Petrofac: Load Input For The Design of Pile Cap
Petrofac: Load Input For The Design of Pile Cap
Total height from the top of pedestal to the bottom of pilecap = 2.15 m
Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
1 LC1 -38.018 956.215 -156.693 0 0 0 1.5 1.33 -38.02 1775.22 -156.69 -336.89 0 81.74
1 LC2 -37.937 363.955 118.831 0 0 0 1.5 1.33 -37.94 1182.96 118.83 255.49 0 81.56
2 LC3 -196.323 1322.182 -22.082 0 0 0 1.5 1.33 -196.32 2141.18 -22.08 -47.48 0 422.09
2 LC4 125 -1.844 -16.257 0 0 0 1.5 1.33 125 817.16 -16.26 -34.95 0 -268.75
3 LC5 -138.308 2346.266 -280.982 0 0 0 1.5 1.33 -138.31 3165.27 -280.98 -604.11 0 297.36
3 LC6 -139.539 1360.036 170.715 0 0 0 1.5 1.33 -139.54 2179.04 170.72 367.04 0 300.01
4 LC7 -297.963 2718.898 -146.657 0 0 0 1.5 1.33 -297.96 3537.9 -146.66 -315.31 0 640.62
4 LC8 71.312 1199.363 -146.274 0 0 0 1.5 1.33 71.31 2018.36 -146.27 -314.49 0 -153.32
5 LC9 -126.759 2329.931 -277.645 0 0 0 1.5 1.33 -126.76 3148.93 -277.65 -596.94 0 272.53
5 LC10 -126.645 1342.509 174.78 0 0 0 1.5 1.33 -126.65 2161.51 174.78 375.78 0 272.29
6 LC11 -285.897 2700.976 -143.241 0 0 0 1.5 1.33 -285.9 3519.98 -143.24 -307.97 0 614.68
6 LC12 83.441 1183.171 -142.16 0 0 0 1.5 1.33 83.44 2002.17 -142.16 -305.64 0 -179.4
7 LC13 -138.67 2048.71 -144.412 0 0 0 1.5 1 -138.67 2867.71 -144.41 -310.49 0 298.14
7 LC14 -126.517 2040.572 -140.756 0 0 0 1.5 1 -126.52 2859.57 -140.76 -302.63 0 272.01
LC15
LC16
LC17
LC18
LC19
LC20
LC21
LC22
LC23
LC24
LC25
LC26
LC27
LC28
LC29
LC30
LC31
LC32
LC33
LC34
LC35
LC36
LC37
LC38
LC39
LC40
LC41
LC42
LC43
LC44
LC45
LC46
Petrofac Doc. No. 0
Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC47
LC48
LC49
LC50
LC51
LC52
LC53
LC54
LC55
LC56
LC57
LC58
LC59
LC60
LC61
LC62
LC63
LC64
LC65
LC66
LC67
LC68
LC69
LC70
LC71
LC72
LC73
LC74
LC75
LC76
LC77
LC78
LC79
LC80
LC81
LC82
LC83
LC84
LC85
LC86
LC87
LC88
LC89
LC90
LC91
LC92
LC93
LC94
LC95
LC96
LC97
Petrofac Doc. No. 0
Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC98
LC99
LC100
LC101
LC102
LC103
LC104
LC105
LC106
LC107
LC108
LC109
LC110
LC111
LC112
LC113
LC114
LC115
LC116
LC117
LC118
LC119
LC120
LC121
LC122
LC123
LC124
LC125
LC126
LC127
LC128
LC129
LC130
LC131
LC132
LC133
LC134
LC135
LC136
LC137
LC138
LC139
LC140
LC141
LC142
LC143
LC144
LC145
LC146
LC147
LC148
Petrofac Doc. No. 0
Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC149
LC150
LC151
LC152
LC153
LC154
LC155
LC156
LC157
LC158
LC159
LC160
LC161
LC162
LC163
LC164
LC165
LC166
LC167
LC168
LC169
LC170
LC171
LC172
LC173
LC174
LC175
LC176
LC177
LC178
LC179
LC180
LC181
LC182
LC183
LC184
LC185
LC186
LC187
LC188
LC189
LC190
LC191
LC192
LC193
LC194
LC195
LC196
LC197
LC198
LC199
Petrofac Doc. No. 0
Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC200
LC201
LC202
LC203
LC204
LC205
LC206
LC207
LC208
LC209
LC210
LC211
LC212
LC213
LC214
LC215
LC216
LC217
LC218
LC219
LC220
LC221
LC222
LC223
LC224
LC225
LC226
LC227
LC228
LC229
LC230
LC231
LC232
LC233
LC234
LC235
LC236
LC237
LC238
LC239
LC240
LC241
LC242
LC243
LC244
LC245
LC246
LC247
LC248
LC249
LC250
Petrofac Doc. No. 0
Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC251
LC252
LC253
LC254
LC255
LC256
LC257
LC258
LC259
LC260
LC261
LC262
LC263
LC264
LC265
LC266
LC267
LC268
LC269
LC270
LC271
LC272
LC273
LC274
LC275
LC276
LC277
LC278
LC279
LC280
LC281
LC282
LC283
LC284
LC285
LC286
LC287
LC288
LC289
LC290
LC291
LC292
LC293
LC294
LC295
LC296
LC297
LC298
LC299
LC300
LC301
Petrofac Doc. No. 0
Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC302
LC303
LC304
LC305
LC306
LC307
LC308
LC309
LC310
LC311
LC312
LC313
LC314
LC315
LC316
LC317
LC318
LC319
LC320
LC321
LC322
LC323
LC324
LC325
LC326
LC327
LC328
LC329
LC330
LC331
LC332
LC333
LC334
LC335
LC336
LC337
LC338
LC339
LC340
LC341
LC342
LC343
LC344
LC345
LC346
LC347
LC348
LC349
LC350
LC351
LC352
Petrofac Doc. No. 0
Load
Loads from STAAD Output Increase Loads at the bottom of pile cap
Factor
Node Load Factor
for Pile
No. Case for Pile MX (kN- MY (kN- MZ (kN-
FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) Cap FX (kN) FY (kN) FZ (kN)
Capacity m) m) m)
Design
LC353
LC354
LC355
LC356
LC357
LC358
LC359
LC360
LC361
LC362
LC363
LC364
LC365
LC366
LC367
LC368
LC369
LC370
LC371
LC372
LC373
LC374
LC375
LC376
LC377
LC378
LC379
LC380
LC381
LC382
LC383
LC384
LC385
LC386
LC387
LC388
LC389
LC390
LC391
LC392
LC393
LC394
LC395
LC396
LC397
LC398
LC399
LC400
Petrofac
Petrofac International Limited
a) in compression = 420 kN
b) in tension = 50 kN
c) in shear = 20 kN
Detail of Materials:
= 650 mm
Clear Cover:
Detail of Pedestal:
= 552.25 kN
= 12.94 kN
Weight of soil above pile cap = {4.7 x 4.7 - 0.5 x 0.9} 0.65 x 18
= 253.19 kN
= 0 kN (No surcharge)
= 819 kN
Total upward load on pile cap due to the design = 4.7 x 4.7 (1.65 - 0) 10
LpX
LpedX
LpedZ
X
LpZ
zi
xi
+Mx2 +Mz1
Critical section for shear
+Mz2 +Mx1
Critical Sections for Bending & Shear (distances from the CG of pile cap):
b) around square pile = 3762.5 mm (at 1.5 d from face of corner pile)
The pile loads are checked against increased capacities for wind/seismic
Refer the separate sheet giving loads on piles for each load case.
d= 887.5 mm
K= Mu/bd2 fcu
= 0.021
= 843.13 mm
Ast = Mu/(0.95 fy z)
= 6273 mm2
Diameter of reinforcement = 25 mm
Provide 25 T @ 250 mm c/c (at the bottom of pile cap along Z direction).
b= 4700 mm
d= 912.5 mm
K= Mu/bd2 fcu
= 0.027
= 866.88 mm
Ast = Mu/(0.95 fy z)
= 8164 mm2
Diameter of reinforcement = 25 mm
Provide 25 T @ 250 mm c/c (at the bottom of pile cap along X direction).
d= 912.5 mm
K= Mu/bd2 fcu
= 0.005
Petrofac
Petrofac International Limited
= 866.88 mm
Ast = Mu/(0.95 fy z)
= 1455 mm2
of BS 8110:Part 1 - 1997)
Diameter of reinforcement = 20 mm
Provide 20 T @ 225 mm c/c (at the top of pile cap along Z direction).
d= 937.5 mm
K= Mu/bd2 fcu
= 0.006
= 890.63 mm
Ast = Mu/(0.95 fy z)
= 1729 mm2
Diameter of reinforcement = 20 mm
Provide 20 T @ 225 mm c/c (at the top of pile cap along X direction).
Maximum design shear stress, nmax = 0.8 (fcu)0.5 or 5 N/mm2, whichever is less (Refer 3.6.4.6
i) along X axis
b= 4700 mm
d= 887.5 mm
= 0.56 N/mm2
Design concrete shear stress, nc = 0.79 {100 As/(bv d)}1/3 {400/d}1/4 /gm
= 1
Partial safety factor for material gm = 1.25 (Refer 2.4.4.1 of BS 8110:Part 1 - 1997)
\ nc = 0.313 N/mm2
Length of portion of the member transversed = 560 - 900/2 (i.e. distance between critical section &
b= 4700 mm
d= 912.5 mm
= 0.58 N/mm2
Design concrete shear stress, nc = 0.79 {100 As/(bv d)}1/3 {400/d}1/4 /gm
gm = 1.25
\ nc = 0.308 N/mm2
This check is required only for those cases where the spacing of pile exceeds Refer 3.11.4.5 of BS 8110:
3 x dia of pile. For other cases, ignore this check. Part 1 - 1997
Punching load is less than the shear strength of concrete, hence Ok.
ii) Check for punching stress along the perimeter of the pedestal:
Allowable shear stress = 0.8 (fcu)0.5 or 5 N/mm2, whichever is less (Refer 3.6.4.6
Punching stress is less than the allowable shear stress, hence Ok.
iii) Check for punching stress at "1.5d" distance from the pedestal face: Refer 3.7.7.4 of BS 8110:
Perimeter, uo = 1200 mm
Allowable shear stress = 0.8 (fcu)0.5 or 5 N/mm2, whichever is less (Refer 3.6.4.6
Punching stress is less than the allowable shear stress, hence Ok.
Petrofac
Petrofac International Limited
v) Check for punching stress at "1.5d" distance from the pile face:
Perimeter, uo = 3762.5 mm
CONTENTS
Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
1 LC1 96.23 93.09 89.95 86.81 109.19 106.05 102.9 99.76 122.14 119 115.86 112.71 135.1 131.95 128.81 125.67 135.1 64.03 10.08 1.33 Safe Safe Safe
1 LC2 93.38 90.24 87.1 83.97 83.55 80.42 77.28 74.14 73.73 70.59 67.45 64.32 63.9 60.77 57.63 54.49 93.38 31.71 7.8 1.33 Safe Safe Safe
2 LC3 155.43 139.2 122.97 106.74 157.26 141.03 124.8 108.57 159.08 142.85 126.62 110.39 160.91 144.68 128.45 112.22 160.91 83.96 12.35 1.33 Safe Safe Safe
2 LC4 33.56 43.89 54.22 64.56 34.9 45.23 55.57 65.9 36.24 46.58 56.91 67.25 37.59 47.92 58.26 68.59 68.59 10.78 7.88 1.33 Safe Safe Safe
3 LC5 180.14 168.7 157.27 145.83 203.37 191.93 180.5 169.06 226.6 215.16 203.73 192.29 249.82 238.39 226.96 215.52 249.82 123.05 19.57 1.33 Safe Safe Safe
3 LC6 174.66 163.13 151.59 140.06 160.55 149.01 137.48 125.94 146.44 134.9 123.37 111.83 132.32 120.79 109.25 97.72 174.66 74.94 13.78 1.33 Safe Safe Safe
4 LC7 239.88 215.25 190.62 165.98 252.01 227.37 202.74 178.11 264.13 239.5 214.86 190.23 276.26 251.62 226.99 202.36 276.26 143.2 20.76 1.33 Safe Safe Safe
4 LC8 99.16 105.06 110.96 116.85 111.26 117.15 123.05 128.94 123.35 129.25 135.14 141.04 135.44 141.34 147.23 153.13 153.13 76.38 10.17 1.33 Safe Safe Safe
5 LC9 178.1 167.62 157.14 146.66 201.05 190.57 180.09 169.61 224 213.52 203.05 192.57 246.96 236.48 226 215.52 246.96 123.88 19.08 1.33 Safe Safe Safe
5 LC10 172.47 162 151.53 141.06 158.02 147.55 137.08 126.61 143.57 133.1 122.63 112.16 129.13 118.65 108.18 97.71 172.47 74.93 13.49 1.33 Safe Safe Safe
6 LC11 237.69 214.05 190.42 166.78 249.53 225.9 202.26 178.62 261.37 237.74 214.1 190.47 273.22 249.58 225.94 202.31 273.22 144 19.99 1.33 Safe Safe Safe
6 LC12 97.16 104.06 110.96 117.85 108.91 115.81 122.71 129.61 120.66 127.56 134.46 141.36 132.42 139.32 146.21 153.11 153.11 74.38 10.3 1.33 Safe Safe Safe
7 LC13 178.52 167.06 155.59 144.13 190.46 178.99 167.53 156.07 202.4 190.93 179.47 168.01 214.34 202.87 191.41 179.94 214.34 121.35 12.51 1 Safe Safe Safe
7 LC14 176.96 166.5 156.04 145.58 188.59 178.13 167.67 157.22 200.23 189.77 179.31 168.85 211.87 201.41 190.95 180.49 211.87 122.8 11.83 1 Safe Safe Safe
LOAD IN PILES & CHECK FOR PILE CAPACITY
Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY
Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY
Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY
Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY
Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY
Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
LOAD IN PILES & CHECK FOR PILE CAPACITY
Node Load
Load on Piles - kN (Effect of design water table is not considered) Max. * Min.
Shear
Factor #
Check for Pile Capacity
Pile Pile for Pile
No. Case per Pile
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Load Load Capacity Compression Tension Shear
* For the calculation of minimum vertical load in pile, the effect of design water table is considered.
# For checking the safety of piles, increase factors for pile capacities are considered (wherever applicable).
Critical Loads in Pile:
Maximum vertical load in pile = 276.26 kN (unfactored)
Minimum vertical load in pile * = 10.78 kN (unfactored)
Maximum shear in pile = 20.76 kN (unfactored)