Project: Riana Dutamas (Savio) Description: Planned Preventive Maintenance (Building Security System) - 1st June 2021 To 31st Dec 2021

The document outlines a planned preventive maintenance schedule for various building security systems from June 1, 2021 to December 31, 2021. It lists the equipment, description of maintenance tasks to be performed, equipment warranty periods, and scheduled maintenance checks every 1, 3, 4, and 6 months. The security systems include perimeter intrusion detection, CCTV, vehicle barrier gates, and card access systems. Tasks include cleaning, cable checks, functionality testing, and database backups.

Uploaded by

azman ab wahab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views4 pages

Project: Riana Dutamas (Savio) Description: Planned Preventive Maintenance (Building Security System) - 1st June 2021 To 31st Dec 2021

The document outlines a planned preventive maintenance schedule for various building security systems from June 1, 2021 to December 31, 2021. It lists the equipment, description of maintenance tasks to be performed, equipment warranty periods, and scheduled maintenance checks every 1, 3, 4, and 6 months. The security systems include perimeter intrusion detection, CCTV, vehicle barrier gates, and card access systems. Tasks include cleaning, cable checks, functionality testing, and database backups.

Uploaded by

azman ab wahab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project : RIANA DUTAMAS (SAVIO )

Description : Planned Preventive Maintenance (Building Security System)-1st June 2021 to 31st Dec 2021

Equip.
Equip. Warranty
Maintencene Equip. Warranty period
YES/NO
No Description YES/NO

YES NO YES NO Start

ELV System
PERIMETER INSTRUTION DETECTOR SYSTEM √ 29th April 2021
Master Equipment
1. Clean dust and foreign matters √
2. Check all the cables termination and connection and ensure cables are tidy and in order

for all master equipment

Closed Circuit Television (CCTV) System √ 29th April 2021


Master Equipment
1. Clean dust and foreign matters √
2. Check all the cables termination and connection and ensure cables are tidy and in order

for all master equipment in riser and control room.
3. Check the video export function of the network video decorder (NVR) to ensure is able to

export the videos in the form of CD, DVD or USB (whichever is applicable).
Field Equipment (CCTV Cameras) √ 29th April 2021
1. Clean dust and foreign matters on camera lens, camera housing of cameras. √
2. Check the picture quality of each cameras and monitor to ensure no flickering and

jerkiness on all the videos displayed on monitors.
3. Check the external, flexible cables are propely supported and undamaged. To ensure

cables are tidy and in order.

Vehicle Barrier Gate System √ 29th April 2021


Master Equipment √
1. Clean dust and foreign matters √
2. To check the operation of every card readers. √
a. Control card verification √
b. Retrive card information from the central database server √
c. Past card flash information to the central database server √
d. Controller and card reader interface √
f. To check the operation of every barrier gate √

Card Access System √ 29th April 2021


Master Equipment
1. Clean dust and foreign matters √
2. Check all the cables termination and connection and ensure cables are tidy and in order

for all master equipment in riser.
3. To check the operation of card access central database server √
a. Record and confirgurate cardholder personal and access information. √
b. Backup transaction, alarm and database audit files to remeable storage media. √
c. Backup of system configuration updates. √
4. To check the operation of work stations √
a. Adding/updating personnel records √
b. Issuing Cards √
Equip. Warranty period Equip. Maintencene period(6 months from Contract) Every 1 Every 3 Every 4 Every 6
Remaks
Month Month Month Month

End Start End

18th Oct 2023

1st June 2021 31st Dec 2021 Sep-21 Nov-21


1st June 2021 31st Dec 2021 Sep-21 Nov-21

18th Oct 2023

1st June 2021 31st Dec 2021 Sep-21 Nov-21


1st June 2021 31st Dec 2021 Sep-21 Nov-21

1st June 2021 31st Dec 2021 Sep-21 Nov-21


18th Oct 2023 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21

1st June 2021 31st Dec 2021 Sep-21 Nov-21

18th Oct 2023

1st June 2021 31st Dec 2021 Sep-21 Nov-21


1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21

18th Oct 2023

1st June 2021 31st Dec 2021 Sep-21 Nov-21


1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21
1st June 2021 31st Dec 2021 Sep-21 Nov-21