This document is a project tracking log for Phase 02, Package 08 of the Qetaifan Island North infrastructure and landscape project. It lists two subcontractor packages - for block and plastering accessories which is complete, and external/internal painting of the substation which is pending signature from the subcontractor. Both packages received approval as noted for their prequalifications, material, and sample/mockup submittals from the client/consultant.

Uploaded by

raed kassab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views6 pages

Cobe B: 1 No

This document is a project tracking log for Phase 02, Package 08 of the Qetaifan Island North infrastructure and landscape project. It lists two subcontractor packages - for block and plastering accessories which is complete, and external/internal painting of the substation which is pending signature from the subcontractor. Both packages received approval as noted for their prequalifications, material, and sample/mockup submittals from the client/consultant.

Uploaded by

raed kassab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

C

O
V
E
N
A
R
T
AL JABER TRADING AND CONTRACTING CO., W.L.L.
P
p.o. Box 1120 Doha, Qatar A (Approved) D (Information, Record)
Q
B (Approved as Noted
Project Packages Tracking Log E (Incomplete, Re-submit)
Re-submit) N
Project: Qetaifan Island North - Phase 02, Package 08 - C (Not Approved, RE-submit) UR (Under Review) o
Date: Tuesday, March 21, 2023
Infrastructure & Landscape t

Package Preparation Client / Consultant Approval A


p
Awarded Subcontractor / p
# Package Name Confirmation / LOA Contract Prequalifications Submittal Material Submittal Design Calculation Shop Drawings Method Statement Sample / Mockup r
Supplier
o
v
B (Approved as Noted e
B (Approved as Noted B (Approved as Noted d
1 Block & Plastering Accessories M/s. EXMET Done N/A N/A N/A N/A Re-submit)
Re-submit) Re-submit)
(
C
o
B (Approved as Noted d
External & Internal Painting Works M/s. JOTUN Pending with s/c for B (Approved as Noted Cobe B: 1 no
2 N/A N/A Re-submit) N/A N/A e
(only substation) (Supply of Material) signature Re-submit) Under review: 1 no
C
)
B (Approved as Noted -
B (Approved as Noted
Structural Steel Material B (Approved as Noted B (Approved as Noted B (Approved as Noted B (Approved as Noted Re-submit)
3 M/s. AL JABER STEEL Done N/A Re-submit) 2
(in between buildings) - 01 Re-submit) Re-submit) Re-submit) Re-submit)
01-Feb-23 2
-
O
B (Approved as Noted c
C (Not Approved, RE-submit) B (Approved as Noted
Structural Steel Material B (Approved as Noted B (Approved as Noted B (Approved as Noted Re-submit) t
4 M/s. AL JABER STEEL Done N/A Pending TQ Ref. QINPH2- Re-submit)
(in entrance) - 02 Re-submit) Re-submit) Re-submit) -
P08-TQ-JTC-STR-00015
01-Feb-23 2
2
:
B (Approved as Noted (8 of 8) C (Not Approved, RE- B (Approved as Noted
Code C: 5 no B (Approved as Noted
Shade Structure, Play Area Shade Structure, & Re-submit) submit) Re-submit)
5 M/s. AL JABER STEEL LOA Under Process Pending If Required by Consultant Cobe B: 3 no Re-submit) M
Shade Canopy for Parking
Under review: 2 no /
28-Jan-23 30-Jan-23 01-Feb-23
s
.
B (Approved as Noted B (Approved as Noted
B (Approved as Noted C
B (Approved as Noted B (Approved as Noted B (Approved as Noted Re-submit) Re-submit)
6 Stainless Steel Handrails M/s. LANDING ZONE Done N/A Re-submit) O
Re-submit) Re-submit) Re-submit)
31-Jan-23 22-Feb-23 V
E
N
B (Approved as Noted A
B (Approved as Noted B (Approved as Noted
B (Approved as Noted B (Approved as Noted B (Approved as Noted Re-submit) R
7 GI Access Ladders M/s. LANDING ZONE Done N/A Re-submit) Re-submit)
Re-submit) Re-submit) Re-submit) T
31-Jan-23
s
u
B (Approved as Noted
b
B (Approved as Noted Re- Re-submit)
8 Epoxy Floor Coating M/s. DCP Pending N/A N/A N/A N/A If Required m
submit)
i
12-Feb-23
t
t
e
B (Approved as Noted (3 of 3) B (Approved as Noted B (Approved as Noted d
9 Roof Waterproofing M/s. BMC Done Done A (Approved) N/A N/A
Re-submit) Re-submit) Re-submit)
a

r
B (Approved as Noted B (Approved as Noted e
B (Approved as Noted B (Approved as Noted Re-submit) Re-submit) v
10 Galvanized Chequered Plate M/s. EXMET Direct Puchase by Site N/A N/A
Re-submit) Re-submit) i
26-Jan-23 12-Feb-23 s
e
d
B (Approved as Noted
B (Approved as Noted B (Approved as Noted
B (Approved as Noted B (Approved as Noted Re-submit) P
11 Steel Doors M/s. MCKINLEY Done N/A N/A Re-submit) Re-submit)
Re-submit) Re-submit) Q
RAL 7037
06-Feb-23
D
o
B (Approved as Noted c
B (Approved as Noted B (Approved as Noted B (Approved as Noted B (Approved as Noted
12 Steel Ventilation M/s. MCKINLEY Done N/A N/A Re-submit) s
Re-submit) Re-submit) Re-submit) Re-submit)
RAL 7037 .
-

2
3
13 Aluminum Mesh GOLDEN METAL DECO Under Process N/A
-
O
c
t
C (Not Approved, RE-submit) UR (Under Review) -
Aluminum Strip & Glass Doors & Windows & 2
14 M/s. VIOLET Under Process N/A to be resubmitted upon Factory Pending Pending Pending Pending
Curtain Walls 2
visit 20-Feb-23
:

P
Wooden Doors / Decorative Wooden Strip / 5Ps Interiors Q
15 Under Process N/A under review Pending Pending Pending Pending
Pantry Cabinet / Toilet Counter Top (SOW shall be confirmed)
R
e
v
.
0
42 Handrail for Retaining Wall 5Ps Interiors Under Process N/A under review under JTC review Pending Pending Pending
1

b
e
e
B (Approved as Noted B (Approved as Noted B (Approved as Noted n
16 Ceramic & Porcelain M/s. CONTEMPORARY Under Process N/A N/A by JTC under review
Re-submit) Re-submit) Re-submit)
s
u
b
B (Approved as Noted
3 Sample Code-B m
B (Approved as Noted Re-submit) B (Approved as Noted
17 Suspended Ceiling M/s. QADCO Done N/A N/A Pending with JEM 2 sample Pending i
Re-submit) Re-submit)
t
05-Feb-23
t
e
B (Approved as Noted d
Code C: 4 no
Soft Landscape & Irrigation M/s. GRAY MAX Re-submit) Under review: 2 no pending
18 Under Process N/A Cobe B: 17 no Under review : 2 no Pending t
(Including Artificial Turf) (Golden Nails - Optional) WW & SMSH pending with s/c
Under review: 2 no o
20-Feb-23

C
B (Approved as Noted o
B (Approved as Noted B (Approved as Noted Re-submit) Code C: 1 no n
19 Kerbstones, & Precast Concrete Blocks M/s. SMEET Done N/A N/a by JTC
Re-submit) Re-submit) Cobe B: 3 no s
11-Feb-23 u
l
t
C (Not Approved, RE-submit) a
20 Road Marking MARK INTERNATIONAL Pending N/A Pending Pending N/a Pending Pending n
09-Feb-23 t
-

2
Code C: 2 no 7
B (Approved as Noted B (Approved as Noted
21 Asphalt M/s. TENPO Pending N/A Cobe B: 5 no N/a by JTC N/a -
Re-submit) Re-submit)
O
c
t
-
Confirmaiton Under 2
22 Road Signage & Way Finding FANAR N/A Pending Pending N/a Pending Pending Pending
Process 2
:

M
A
Revised Confirmaiton B (Approved as Noted B (Approved as Noted B (Approved as Noted
23 DI Manhole Cover and Frame M/s. CUBE MIDDLE EAST N/A N/A under JTC review Pending S
Under Process Re-submit) Re-submit) Re-submit)
D
o
c
Revised Confirmaiton B (Approved as Noted B (Approved as Noted by JTC s
24 JRC 14, & JRC4 (QNBN) M/s. CUBE MIDDLE EAST N/A N/A under review Pending .
Under Process Re-submit) Re-submit) 26-Jan-23

R
e
q
Revised Confirmaiton B (Approved as Noted B (Approved as Noted by JTC u
25 JRC 12 (TELECOM) M/s. CUBE MIDDLE EAST N/A N/A under review Pending
Under Process Re-submit) Re-submit) 26-Jan-23 e
s
t

s
Revised Confirmaiton B (Approved as Noted B (Approved as Noted e
26 GAS Manhole Cover and Frames M/s. CUBE MIDDLE EAST N/A N/A under review Pending
Under Process Re-submit) Re-submit) n
t

t
o

M
/
s
.

C
O
V
Awarded Subcontractor /
# Package Name Confirmation / LOA Contract Prequalifications Submittal Material Submittal Design Calculation Shop Drawings Method Statement Sample / Mockup
Supplier

B (Approved as Noted B (Approved as Noted


27 EPDM Rubber M/s. Total Flooring Under Process N/A N/A Pending Pending Pending
Re-submit) Re-submit)

B (Approved as Noted (8 of 8) C (Not Approved,


Granite, Paving Stone, Marble (Threshold), & Code C: 1 no Re-submit) RE-submit)
28 M/s. ORYX Done N/A A (Approved) N/A by JTC
Exterior Wall Caldding Cobe B: 7 no
08-Feb-23 24 , 25-Jan-23

29 Street Furniture & Sitewide Accessories PPT Under Process N/A Under review Pending Pending Pending Pending Pending

B (Approved as Noted B (Approved as Noted


30 Toilet Cubicle M/s. BUILDTECH Under Process N/A N/a Pending Under review Pending
Re-submit) Re-submit)

replaced with concrete and


31 MCC Kiosk
block

32 Carpet Flooring & PVC Carpet Skirting M/s. Total Flooring Under Process N/A Pending Pending N/a Pending Pending Pending

B (Approved as Noted
M/s. Glow ID Will be Issued upon Re-submit)
33 Furniture (Internal) N/A Pending N/a Pending Pending Pending
M/s KID Approval of PQ & MAS
29-Jan-23

34 Play Ground Equipment & Fitness GYM Equipment WT Burden Under Process N/A Pending Pending N/a Pending Pending Pending

35 Composite Timber Decking M/s. EQUIPAR Under Process N/A Under review Pending N/a Pending Pending Pending

36 Fountain not finalized

B (Approved as Noted B (Approved as Noted B (Approved as Noted


37 GRP & GRP Lining & Ladder M/s. STABLE Done N/A N/A by JTC N/A
Re-submit) Re-submit) Re-submit)

38 External Insulation and Finish System (EIFS) not finalized

M/s. QATAR Code - B Code - B Code - B Code - B


39 Hollow Core Slab Done N/A Under review N/A
INTERNATIONAL PRECAST

40 Gate Barrier not finalized

Code -B
Code -B Code -B
41 Ironmongery M/s. EURO ART TRADING Done N/A some comments shall be N/A upon MAS approval N/A
shall cover all items
addressed
Original
Activity ID Activity Name BL Project Start BL Project Finish Start Finish Planned % Actual %
Duration
2P8.MA.1.STRU.SM.140 Waterproofing Material_Submission 2 27-Jun-22 29-Jun-22 25-Oct-22 1-Nov-22 100.00% 0%
2P8.MA.1.STRU.SM.130 Anti Termite Material_Submission 7 3-Jul-22 13-Jul-22 25-Oct-22 1-Jan-23 0.00% 0.00%
2P8.MA.1.STRU.SM.170 Reinforcement Material_Submission 7 5-Jul-22 15-Jul-22 25-Oct-22 1-Jan-23 0.00% 0.00%
2P8.MA.1.STRU.SM.110 Concrete Material_Submission 7 6-Jul-22 16-Jul-22 4-Oct-22 11-Oct-22 100.00% 0.00%
2P8.MA.1.STRU.SM.175 Hollow Core Material_Submission 7 16-Jul-22 23-Jul-22 8-Nov-22 15-Nov-22 100% 0%
2P8.MA.1.ARCH.SM.110 Blockworks Material_Submission 7 28-Jul-22 4-Aug-22 14-Nov-22 21-Nov-22 100% 0%
2P8.MA.1.ARCH.SM.120 Plastering Accessories Material_Submission 7 6-Aug-22 13-Aug-22 20-Nov-22 27-Nov-22 100% 0%
2P8.MA.1.ARCH.SM.130 Wet Area Waterproofing Material_Submission 7 14-Aug-22 21-Aug-22 20-Nov-22 27-Nov-22 100% 0%
2P8.MA.1.ARCH.SM.230 Internal Paint Material_Submission 7 20-Aug-22 27-Aug-22 1-Dec-22 8-Dec-22 0.00% 0%
2P8.MA.1.ARCH.SM.435 Structural Steel Material_Submission 7 20-Aug-22 27-Aug-22 7-Dec-22 14-Dec-22 0.00% 0%
2P8.MA.1.ARCH.SM.220 Epoxy Floor Coating Material_Submission 7 25-Aug-22 1-Sep-22 19-Dec-22 26-Dec-22 0.00% 0.00%
2P8.MA.1.EXTR.SM.110 Manhole Cover and Frames Material_Submission 7 25-Aug-22 1-Sep-22
2P8.MA.1.ARCH.SM.140 Roof Waterproofing Material_Submission 7 31-Aug-22 7-Sep-22 25-Dec-22 1-Jan-23 0.00% 0.00%
2P8.MA.1.ARCH.SM.440 Misc. Steel Material_Submission 7 31-Aug-22 7-Sep-22 5-Nov-22 1-Jan-23 0% 0.00%
2P8.MA.1.ARCH.SM.150 Steel Doors Material_Submission 7 31-Aug-22 7-Sep-22 17-Oct-22 24-Oct-22 100.00% 0%
2P8.MA.1.ARCH.SM.170 Access Ladders Material_Submission 7 6-Sep-22 13-Sep-22 13-Dec-22 20-Dec-22 0.00% 0%
2P8.MA.1.ARCH.SM.250 Ceramic & Porcelain Tiles Material_Submission 7 6-Sep-22 13-Sep-22 17-Oct-22 24-Oct-22 100% 0%
2P8.MA.1.ARCH.SM.190 Galvanized Chequered Plate Material_Submission 7 12-Sep-22 19-Sep-22 5-Nov-22 12-Nov-22 100% 0%
2P8.MA.1.ARCH.SM.270 Suspended Ceiling Material_Submission 7 12-Sep-22 19-Sep-22 23-Oct-22 30-Oct-22 18% 0%
2P8.MA.1.EXTR.SM.220 Kerbstones Material_Submission 7 12-Sep-22 19-Sep-22
2P8.MA.1.EXTR.SM.200 EPDM Rubber Material_Submission 7 12-Sep-22 19-Sep-22
2P8.MA.1.ARCH.SM.160 Steel Ventilation Material_Submission 7 18-Sep-22 25-Sep-22 26-Nov-22 3-Dec-22 18% 0%
2P8.MA.1.ARCH.SM.350 Glass Window Material_Submission 7 18-Sep-22 25-Sep-22 29-Oct-22 5-Nov-22 0% 0%
2P8.MA.1.EXTR.SM.180 Precast Concrete Blocks Material_Submission 7 18-Sep-22 25-Sep-22
2P8.MA.1.ARCH.SM.280 External Paint Material_Submission 7 24-Sep-22 1-Oct-22 1-Dec-22 8-Dec-22 0% 0%
2P8.MA.1.ARCH.SM.210 Wooden Doors Material_Submission 7 24-Sep-22 1-Oct-22 3-Nov-22 10-Nov-22 0.00% 0%
2P8.MA.1.ARCH.SM.273 Decorative Wooden Strip Material_Submission 7 24-Sep-22 1-Oct-22 9-Nov-22 16-Nov-22 0% 0%
2P8.MA.1.EXTR.SM.100 Road Works Material_Submission 7 24-Sep-22 1-Oct-22
2P8.MA.1.EXTR.SM.210 Granite Paving Material_Submission 7 24-Sep-22 1-Oct-22
2P8.MA.1.ARCH.SM.240 Signboard Material_Submission 7 29-Sep-22 6-Oct-22 7-Dec-22 14-Dec-22 0% 0%
2P8.MA.1.ARCH.SM.360 Glass Door Material_Submission 7 29-Sep-22 6-Oct-22 20-Nov-22 27-Nov-22 0% 0%
2P8.MA.1.EXTR.SM.140 Asphalt Works Material_Submission 7 29-Sep-22 6-Oct-22
2P8.MA.1.EXTR.SM.240 Artificial Turf Material_Submission 7 29-Sep-22 6-Oct-22
2P8.MA.1.ARCH.SM.290 Aluminum Strip Material_Submission 7 5-Oct-22 12-Oct-22 13-Dec-22 20-Dec-22 0% 0%
2P8.MA.1.ARCH.SM.420 Toilet Counter Top Material_Submission 7 5-Oct-22 12-Oct-22 21-Nov-22 28-Nov-22 0% 0%
2P8.MA.1.EXTR.SM.150 Road Signage and Way Finding Material_Submission 7 5-Oct-22 12-Oct-22
2P8.MA.1.EXTR.SM.250 Street Furniture Material_Submission 7 5-Oct-22 12-Oct-22
2P8.MA.1.ARCH.SM.330 Toilet Cubicle System Material_Submission 7 11-Oct-22 18-Oct-22 13-Dec-22 20-Dec-22 0% 0%
2P8.MA.1.ARCH.SM.320 Furniture Material_Submission 7 11-Oct-22 18-Oct-22 21-Nov-22 28-Nov-22 0% 0%
2P8.MA.1.EXTR.SM.230 Softlandscaping Material_Submission 7 11-Oct-22 18-Oct-22
2P8.MA.1.EXTR.SM.260 Play Equipment Material_Submission 7 11-Oct-22 18-Oct-22
2P8.MA.1.ARCH.SM.300 MCC Kiosk Material_Submission 7 17-Oct-22 24-Oct-22 25-Dec-22 1-Jan-23 0.00% 0%
2P8.MA.1.ARCH.SM.200 Pantry Cabinet Material_Submission 7 17-Oct-22 24-Oct-22 21-Nov-22 28-Nov-22 0.00% 0%
2P8.MA.1.ARCH.SM.430 Curtain Wall Material_Submission 7 17-Oct-22 24-Oct-22 21-Nov-22 28-Nov-22 0% 0%
2P8.MA.1.EXTR.SM.290 Fountain Material_Submission 7 17-Oct-22 24-Oct-22
2P8.MA.1.EXTR.SM.320 Play Area Shade Structure Material_Submission 7 17-Oct-22 24-Oct-22
2P8.MA.1.EXTR.SM.360 Composite Timber Decking Material_Submission 7 22-Oct-22 29-Oct-22
2P8.MA.1.ARCH.SM.410 Carpet Flooring Material_Submission 7 23-Oct-22 30-Oct-22 8-Sep-22 28-Nov-22 0.00% 0%
2P8.MA.1.EXTR.SM.330 Shade Canopy for Parking Material_Submission 7 23-Oct-22 30-Oct-22

Page 3 of 6
Original
Activity ID Activity Name BL Project Start BL Project Finish Start Finish Planned % Actual %
Duration
2P8.MA.1.EXTR.SM.370 Shade Structure Material_Submission 7 26-Oct-22 2-Nov-22
2P8.MA.1.ARCH.SM.180 Stainless Steel Handrails Material_Submission 7 29-Oct-22 5-Nov-22 19-Dec-22 26-Dec-22 0% 0%
2P8.MA.1.ARCH.SM.445 PVC Carpet Skirting Material_Submission 7 29-Oct-22 5-Nov-22 8-Sep-22 28-Nov-22 0.00% 0%
2P8.MA.1.EXTR.SM.340 Sitewide Accessories Material_Submission 7 29-Oct-22 5-Nov-22
2P8.MA.1.EXTR.SM.350 Fitness Gym Equipment Material_Submission 7 3-Nov-22 10-Nov-22
Material Submittals 8-Sep-22 1-Jan-23 0.00% 0.00%
Structural 4-Oct-22 11-Oct-22 0.00% 0.00%
Short Lead 4-Oct-22 11-Oct-22 0.00% 0.00%
Architectural 8-Nov-22 15-Nov-22 100% 0%
Short Lead 10-Nov-22 17-Nov-22 18% 0%
Long Lead 8-Sep-22 15-Sep-22 100.00% 0%
External
Short Lead
Long Lead

Page 4 of 6
AL JABER TRADING AND CONTRACTING CO., W.L.L.
p.o. Box 1120 Doha, Qatar
Pre-qualification Submittal Tracking Sheet
Project: Qetaifan Island North - Phase 02, Package 08 - Infrastructure & Landscape
# Package Name Memo to Procurement Expected Subcontractors Contact Person Mobile No. Email Address Remark
Ref & Date

JOTUN Muthna Abdall 66742984 [email protected]


00086
1 External & Internal Painting Works HEMPL
15-Sep-22
NATIONAL PAINT

DCP Mohammed Yassen 3306 7369 [email protected]

3 Epoxy Floor Coating 00103 SIKA Ayman Mustapha 55951391


15-Sep-22 [email protected]

CIKO Elie Issa Al Samarany 50767573 [email protected]>

ALTECH Arjun Jim Joseph 66851273 [email protected]

4 Aluminum Strip & Glass Doors & Windows & Curtain 00116 VIOLET MANEK MUHASIN 3133 5466 [email protected]
Walls 22-Sep-22

EQUIPAR Awny Naseem 40170242 [email protected]

5 Wooden Doors / Decorative Wooden Strip / Pantry 00117 ARCHITECTURAL JOINERY Irshad Ahmed 33148922 [email protected]
Cabinet 22-Sep-22
SBK Kristine 44354644 [email protected]

TAYLOS Naveen T V 77826701 [email protected]


00108
6 Ceramic, Porcelain & Marble Threshold ARTCROP Mylene Talampas 4450 6660/ 1 [email protected]
19-Sep-22

QADCO KAMAL KHATIWADA 74491441 [email protected]

7 Suspended Ceiling 00109 JASCON ZAHID KHAN 44747222


19-Sep-22 [email protected]

GIMS Khaleeq Siddiqui 55554285 [email protected]

8 Soft Landscape & Irrigation (Including Artificial Turf) 00040 AL MAHMOUD VEK Amalia Al Amayreh 30119919 [email protected]
19-Jun-22

AL SEHMEIAH Noby Alex 55486928 [email protected]

00080 SMEET Ahmed Hassan 66808239 [email protected]


9 Kerbstones, & Precast Concrete Blocks
15-Sep-22
QATAR PAVING STONE Suresh Kumar 55603016 [email protected]
[email protected]

MARK INTERNATIONAL Mohammed Iqbal 33876813 [email protected]

10 Road Marking 00113


20-Sep-22

TENPO Khaled Kassas 70802002 [email protected]


00111
11 Asphalt
20-Sep-22

FANAR Mutie 55801076 [email protected]


00115
12 Road Signage & Way Finding 21-Sep-22 SIGMA METAL Khaled Fayoumi 55866518 [email protected]

HI 5 Haseeb 66229942 [email protected]

PPT Tamer Zakaria 33855833 [email protected]

13 EPDM Rubber & Tartan Rubber Flooring 00112 Al Rayyan Swimming Pools Laith Al Lefdawi 50224519
20-Sep-22 [email protected]

CASTELLO Fadi 70491441 [email protected]

16 Street Furniture & Sitewide Accessories 00123 Qatar Consol Elliot Charles Rouchon 5018 8257 [email protected]
25-Sep-22

GIBCA SUMMAIYA YOUSAFI 33489477 [email protected]


00114
17 Toilet Cubicle Build-Tech Yara Murar 3068 4676 [email protected]
21-Sep-22

AL MUFTAH M.T. Hameed 55838029 [email protected]


00099
18 MCC Kiosk 11-Sep-22 STABLE Mohammed Al Taweel 55510618 [email protected]

AMIANTIT QATAR PIPES Bassem Mahmoud 44114873/4/6 [email protected]

FLOOR COVERING

19 Carpet Flooring & PVC Carpet Skirting 00124


25-Sep-22

PPT Tamer Zakaria 33855833 [email protected]

20 Play Ground Equipment & Fitness GYM Equipment 00119 Qatar Consol Elliot Charles Rouchon 5018 8257 [email protected]
24-Sep-22

CHABROS Jocelyn Tan 30590470 [email protected]


00125
21 Composite Timber Decking
25-Sep-22

Al Rayyan Swimming Pools Laith Al Lefdawi 50224519 [email protected]

22 Fountain 00118
23-Sep-22

24 External Insulation and Finish System (EIFS) 00126


25-Sep-22

25 Third Party Survey Works

26 Aggregate 20mm

27 Waterstop Material
# Package Name Memo to Procurement Expected Subcontractors Contact Person Mobile No. Email Address Remark
Ref & Date

28 Geotextaile Membrane

29 BMC Manhole Waterproofing Material 00149


16-Oct-22

30 Reinforcement Welded Wire Mesh 00154


16-Oct-22

31 Manhole Covers and Frames