5.roof Beam
5.roof Beam
5.roof Beam
32
5.96
A B C D E 01 03
02 3-Y20 (ST) 3-Y20 (ST) 3-Y20 (ST) 3-Y20 (ST) 3-Y20 (ST) 3-Y16 (ST)
01 02 2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT)
5.90
A 01
A
RB1(230X450)
3-Y16(ST) 3-Y16(ST) 3-Y16(ST) 3-Y16(ST) 3-Y16 (ST) 2-Y12 (EXT)
2L-Y8 @145C/C 2L-Y8 @145C/C 2L-Y8 @145C/C 2L-Y8 @145C/C 2L-Y8 @145C/C
B
RB1(230X450)
L.S. OF PB1(230 x 450) (A1-E1) L.S. OF RB2(230 x 450) (D1-D5)
2.63 3.20 3.20 3.20 1.32
5.96
A B C D E
01 03
3-Y20 (ST) 3-Y20 (ST) 3-Y20 (ST) 3-Y20 (ST) 3-Y20 (ST) 3-Y16 (ST)
2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT)
C 2-Y20 (EXT) 2-Y20 (EXT)
RB1(230X450)
01
B
3-Y16(ST) 3-Y16(ST) 3-Y16(ST) 3-Y16(ST)
3-Y16 (ST) 2-Y12 (EXT)
2L-Y8 @145C/C 2L-Y8 @145C/C 2L-Y8 @145C/C 2L-Y8 @145C/C
D 2L-Y8 @145C/C
RB1(230X450)
L.S. OF PB1(230 x 450) (A1-E1) L.S. OF RB2(230 x 450) (D1-D5)
5.96 5.96 5.96
01 03 01 03 01 03
3-Y16 (ST) 3-Y16 (ST) 3-Y16 (ST)
2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT) 2-Y20 (EXT)
E
RB1(230X450)
1.32
1.20
C D E
F
3-Y16 (ST) 2-Y12 (EXT) 3-Y16 (ST) 2-Y12 (EXT) 3-Y16 (ST) 2-Y12 (EXT)
2L-Y8 @145C/C 2L-Y8 @145C/C 2L-Y8 @145C/C
A B
2.63
3-Y16 (ST) L.S. OF RB2(230 x 450) (D1-D5)
L.S. OF RB2(230 x 450) (D1-D5) L.S. OF RB2(230 x 450) (D1-D5)
02
NOTE:
→ Extra Bars in Beams shall be placed for a length of - NOTE:
4-Y12 (ST) a) 0.30*L on either sides of supports at top 1) Beams RB1 Are of size 230 mm x 450mm
2L-Y8 @145C/C b) 0.70*L in the mid span at bottom
→ Do not Scale the drawing. 1) Beams RB2 Are of size 230 mm x 380mm
2L-Y8 @145C/C
→ Only written dimensions are to be followed. 2) All the beam depths mentioned are inclusive of slab thickness
L.S. OF PB1(230 x 380) (A2-B2) LOCAL DISK D/SVCPE/Narayanpet/2023
PROJECT NAME- PROJECT TITLE- DRAWN BY- NIKITA SUB.DATE - 01/03/2023
CONSTRUCTION OF COMMUNITY HALLIN WARD
DRG REF.NO. - 05 REV.DATE - 06/03/2023
ROOF BEAM LAYOUT
NO-12 IN NARAYANPET TOWN.