Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
1. Site preparation ● Poor communication M ● DESCON employees shall have mandatory training. L
between work parties. ● Work permit from the client, with all concurring parties
signatures approval must be obtained prior to start of work and
display at site
● Safety requirements stated on the work permit must be available on
● Inexperience persons / site and strictly followed
lack of safety awareness ● Toolbox talk shall be conducted to all personnel on site &
documented before start of work.
● Appropriate PPE shall be worn by all personnel at site.
● Assigned trained dedicated Banks man for job with reflective jacket.
● No water no work policy shall be followed.
● Heat stress ● Work Schedule according to heat Index
● Ear protection shall be worn where required.
● Noise ● Noise meter will be made available at site.
● Maintenance of equipment on regular basis.
● Vehicles Movement ● Use of Approved/Trained license drivers.
● Vehicle movements on site shall be controlled by banks man
● Appropriate signage to be provided.
JOB SAFETY ANALYSIS (JSA)
TANK MODIFICATION AND REPAIR
WORK
Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
St Activity Haza H M L Control H M L
ep rd Measures
● Use leather gloves for hand protection.
● Pinch point. ● Keep away body parts (hand, feet, head, e.t.c) from the
line of fire (LOF).
● Suitable length of trailer shall be arranged according
to length of Shell Plates, pipe spools, supports etc.
● Vehicle hit to ● Red flag at the back end of long pipe spool shall
existing facility be provided.
. ● Site specific traffic rules shall be followed.
● All vehicle movements will be controlled by a certified
banks man.
● Banks man shall be provided for reversing vehicle.
Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
St Activity Haza H M L Control H M L
ep rd Measures
installation ● Trained steel cutter and trained steel fixer shall
work be deployed for each work.
● Valid inspection sticker tools and plants shall be allowed.
● Restricted entry only authorized persons allowed only
in steel fixing area.
4 Installation / ● Slips, trips, falls M ● General housekeeping required to prevent slip, trips L
removal of ● Protruding nails and falls.
Shuttering work ● Puncturing/brushing ● Access area to be clear from all obstructions.
& de nailing against sharp edges ● Use basket while lifting the material.
using hand tools. of concrete ● Nails to be removed.
● Ensure dust mask or respirator.
● Fingers getting ● Allot sufficient manpower.
caught between the ● Correct PPEs (leather gloves, cut resistant gloves etc) to
forms be worn.
● Dust ● Explain proper manual handling techniques during tool
● Improper manual handling box talk.
● Use mechanical means wherever practical.
● Maintain good housekeeping.
5 Installation of form ● Slips/trip and falls M ● Bend down all nails/protruding objects L
JSA Number: JSA Title: TANK MODIFICATION AND REPAIR WORK
Area: Activity: Civil work Date
Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
St Activity Haza H M L Control H M L
ep rd Measures
work and concrete ● Protruding objects ● Steps or ramp will be provided for access
walkways ● Puncture tools ● All access and egress will be clear from material, tools
and equipment
● protection should be provided
6 Use of Power ● Inappropriate operator M ● Only trained/experienced person to use the power tools. L
tools like drilling ● Trips and fall ● Proper PPE should be worn.
machines, ● Sharp Objects
Electric
Saw / Generator
etc
7 Setting of ● Diesel spillage M ● Only trained operator to use equipment L
concrete using ● Contact with ● Correct PPE to be worn by masons (rubber boots with
diesel concrete cement chemicals steel toe caps) as per cement MSDS
vibrator and ● Fire ● Trained fire watch to be provided.
hand tools ● Fire extinguishers to be kept at upwind direction
nearby vibrator.
● Use proper Spill Kit.
8 Concrete curing ● Slips/trip and falls M ● Good housekeeping maintained in working area L
with water ● Skin/eye irritation ● Do not take water from the fire water tank.
9 Use of Power ● Inappropriate operator M ● Only trained/experienced person to use the power tools. L
tools like drilling ● Trips and fall ● Proper PPE should be worn.
JSA Number: JSA Title: TANK MODIFICATION AND REPAIR WORK
Area: Activity: Civil work Date
Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
machines, Electric ● Sharp Objects
Saw / Generator
etc
10 Minor ● Improper manual handling M ● Always follow carefully the manufacturer’s instructions. L
Maintenance of ● Slip/ trip and fall. Repairs can be done only at designated area. No repair
equipment. ● Workers struck shall be done on work site.
by hammer/Pin ● Only trained and experienced mechanic to perform the job.
● Injuries. ● Only trained personnel shall perform this activity
Electrical ● Crushing. using proper tools.
Connection ● Caught between. ● Area to be clear of all personnel.
● Poor lighting ● Drip tray shall be provided to control spillage.
11 Confined space ● Lake of Communication H ● All personnel working in confined space must L
entry. have confined space training.
● confined space procedure shall be followed.
● Hole watcher is attentive all the time during
● Ventilation. confined space activity. Lighting provided in CSE to
be 24V.
● Damage material ● Easy communication between hole watcher and
supervisor is established all the time.
● Oxygen deficiency ● Ensure that passage and transport rout is clear during
confined space activities. Proper access/agrees should be
JSA Number: JSA Title: TANK MODIFICATION AND REPAIR WORK
Area: Activity: Civil work Date
Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
accumulation of maintained.
toxic gases Gas test to be done by AGT prior to entering into
the confined space.
A trained and qualified individual should outside the tank
with the responsibility of ensuring the safety of
authorized entrants (Fabricator, Fitter, Welder e.tc)
through the performance pre‐entry briefing, checking and
● Physical hazards inspecting PPE, equipment and tools and performing
regular monitoring in ensuring person working inside pipe
remains safe for entry and occupation.
A written rescue plan that has provision for conducting a
timely rescue of individuals working inside the pipe
(Confined Space) should be kept on site. Raising the
alarm in the event of an emergency using the
radio/mobile phones provided to them.
Ensure effective communication systems for the entry
are tested.
● Improper stacking Proper light should be provided less than 25v.
of material All material stack proper and category wise.
JSA Number: JSA Title: TANK MODIFICATION AND REPAIR WORK
Area: Activity: Civil work Date
Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
● Rescue arrangement shall be made while working
● Unauthorized entrant more than five meter inside large bore size.
● SHE&S Procedure shall be followed.
● Close supervision required while working inside.
● Lack of oxygen
● Execute the work under close supervision and presence
/oxygen/ air
of hole watcher.
deficiency
● Proper air supply to be provided or air mover will
be provided.
● Proper ventilation shall be there.
● Working crew shell be trained for confined space working.
12 Minor maintenance ● Fire / Explosion M ● Obtain all necessary approvals prior to start the job. L
work Connection ● Standby fire extinguisher/Fire watcher.
/Disconnection and ● Barricade the area.
Operation of Diesel
● SWITCH OFF DG (Diesel generator) if any emergency alarm
Generator set /
is sounded. Switch off the engine while fueling.
Welding machines
● Fueling will be done in day time.
/ovens /
Distribution ● Ensure no conflicting jobs in vicinity before start of job.
boards/grinder ● Sparks. ● DG must have inspection sticker.
for
JSA Number: JSA Title: TANK MODIFICATION AND REPAIR WORK
Area: Activity: Civil work Date
Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
power supply Ensure all lights are intrinsically safe and are pre‐inspected.
purpose including Close supervision during activity.
repair work. Using
Only competent electrician to perform the job.
power
Proper earthing shall be provided.
13 Extended ● Inadequate lighting in M ● Adequate lighting at work area and Access/Egress area. L
hour/night and around work areas, Emergency route to muster point to be clearly
Works (Actual causing shadows or illuminated.
works will be the poorly lit work areas ● Proper cable management
same as day that could result in ● Use clear safety glass for night work for good visibility.
work) unsafe acts and injuries
● Warning Lights and sign boards.
taking place
● Trained Flag man for equipment movement provided
with signal torch.
● Close supervision required while working in night shift.
14 Emergency ● Poor Communication M ● Educate the workforce about Emergency Procedure. L
Procedure / ● All safety sign board shall be displayed properly at site.
Response ● In case of any Emergency all work will be stopped, Shut
down all running equipment & Machineries and reported
to Muster Point
JSA Number: JSA Title: TANK MODIFICATION AND REPAIR WORK
Area: Activity: Civil work Date
Task Description Civil work activity including installation of Shuttering ,Rebar ,Form work , Concrete work and Back filling activity
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
● Improper Access/ Egress ● Proper Access & Egress shall be available.
● All Workforces shall know the Muster Point location.
● Emergency Procedure to be followed.
● Emergency # 00000000
● Medical # 00000000
15. House keeping ● Trips and fall M ● All waste generated shall be contained and disposed off L
in designated waste skips.
● Sharp Objects ● Do not store materials/equipments inside the plant area.
● Use Proper Personal protective equipment for handling
● Equipment damage of waste.
● All materials shall be removed from the site to a
safe storage location immediately after the work.
Approved
Signature Print Date
Performing Party
Signatu Pri Date
re nt