NO. 22
FEBRUARY ‘23
APPENDIX VI
Contractor’s Resources
March 2023
List of documents:
HS Manager
ES Manager
Florian Cota
Chief Surveyor
Hekuran Marra (Designer)
Ergest Lila
Auren Dhono
Bernard Luzi (Designer)
(Assistant Surveyor Engineer)
Ermal Lacka
(Assistant Surveyor Engineer)
Structures/Bridges Substructure Earthworks
Permanent Railway Director
Works Director Director
Gaetano Riolo
Fation Bejko Andrea Reitano
Andi Ndoni (Surveyor Engineer)
Pajtim Nelaj (Site Manager) Tomaso Muzzetto (Site Manager) SuperstructureTeam Klevis Hysi (Surveyor Engineer)
Serxhio Shaipi
Vladimir Veizi (Site Engineer) Klensi Jahja (Site Engineer)
(Surveyor Technician)
Dorian Korbeci (Site Engineer) Astrit Goduni (Technician) Hermes Cobo (Surveyor Assistant)
INC S.p.A
February-23 Mr. Roberto Russo
Contractor's Representative
2. Contractor's Staff (Contractor's Monthly Report
Sub-Clause 6.10 - Records of Contractor’s Personnel Month: Feb-23
February `23)
Employee / Subcontractor Data Payroll sheet data / Daily reports Calendar Days
Summary Report
Arrival to the Salary Day on Hours Worked February-23
Item
Name Of Employee / Subcontractor In Capacity of Site per hour Work Regular Overt. Public Sunday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
wd id nw
EURO/Hr. Hours Hours Holiday Hours Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 42 43 44
OVERHEAD PERSONNEL
1 Roberto Russo Contractor's Representative 3-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
2 Dhimitraq Mili Project Manager 3-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
3 Ettore Vieni Deputy Project Manager 3-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
4 Barlet Dede Deputy Project Manager 4-Nov-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
5 Nikolin Braho Chief Designer 3-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
6 Gaetano Riolo Permanent Railway Director 15-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
7 Fation Bejko Structures/Bridges Works Director 23-Sep-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
8 Andrea Reitano Substructure Earthworks Director 3-May-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
9 Kristian Gjetja Planning & Cost Control Manager 3-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
10 Evis Hoxha Permit Manager 3-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
11 Francesco Di Leone Signaling System Director 15-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
12 Bruno Serreqi Telecommunication System Director 15-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
13 Orjol Ndrekaj QC Manager 15-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
14 Dritan Bardhoci Site Quality Contol Engineer 16-Jul-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
15 Elton Nano Head of Technical Office 3-Jan-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
16 Tommaso Muzzeto Earthwork Site Manager 24-Jan-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
17 Iza Muja Designer 24-Jan-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
18 Keti Golloshi ESMS Specialist 19-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
19 Marenglen Cekaj HSE Specialist 15-Oct-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
20 Evis Shehu Resettlement Liasion Officer 1-Sep-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
21 Iv Balca Deputy Resettlement Liasion Officer 2-Oct-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
22 Ergest Lila Chief Surveyor 25-Oct-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
23 Auren Dhono Surveyor Engineer 1-Aug-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
24 Ersi Cela Quantity Surveyor 1-Oct-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
25 Hekuran Marra Specialist Designer 1-Oct-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
26 Bernard Luzi Surveyor 1-Dec-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
SUBTOTAL wd = Working Day nw = Non Working Day id = Idling Day (lack of Eng. instruction) 624 0 104
PRODUCTION PERSONNEL
1 Shkelzen Hoxha Logistic 9-Nov-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
2 Elson Spahiu Logistic 1-Jul-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
3 Dhimiter Pasho Storekeeper 12-Oct-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
4 Valentin Laska Storekeeper 13-Sep-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
5 Klens Jahja Site Engineer 13-Jul-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
6 Vladimir Veizi Site Engineer 15-Oct-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
7 Dorian Korbeci Site Engineer 16-Oct-22 23 184 nw wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 23 0 5
8 Andi Ndoni Surveyor 13-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
9 Klevis Hysi Surveyor 16-Mar-22 21 168 wd wd wd nw nw nw wd wd wd nw wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 21 0 7
10 Ermal Lacka Surveyor 12-Feb-21 17 136 wd nw wd wd nw wd nw wd nw wd wd nw wd nw wd wd nw nw nw wd wd wd wd wd nw nw wd wd 17 0 11
11 Serxho Shaipi Surveyor 13-Feb-21 18 144 wd wd wd wd nw wd wd wd wd wd nw nw wd wd nw wd nw wd nw wd nw wd nw wd wd nw wd nw 18 0 10
12 Hermes Cobo Surveyor Assistant 14-Mar-22 19 152 wd wd nw wd nw wd wd wd nw wd wd nw nw wd wd wd wd wd nw wd wd wd nw nw wd nw wd wd 19 0 9
13 Evis Gashi Surveyor Assistant 13-Mar-22 20 160 wd wd wd wd nw wd wd wd wd wd wd nw wd wd nw wd wd wd nw nw wd wd wd wd nw nw nw wd 20 0 8
14 Vojsava Ismailati Surveyor Assistant 12-Jul-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
15 Behar Daci Surveyor Assistant 13-Aug-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
16 Adelian Gaxho Surveyor Assistant 14-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
17 Gledion Goduni Technician 13-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
18 Albert Vladi Technician 16-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
19 Astrit Goduni Technician 15-Dec-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
20 Arjan Ibrahimi Technician 28-Oct-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
21 Qatip Caka Operator 29-Nov-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
22 Hiqmet Hoxhallari Operator 19-Dec-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
23 Elisander Elmazaj Operator 22-Nov-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
24 Xhemal Avdulaj Operator 12-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
25 Ndricim Gjeli Mechanic 13-Feb-21 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
26 Arsen Cobaj Welder 17-Sep-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
27 Astrit Kodragjini Operator 13-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
28 Aurel Tenaj Operator 16-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
29 Nazif Bajo Operator 17-Jun-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
30 Flatun Seitaj Operator 18-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
31 Bajram Mehmeti Operator 15-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
32 Pellumb Alibehaj Concrete Pump Operator 20-Jun-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
33 Ledion Olldashi Operator 21-Mar-22 24 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
Employee / Subcontractor Data Payroll sheet data / Daily reports Calendar Days
Summary Report
Arrival to the Salary Day on Hours Worked February-23
Item
Name Of Employee / Subcontractor In Capacity of Site per hour Work Regular Overt. Public Sunday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
wd id nw
EURO/Hr. Hours Hours Holiday Hours Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 42 43 44
SUBTOTAL wd = Working Day nw = Non Working Day id = Idling Day (lack of Eng. instruction) 3,733 0 971
SUBCONTRACTORS
1 SPIT Designer Mar-21 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
2 ECM Signaling Mar-21 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
3 CACTTUS Telecommunication Mar-21 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
4 SFERA STUDIO Designer Mar-21 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
5 ALTEA Laborarory and Geotechnical Invest. Mar-21 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
6 ENERGY PLUS ITALIA Consultant Mar-21 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
7 JV Prima Energy-Elmazaj-GardenLine Civil Works Oct-21 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
8 Kirshberger Albania Civil Works Sep-22 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
SUBTOTAL wd = Working Day nw = Non Working Day id = Idling Day (lack of Eng. instruction) 168 0 28
3. Contractor's Equipment (Contractor's Monthly Report
Sub-Clause 6.10 - Records of Contractor’s Equipment Month: Feb-23
February `23)
Contractor's / Subcontractor'S Equipment Data Owning & Operating Cost / Machine Shift Reports Calendar Days
Summary Report
Internal Description Power Arrival to the Total Days on Work Hours Worked February-23
Item
Number Site O&O Cost Standing Running Total Standing Running Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
wd id nw
Kw/Kwh/Hp EURO/Hr. Days Days Days Hours Hours Hours Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 44 45 46
OVERHEAD EQUIPMENT
1 AB 930 CP Skoda Karoq Mar-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
2 AB 824 CP Skoda Karoq Mar-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
3 AA 577 UC Hyndai Tucson Mar-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
4 AB 405 ED Toyota Rav 4 Mar-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
5 AA 847 SB Citroen Mar-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
6 AA 488 RY Mitsubishi Pajero Mar-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
7 AB 510 EO Opel Antara Sep-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
8 AA 824 TG Subaru Mar-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
9 AB 870 CP Skoda Fabia Mar-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
10 AB 212 EP Fiat 16 Sep-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
11 AB 475 EV Suzuki Grand Vitara Oct-21 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
12 AA 140 EO Fiat Panda Oct-21 0 23 23 0 184 184 wd wd wd nw nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 23 0 5
13 AB 464 FM KIA Sportage Jan-22 0 24 24 0 192 192 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
14 AB 132 ID Fiat Panda Oct-22 0 22 22 0 176 176 wd wd nw wd nw wd wd wd wd nw wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 22 0 6
15 AA 734 YC Dacia Mar-21 0 22 22 0 176 176 wd nw wd wd nw wd wd nw wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 22 0 6
16 AA 561 EG Mercedez-Benz Class E Mar-21 0 21 21 0 168 168 wd wd nw nw nw wd nw wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 21 0 7
17 AB 456 YG Dacia Sep-21 0 23 23 0 184 184 wd wd wd wd nw wd wd wd nw wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 23 0 5
18 AB 674 AC Van Sep-21 0 22 22 0 176 176 wd nw wd wd nw nw wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 22 0 6
19 AB 186 AL Mini Bus Sep-21 0 22 22 0 176 176 wd wd wd nw nw wd wd wd wd nw wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 22 0 6
20 AA 736 YC Dacia Sep-21 0 23 23 0 184 184 wd wd nw wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 23 0 5
21 AA 384 RV Mitsubishi L200 Sep-21 0 21 21 0 168 168 wd wd wd wd nw nw wd nw wd wd wd nw nw wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 21 0 7
22 AA 459 HS Toyota Hilux Sep-21 0 20 20 0 160 160 wd wd wd nw nw wd wd wd nw wd wd nw wd wd wd wd nw wd nw wd nw wd wd wd wd nw wd wd 20 0 8
23 AB 251 CI Toyota Rav 4 Mar-21 0 21 21 0 168 168 nw wd wd wd nw wd nw wd wd wd wd nw wd wd nw wd wd wd nw wd wd wd wd wd wd nw wd wd 21 0 7
24 AA 126 OH Ford Ranger Mar-21 0 23 23 0 184 184 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd nw 23 0 5
25 AA 215 SZ Servise Vehicle Sep-21 0 19 19 0 152 152 wd wd wd wd nw wd nw nw wd wd wd nw nw wd wd wd nw wd nw wd wd wd nw wd wd nw wd wd 19 0 9
26 AA 679 GM PickUp Mar-21 0 23 23 0 184 184 wd wd wd wd nw wd wd wd nw wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 23 0 5
27 AA 036 XZ Dacia Sep-22 0 21 21 0 168 168 nw wd wd wd nw wd wd wd wd wd wd nw wd nw wd wd nw wd nw wd wd wd wd wd wd nw wd wd 21 0 7
28 AA 384 RV PickUp Jul-22 0 20 20 0 160 160 wd wd wd wd nw nw wd nw wd wd wd nw nw wd wd wd wd wd nw wd wd nw wd wd wd nw wd wd 20 0 8
29 AB 185 AL Mini Bus Oct-22 0 20 20 0 160 160 wd wd wd wd nw wd wd wd nw wd wd nw wd wd nw wd wd wd nw wd wd wd wd nw wd nw wd nw 20 0 8
30 AA 666 CV Wolksvagen Touareg May-22 0 23 23 0 184 184 wd wd wd wd nw wd nw wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 23 0 5
31 AA 398 OC FlatBed Van Mar-22 0 19 19 0 152 152 wd wd wd wd nw nw wd nw wd wd wd nw nw wd nw wd wd nw nw wd wd wd wd wd wd nw wd wd 19 0 9
32 AB 825 EC FlatBed Van Aug-22 0 23 23 0 184 184 wd wd wd wd nw wd wd wd nw wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 23 0 5
33 AA 251 UR FlatBed Van Jul-22 0 23 23 0 184 184 wd wd wd wd nw wd nw wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 23 0 5
SUBTOTAL wd = Working Day nw = Non Working Day id = Idling Day (lack of Eng. instruction) 742 0 182
PRODUCTION EQUIPMENT
1 0 0 0
2 0 0 0
3 0 0 0
4 0 0 0
5 0 0 0
6 0 0 0
7 0 0 0
8 0 0 0
9 ` 0 0 0
10 0 0 0
11 0 0 0
12 0 0 0
13 0 0 0
14 0 0 0
15 0 0 0
16 0 0 0
17 0 0 0
SUBTOTAL wd = Working Day nw = Non Working Day id = Idling Day (lack of Eng. instruction) 0 0 0
SUBCONTRACTOR's HEAVY MACHINIERIES
1 CAT 323 DLN Excavator 0 24 24 0 240 240 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
2 CAT 320 GC Excavator 0 24 24 0 240 240 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
3 CAT 308 CR Mini Excavator 0 13 13 0 130 130 nw nw nw nw nw nw nw nw nw nw nw nw nw wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 13 0 15
4 CAT 330 Excavator 0 24 24 0 240 240 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
5 CAT 322 BLN Excavator 0 24 24 0 240 240 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
6 CAT D6R Dozer 0 24 24 0 240 240 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
7 CAT 120M Grader 0 24 24 0 240 240 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
8 CAT 329 Excavator 0 24 24 0 240 240 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
9 CAT 314 Excavator 0 24 24 0 240 240 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd 24 0 4
10 TH50HD Drilling Machine 0 19 19 0 190 190 wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd wd wd wd nw wd wd wd nw nw nw nw nw nw 19 0 9
Contractor's / Subcontractor'S Equipment Data Owning & Operating Cost / Machine Shift Reports Calendar Days
Summary Report
Internal Description Power Arrival to the Total Days on Work Hours Worked February-23
Item
Number Site O&O Cost Standing Running Total Standing Running Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
wd id nw
Kw/Kwh/Hp EURO/Hr. Days Days Days Hours Hours Hours Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 44 45 46
SUBTOTAL wd = Working Day nw = Non Working Day id = Idling Day (lack of Eng. instruction) 1,555 0 405