Subject: Proposal for 3kw Single phase On Grid tied rooftop solar system with
Anchor Panasonic Inverter under subsidy of National Portal scheme
Respected Sir,
This has reference to your requirement regarding rooftop solar PV power plant. We thank you
for showing interest in our products.
The capacity required by you is 3kw rooftop solar PV plant. As per suggestion to reduce electricity
cost, we are pleased to offer you 3kw on grid solar system
Proposed On-Grid tied SPVPP of Tirupati Solar Energy and Services gives following benefits
➢ Reduction in power bills
➢ Accelerated depreciation benefit (if eligible)
➢ Utilization of roof top space (no extra space required)
➢ Minimum maintenance system.
➢ No recurring cost
We welcome the opportunity to talk with your above particular needs and design a system that will
meet your objectives. Please fill free to contact us with questions or for further information.
Best Regards,
Once you go through our proposal, you might still have questions. Please don’t hesitate to
contact us, and we will be happy to resolve your doubts. We know that you are investing (not
spending!) your hard-earned money and you want to make sure it is going into the right
hands. At Tirupati Solar Energy and Services our team is highly professional, extremely ethical,
and possesses tremendous technical expertise. We assure you of our best intentions, best-in-
class quality and service, and that we will be with you throughout your solar journey. Thank
you for considering us!
TABLE OF CONTENTS
WELCOME ........................................................................................................................................2
1 SECTOR PROFILE.......................................................................................................................2
2 PV SYSTEM STANDARDS & SPECIFICATIONS ..................................................................... 3
Warranty ............................................................................................................................7
The Warranty does not cover ............................................................................. 7
The Warranty shall be void if .............................................................................. 7
3 ANNUAL ENERGY YIELD ..................................................................................................... 7
Performance Ratio.............................................................................................................9
4 FINANCIAL ANALYSIS AND PROJECT SCHEDULE ............................................................. 10
Total Cost of Project ........................................................................................................... 10
5 PROJECT START UP AND FUNCTIONAL REQUIREMENTS ................................................ 11
a Site Preparation .............................................................................................................. 11
b Inter Row Spacing for the PV Mounting Structure ................................................... 11
6 CONTACT US .......................................................................................................................... 11
Huge demand of energy with 1 billion populations in India.Country ranks 5th in the production
and consumption of electricity. The geographic location of the country provides good
platform for producing energy from sun i.e. solar energy, every part of India receives 4-8KWh
of solar radiation. Solar energy sector will be a booming sector in upcoming years.
• Transparency
Junction Box
▪
Module mounting structures are used to mount PV modules in place.
▪
Our mounting structures are made of PU Coating mild-steel,
designed to last through the life of the PV system.
▪
There is no drilling or penetration on the RCC roof, so the water-
proofing of the roof remains intact.
▪ Certification/ Standard:
- Mounting structure steel: IS 2062: 1992
- Mounting structure galvanization: IS 4759
Mounting structure is designed to withstand a wind
▪ speed of 150 km/hr.
DC Connector
- MC4 or compatible
- IP67 (or higher) rated for outdoor
Meter
▪
The bi-directional electronic energy meter (net meter) will
be installed for the measurement of import/ export of
energy as per regulations of the Distribution Company.
- Accuracy class of net meter: 0.5s
▪
The unidirectional solar meter will be installed for the
measurement of solar energy generation as per
regulations of the Distribution Company.
▪
In addition to the metering and monitoring
arrangement in inverters, monitoring of voltage,
current and energy will be provided at the low voltage
switchboards. These meters will be digital with an RS
485 port for remote monitoring. They will have
accuracy class 1.0S.
Cable
All the DC and AC cables are designed for outdoor
application with a continuous ambient temperature of
50°C. They are sized for a power loss and a voltage drop
less below 2%.
Page | 6
TECHNO-COMMERCIAL PROPOSAL | CONFIDENTIAL
DC Cabling
AC Cabling
The THEE phase AC output from the inverter will be
connected to inverter combiner panel. The size of AC
cable is ranging between 10 sqmm to 250 sqmm for
different size of inverters.
Earthing System
Lightning Protection
The entire PV plant will be protected from lightning. The
air terminal will be capable of handling multiple strikes of
lightning current and should be maintenance free after
installation. Terminals of LA will be connected to earthing
pit. Chemical earthing pit is used. Dimension of earthing
strip is 25 mm x 3 mm GI.
Page | 7
2.1 Warranty
Grid-tied : 60 (sixty) months from the date of commissioning of the
1
Inverter plant or 62 (sixty two) month from the date of supply of
equipment at site, whichever is earlier.
▪
Any damage due to force majeure events including but not limited to natural calamities such as
typhoons, earthquakes, tsunamis, hurricanes, floods, war, act of terrorism, riots, civil disturbances,
insurrection, military uprising, generally
known as act of God.
▪
Misuse, abuse, theft, vandalism, etc. of the entire PV system or any of its components,with willfully,
accidentally or through negligence by the Client or
anyone else;
TIRUPATI SOLAR ENERGY AND SERVICES has predicted the annual energy yields for the
Project using the basic design and indicative layout as described in the previous sections.
Page | 8
Loss Description
THEE types of shading losses are considered in the PV energy yield
Shading model: horizon shading, shading betweenrows of modules
and near shading due to trees and buildings.
Losses due to "mismatch" are related to the fact that the real
Modulemismatch modules in an array do not all rigorously present the same
current/voltage profiles: there is a statistical variation between
Performance Ratio
The quality of a PV power plant may be described by its Performance Ratio (PR). The PR,
usually expressed as a percentage, can be used to compare PV systems independent of size
and solar resource. The PR may be expressed as:
By normalizing with respect to irradiation, the PR quantifies the overall effect of losses on the
rated output and allows a comparison between PV plants.
Page | 10
Bill of Material
Sr. Name of Material Quantity Make Specification
No.
1 Panel 6 Premier Energies 545Wp mono DCR
Sr.
No. Items and Description Quantity (KW/%) Rate/KW Amount
4 Discount 10,000
Details of Subsidy
A Subsidy Amount 6 kW 3 ₹ 43,764
Terms and Conditions:
1. System is designed based on the available roof top area.
2. It is assumed that the roof has direct access shadow free and obstruction free area will be
provided for Solar PV power plant.
3. String Inverter will be used.
4. Access to existing distribution system is available.
5. Any modifications for new work that might be needed in civil, structure, electrical and any
other area other than covered under this scope of this proposal is not included.
6. Any damage to module due to water used for module cleaning is not responsibility of
Tirupati Solar Energy and Services
7. Defect liability period: One Year
8. LA provided will cover 10M to101 M radius.
9. Civil work not included.
10. Remote monitoring facility included.
11. Prices are subject to change without any prior notice
12. Rating selection and quantity will be as per subject to design approval.
13. Module and Inverter warranty: back-to-back manufacturer warranty.
14. Payment Terms: 50% advance against confirm purchase order, 50% Before Dispatch.
15. Delivery Time: 2 to 3 weeks from the date of payment received.
16. As per Site situation cost of Module mounting structure may vary.
17. These rates are applicable for 7 days only
Expectation from MR. KURUNDKAR SIR .
1. They will provide all necessary documents support for net metering.
2. They will provide fencing or wall compound for the solar power plant.
3. They will provide separate room for Inverter & Junction Box Mounting with proper ventilation
facility.
4. Access to the roof to Tirupati Solar Energy and Services personal to site for storage of material &
erection &Commissioning& during maintenance.
5. They will provide water & Electricity free of charge during this site execution, mounting structure
assembly to Tirupati Solar Energy and Services.
6. They will provide IP Address & internet connectivity for remote monitoring system.
7. They will provide temporary storage space for project material (Solar Modules, cables, Structural
etc.)
8. They will provide good quality water TDS less than 100 during & after installation.
9. Additional modification in LT Panel (If required) will be provided by MR. KURUMKAR SIR .
It is our pleasure to work with you and full fill your particular needs & design a system accordingly that will
meet MR. KURUNDKAR SIR ’s Expectations.
Best Regard
The project start-up and functional requirements shall essentially consist of all the supply,
installation, testing and commissioning required to set up and operate a PV plant. The
following sections discuss important parameters to be considered for a solar PV plant start-
up.
a) Site Preparation
The site preparation shall include all the work as required for installation of a utility scale solar
PV plant as per international practices. This shall essentially include:
In addition to optimizing the inter-row pitch for minimum shading, adequate inter-row
spacing shall be maintained for cleaning of modules. Although this will depend on the strategy
adopted for module cleaning.
CONTACT US
OFFICE
Email – [email protected]