01 2021 Berr Industry Electrical Projects
01 2021 Berr Industry Electrical Projects
01 2021 Berr Industry Electrical Projects
www.berrindustry.com
BERR Industry;
! The information given here does not cover the last 20 months.. Due to the Covid-19 outbreak we experienced in 2020, no
significant work was done this year and the number of employees has been reduced.
ENGINEERING SOLUTIONS
ABOUT US www.berrindustry.com
Health, safety and environment are, in fact, its highest priority. BERR recognizes and acknowledges the
importance of achieving world-class performance with respect to protection of HSE on every project as an
integral part of its organizational culture. All personnel are encouraged to actively engage in all the HSE
programs and every conceivable effort is made to provide all the necessary training and development to
enforce the project requirements to attain its “Zero Accident” policy.
ENGINEERING SOLUTIONS
POWER PLANT ENGINEERING SERVICES www.berrindustry.com
ENGINEERING SOLUTIONS
ABOUT US www.berrindustry.com
SUBSTATION
The services offered by BERR follow the forms of different types of projects, in accordance with the needs
and requirements of the customers, and are aimed at exceeding customers' expectations.
MOBILE SUBSTATION
POWER GENERATION
• H.F. & D.O. Fuel Fired Simple & Combined Cycle Power Plant Project
• LV-MV Electrical Project / SCADA Automation System / Substation Calculation
ENGINEERING SOLUTIONS
www.berrindustry.com
ENGINEERING SOLUTIONS
www.berrindustry.com
ENGINEERING SOLUTIONS
TRANSFORMER www.berrindustry.com
ENGINEERING SOLUTIONS
CASE STUDY www.berrindustry.com
Project Name & Location : Tosyalı TOYO Rolling Mill | Adana | TURKEY
Project Description : Danieli (Danieli & C. Officine Meccaniche S.P.A.)
1.000.000 Ton per Year. Steel Workshop | Bar Rolling Mill | Wire Rod Rolling Mill
Project Info : 13 Months | 2013 ~ 2014 | 45 Workers
Scope of Works : 4000 Ah Breaker Assembly of the 156 MVA Arc Furnace Reactor,
( Manpower Based Electrical Medium Voltage Clads Assembly of the Arc Furnace Reactor,
Installation Contracting. Medium Voltage Copper Bar Assembly,
120.000 ManHour ) Medium Voltage Cabling & Trying,
Control Panel and Relay System,
Commissioning & Start Up,
Servo System Ultrasonic Test Equipment Assembly,
Complete Electrical Assembly of the Coil&Rod Rolling Mill Factory
Project Budget : 1.500.000,- USD (One Million Five Hundred Thousand Dollars )
ENGINEERING SOLUTIONS
www.berrindustry.com
TRANSFORMER AREA
Project Name & Location : MKEK Steel Making WorkShop | Kırıkkale | TURKEY
Project Description : Danieli (Danieli & C. Officine Meccaniche S.P.A.)
120.000 Ton per Year. Steel Workshop | Hi-Alloy Steel Ingots
Project Info : 7 Months | 2017 ~ 2018 | 40 Workers
Scope of Works : Meltshop
( Manpower Based Electrical Scrap Yard
Installation Contracting. Ferro Alloy Additives Charging Area
70.000 ManHour ) Electric Arc Furnace
Ladle Refining Furnace
Vacuum Degassing
Fume Treatment Plant
Workshops
Ingot Casting Area
EM & SVC Ssytem
Project Budget : 1.100.000,- USD ( One Million A Hundred Thousand Dollars )
ENGINEERING SOLUTIONS
www.berrindustry.com
MKEK STEEL
ENGINEERING SOLUTIONS
www.berrindustry.com
MKEK STEEL
ENGINEERING SOLUTIONS
www.berrindustry.com
MKEK STEEL
ENGINEERING SOLUTIONS
www.berrindustry.com
MKEK STEEL
ENGINEERING SOLUTIONS
CASE STUDY www.berrindustry.com
IZMIT - TURKEY
800-1300mm
ASGABAT - TURKMENISTAN
KIRIKLARELI - TURKEY
MARY - TURKMENISTAN
CANAKKALE - TURKEY
ISTANBUL - TURKEY
Adress:
TR - Postane, Levent Site, I-6 No:7 34940 Tuzla, Istanbul, Turkey
UK - Kingston Upon Hull (England) United Kingdom
www.BerrIndustry.com | [email protected]