Operation Process Chart - JERWIN DE LA CUESTA
Operation Process Chart - JERWIN DE LA CUESTA
MM - BM
Operation Process Chart
10min. Grooving of edges 10min. Grooving on edges 10min. Grooving on edges 5min. Noching 5min. Noching
0-3 0-1 0-2 0-13 0-14
10 mins.
15min. Assembled to form frame 2min. Prepared 15 mins.
0-15 0-16 5 mins.
5 mins.
10min. Inserted the frame 5 mins.
0-17 2 mins.
10 mins.
5min. Nailed on
0-20