Jadual Pelaksanaan Pekerjaan
Jadual Pelaksanaan Pekerjaan
Jadual Pelaksanaan Pekerjaan
Mobilisasi & Demobilisasi 15,000,000.00 0.78 0.1 0.1 0.1 0.1 0.1 0.1 0.1 100
Air & Listrik Kerja 15,000,000.00 0.777453 0.3 0.3 0.3
Kebersihan area Kerja Sebelum dan Sesudah Pekerjaan 15,000,000.00 0.78 0.3 0.3 0.3
APD 3,000,000.00 0.16 0.1 0.1
Alat dan perlengkapan Kerja 5,000,000.00 0.26 0.1 0.1 0.1 0.1 0.1
LPA Layer, thickness = 15 m + Compaction 713,451,375.00 36.97833 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2
Wiremesh M7 1 layer - (Include Beton Decking) 508,545,375.00 26.36 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Formwork thickness 10 cm 35,042,800.00 1.816275 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Concrete thk.10 cm (K - 300) 615,838,080.00 31.92 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Perawatan Beton ( 3 X sehari selama 7 Hari) 3,500,000.00 0.18 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0
1,929,377,630.00
100.00
Jumlah Keseluruhan (Dibulatkan) 1,929,377,000.00
Prosentase Rencana Keseluruhan 0.1 0.2 0.5 0.4 0.7 0.4 1.6 2.0 2.1 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 1.8 1.8 1.0 1.0 1.0 1.0 0.03 0.03
Rencanan Komulatif Pekerjaan - 0.1 0.3 0.8 1.2 1.9 2.4 4.0 6.0 8.1 11.1 14.1 17.1 20.1 23.1 26.2 29.2 32.2 35.2 38.2 41.2 44.2 47.2 50.2 53.2 56.3 59.3 62.3 65.3 68.3 71.3 74.3 77.3 80.3 83.4 86.4 89.4 92.4 94.2 96.0 97.1 98.1 99.0 100 100 100
Prosentase Rencana Pekerjaan - - - - - - - - - - - - - - -
Realisasi Komulatif Pekerjaan - - - - - - - - - - - - - - -
Deviasi - - - - - - - - - - - - - - -
JADUAL MATERIAL ONSITE
Pekerjaan : RIGID JALAN NURSERY
Lokasi : SAMARA HILLS
Kontraktror : PT. FULLMOON CREATIVE LOMBOK
HARI
U R A I A N P E K E R J A A N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 27 28 29 30 31 32
1 2
Ra KEBUTUHAN BETON HARIAN
Pekerjaan : RIGID JALAN NURSERY
Lokasi : SAMARA HILLS
Kontraktror : PT. FULLMOON CREATIVE LOMBOK
HARI
U R A I A N P E K E R J A A N
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45