ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 1 of 22
Star Exercise 1-B-R11
This page was intentionally left blank.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 2 of 22
Star Exercise 1-B-R11
Purpose
1. To enter equipment data and protection landmarks.
2. To navigate, enter, and retrieve data from each library into respective devices.
3. To Run Protective Device Design Assessment and verify the entered data.
4. To test the protection and coordination settings of this system by generating TCCs.
5. To display the Datablock for Device Settings on one-line.
6. To Run short-circuit in Star, verify TCC kA, and display of Min. and Clipping Current in
Star View.
Part 1: Data Entry
1. Open project “STAR-EX1-BR3” and use default ETAP library file (etaplibxxxx.lib).
2. Make sure you are in Edit mode, use the following One-line Diagram in the project and
enter the data for elements shown below.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 3 of 22
Star Exercise 1-B-R11
Cable1
Enter below data in Ampacity and Protection page of Cable Editor.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 4 of 22
Star Exercise 1-B-R11
T1
Verify and enter below data in Rating and Protection page of 2-Winding Transformer Editor.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 5 of 22
Star Exercise 1-B-R11
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 6 of 22
Star Exercise 1-B-R11
Mtr1
Verify and enter below data in Nameplate, Impedance, and Protection page of Induction
Machine Editor.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 7 of 22
Star Exercise 1-B-R11
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 8 of 22
Star Exercise 1-B-R11
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 9 of 22
Star Exercise 1-B-R11
Phase CT
Enter the below data for CT1 and CT2 then connect to Relay1.
Note the CT Phase/Ground Type option can be selected when the CT is disconnected from relay.
The Phase/Ground option becomes display only after connection to relay.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 10 of 22
Star Exercise 1-B-R11
Ground CT
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 11 of 22
Star Exercise 1-B-R11
Overcurrent Relay
Select GE Multilin Relay 735/737 from library on OCR page of relay editor.
In Current tab of Input page, assign CT1 to Phase terminal and CT2 to Ground terminal of relay.
In Base tab of Input page, select the Cable1 as the protected element to have the ampacity as
reference for adjustment of relay pickup settings.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 12 of 22
Star Exercise 1-B-R11
In Output page, add Digital Output (DO1) and Interlock it with HVCBs.
Apply the Phase Settings in Phase tab of OCR page. Compare pickup with Cable Amps.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 13 of 22
Star Exercise 1-B-R11
Apply the Ground Settings in Ground tab of OCR page
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 14 of 22
Star Exercise 1-B-R11
Fuse (AC)
Select the fuse from library.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 15 of 22
Star Exercise 1-B-R11
Low Voltage Circuit Breaker (LVCB AC)
In Rating page, select below breaker and trip device from library. In selection, pay attention to
the required information for proper selection of breaker and trip device.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 16 of 22
Star Exercise 1-B-R11
Apply Phase Settings in Phase tab of Trip Device page.
Apply Ground Settings in Ground tab of Trip Device page.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 17 of 22
Star Exercise 1-B-R11
Low Voltage Circuit Breaker (LVCB AC)
In Rating page, select below breaker and trip device from library.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 18 of 22
Star Exercise 1-B-R11
Trip Device Settings:
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 19 of 22
Star Exercise 1-B-R11
Overload Heater
Select Typical Curve for Thermal characteristics of overload heater and enter the Trip Amps.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 20 of 22
Star Exercise 1-B-R11
Part 2: Run Protective Device Design Assessment
1. Run the Protective Device Design Assessment from one-line and verify there is no
warning or alert displayed in violation of requested data entry steps in Part 1.
Part 3: Creation of TCC and Device Settings Report
1. Select the whole one-line and make a Star View.
2. Create Device Settings Reports from one-line and Star View.
3. Select the “Device Settings – Brief” Datablock format from toolbar and display it on one-
line for printing.
Part 4: Run Short-Circuit in Star
1. Run / Update Short-Circuit in Star to update the TCC Clipping Currents on TCC kA page
of devices with minimum (30 Cycle kA Short-Circuit Current in Standard page from
Study Case) and maximum (1/2 Cycle kA Short-Circuit Current in Standard page from
Study Case) bus fault currents.
2. Compare the bus fault currents displayed on one-line with TCC kA page of adjacent
protective devices and verify the updated Clipping and Minimum currents.
3. Display the TCC Clipping Current and Minimum Current on created Star View.
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 21 of 22
Star Exercise 1-B-R11
This page was intentionally left blank
ETAP Workshop Notes ©1996-2021 ETAP/Operation Technology, Inc. All rights reserved. Page 22 of 22