INSTALL ATION INSTRUCTIONS

Street lighting kit, 65U / SLK / SDK


Inline fuse / Disconnect

IMPORTANT
Read and understand all instructions and
safety information before use. Be aware
of proper usage and potential hazards.

WARNING: Risk of shock, disconnect Step 1


power before installation • Measure cable diameter. Refer to Table 1, select
corresponding section on molded sleeve. Cut off remaining
CAUTION: Product must be installed by a sections of housing to size referenced in Range column,
qualified electrician in accordance with Table 1. Example: If cable OD is 0.390 inch, it falls within the
national and local electrical codes. AWG 4-2 range - cut at 4-2 line.

Table 1
CAUTION: Identify LINE and LOAD sides Range Cable O.D. (inch)
of wiring and molded connector bodies 14-10 0.120-0.205
before beginning installation. These 8-6 0.195-0.330
instructions are not intended as a 4-2 0.320-0.430
substitute for adequate training or
experience in such safety practices. These
instructions do not attempt to provide for Step 2
every possible contingency. • Thoroughly clean approximately 8" along load side cable end.
Apply lubricant and insert cable through small hole in load
Contents: side (plug) housing. Push through a sufficient distance to
• (A) Line side (Receptacle) housing permit 3/8" stripping of insulation. Strip insulation a distance
• (B) Load side (Plug) housing of 3/8" as shown.

• (C) Fuse holder


8"
• (D) Connecting link (SDK only)
• (E) Fuse (Not included) Insert
• Assembly Dowel
Load side
• Lubricant (plug) housing

⅜" Strip
length

(C)

(D)

(A) (B) (E)


2 of 2

STEP 3 • Apply lubricant lightly to outside of fuse holder. Place the


• Insert cable into crimp barrel of fuse holder and crimp. Refer wood dowel into socket and position the free end of dowel
to Table 2 for suggested tool and die. against a firm surface. Push the load side (plug) housing
forward until fuse holder snaps into position. Wipe off any
STEP 4
excess lubricant.
Fuse holder
STEP 5

Fuse holder Firm


Insert Surface

Crimp Push
Wood dowel
Fuse holder
in lock position

A A

1 Section A-A

2 3 • Repeat all the above steps with line side (receptacle) housing.
Crimp location
STEP 6
Table 2
• Insert 13/32” by 11/2" fuse (600 Volt 30 Amp max.) or connecting
Crimp Conductor size AWG Recommended tool and dies
area link into the plug (load side) housing.
Stranded Solid T&B tool No. Die type
1 14 12, 14 WT111M “C” cavity STEP 7
1 10,12 8, 10 WT111M “C” cavity
2 8 6 TBM45S “Blue” cavity
2 6 4 TBM45S “Blue” cavity
Large contact
3 4 2 TBM45S “Gray” cavity Fuse

3 2 — TBM45S “Brown” cavity


WARNING:
DO NOT use glass body fuse

• Connect load side (plug) and line side (receptacle) housings


together.

Street lighting kit, 65U / SLK / SDK | Installation Instructions | 233_R2 | 0054416 C


tnb.abb.com (US/Latin America) We reserve the right to make technical We reserve all rights in this document and
tnb.ca.abb.com (Canada) changes or modify the contents of this in the subject matter and illustrations
abb.com document without prior notice. With contained therein. Any reproduction
Warranty: tnb.abb.com/ecpwarranty regard to purchase orders, the agreed – in whole or in part – is forbidden without
particulars shall prevail. ABB does not prior written consent of ABB.
accept any responsibility whatsoever for Copyright© 2019 ABB. All rights reserved.
potential errors or possible lack of
information in this document.