.
(5) Replacement cable sheath materials are to have physical properties that are the same as, or equivalent to, the
cable sheath. Replacement cable sheaths are to be centered over the splices and to overlap the existing cable
sheaths by at least 51mm. Replacement cable sheaths are to be installed so that a watertight seal with the existing
cable sheaths is created.
(6) The electrical continuity of any cable armour is to be re-established by a jumper of wire or braid, or replacement
armour of the same metal.
(7) For cables with a sheath over the armour, a replacement covering is to be used.
3 The wording to retain the original electrical, mechanical, flame-retardant and, in cases where necessary,
fire-resisting properties of the cable in 2.7.3-5, Part 10 of the Rules means that connections and branching of cables
are to be made within enclosures with no possibility of any outward spreading of fire by internal short-circuits or
other causes. In addition, the type of enclosure is to be selected from those meeting the requirement given in 2.1.3-4
according to installation location.
2.8.1 General
1 Accumulator batteries of an adequate discharge rate are to be selected according to their application.
2 In the case where alkali batteries are used, the specification including the construction, performance, method of
installation, etc., is to be submitted at each time to the Society for approval.
2.8.3 Location
1 Accumulator batteries are not to be located in high temperature or low temperature areas, or areas exposed to
steam, water or oil vapour.
2 The term large batteries in 2.8.3-2, Part 10 of the Rules means the accumulator batteries connected to battery
charging facilities with an output of 2 kW or more. Here, the output of battery charging facilities is to be the product
of rated current of the rectifier and nominal voltage of the battery group. Deck boxes may be naturally ventilated.
Natural ventilation by means of a duct of ample dimensions, terminating at least 1.25 m above in a goose-neck,
mushroom-head or the equivalent will be sufficient. Holes for air inlet are to be provided on at least two opposite
sides of the box.
3 Accumulator batteries connected to battery charging facilities with a capacity in a range from 0.2 to 2 kW are to
be placed in a battery box installed within a battery compartment or on the upper deck or upward. In the case where
they are unable to be installed in such areas, the following requirements are to be complied with:
(1) To be placed in a storage box or on a shelf provided at an adequate area,
(2) To be placed in an open state within the machinery space, or
(3) To be placed in a compartment with good air ventilation.
4 Accumulator batteries connected to battery charging facilities with a capacity of 0.2 kW or less may be placed in
an open state at an adequate area or may be placed in a battery box.
-51-
2013 Guidance for High Speed Craft (Part 10 Chapter 2)
2.8.5 Ventilation
1 Where accumulator batteries are arranged in two tiers or more, all shelves are to have not less than 50 mm space,
front and back, of circulation of air.
2 The capacity of exhaust ventilation of a battery compartment is to be of the value obtained by the following
formula or more:
Exhaust capacity Q = 100 I n (litre/h)
I :maximum charging current at end (where no specific limitation is imposed, the charging current in 10
hours is to be regarded as the standard)
n :number of batteries
3 It is recommended that the ventilation system for a compartment containing accumulator batteries connected to
battery charging facilities with an output of 2 kW or more be of the mechanical exhaust-ventilation.
-52-
2013 Guidance for High Speed Craft (Part 10 Chapter 4)
4.1 Enclosed Cargo Holds for Carrying Motor Vehicles with Fuel in Their Tanks for Their Own
Propulsion and Enclosed Compartments adjoining the Cargo Holds, etc.
-53-
2013 Guidance for High Speed Craft (Part 11 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
The definition of Craft for restricted service specified in 1.1.1-1, Part 11 of the Rules is to be referred to 2.1.4,
Part 4 of the Guidance.
1.2 Definitions
1.2.1 Application
Being ensured in accordance with the test procedures deemed as appropriate by the Society specified in
provisions of 1.2, Part 11 of the Rules means that materials are approved by the Society in accordance with the
provisions specified in Chapter 1, Part 4 of the Guidance for the Approval and Type Approval of Materials and
Equipment for Marine Use.
-54-
2013 Guidance for High Speed Craft (Part 11 Chapter 2)
-55-
2013 Guidance for High Speed Craft (Part 11 Chapter 3)
-56-
2013 Guidance for High Speed Craft (Part 14 Chapter 1)
Chapter 1 GENERAL
1.1 General
1.1.1 Application
1 With regard to requirement stipulated in 7.3.1.3 of THE INTERNATIONAL CODE OF SAFETY FOR HIGH
SPEED CRAFT, Stairway may be categorised as areas of minor fire hazard.
2 With regard to requirement stipulated in 7.4.4.1 of THE INTERNATIONAL CODE OF SAFETY FOR HIGH
SPEED CRAFT, Public spaces extending over 2 decks may be considered as one space, provided as follows.
(1) the length and width of the openings area between lower and upper part is at least 25% of the mean length and
width of the upper part of the whole space or at least of a corresponding area.
(2) sufficient means of escape is provided from both levels of the space directly leading to an adjacent safe area or
compartment.
(3) the whole space is served by one section of sprinkler system with one relieve valve.
3 With regard to requirement stipulated in Table 7.4-1 of THE INTERNATIONAL CODE OF SAFETY FOR HIGH
SPEED CRAFT, Ventilation openings may be accepted in entrance doors to public toilets if positioned in the lower
portion of such doors and fitted with closable grilles operable from the public space side and made of
non-combustible or fire-restricting material.
4 As for the requirements for dead craft condition and restoration from the dead craft condition specified in 9.1.5
of THE INTERNATIONAL CODE OF SAFETY FOR HIGH SPEED CRAFT, the following (1) through (3) are to be
complied.
(1) Dead craft condition for the purpose of Regulation 9.1.5 is to be understood to mean a condition under which the
main propulsion plant and auxiliaries are not in operation and, in restoring the propulsion, no stored energy is
assumed to be available for starting and operating the propulsion plant, the main source of electrical power and
other essential auxiliaries. It is assumed that means are available at all times to start the emergency generator or
one of the main generators when the main source is arranged according to paragraph 12.7.2.
(2) Where the emergency source of power is an emergency generator which complies with section 12.4, or a main
generator meeting the requirements of paragraph 12.7.2, it is assumed that means are available to start this
generator and consequently this generator may be used for restoring operation of the main propulsion plant and
auxiliaries where any power supplies necessary for engine operation are also protected to a similar level as the
starting arrangements.
(3) Where there is no emergency generator installed or an emergency generator does not comply with section 12.4,
the arrangements for bringing main and auxiliary machinery into operation are to be such that initial charge of
starting air or initial electrical power and any power supplies for engine operation can be developed on board the
craft without external aid. If for this purpose an emergency air compressor or electric generator is required, these
units are to be powered by a hand-starting oil engine or a hand-operated compressor. The arrangements for
bringing main and auxiliary machinery into operation are to have a capacity such that the starting energy and
any power supplies for engine operation are available within 30 minutes of a dead craft condition.
5 As for the application of 9.8 of THE INTERNATIONAL CODE OF SAFETY FOR HIGH SPEED CRAFT, the
following requirements are to be complied.
(1) On monohulls, propeller shaft and bearings of at least one main engine, when passing through the aft machinery
space, are to be protected as following requirements (a) or (b).
(a) Steel shaft bearings are to be protected by water spray.
(b) Shafts made of composite material (FRP) are to be protected by the following i) or ii).
-57-
2013 Guidance for High Speed Craft (Part 14 Chapter 1)
-58-
2013 Guidance for High Speed Craft (Annex 1)
1.1.1
For craft operating in areas where ice accretion is likely to occur, the following icing allowance should be made
in the stability calculations:
(1) 30 kg/m2 on exposed weather decks and gangways;
(2) 7.5 kg/m2 for projected lateral area of each side of the craft above the waterplane;
(3) the projected lateral area of discontinuous surfaces of rail, sundry booms, spars (except masts) and rigging and
the projected lateral area of other small objects should be computed by increasing the total projected area of
continuous surfaces by 5% and the static moments of this area by 10%;
(4) reduction of stability due to asymmetric ice accumulations in cross-structure.
1.1.2
For craft operating in areas where ice accretion may be expected:
(1) Within the areas defined in 1.2.1(1), (3), (4) and (5) known to have icing conditions significantly different from
those in 1.1.1, ice accretion requirements of one half to twice the required allowance may be applied.
(2) Within the area defined in 1.1.1(2), where ice accretion in excess of twice the allowance required by 1.1.1 may
be expected, more severe requirements than those given in 1.1.1 may be applied.
1.1.3
Information should be provided in respect of the assumptions made in calculating the condition of the craft in
each of the circumstances set out in this Annex for the following:
(1) duration of the voyage in terms of the period spent in reaching the destination and returning to port; and
(2) consumption rates during the voyage for fuel, water, stores and other consumables.
1.2.1
In the application of 1.1, the following icing areas (See Fig.1) (1) through (5) should apply:
o o
(1) The area north of latitude 65 30¢ N, between longitude 28 W and the west coast of Iceland ; north of the north
o o o
coast of Iceland ; north of the rhumb line running from latitude 66 N, longitude 15 W to latitude 73 30¢ N
o o o o o
longitude 15 E, north of latitude 73 30¢ N between longitude 15 E and 35 E, and east of longitude 35 E, as
o
well as north of latitude 56 N in the Baltic Sea.
o
(2) The area north of latitude 43 N bounded in the west by the North American coast and the east by the rhumb line
o o o o
running from latitude 43 N, longitude 48 W to latitude 63 N, longitude 28 W and thence along longitude
o
28 W.
(3) All sea areas north of the North American continent, west of the areas defined in subparagraphs (1) and (2) of
this paragraph.
(4) The Bering and Okhotsk Seas and the Tartary Strait during the icing season.
o
(5) South of latitude 60 S.
1.3.1
Craft intended for operation in areas where ice accretion is known to occur should be:
(1) designed to minimize the accretion of ice; and
(2) equipped with such means for removing ice as the Administration may require.
-59-
2013 Guidance for High Speed Craft (Annex 1)
Fig. 1
-60-
2013 Guidance for High Speed Craft (Annex 2)
1.1 General
The stability of these craft should be considered in the hull-borne, transient and foil-borne modes. The stability
investigation should also take into account the effects of external forces. The following procedures are outlined for
guidance in dealing with stability.
In addition, hull-borne mode has the same meaning as displacement mode defined in 2.1.30, Part 1 of the Rules
and foil-borne mode has the same meaning as non-displacement mode defined in 2.1.31, Part 1 of the Rules.
Table 1 Typical Wind Pressures, 100 Nautical Miles from Land for Beaufort Scale 7
Z above waterline (m) 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
PV (Pa) 46 46 50 53 56 58 60 62 64
Note:
These values may not be applicable in all areas.
-61-
2013 Guidance for High Speed Craft (Annex 2)
-62-
2013 Guidance for High Speed Craft (Annex 2)
Fig. 3
Notes:
æ LB ö æ LH ö
GM = n B çç - S + n H çç -S
è 2tanl B ø è 2tanl H ø
where:
n B = percentage of hydrofoil load borne by front foil
n H = percentage of hydrofoil load borne by aft foil
L B = clearance width of front foil
LH = clearance width of aft foil
a = clearance between bottom of keel and water
g = height of centre of gravity above bottom of keel
l B = angle at which front foil is inclined to horizontal
l H = angle at which aft foil is inclined to horizontal
S = height of centre of gravity above water
-63-
2013 Guidance for High Speed Craft (Annex 2)
1.3.4
Paragraphs 1.2.2-2 of this Guideline should be applied to this type of craft as appropriate and any computer
simulations or design calculations should be verified by full-scale tests.
-64-
2013 Guidance for High Speed Craft (Annex 3)
A multihull craft, in the intact condition, should have sufficient stability when rolling in a seaway to successfully
withstand the effect of either passenger crowding or high-speed turning as described in 1.1.4. The craft s stability
should be considered to be sufficient provided compliance with this paragraph is achieved. Alternatively another
method of assessment may be employed, as provided for in 1.1.4, Part 8 of the Rules.
1.1.2 Maximum GZ
o
The maximum GZ value should occur at an angle of at least 10 .
-65-
2013 Guidance for High Speed Craft (Annex 3)
1.2.1
The method of application of criteria to the residual stability curve is similar to that for intact stability except
that the craft in the final condition after damage should be considered to have an adequate standard of residual
stability provided:
(1) the required area A2 should be not less than 0.028 m-rad. (Fig. 2 refers); and
(2) there is no requirement regarding the angle at which the maximum GZ value should occur.
Notes:
HL1 = Heeling lever due to wind
-66-
2013 Guidance for High Speed Craft (Annex 3)
1.2.2
The wind heeling lever for application on the residual stability curve should be assumed constant at all angles of
inclination and should be calculated as follows :
HL3 = ( Pd AZ ) /(9800D)
where:
Pd = 120 (Pa)
2
A = projected lateral area of the portion of the craft above the lightest service waterline (m )
Z = vertical distance from the centre of A to a point one half of the lightest service draught (m)
D = displacement (t)
1.2.3
The same values of roll angle should be used as for the intact stability.
1.2.4
The downflooding point is important and is regarded as terminating the residual stability curve. The area A2
should therefore be truncated at the downflooding angle.
1.2.5
The stability of the craft in the final condition after damage should be examined and shown to satisfy the criteria,
when damaged as stipulated in 1.6, Part 8 of the Rules.
1.2.6
In the intermediate stages of flooding, the maximum righting lever should be at least 0.05 m and the range of
o
positive righting lever should be at least 7 . In all cases, only one breach in the hull and only one free surface need to
be assumed.
1.3.1
In applying the heeling levers to the intact and damaged curves the following should be considered:
(1) for intact condition:
(a) wind heeling lever - steady wind (HL1); and
(b) wind heeling lever (including gusting effect) plus either the passenger crowding or speed turning levers
whichever is the greater (HTL).
(2) for damage condition:
(a) wind heeling lever - steady wind (HL3); and
(b) wind heeling lever plus heeling lever due to passenger crowding (HL4).
-67-
MAJOR CHANGES AND EFFECTIVE DATES
Amendments to the GUIDANCE FOR HIGH SPEED CRAFT made between 1 January 2012 and 1 January 2013
and their effective date are as follows:
“Guidance for high speed craft” has been partly amended as follows:
1 Application of CMS
(1) (omitted)
(2) Auxiliary machinery prescribed in item 5 of Table 3.10.1 in Part 2 of the Rules are as
follows:
((a) to (f) are omitted)
(g) Coolers
Main fresh water coolers (for cylinder jackets and pistons), F.O. valve cooling fresh
water/oil coolers, fresh water coolers for turbochargers, cooling fresh water coolers for
generator engines, F.O. coolers, main L.O. coolers, turbocharger L.O. coolers, camshaft
L.O. coolers, reduction gear L.O. coolers, hydraulic oil coolers, coolers for C.P.P., stern
tube L.O. coolers
((h) to (m) are omitted)
1
Sub-paragraph -6 has been amended as follows.
6 Confirmatory Survey
In ships deemed by the Society as maintaining their machinery and equipment well, overhaul
inspections by the shipowner (or the ship management company) may forgo the open-up
examination performed in the presence of Surveyors by conducting the following confirmatory
surveys, provided that the machinery and equipment are overhauled as part of the ship’s
maintenance practices and the records from such overhauls are kept in good order. In this case, the
date of the next open-up examination is to be within a 5-year period from the date of its last
overhaul and inspection.
(1) Procedure of the confirmatory survey
(a) In case of any machinery and equipment specified in (2) below overhauled and inspected
by the Chief Engineer as a routine maintenance work, one copy of the inspection report
including the items mentioned below is to be submitted to, and reviewed by the attending
Surveyor. Also, the Chief Engineer’s profile is to be confirmed by the attending Surveyor.
i) Signature of the Chief Engineer and licence number
ii) Date and place of the inspection
iii) Inspection items and their results
iv) Operating conditions before and after the inspection
(b) Parts replaced with spares or repaired are to be verified by visual examinations on them or
photographs of them.
(c) Visual examinations are to be carried out for main propulsion machinery, and
examinations under operating conditions, as well as visual examinations inspections are to
be carried out for other machinery and auxiliary machinery, etc.
(d) Visual examinations of lubricating oil conditions are to be carried out through open-up
inspections, etc. of the lubricating oil filters of crankshafts, main bearings, crankpin
bearings, crankpin bolts as well as the camshafts and camshaft driving devices of main
diesel engines.
(e) Visual examinations to confirm the current conditions and lubricating oil maintenance
conditions of intermediate shafts, thrust shafts and bearings are to be carried out as far as
possible.
(f) Confirmation of the open-up inspection and adjustment records of safety valves
(excluding fusible plugs) is to be carried out for air reservoirs.
(dg) As a result of the confirmatory survey stipulated in (a) to (ef) above, open-up
examinations and/or re-examinations may be required when deemed necessary by the
Surveyor.
(2) Items applicable to the confirmatory survey
Items of machinery and equipment applicable to the confirmatory surveys are as follows.
(a) Main diesel engines
However, crankshafts, main bearings, crank pin bearings, crank pin bolts, camshafts, and
camshaft driving gears are to be excluded. Note that the number of items of the
confirmatory surveys is to be restricted to half the number of total survey items for the
main diesel engine within one cycle of CMS.
(b) Diesel engines used for driving generators, auxiliary machinery essential for main
propulsion or auxiliary machinery for the manoeuvring and the safety of the ship
However, an open-up examination of the diesel engine for driving the main generator is to
be carried out in the presence of the Surveyor in cases where a single unit of such engines
is fitted on ship.
(c) Intermediate shafts, thrust shafts and bearings
2
(cd) Auxiliary machinery (air compressors, pumps, heat exchangers, air reservoirs, deck
machinery and distilling plants)
(3) Timing of the confirmatory survey
A confirmatory survey is by the time of next periodical survey from the day the item of the
machinery and equipment intended for the confirmatory survey was overhauled and inspected
at sea.
4 Approval of PMS
Conditions for approval of PMS are as follows:
((1) and (2) are omitted)
(3) Survey Schedule Table
The machinery maintenance scheme is to cover the maintenance plan for all the machinery as
(1) above. For machinery, equipment and parts with a condition monitoring system which
complies with the following requirements, the inspection intervals may be prolonged until an
abnormal condition is observed. In this case, the machinery maintenance scheme for PMS is
also to cover all condition monitoring functions, criteria for judgment and procedures for
monitoring, analysis and handling (including reporting observed abnormal conditions to the
Society) of the system.
(a) Crank pins and their bearings and crank journals and their bearings for main diesel
engine
(ba) Rotors, casings, main bearings, couplings between turbine and reduction gear, nozzle
valves and manoeuvring valves for main steam turbine
(cb) Auxiliary steam turbine for main generator
(d) Thrust shaft and the bearings for main propulsion
(ec) Reduction gears for main propulsion
(fd) Flexible couplings for main propulsion
(ge) Other items deemed necessary by the Society.
When this survey schedule table is amended, the amended survey schedule table is to be
submitted to the Society for approval.
(4) Machinery Maintenance Records
Machinery maintenance records are to include at least the following items, and are to be
programmed and maintained by the Maintenance management system. These records are to be
retained on board the ship at all times.
(a) Date of maintenance work
(b) Signature by the Chief Engineer
(c) Details of maintenance work and results
(d) Total running hours (parts replacement intervals and overhaul intervals)
(e) Names of parts replaced
(f) Measuring data (including original design dimensions and allowable tolerance)
(g) The condition of damage and repair method
(h) Results of visual examinations of lubricating oil conditions carried out through open-up
examinations of the lubricating oil filters, etc. of crankpins, crank journals, thrust shafts
and bearings of main diesel engines (in cases where the principle components of such
engines were inspected through independent open-up surveys conducted by chief
3
engineers)
((5) to (7) are omitted)