Petrofac: Load Input For The Design of Pile Cap

The document provides load case information for the design of a pile cap. It includes 14 load cases with forces and moments applied at different nodes. The total height of the pile cap is 2.15 meters. Loads from a structural analysis program are factored up by 1.5 to account for increased capacity of the pile cap design. The factored loads are then listed for each load case and node.

Uploaded by

jssrycbr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views32 pages

Petrofac: Load Input For The Design of Pile Cap

The document provides load case information for the design of a pile cap. It includes 14 load cases with forces and moments applied at different nodes. The total height of the pile cap is 2.15 meters. Loads from a structural analysis program are factored up by 1.5 to account for increased capacity of the pile cap design. The factored loads are then listed for each load case and node.

Uploaded by

jssrycbr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 32

Load Input for the Design of Pile Cap

Whether the load at the bottom of pile cap is available or not = No

Total number of load cases = 14 nos

Total height from the top of pedestal to the bottom of pilecap = 2.15 m

Petrofac Doc. No. 0

Petrofac International Limited Date 12-04-2005

Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
1 LC1 -38.018 956.215 -156.693 0 0 0 1.5 1.33 -38.02 1775.22 -156.69 -336.89 0 81.74
1 LC2 -37.937 363.955 118.831 0 0 0 1.5 1.33 -37.94 1182.96 118.83 255.49 0 81.56
2 LC3 -196.323 1322.182 -22.082 0 0 0 1.5 1.33 -196.32 2141.18 -22.08 -47.48 0 422.09
2 LC4 125 -1.844 -16.257 0 0 0 1.5 1.33 125 817.16 -16.26 -34.95 0 -268.75
3 LC5 -138.308 2346.266 -280.982 0 0 0 1.5 1.33 -138.31 3165.27 -280.98 -604.11 0 297.36
3 LC6 -139.539 1360.036 170.715 0 0 0 1.5 1.33 -139.54 2179.04 170.72 367.04 0 300.01
4 LC7 -297.963 2718.898 -146.657 0 0 0 1.5 1.33 -297.96 3537.9 -146.66 -315.31 0 640.62
4 LC8 71.312 1199.363 -146.274 0 0 0 1.5 1.33 71.31 2018.36 -146.27 -314.49 0 -153.32
5 LC9 -126.759 2329.931 -277.645 0 0 0 1.5 1.33 -126.76 3148.93 -277.65 -596.94 0 272.53
5 LC10 -126.645 1342.509 174.78 0 0 0 1.5 1.33 -126.65 2161.51 174.78 375.78 0 272.29
6 LC11 -285.897 2700.976 -143.241 0 0 0 1.5 1.33 -285.9 3519.98 -143.24 -307.97 0 614.68
6 LC12 83.441 1183.171 -142.16 0 0 0 1.5 1.33 83.44 2002.17 -142.16 -305.64 0 -179.4
7 LC13 -138.67 2048.71 -144.412 0 0 0 1.5 1 -138.67 2867.71 -144.41 -310.49 0 298.14
7 LC14 -126.517 2040.572 -140.756 0 0 0 1.5 1 -126.52 2859.57 -140.76 -302.63 0 272.01
LC15
LC16
LC17
LC18
LC19
LC20
LC21
LC22
LC23
LC24
LC25
LC26
LC27
LC28
LC29
LC30
LC31
LC32
LC33
LC34
LC35
LC36
LC37
LC38
LC39
LC40
LC41
LC42
LC43
LC44
LC45
LC46
Petrofac Doc. No. 0

Petrofac International Limited Date 12-04-2005

Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC47
LC48
LC49
LC50
LC51
LC52
LC53
LC54
LC55
LC56
LC57
LC58
LC59
LC60
LC61
LC62
LC63
LC64
LC65
LC66
LC67
LC68
LC69
LC70
LC71
LC72
LC73
LC74
LC75
LC76
LC77
LC78
LC79
LC80
LC81
LC82
LC83
LC84
LC85
LC86
LC87
LC88
LC89
LC90
LC91
LC92
LC93
LC94
LC95
LC96
LC97
Petrofac Doc. No. 0

Petrofac International Limited Date 12-04-2005

Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC98
LC99
LC100
LC101
LC102
LC103
LC104
LC105
LC106
LC107
LC108
LC109
LC110
LC111
LC112
LC113
LC114
LC115
LC116
LC117
LC118
LC119
LC120
LC121
LC122
LC123
LC124
LC125
LC126
LC127
LC128
LC129
LC130
LC131
LC132
LC133
LC134
LC135
LC136
LC137
LC138
LC139
LC140
LC141
LC142
LC143
LC144
LC145
LC146
LC147
LC148
Petrofac Doc. No. 0

Petrofac International Limited Date 12-04-2005

Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC149
LC150
LC151
LC152
LC153
LC154
LC155
LC156
LC157
LC158
LC159
LC160
LC161
LC162
LC163
LC164
LC165
LC166
LC167
LC168
LC169
LC170
LC171
LC172
LC173
LC174
LC175
LC176
LC177
LC178
LC179
LC180
LC181
LC182
LC183
LC184
LC185
LC186
LC187
LC188
LC189
LC190
LC191
LC192
LC193
LC194
LC195
LC196
LC197
LC198
LC199
Petrofac Doc. No. 0

Petrofac International Limited Date 12-04-2005

Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC200
LC201
LC202
LC203
LC204
LC205
LC206
LC207
LC208
LC209
LC210
LC211
LC212
LC213
LC214
LC215
LC216
LC217
LC218
LC219
LC220
LC221
LC222
LC223
LC224
LC225
LC226
LC227
LC228
LC229
LC230
LC231
LC232
LC233
LC234
LC235
LC236
LC237
LC238
LC239
LC240
LC241
LC242
LC243
LC244
LC245
LC246
LC247
LC248
LC249
LC250
Petrofac Doc. No. 0

Petrofac International Limited Date 12-04-2005

Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC251
LC252
LC253
LC254
LC255
LC256
LC257
LC258
LC259
LC260
LC261
LC262
LC263
LC264
LC265
LC266
LC267
LC268
LC269
LC270
LC271
LC272
LC273
LC274
LC275
LC276
LC277
LC278
LC279
LC280
LC281
LC282
LC283
LC284
LC285
LC286
LC287
LC288
LC289
LC290
LC291
LC292
LC293
LC294
LC295
LC296
LC297
LC298
LC299
LC300
LC301
Petrofac Doc. No. 0

Petrofac International Limited Date 12-04-2005

Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC302
LC303
LC304
LC305
LC306
LC307
LC308
LC309
LC310
LC311
LC312
LC313
LC314
LC315
LC316
LC317
LC318
LC319
LC320
LC321
LC322
LC323
LC324
LC325
LC326
LC327
LC328
LC329
LC330
LC331
LC332
LC333
LC334
LC335
LC336
LC337
LC338
LC339
LC340
LC341
LC342
LC343
LC344
LC345
LC346
LC347
LC348
LC349
LC350
LC351
LC352
Petrofac Doc. No. 0

Petrofac International Limited Date 12-04-2005

Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC353
LC354
LC355
LC356
LC357
LC358
LC359
LC360
LC361
LC362
LC363
LC364
LC365
LC366
LC367
LC368
LC369
LC370
LC371
LC372
LC373
LC374
LC375
LC376
LC377
LC378
LC379
LC380
LC381
LC382
LC383
LC384
LC385
LC386
LC387
LC388
LC389
LC390
LC391
LC392
LC393
LC394
LC395
LC396
LC397
LC398
LC399
LC400
Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

DESIGN OF RECTANGULAR PILE CAP: (as per BS 8110:Part 1 - 1997)


1.0 GENERAL DATA:

Name of the pile cap = PC1

Type of pile = Precast driven

Shape of pile = Square

Size of pile = 300 mm Sq.

No. of piles = 16 nos

Depth of design water table below FGL = 0 mm

Capacity of Pile (unfactored):

a) in compression = 420 kN

b) in tension = 50 kN

c) in shear = 20 kN

Capacity increase factor for wind/seismic loads = 1.33

Detail of Materials:

Grade of concrete = 25 N/mm2

Grade of reinforcement = 390 N/mm2

Density of concrete = 25 kN/m3

Density of soil = 18 kN/m3

Detail of Pile Cap:

Length of pile cap in X direction, LpX = 4700 mm

Length of pile cap in Z direction, LpZ = 4700 mm

Thickness of pile cap, tp = 1000 mm

Founding depth of bottom of pile cap below FGL = 1650 mm

\ Depth of soil above pile cap = 1650 - 1000

= 650 mm

Surcharge above pile cap, if any = 0 kN/m2

Clear Cover:

a) for bottom reinforcement = 75 mm

b) for top reinforcement = 50 mm

Detail of Pedestal:

Length of pedestal in X direction, LpedX = 500 mm

Length of pedestal in Z direction, LpedZ = 900 mm

Height of pedestal above FGL = 500 mm


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

Weight of Pile Cap + Pedestal + Soil + Surcharge:

Self weight of pile cap = {4.7 x 4.7 x 1} 25

= 552.25 kN

Weight of pedestal = 0.5 x 0.9 {0.5 + 1.65 - 1} 25

= 12.94 kN

Weight of soil above pile cap = {4.7 x 4.7 - 0.5 x 0.9} 0.65 x 18

= 253.19 kN

Load due to surcharge, if any = {4.7 x 4.7 - 0.5 x 0.9} 0

= 0 kN (No surcharge)

\ Total weight = 552.25 + 12.94 + 253.19 + 0

= 819 kN

Upward Load on Pile Cap due to Water Table:

Total upward load on pile cap due to the design = 4.7 x 4.7 (1.65 - 0) 10

water table = 365 kN


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

LpX
LpedX
LpedZ

X
LpZ

zi

xi

PLAN OF PILE CAP


(only to indicate the direction of co-ordinate axes)
0.3 Dp
(Typ)

+Mx2 +Mz1
Critical section for shear

+Mz2 +Mx1

PLAN SHOWING CRITICAL SECTIONS


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR
(only to indicate the location of critical sections)

2.0 ARRANGEMENT OF PILES & PROPERTIES OF PILE GROUP:


Note: The centre of pile cap is taken as the origin. (For layout of piles, refer separate drawing.)

Co-ordinates, m Moment of Inertia, m4


Pile No.
xi zi Ixxi Izzi

P1 -1.95 1.95 3.803 3.803

P2 -0.65 1.95 3.803 0.423

P3 0.65 1.95 3.803 0.423

P4 1.95 1.95 3.803 3.803

P5 -1.95 0.65 0.423 3.803

P6 -0.65 0.65 0.423 0.423

P7 0.65 0.65 0.423 0.423

P8 1.95 0.65 0.423 3.803

P9 -1.95 -0.65 0.423 3.803

P10 -0.65 -0.65 0.423 0.423

P11 0.65 -0.65 0.423 0.423

P12 1.95 -0.65 0.423 3.803

P13 -1.95 -1.95 3.803 3.803

P14 -0.65 -1.95 3.803 0.423

P15 0.65 -1.95 3.803 0.423

P16 1.95 -1.95 3.803 3.803


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

Total 33.808 33.808

Critical Sections for Bending & Shear (distances from the CG of pile cap):

a) for bending about X axis = 450 mm (at the pedestal face)

b) for bending about Z axis = 250 mm (at the pedestal face)

c) for shear about X axis = 560 mm Refer 3.11.4.3 of BS 8110:

d) for shear about Z axis = 560 mm Part 1 - 1997

Perimeter for Punching Shear:

a) around pedestal = 4480 mm (at location of critical section)

b) around square pile = 3762.5 mm (at 1.5 d from face of corner pile)

c) around circular pile = (Not applicable in this case)

(where d = effective depth of pile cap)

3.0 CHECK FOR PILE LOADS (unfactored):

a) Maximum vertical load on pile = 276.26 kN (Compression)

b) Minimum vertical load on pile = 10.78 kN (No Tension)

c) Maximum shear on pile = 20.76 kN

The pile loads are checked against increased capacities for wind/seismic

load combinations with appropriate factors, wherever applicable.

Refer the separate sheet giving loads on piles for each load case.

a) Check for compression capacity = Safe Hence Ok for compression

b) Check for tension capacity = Safe Hence Ok for tension

c) Check for shear capacity = Safe Hence Ok for shear


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

4.0 DESIGN OF PILE CAP:

Design forces for the pile cap = Actual pile reactions


(only for the calculation of
Diameter of reinforcement = 25 mm initial effective depth)

4.1 Design for Bending Moment:

a) Calculation of reinforcement at the bottom of pile cap:

i) factored BM about X axis

MuX1 b = 1617.44 kN-m (factored)

MuX2 b = 1959.37 kN-m (factored)

\ Maximum design bending moment MuX b = 1959.37 kN-m

K' = 0.156 Refer 3.4.4.4 of BS 8110:

b= 4700 mm Part 1 - 1997

d= 887.5 mm

K= Mu/bd2 fcu

= 0.021

z = d {0.5 + sqrt(0.25 - K/0.9)} (zmax = 0.95d)

= 843.13 mm

Ast = Mu/(0.95 fy z)

= 6273 mm2

Astmin = 6110 mm2 (0.13%, Refer Table 3.25

\ Area of reinforcement required Astreq = 6273 mm2 of BS 8110:Part 1 - 1997)

Diameter of reinforcement = 25 mm

Required spacing of reinforcement = 367 mm

Spacing of reinforcement provided = 250 mm

Astprovided = 9232 mm2

Provide 25 T @ 250 mm c/c (at the bottom of pile cap along Z direction).

Percentage of reinforcement provided = 0.221 %


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

ii) factored BM about Z axis

MuZ1 b = 1811.48 kN-m (factored)

MuZ2 b = 2622.05 kN-m (factored)

\ Maximum design bending moment MuZ b = 2622.05 kN-m

K' = 0.156 Refer 3.4.4.4 of BS 8110:


Part 1 - 1997

b= 4700 mm

d= 912.5 mm

K= Mu/bd2 fcu

= 0.027

z = d {0.5 + sqrt(0.25 - K/0.9)} (zmax = 0.95d)

= 866.88 mm

Ast = Mu/(0.95 fy z)

= 8164 mm2

Astmin = 6110 mm2 (0.13%, Refer Table 3.25

\ Area of reinforcement required Astreq = 8164 mm2 of BS 8110:Part 1 - 1997)

Diameter of reinforcement = 25 mm

Required spacing of reinforcement = 282 mm

Spacing of reinforcement provided = 250 mm

Astprovided = 9232 mm2

Provide 25 T @ 250 mm c/c (at the bottom of pile cap along X direction).

Percentage of reinforcement provided = 0.215 %

b) Calculation of reinforcement at the top of pile cap:

i) factored BM about X axis

MuX1 t = 467.02 kN-m (factored)

MuX2 t = 467.02 kN-m (factored)

\ Maximum design bending moment MuX t = 467.02 kN-m

K' = 0.156 Refer 3.4.4.4 of BS 8110:

b= 4700 mm Part 1 - 1997

d= 912.5 mm

K= Mu/bd2 fcu

= 0.005
Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

z = d {0.5 + sqrt(0.25 - K/0.9)} (zmax = 0.95d)

= 866.88 mm

Ast = Mu/(0.95 fy z)

= 1455 mm2

Astmin = 6110 mm2 (0.13%, Refer Table 3.25

of BS 8110:Part 1 - 1997)

\ Area of reinforcement required Astreq = 6110 mm2

Diameter of reinforcement = 20 mm

Required spacing of reinforcement = 241 mm

Spacing of reinforcement provided = 225 mm

Astprovided = 6565 mm2

Provide 20 T @ 225 mm c/c (at the top of pile cap along Z direction).

Percentage of reinforcement provided = 0.153 %

ii) factored BM about Z axis

MuZ1 t = 570.51 kN-m (factored)

MuZ2 t = 570.51 kN-m (factored)

\ Maximum design bending moment MuZ t = 570.51 kN-m

K' = 0.156 Refer 3.4.4.4 of BS 8110:

b= 4700 mm Part 1 - 1997

d= 937.5 mm

K= Mu/bd2 fcu

= 0.006

z = d {0.5 + sqrt(0.25 - K/0.9)} (zmax = 0.95d)

= 890.63 mm

Ast = Mu/(0.95 fy z)

= 1729 mm2

Astmin = 6110 mm2 (0.13%, Refer Table 3.25

\ Area of reinforcement required Astreq = 6110 mm2 of BS 8110:Part 1 - 1997)

Diameter of reinforcement = 20 mm

Required spacing of reinforcement = 241 mm

Spacing of reinforcement provided = 225 mm


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

Astprovided = 6565 mm2

Provide 20 T @ 225 mm c/c (at the top of pile cap along X direction).

Percentage of reinforcement provided = 0.149 %

4.2 Check for One-way Shear:

Maximum design shear stress, nmax = 0.8 (fcu)0.5 or 5 N/mm2, whichever is less (Refer 3.6.4.6

= 4 N/mm2 of BS 8110:Part 1 - 1997)

i) along X axis

Design shear force, VuX = 2335.79 kN (factored)

b= 4700 mm

d= 887.5 mm

\ Shear stress, n = VuX/b d

= 0.56 N/mm2

Refer Table 3.8 of BS 8110: Part 1 - 1997.

Design concrete shear stress, nc = 0.79 {100 As/(bv d)}1/3 {400/d}1/4 /gm

Factor for characteristic strength of concrete = (fcu/25)1/3 where, fcumax = 40 N/mm2

= 1

100 As/bv d = 0.221

{400/d}1/4 = 0.819 (without shear reinforcement)

Partial safety factor for material gm = 1.25 (Refer 2.4.4.1 of BS 8110:Part 1 - 1997)

\ nc = 0.313 N/mm2

Length of portion of the member transversed = 560 - 900/2 (i.e. distance between critical section &

by shear failure plane, av = 110 mm edge of pedestal)

Enhanced allowable shear stress = nc {2d/av} Refer 3.4.5.8 of BS 8110:

= 5.051 N/mm2 Part 1 - 1997

Shear stress is less than the allowable stress, hence Ok.

ii) along Z axis

Design shear force, VuZ = 2485.89 kN (factored)


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

b= 4700 mm

d= 912.5 mm

\ Shear stress, n = VuZ/b d

= 0.58 N/mm2

Refer Table 3.8 of BS 8110: Part 1 - 1997.

Design concrete shear stress, nc = 0.79 {100 As/(bv d)}1/3 {400/d}1/4 /gm

Factor for characteristic strength of concrete = 1

100 As/bv d = 0.215

{400/d}1/4 = 0.814 (without shear reinforcement)

gm = 1.25

\ nc = 0.308 N/mm2

av = 560 - 500/2 (i.e. distance between critical section &

= 310 mm edge of pedestal)

Enhanced allowable shear stress = nc {2d/av} Refer 3.4.5.8 of BS 8110:

= 1.813 N/mm2 Part 1 - 1997

Shear stress is less than the allowable stress, hence Ok.

4.3 Check for Two-way Shear:

i) Check for punching due to pedestal:

This check is required only for those cases where the spacing of pile exceeds Refer 3.11.4.5 of BS 8110:

3 x dia of pile. For other cases, ignore this check. Part 1 - 1997

Refer 3.7.7 & Figure 3.23 of BS 8110:Part 1 - 1997.

Maximum punching load from pedesta = 2762 kN (unfactored)

Load factor = 1.6

\ Factored punching load, Pu = 4419.2 kN

Perimeter along the critical section, u = 4480 mm

Effective depth, d = 900 mm

\ Shear strength due to concrete, Vc = 10378 kN

Punching load is less than the shear strength of concrete, hence Ok.

ii) Check for punching stress along the perimeter of the pedestal:

Refer 3.11.4.5 of BS 8110:Part 1 - 1997.


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

Maximum punching load from pedesta = 2732 kN (unfactored)

Load factor = 1.6

\ Factored punching load, Pu = 4371.2 kN

Perimeter along the critical section, uo = 2800 mm

Effective depth, d = 900 mm

\ Shear stress, n = 1.735 N/mm2

Allowable shear stress = 0.8 (fcu)0.5 or 5 N/mm2, whichever is less (Refer 3.6.4.6

= 4 N/mm2 of BS 8110:Part 1 - 1997)

Punching stress is less than the allowable shear stress, hence Ok.

iii) Check for punching stress at "1.5d" distance from the pedestal face: Refer 3.7.7.4 of BS 8110:

Effective depth, d = 900 mm Part 1 - 1997

Perimeter at critical section,

a) parallel to X axis = 6400 mm

b) parallel to Z axis = 7200 mm

\ Total perimeter along the critical section, u = 13600 mm

Maximum punching load from pedesta = 3139 kN

Load factor = 1.6

\ Factored punching load, Pu = 5022.4 kN

\ Punching shear stress, n = 0.41 N/mm2

Allowable punching stress = 0.311 N/mm2

Punching stress is more than the allowable stress, hence revise.

iv) Check for punching stress around the perimeter of pile:

Maximum punching load, Ppile = 276.26 kN (unfactored)

Load factor = 1.6

\ Factored punching load, Pu = 442.02 kN

Perimeter, uo = 1200 mm

Effective depth, d = 900 mm

\ Punching shear stress, n = 0.409 N/mm2

Allowable shear stress = 0.8 (fcu)0.5 or 5 N/mm2, whichever is less (Refer 3.6.4.6

= 4 N/mm2 of BS 8110:Part 1 - 1997)

Punching stress is less than the allowable shear stress, hence Ok.
Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

v) Check for punching stress at "1.5d" distance from the pile face:

Maximum punching load, Ppile = 276.26 kN

Load factor = 1.6

\ Factored punching load, Pu = 442.02 kN

Perimeter, uo = 3762.5 mm

Effective depth, d = 900 mm

\ Punching shear stress, n = 0.131 N/mm2

Allowable punching stress = 0.311 N/mm2

Punching stress is less than the allowable stress, hence Ok.


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR

CONTENTS

S. No. Description Page No.

1.0 General Data 1

2.0 Arrangement of Piles & Properties of Pile Group 3

3.0 Check for Pile Loads 5

4.0 Design of Pile Cap 6

4.1 Design for Bending Moment 6

4.2 Check for One-way Shear 9

4.3 Check for Two-way Shear 10

Appendix 1 Load Input for the Design of Pile Cap

Appendix 2 Load in Piles & Check for Pile Capacity

Appendix 3 Critical Bending Moments & Shear Forces


Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR
Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR
Petrofac
Petrofac International Limited

DOCUMENT No. DATE


PROJECT: Kashagan Development Experimental Program 12-04-2005
DESIGNED CHECKED SHEET
TITLE : Design of Pile Cap for Pipe Racks JJX MNR
LOAD IN PILES & CHECK FOR PILE CAPACITY

Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear

1 LC1 96.23 93.09 89.95 86.81 109.19 106.05 102.9 99.76 122.14 119 115.86 112.71 135.1 131.95 128.81 125.67 135.1 64.03 10.08 1.33 Safe Safe Safe
1 LC2 93.38 90.24 87.1 83.97 83.55 80.42 77.28 74.14 73.73 70.59 67.45 64.32 63.9 60.77 57.63 54.49 93.38 31.71 7.8 1.33 Safe Safe Safe
2 LC3 155.43 139.2 122.97 106.74 157.26 141.03 124.8 108.57 159.08 142.85 126.62 110.39 160.91 144.68 128.45 112.22 160.91 83.96 12.35 1.33 Safe Safe Safe
2 LC4 33.56 43.89 54.22 64.56 34.9 45.23 55.57 65.9 36.24 46.58 56.91 67.25 37.59 47.92 58.26 68.59 68.59 10.78 7.88 1.33 Safe Safe Safe
3 LC5 180.14 168.7 157.27 145.83 203.37 191.93 180.5 169.06 226.6 215.16 203.73 192.29 249.82 238.39 226.96 215.52 249.82 123.05 19.57 1.33 Safe Safe Safe
3 LC6 174.66 163.13 151.59 140.06 160.55 149.01 137.48 125.94 146.44 134.9 123.37 111.83 132.32 120.79 109.25 97.72 174.66 74.94 13.78 1.33 Safe Safe Safe
4 LC7 239.88 215.25 190.62 165.98 252.01 227.37 202.74 178.11 264.13 239.5 214.86 190.23 276.26 251.62 226.99 202.36 276.26 143.2 20.76 1.33 Safe Safe Safe
4 LC8 99.16 105.06 110.96 116.85 111.26 117.15 123.05 128.94 123.35 129.25 135.14 141.04 135.44 141.34 147.23 153.13 153.13 76.38 10.17 1.33 Safe Safe Safe
5 LC9 178.1 167.62 157.14 146.66 201.05 190.57 180.09 169.61 224 213.52 203.05 192.57 246.96 236.48 226 215.52 246.96 123.88 19.08 1.33 Safe Safe Safe
5 LC10 172.47 162 151.53 141.06 158.02 147.55 137.08 126.61 143.57 133.1 122.63 112.16 129.13 118.65 108.18 97.71 172.47 74.93 13.49 1.33 Safe Safe Safe
6 LC11 237.69 214.05 190.42 166.78 249.53 225.9 202.26 178.62 261.37 237.74 214.1 190.47 273.22 249.58 225.94 202.31 273.22 144 19.99 1.33 Safe Safe Safe
6 LC12 97.16 104.06 110.96 117.85 108.91 115.81 122.71 129.61 120.66 127.56 134.46 141.36 132.42 139.32 146.21 153.11 153.11 74.38 10.3 1.33 Safe Safe Safe
7 LC13 178.52 167.06 155.59 144.13 190.46 178.99 167.53 156.07 202.4 190.93 179.47 168.01 214.34 202.87 191.41 179.94 214.34 121.35 12.51 1 Safe Safe Safe
7 LC14 176.96 166.5 156.04 145.58 188.59 178.13 167.67 157.22 200.23 189.77 179.31 168.85 211.87 201.41 190.95 180.49 211.87 122.8 11.83 1 Safe Safe Safe
LOAD IN PILES & CHECK FOR PILE CAPACITY

Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY

Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY

Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY

Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY

Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY

Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY

Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear

Legend: Minus sign indicates tensile load in pile

* For the calculation of minimum vertical load in pile, the effect of design water table is considered.
# For checking the safety of piles, increase factors for pile capacities are considered (wherever applicable).
Critical Loads in Pile:
Maximum vertical load in pile = 276.26 kN (unfactored)
Minimum vertical load in pile * = 10.78 kN (unfactored)
Maximum shear in pile = 20.76 kN (unfactored)