001/PPIC-IMS/CBT-GSB/VI/2022: Installation Method Statement COMPANY Document Number
001/PPIC-IMS/CBT-GSB/VI/2022: Installation Method Statement COMPANY Document Number
001/PPIC-IMS/CBT-GSB/VI/2022: Installation Method Statement COMPANY Document Number
i
8.0 Safety …………………………………………………………… 8
8.1 General …………………………………………………………… 8
8.2 Strong Wind Preparation Work ……………………………………….. 9
8.3 Safety Line …………………………………………………………… 9
ii
Project Overview Project Summary & Scope
Stage Activities
1. Material Handling This stage shall cover all the activities
handling of structures, transportation of
Materials from lay down yard to erection
points process of loading-unloading and
material sorting for assembly.
2. Modules Ground Assembly This stage defines activities carried out in
which cover the preparation and setting of
jigs for ground assembly, main beam/truss
assembly, tie beam assembly, tie brace
assembly, purlin assembly, H.S.B. Pre-
tightening, dimension checking, dimension,
H.S.B. full tightening, dimension checking,
setting of safety equipment and hoisting up of
modules.
3. Tie Rod Fixing Stage in which the assembled component is
lifted up from jigs and the tie rod is fixed to
ensure the component is maintained as per
designated length prior to hoisting and
installation.
4. Assembly ( tie beam, purlin, beam ) Stage in which component are assembled and
joined together to from larger structures
(modules). This stage includes assembly of
element or piece to element or either piece to
piece.
6.0 Bolting
6.1 Tightening Procedures
a) In general, the tightening of bolts shall be carried out in two stages consist
of pre-tightening and full ( final ) tightening at every group of connections.
b) Pre-tightening of the High-Strength Bolt by hand tools in every joint group
shall be done.
c) Full tightening shall be carried out using tools exclusively for torque
wrench High-Strength Bolts and tightening shall be tested with the moment
torque.
d) The following figures show the allowable sequence for bolt tightening at
any join
e) The tightening work shall be implemented in two rounds, the second being
done to ensure all bolts are equally stressed.
f) Allowable torque for bolt tightening and inspection
In the completed connection, all bolts shall have at least the minimum bolt
tension specified below when all bolts in the bolt group are tightened.
8.0 Safety
8.1 General
a. The safety standard shall be maintained throughout the erection process.
b. Temporary bracing shall be introduced wherever necessary to take care of
all loads to which the structure may be subjected, including equipment and
the operation of the same.
c. Such bracing shall be kept in place as long as may be required for safety.
d. Wherever stacked material, erection equipment or other loads are carried
during erection, proper provision shall be made to accommodate the
resulting stresses.
e. Tools box meeting shall be held daily at the jobsite prior to starting work.
During such meeting, the site manager / engineer shall instruct the workers
of the day work programs and shall remind the workers of working safety
and also to take care of the safety of all workers.
f. The Site Manager shall instruct all supervisor, staffs and workers of the
followings and shall be maintained throughout the erection work takes
place :
i. Safety helmets, safety hardness safety goggles and safety shoes shall
always be working be worn at site.
ii. All hand working tools like spanner, hammer, and punch shall be
secured and shall be tied up with rope to safety belt.
iii. All mechanical / electrical equipment / devices shall be checked at
regular intervals before usage.
iv. All lifting and alignment sling wires shall be checked at regular basis
and damaged sling shall be replaced immediately.
v. Shackles and wire ropes shall be chosen from safe lifting capacity.
vi. Rubbish and unwanted materials shall be brought down to the ground
dumping point to avoid from flying away.
vii. Working platforms, temporary scaffoldings, safety cables and etc. shall
be erected to maintain safe working environment wherever necessary.
viii. Adequate warning / hazard notices shall be places to warn and educate
workers.
ix. Necessary fire extinguishers, sand buckets shall be kept available.
x. First aid kit shall be made available.
xi. Adequate precautions shall be taken for traffic control and look out
during crane age operations.
xii. Smoking shall be permitted at “smoking area “only.
8.2 Strong Wind Preparation Work.
a) When strong wind storm approaching, site Manager/ Supervisors shall, take
and inspection of the work to ensure the following :
ii. Confirming all locations in each group have properly tightening within
the specified requirements.
c) Bolts where abnormalities are not noticeable shall be accepted.
d) Bolts subject to rejection shall not be re-used and shall be replaced.
1. ORGANIZATION STRUCTURE
2. PROJECT SCHEDULE
6. ERECTION SQUENCE
8. LIFTING CALCULATION
9. JSA
ORGANIZATION
STRUCTURE
PT. GERBANG SARANABAJA
Steel Structure Fabrication & Installation
ORGANIZATION STRUCTURE
PROJECT MANAGER
Slamet Riyadi
Yoris 1. Harun
WORKER/ASSISTANT
4 Detail Engineering Design ( DED) Approved 14 days Wed 25/05/22 Tue 07/06/22 Approval of DED
25/05 07/06
5 Review GA Drawing 7 days Tue 07/06/22 Mon 13/06/22 Review GA Drawing
07/06 13/06
6 Shop Drawing 15 days Mon 20/06/22 Mon 04/07/22 Shop Drawing
20/06 04/07
7 Purchase Material & On Shop 120 days Wed 25/05/22 Wed 21/09/22 Purchase Material & On Shop
25/05 21/09
8 PHASE 1 ( LINE 1 - 42 / A-M ) 158 days Thu 14/07/22 Sun 18/12/22
9 Fabrication Phase 1 ( Line 1 - 42/ A - M ) 70 days Tue 30/08/22 Mon 07/11/22 Fabrication Phase 1 ( Line 1 - 42/ A - M )
30/08 07/11
10 Anchor Bolt Installation 90 days Thu 14/07/22 Tue 11/10/22 Anchor Bolt Installation ( by others )
14/07 11/10
11 Delivery to site 65 days Sat 24/09/22 Sun 27/11/22 Delivery to Site
24/09 27/11
12 Ground Assembly Phase 1 ( line 1 - 42 ) 60 days Tue 04/10/22 Fri 02/12/22 Ground Assembly Phase 1 ( line 1-15 )
04/10 02/12
13 Erection Phase 1 ( line 42 - 1 ) 60 days Sat 08/10/22 Tue 06/12/22 Erection Phase 1 ( line 1 - 15)
08/10 06/12
14 Finishing 50 days Sun 30/10/22 Sun 18/12/22 Finishing
30/10 18/12
15 PHASE 2 ( LINE 1 - 40 / N - AA ) 162 days Tue 30/08/22 Tue 07/02/23
16 Fabrication Phase 2 ( Line 1 - 40 / N - AA ) 60 days Mon 03/10/22 Thu 01/12/22 Fabrication Phase 2 ( Line 15 - 21/ A - M )
03/10 01/12
17 Anchor Bolt Installation 90 days Tue 30/08/22 Sun 27/11/22 Anchor Bolt Installation
30/08 27/11
18 Delivery to site 55 days Sat 12/11/22 Thu 05/01/23 Delivery to Site
12/11 05/01
19 Ground Assembly Phase 2 ( line 1 - 40/ N - AA ) 60 days Thu 17/11/22 Sun 15/01/23 Ground Assembly Phase 2 ( line 1 - 40/ N - AA )
17/11 15/01
20 Erection Phase 2 ( line 40 - 1 ) 60 days Sat 03/12/22 Tue 31/01/23 Erection Phase 2 ( line 40 - 1 )
03/12 31/01
21 Finishing 50 days Tue 20/12/22 Tue 07/02/23
SAFETY QUALITY
CHECK/INSPECTION
PREPARATION / CONSTRUCTION CHECK/INSPECTION
- Safety Induction Drawing Erection Data of Material received - Flow & Procedure
Explain Procedure & regulation - Drawing & Material data
Joint Inspection
Check PPE : Anchor Bolt - Check Alignment/Leveling
- Helmet check & Inspection - Check Quantity/visual/cleaning
- Safety Shoes - Report
PREPARATION & HANDLING
- gloves
Check Material Position
Prepared for Loading
- Check Area
- Check Man Power PPE - Check mobile crane
- Check Material Position JSA - Supporting Temporary
Loading Materials
- Check tools & Equipment - Check Access & Area Condition
- Check Access & Area Condition
Material Moving
Erection Area
Joint Inspection
Open Packing - Check Visual Material & Paint
Material Sorted - Check Quantity
- Check Marking per Component
- Report
Touch Up Paint
Joint Inspection
Joint Inspection - Recheck Component / Marking Quantity
- Check Man Power PPE Joint Inspection - Recheck Visual Paint
STRUCTURE CONSTRUCTION
- Check Material Position JSA Preparation erection - Check Preparation Tools & Equipment
- Check tools & Equipment Erection
- Check Access & Area Condition Column
- Check Lift Line Erection module -1
- Check Electrical Tools Erection module -2
- Report Erection module -3
Touch up Paint
- Check Visual Paint
- Check Quantity
Inspection - Check Marking per Component
Squence Area - Report
- Check Man Power PPE Preparation Mat (By Others) Roofing / Walling (By Others)
- Check Material Position JSA Roofing/Walling Installation - Check Visual
ROOFING /WALLING (By Others)
Verify or Test By
Description of Operation / Reference Acceptance Gerbang SaranaBaja Cipta Baja Trimatra Remarks/Records
Item No.
Inspection or Test Document Criteria Key Sign/Date Key Sign/Date (eg. Test Frequency, Reports,
Certificates, Checklist, etc )
1 Prepare JSA Approved JSA S SO W
Revision : 02
ANCHOR BOLT REPORT Page : of
Y
Note :
a. Tolerance recommended : +/- 3 mm
b. All the parts that found out of tolerance ,
shall be adjusted
A Done Adjusted
X R Totally Repair
INSPECTION Page : of
Date : 02 January 2013
DEVIATION ELEVATION
No. LOCATION MARKING INSPECTION DATE REMARK
1 / / mm mm M M
2 / / mm mm M M
3 / / mm mm M M
4 / / mm mm M M
5 / / mm mm M M
6 / / mm mm M M
7 / / mm mm M M
8 / / mm mm M M
9 / / mm mm M M
10 / / mm mm M M
11 / / mm mm M M
12 / / mm mm M M
Note : a. Tolerance recommended b. All the parts that found out of tolerance, Submit by : Approved by :
1. Alignment 1/1000 Height shall be adjusted
2. Elevation + 3 mm * Mark bellow, after adjusted
A Done Adjusted
(………………) kgf m
Ø GRADE Ø GRADE
mm 8.80 S or F10T 10.90 Inch A325
16 21.14 kgf m 25.80 kgf m 30.25 kgf m 5/8 18.26 kgf m
20 40.75 kgf m 49.74 kgf m 58.32 kgf m 3/4 32.30 kgf m
22 55.27 kgf m 67.46 kgf m 79.09 kgf m 7/8 52.49 kgf m
24 72,88 kgf m 88.94 kgf m 104.29 kgf m 1 78.44 kgf m
27 105.73 kgf m 129.04 kgf m 151.30 kgf m 1 1/8 96.90 kgf m
30 137.55 kgf m 167.87 kgf m 196.84 kgf m 1 1/4 136.51 kgf m
33 186.54 kgf m 227.66 kgf m 266.94 kgf m 1 3/8 179.76 kgf m
Prepared by : Approved by :
( ) ( ) ( )
Sign/name/date Sign/name/date Sign/name/date
DAILY REPORT
Total 0
Working hours : at 07 Am to 18 Pm = 8 Hours PT. Cipta Baja Trimatra PT. Gerbang SaranaBaja
Weather : Rain starting at …………. until …….. Approved by, Checked by, Prepared by,
: Drizzle starting at ………..until ……..
PT. Cipta Baja Trimatra , Instruction :
( ) ( ) ( )
PT. GERBANG SARANABAJA
MASA PELAKSANAAN :
TANGGAL :
Hal : ______ / _____
( NCR ) Page : of
Date
Reinspection Result :
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
ERECTION SQUENCE
47 44 39 34 29 24 19 14 9 4 1
48 45 40 35 30 25 20 15 10 5 2
3
49 46 41 36 31 26 21 16 11 6
43 38 13 8
33 27 23 18
WAREHOUSE PHASE 1
42 37 32 28 22 17 12 7
43 39 34 30 25 20 16 11 7 3
42 38 33 29 24 19 15 10 6 2
41 37 32 28 23 18 14 9 5 1
WAREHOUSE PHASE 2
36 26 21 12
6000
C1 DET - C5 C5 C6
41' 41'
6000
6000
C7 C8 C7 C2 C5 C6
DET - C2 41 41
C1 2000
6000
6000
C5 C6
C2
38' 38' NOTE
6000
6000
C7 C8 C7 C2 C4 C2 C6
38 38
DET - C7 DET - C8
9000
9000
C2 DET - C4 C4 C6
36 36
9000
9000
C8 C7 C2 C4 C6
C7
34 34
C2
9000
9000
C4 C6
32 32
C2
9000
9000
C9 C8 C9 C4 C6
30 30
DET - C9
C2
9000
9000
C4 C6 DRAWING STATUS
28 28
C2 FOR APPROVAL
9000
9000
C7 C7 C4 C6
C8
26 26 PROJECT OWNER
ACCESS CRANE FOR ERECTION
ACCESS CRANE FOR ERECTION
ERECTION
ACCESS CRANE FOR ERECTION
C2
9000
9000
C4 C6 PT. CELLA MANAJEMEN LOGISTIK
24 24
C2 CONTRACTOR
9000
9000
C7 C7 C4 C6
C8
ACCESS CRANE FOR192000
192000
CIPTA BAJA TRIMATRA
22 22 GENERAL CONTRACTOR
C2
9000
9000
C4 C6 CIVIL & STRUCTURE CONSULTANT
20 20
C2
9000
9000
C9 C8 C9 C4 C6
18 18 MECHANICAL & ELECTRICAL :
C2
9000
9000
C4 C6
16 16
C2 PROJECT NAME
9000
9000
C7 C8 C7 C2 C4 C6 CELLA MANAJEMEN LOGISTIK
14 14 WAREHOUSE
C2 Delta Silicon 8 - CIKARANG - WEST JAVA
9000
9000
C2 C4 C6 DRAWING TITLE
12 12
ANCHOR PLAN
9000
9000
C7 C8 C7 C2 C4 C6
10 10 WAREHOUSE PHASE 1
9000
9000
C2 C4 C6 SCALE :
8 8 FILE NAME :
9000
9000
DET - C3
DRAWING REFERENCE
C8 C3 C2 C4 C6
C7
6 6 DOC NUMBER :
6000
6000
C3 C4 C6 APPROVAL
4' 4' DOC NUMBER NAME SIGN DATE
6000
6000
C3 C4 C6
DATE PLOTTED : 03.06.2022
C7 C8
...........................
4 4 RG
DRAFTER
6000
6000
C3 C4 C6
CHECK SUY
1' 1'
...........................
6000
6000
EC1 C7 EC1 EC1 C8 EC1 EC1 C3 C4 C6 EC1
DRAFTER
1 1
CHECK
700 5000 7500
5000 7500 7250 7250 8000 8000 8000 8000 8000 8000 10000 10000
PROJECT NUMBER :
95000 12500
SXXXXX-WDS
M L K J I H G F E D C B A M L K
NOTE : DETAIL SEE DWG DRAWING NUMBER : REVISION :
ANCHOR PLAN EL.+1500 T.O.C _ PHASE 1
ANCHOR PLAN EL.+7000 T.O.C _ PHASE 1
SCALE 1:400
WDS1-GA003 & 004 SXXXXX-WDS1-GA002 A
SCALE 1:400
Tekla structures
STATUS PENERBIT
REV DESCRIPTION APPROVAL TANGGAL
A ISSUED FOR APPROVAL 06.06.2022
CN1
B.O.BPL. EL.+7.050
CN1 CN1 CN1 CN1 CN1 CN1
C1
40
C1 EC1 EC1 EC2 EC1 EC1
EC1 EC1 EC2 EC1 EC1 EC3 EC1
9000
CN1 C2 C3 CN1
39
C7 NOTE
9000
CN1 C2 C4 C5 C6 C3 CN1
37
C7
9000
CN1 C2 C7 C3
CN1
35
9000
CN1 C2 C4 C5 C6 C3
CN1
33
C7
9000
CN1 C2 C7 C3 CN1
31
9000
CN1 C2 C4 C5 C6 C3
CN1
29
C7
9000
DRAWING STATUS
CN1 C2 C7 C3 CN2
27
FOR APPROVAL
9000
CN1 C2 C4 C5 C6 C7 C3 PROJECT OWNER
CN2
ACCESS CRANE FOR ERECTION
9000
CN1 C2 C3 CN2
23 CONTRACTOR
C7
9000
177000
CN1 C4 C5 C4 CIPTA BAJA TRIMATRA
C2 C3 CN1 GENERAL CONTRACTOR
21
C7
9000
CIVIL & STRUCTURE CONSULTANT
C2 C3 CN1
19
C7
9000
C2 C4 C5 C4 C3 MECHANICAL & ELECTRICAL :
CN1
17
C7
9000
C2 C3 CN1
15
C7 PROJECT NAME
9000
CELLA MANAJEMEN LOGISTIK
C2 C4 C5 C4 C3 CN1
WAREHOUSE
13 Delta Silicon 8 - CIKARANG - WEST JAVA
C7
9000
DRAWING TITLE
C2 C3 CN2
11
C7 ANCHOR BOLT PLAN
9000
C2 C4 C5 C4 C3 CN2
WAREHOUSE PHASE 2
9
C7
9000
SCALE :
C2 C3 CN2 FILE NAME :
7
C7
DRAWING REFERENCE
9000
C2 C4 C5 C4 C3 DOC NUMBER :
CN1
5
C7 APPROVAL
7500
C2 C7 C3 DOC NUMBER NAME SIGN DATE
CN1
DATE PLOTTED : 06.06.2022
3 ...........................
RG
7500
DRAFTER
C1 EC1 EC1 EC2 EC1 EC1 EC2 EC1 EC1 EC2 EC1 EC1 EC1 C1
CN1 CHECK
2 SUY
10000 8000 8000 8000 8500 8000 8000 8000 8000 8500 8000 8500 7500 5000 11000
...........................
123700 700 DRAFTER
CHECK
. AA Z Y X W V U T S R Q P O N
PROJECT NUMBER :
SXXXXX-WDS
ANCHOR BOLT PLAN
SCALE : 1:400 DRAWING NUMBER : REVISION :
B.O.BPL. EL. +1.550 UNLESS NOTE OTHERWISE
SXXXXX-WDS2-GA002 A
Tekla structures
ERECTION STEP
( Illustration )
E
CRANE 25T
1 C
1a
2
2a
3 B
3a
4
4a
5 A
STEP 01
Tekla Structures
E
CRANE 25T
1 C
1a
2
2a
3 B
3a
4
4a
5 A
STEP 02
Tekla Structures
E
CRANE 25T
1 C
1a
2
2a
3 B
3a
4
4a
5 A
STEP 03
Tekla Structures
E
1 C
1a CRANE 25T
2
2a CRANE 25T
3 B
3a
4
4a
5 A
STEP 04
Tekla Structures
E
1
C
1a
CRANE 25T
2
2a CRANE 25T
3 B
3a
4
4a
5 A
STEP 05
Tekla Structures
E
D
CRANE 25T
CRANE 25T
1
C
1a
2
2a
3 B
3a
4
4a
5 A
STEP 06
Tekla Structures
E
1
1a C
2
2a
CRANE 25T
3
3a B
CRANE 25T
4
4a
5
A
STEP 07
Tekla Structures
E
1
1a C
2
2a
CRANE 25T
3
B
3a CRANE 25T
4
4a
5
A
STEP 08
Tekla Structures
E
1 CRANE 25T
1a C
CRANE 25T
2
2a
3
B
3a
4
4a
5 A
STEP 09
Tekla Structures
E
CRANE 25T
D
CRANE 25T
1
C
1a
2
2a
3
B
3a
4
4a
5 A
STEP 10
Tekla Structures
CRANE 25T
E
CRANE 25T
1
1a C
2
2a
3
B
3a
4
4a
5
A
STEP 11
Tekla Structures
CRANE 25T
CRANE 25T E
1
1a C
2
2a
3
3a B
4
4a
5
A
STEP 12
Tekla Structures
1
1a
2
2a
3
3a
4
4a
5
5a
6
6a
7
7a
8
8a
9
9a
10
10a
11
11a
12
12a
13 E
13a
14
14a
15 D
15a
16
16a
17 C
17a
18
18a
19 B
19a
20
20a A
21
Tekla Structures
LIFTING CALCULATION
MODULES LIFTING CALCULATION
CELLA ARGYA LOGISTIK
DELTA SILICON - BEKASI
RFTER
Purlin
3.900,00
Tei Beam
Sag Rod
Accessories 750,00
CRANE 25 T
ERECTION MODULE ( 9 M x 24 M )
3m 6m 6m 6m 3m
24 meters
RIGGING POINT
Top elevation
Material Frame
JSA
JOB SAFETY ANALYSIS (JSA) / ANALISA KESELAMATAN PEKERJAAN ( AKP ).
Nama Pekerjaan Steel Work Installation Disetujui oleh Tandatangan / JSA No / No JSA 01/IV/2017/GSB
/Task Title / Approved by Sign Off
Contractor Mgr Dibuat Tanggal
/Issued on
No Kontrak Contractor HSE Revisi Tanggal
/Contract No /Revision date
Perusahaan PT. Gerbang Saranabaja HSE PT.Cipta Baja Trimatra No. Rev/Rev No.
/Company
Alat Pelindung Diri (APD) yang wajib digunakan /Mandatory Using of Personal Protective Equipment (PPE)
Topi Pengaman, Kacamata Pengaman, Sepatu safety, Rompi Cahaya Yang Menyolok, Sarung Tangan, / Hard Hat, Safety Glass, Safety
Shoess, High Visibility Vest and Hand Gloves.
5. Pemasangan kolom/tiang 1. Orang kejatuhan material 1. Semua personel tidak ada di titik erection
Person being hit by falling objects All person cleared area. Authorized persons
Erection of the columns and tie beams 2. Tiang/kolom mengenai personel only
dibawah 2. Pemasangan barricade dan rambu-rambu
Columns striking ground personnel K3
Installation barricade and sign board
3. Tiang/kolom roboh 3. Pemasangan life line ke beam
Columns falling over Installation life line to beam.
4. Spotter selalu ada di tempat
Spotter in place
4. Jatuh dari ketinggian 5. Menahan dengan menggunakan bolt
Falls from height dibagian kaki tiang/kolom
Holding down bolts to be cast into footing
6. Kolom harus diikat pada T Beams
Columns to be tied in with beam
7. Kolom harus lurus
Columns to be leveled
8. Diagonal bracing harus dipasang dengan
kencang
Diagonal bracing to be installed as soon as
tie beam is bolted to columns
9. Semua rigger, kompeten dan tersertifikasi
All rigger certified and competent
10. Personel akan menginstall bolt ke atas
beam, naik menggunakan manlift, saat
menginstall bolt personel mengikat body
harness ke life line (wire sling 8 mm) yang di
pasang diantara beam.
11. Gunakan safety body harness selama dalam
manlift dan diatas beam serta mencatolkan
hook ke life line.
6. Pemasangan rafter/ Installation of rafter 1. Jatuh dari ketinggian 1. Installasi rafter dibawah oleh personel.
Falling from height 2. Personel berada dalam manlift untuk naik ke
2. Material jatuh atas rafter dan H-beam dengan
Falling objects mencatolkan hook secara bertahap dari
3. Struktur amblas railing manlift ke life line.
Structural collapse 3. Gunakan safety body harness selama
dalam man basket dan cantolkan pada
anchor point.
Safety harness must be worn in man basket
at all times & secured to a safe anchorage
point
4. Hanya orang yang berkepentingan yang ada
di area (tidak ada orang yang boleh
mendekati manlift pada saat erection
dilakukan)
Only authorized person in area (no person
to allowed near manlift while erection taking
place)
5. Pemasangan barricade dan rambu K3
Installation Barricade and sign board.
6. Rafter harus dipasang dengan tag line untuk
mencegah pemutaran dan sebagai
pengontrol.
Rafter to be secured with tag line to prevent
spinning and to assist in the controlled
placement of the rafter
7. Rafter diikat dengan bagian atas beam
untuk menstabilkan struktur rafter dan ada
orang yang memegang tali tag line untuk
mencegah pemutaran.
Rafter to rafter tie in with top beam to
stabilize structure
Rafter never allowed to be free standing
unless guy wires are used to secure and
prevent movement
8. Cross bracing (horizontal) harus dipasang
dan purlin harus dipasang pada rafter
Cross bracing (Horizontal) to be installed
once purlins are connected to rafters
7. Pemasangan purlin 1. Jatuh dari ketinggian 1. Installation purlin di atas ketinggian
Installation purlin Falling from height 2. Personel akan menginstall bolt ke atas
2. Material jatuh purlin, naik menggunakan manlift, saat
Falling objects menginstall bolt personel mengikat body
harness ke life line (wire sling 8 mm) yang
sudah di pasang .
8. Painting 1. Gejala sesak nafas, mual dan iritasi 1. Penggunaan alat pelindung diri lengkap
pada mata The use of personal protective equipment
Symptoms of shortness 2. Menggunakan wadah penampung dan isi
of breath, nausea and irritation of 1/3 dari wadah serta tutup cat (stock )
the eyes Using placeholders and fill the
2. Pencemaran container 1/3 of the container and the lid of
contamination paint ifnot used
9. Pemotongan 1. Percikan api yang dapat 1. Menempatkan tabung pada posisi berdiri
Cutting menyebabkan kebakaran dan dan pemakaian selang harus memanjang
ledakan Placing the tubes in a standing
Sparks can cause fires position and use the hose should
and explosions be elongated
10. Pengelasan 1. Orang dapat cidera 1. Pemasangan fire blangket
Welding people can be injured Installation of fire blanket
2. Percikan api yang dapat 2. APD selalu digunakan di area kerja
menyebabkan kebakaran PPE is always used in the work area
Sparks can cause fires
11. House Keeping 1. Tangan tergores, terpukul, terjepit, 1. Perhatikan arah gerakan
terpukul Note the direction of movement
Hand scratched, hit, pinched 2. Menjaga kebersihan dan kerapihan di area
kerja/ Maintain cleanliness and tidiness in
the work area
SOCIALIZATION ATTENDANCE LIST / TANDA HADIR SOSIALISASI
TITLE / JUDUL :
DAY / HARI :
DATE/ TGL :
CREW / KRU :
SUPERVISOR / PENGAWAS :