For Construction Drawing - FCD: General Structural Notes & Specifications

This document provides notes and specifications for structural steel members and concrete construction. It outlines material requirements for structural steel conforming to ASTM A36 specifications and welds conforming to AWS D1.1 structural welding code. It also provides fabrication and erection notes requiring the contractor to verify dimensions, provide temporary bracing and shoring, and be responsible for accurate placement of steel works. Reinforcement and concrete notes specify minimum compressive strengths, maximum aggregate sizes and slumps for different locations in accordance with ACI 318 and NSCP C101-10 codes.

Uploaded by

Jossell De Ala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
823 views1 page

For Construction Drawing - FCD: General Structural Notes & Specifications

This document provides notes and specifications for structural steel members and concrete construction. It outlines material requirements for structural steel conforming to ASTM A36 specifications and welds conforming to AWS D1.1 structural welding code. It also provides fabrication and erection notes requiring the contractor to verify dimensions, provide temporary bracing and shoring, and be responsible for accurate placement of steel works. Reinforcement and concrete notes specify minimum compressive strengths, maximum aggregate sizes and slumps for different locations in accordance with ACI 318 and NSCP C101-10 codes.

Uploaded by

Jossell De Ala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL STRUCTURAL NOTES & SPECIFICATIONS

CONSTRUCTION NOTES NOTES ON STRUCTURAL STEEL MEMBERS


1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS BEAM STIRRUPS AND COLUMN TIES ...................................... 1 1/2 IN. (40mm) A. MATERIALS
OTHERWISE SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL
CONDITIONS. WHERE CONCRETE IS EXPOSED TO EARTH 1. ALL STRUCTURAL STEEL MEMBERS SHOULD CONFORM WITH ASTM A 36 STEEL SPECIFICATIONS.
BUT POURED AGAINST FORMS ............................................... 2 IN. (50mm)
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL, 2. WELDS SHOULD BE E70 ELECTRODES AND SHOULD CONFORM TO THE AWS D1.1 - STRUCTURAL
MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEER'S WELDING CODE - STEEL FOR STRUCTURAL WELDING IN BUILDING CONSTRUCTION. ALL WELDS
WHERE CONCRETE IS DEPOSITED
SHALL DEVELOP AT LEAST 100% OF THE STRUCTURAL STEEL MEMBER STRENGTH.
APPROVAL BEFORE FABRICATION. DIRECTLY AGAINST EARTH ..................................................... 3 IN. (75mm)
(REFER TO NSCP C101-10 SECTION 510.2)
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN, CHECK
WITH MECHANICAL AND ELECTRICAL CONTRACTORS FOR CONDUITS, PIPE SLEEVES, ETC.
6. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN B. FABRICATION AND ERECTION
ACCORDANCE WITH TABLE 1 (TABLE OF LAP SPLICE AND ANCHORAGE LENGTH) UNLESS 1. IN ACTUAL FABRICATION OF STEEL TRUSSES, MEMBERS MEETING AT A POINT SHALL HAVE
TO BE EMBEDDED IN CONCRETE.
OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. THEIR GRAVITY AXIS INTERSECT AS NEARLY AS PRACTICABLE AT A COMMON POINT TO AVOID
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN AND PROVIDE ADEQUATE ECCENTRICITY.
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED
SHORINGS AND BRACINGS OF THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING
AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE BEFORE
CONSTRUCTION IN ACCORDANCE TO ACI 347 "GUIDE TO FORMWORK FOR CONCRETE.
PROCEEDING WITH THE WORK.
B. CONCRETE & REINFORCEMENT 8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS,
EQUIPMENTS, AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, 3. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACING AND SHORING FOR ALL
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST AMERICAN STRUCTURAL MEMBERS AS REQUIRED FOR STRUCTURAL STABILITY DURING ALL PHASES OF
ELECTRICAL, AND MECHANICAL DRAWINGS.
CONCRETE INSTITUTE CODE ACI-318 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONSTRUCTION.
CONCRETE & NATIONAL STRUCTURAL CODE OF PHILS NSCP C101-10. 9. ALL CONCRETE SHALL BE KEPT MOIST CONDITION FOR AT LEAST THE FIRST SEVEN (7) DAYS
IMMEDIATELY AFTER PLACEMENT BY THE USE OF WET BURLAP, FOG SPRAYING, CURING 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE LOCATION OF ALL STEEL
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF COMPOUNDS OR OTHER APPROVED METHODS. WORKS INCLUDING ITEMS USED TO ATTACH MATERIALS TO OTHER PARTS OF THE WORK.
TWENTY EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE AGGREGATE AND
SLUMPS AS FOLLOWS : 10. STRIPPING OF FORMS AND SHORES: (REFER TO NSCP C101-1 SECTION 406.2 ) 5. THE CONTRACTOR SHALL SEE TO IT THAT ANY OR ALL ITEMS OF WORK WHICH ARE TO BE
BUILT INTO THE WORKS OF OTHER TRADES ARE INSTALLED AT THE PROPER TIME.
LOCATION 28 DAYS STRENGTH( f'c) MAX. SIZE AGGREGATE MAX. SLUMP FOUNDATION ..................................................... 24 HRS.
6. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL SAMPLES, SHOP AND ERECTION DRAWINGS,
CURBS 3000 PSI (20.70 N/mm²) 1 IN. (25mm) 4 IN. (19mm) SUSPENDED SLAB EXCEPT WHEN SHOWING IN DETAIL THE PROPOSED DESIGN, FABRICATION AND ERECTION. NO WORK SHALL
ADDITIONAL LOADS ARE IMPOSED ................... 14 DAYS & 70% fc' Concrete Strength BE STARTED UNTIL THESE SAMPLES AND DRAWINGS HAVE BEEN APPROVED.
SLAB ON GRADE 3000 PSI (20.70 N/mm²) 1 IN. (25mm) 4 IN. (19mm)
7. ALL WELDERS MUST BE A CERTIFIED WELDER BY TESDA.
WALLS .............................................................. 24 HRS. & 70% fc' Concrete Strength
FOUNDATION & C. STRUCTURAL STEEL MATERILAS AND WELDING TESTING
RETAINING WALL, 5000 PSI (34.48 N/mm²) 3/4 IN. (19mm) 4 IN. (19mm) BEAMS .............................................................. 14 DAYS & 80% fc' Concrete Strength
1. ALL WELDS SHALL BE TESTED IN ACCORDANCE WITH ASTM E1417 "PRACTICE FOR LIQUID
FTB, GRADE BEAM
PENETRANT TESTING" AND ASTM E165 "STANDARD TEST METHOD FOR LIQUID PENETRANT EXAMINATION".
SLAB 3000 PSI (20.70 N/mm²) 3/4 IN. (19mm) 4 IN. (19mm) C. FOUNDATION 2. STRUCTURAL WELDS SHALL BE TESTED IN ACCORDANCE WITH ASTM E1417 "PRACTICE FOR LIQUID
1. FOUNDATION IS DESIGNED FOR AN ALLOWABLE SOIL BEARING CAPACITY PENETRANT TESTING" AND ASTM E165 "STANDARD TEST METHOD FOR LIQUID/DYE PENETRANT EXAMINATION".
PEDESTAL 5000 PSI (34.48 N/mm²) 3/4 IN. (19mm) 4 IN. (19mm)
SEE SOIL INVESTIGATION REPORT BY OTHERS ONLY QUALIFIED PERSONNEL SHALL BE INVOLED IN PENETRANT EXAMINATIONS.
3a. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 "SPECIFICATIONS FOR DEFORMED AND 2. FOUNDATION SHALL REST ON NATURAL SOIL. UNLESS OTHERWISE NOTED BY THE ENGINEER, NO 3. VISUAL INSPECTION IS OFTEN THE MOST COST-EFFECTIVE METHOD, BUT IT MUST TAKE PLACE PRIOR TO, DURING
PLAIN BILLET-STEEL BARS FOR CONCRETE REINFORCEMENT LATEST REVISIONS. PART OF THE FOUNDATION SHALL REST ON FILL.
AND AFTER WELDING. VISUAL INSPECTION REQUIRES GOOD EYESIGHT, SUFFICIENT LIGHT AND LITTLE EQUIPMENT
COLUMN HOOPS AND BEAM STIRRUPS ARE ALL GRADE 40 BARS.
LIKE POCKET RULE, WELD SIZE GAUGE, MAGNIFYING GLASS, STRAIGHT EDGE AND SQUARE FOR CHECKING
USE GRADE 40 REBAR FOR DIA. 12 AND SMALLER BARS AND GRADE 40 FOR DIA. 16 AND LARGER BARS. 3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION HAVE BEEN
STRAIGHTNESS, ALIGNMENT AND PERPENDICULARITY.
COMPLETED AND PRIOR TO CONCRETE PLACEMENT TO CONFIRM THE DESIGN SOIL BEARING
3b. DEVELOPMENT LENGTH AND SPLICES OF REINFORCEMENT FOR ALL REINFORCING BARS CAPACITY.
(COMPRESSION AND TENSION) SHALL BE IN ACCORDANCE WITH NSCP C101-15 CHAPTER 412 UNLESS 4. WELDS SUBJECT TO LIQUID/DYE PENETRANT TEST SHALL BEEN FOUND ACCEPTABLE BY VISUAL INSPECTION.
D. DRAWINGS BAD WELDS BY VISUAL INSPECTION SHALL BE REMOVED AND RE-WELD.
OTHERWISE SPECIFIED.
1. ANY DISCREPANCY BETWEEN ARCHITECTURAL AND STRUCTURAL DRAWINGS SHALL BE
4a. IN GENERAL, THE LATEST EDITION OF ACI-315, DETAILS AND DETAILING REINFORCEMENT 5. STRUCTURAL STEEL SHALL BE TESTED BY TENSION TESTING IN ACCORDANCE WITH ASTM A370 "STANDARD TEST
REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING WITH THE PORTION OF THE
REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO, UNLESS OTHERWISE SHOWN WORK INVOLVED. METHODS AND DEFINITIONS FOR MECHANICAL TESTING OF STEEL PRODUCT" AND
OR NOTED.
E. MATERIALS TESTING A. SELECT BORROW MATERILS ITEM 104.3:
4b. IN GENERAL, THE LATEST EDITION OF ACI-304, GUIDE FOR MEASURING, MIXING, TRANSFORTING,
AND PLACING CONCRETE SHALL BE ADHERED TO, UNLESS OTHERWISE SHOWN OR NOTED. 1. STRUCTURAL CONCRETE SHALL BE SUBJECTED COMPRESSION CYLINDRICAL TEST AT REPUTABLE TESTING 1. SELECT BORROW MATERIALS FOR FILL SHALL BE FREE OF EXCESS MOISTURE, MUCH, ROOTS,
CENTER. THREE (3) CYLINDRICAL SAMPLES SHALL BE TESTED AT 7 DAYS FOR EARLY STRENGTH DETECTION, SOD, OR OTHER DELETERIOUS MATERIAL; MATERAILS SHALL CONFORM TO THE FOLLOWING:
4c. IN GENERAL, THE LATEST EDITION OF ACI-117, SPECIFICATIONS FOR TOLERANCES FOR CONCRETE THREE (3) SAMPLES SHALL TESTED AT 14 DAYS FOR REMOVAL OF FORMS AND THREE (3) CYLINDRICAL MAXIMUM SIEVE SIZE = 75mm --------- 100% BY MASS PASSING
SHALL TESTED AT 28 DAYS FOR DESIGN STRENGTH ACCEPTABILITY REQUIREMENT. CONCRETE SHALL BE #200 SIEVE SIZE = 0.075mm ----- 15% BY MASS PASSING (maximum)
CONSTRUCTION AND MATERIALS SHALL BE ADHERED TO, UNLESS OTHERWISE SHOWN OR NOTED. LIQUID LIMIT = 30% maximum
TESTED IN ACCORDANCE WITH ASTM SPECIFICATIONS AND ACI CODE / NSCP 2015 REQUIREMENTS.
PLASTICITY INDEX = 6 maximum
4d. IN GENERAL, THE LATEST EDITION OF ACI-347, GUIDE FOR FORMWORKS FOR CONCRETE INCASE STRENGTH TESTS AT 28 DAYS DIDNOT REACHED THE REQUIRED DESIGN STRENGTH, CORE
SAMPLES SHALL BE TAKEN FROM THE HARDEN CONCRETE AND HAVE IT TESTED FOR COMPRESSION.
ACCEPTANCE AND REJECTION OF CORE TESTS SHALL BE IN ACCORDANCE WITH NSCP 2015 CHAPTER 405. B. FOUNDATION FILL MATERIALS ( ITEM 103.3):
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: CONCRETE REBOUND HAMMER TEST SHALL NOT BE USED PER ACI CODE.
1. FOUNDATION FILL MATERIAL SHALL BE GRANULAR MATERIAL FREE OF EXCESS MOISTURE,
SUSPENDED SLABS, WALLS NOT EXPOSED TO EARTH OR WEATHER: 2. STRUCTURAL REINFORCING STEEL SHALL BE TAKEN AT LEAST THREE (3) SPECIMENS IN EVERY BATCH OF MUCH, ROOTS, SOD OR OTHER DELETERIOUS MATERIAL;
42mm BAR and 58mm BAR .................................................. 2 IN. (50mm) DELIVERY. REBAR TESTING AND ACCEPTANCE CRITERIA SHALL BE IN ACCORDANCE WITH MATERIALS SHALL CONFORM TO THE FOLLOWING:
36mm BAR and SMALLER .................................................. 3/4 IN. (20mm) ASTM SPECIFICATIONS REQUIREMENTS. MAXIMUM SIEVE SIZE = 50mm --------- 100% BY MASS PASSING
#10 SIEVE SIZE = 2mm ----------- 50% BY MASS PASSING (maximum)
#40 SIEVE SIZE = 0.425mm ------ 30% BY MASS PASSING (maximum)
CONCRETE EXPOSED TO EARTH OR WEATHER:
#200 SIEVE SIZE = 0.075mm ----- 15% BY MASS PASSING (maximum)
20mm BAR through 36mm BAR ........................................... 2 IN. (50mm) LIQUID LIMIT = 35% maximum
16mm BAR and SMALLER .................................................. 11/2 IN. (40mm) PLASTICITY INDEX = 6 maximum

For Construction Drawing - FCD


ARCHITECT REPUBLIC ACT 9266, ARTICLE IV SECTION 33 STRUCTURAL ENGINEER OWNER PROJECT TITLE ORIG. DWG. INFO SHEET NUMBER

JOSSELL J. DE ALA,UAP LIZARDO P. REMOJO,MEng,M.ASEP,ISSEP, F.PICE GARECO PROPOSED PHYSICAL REFINING AND DRY
SPECIALIST STRUCTURAL ENGINEER, I.StructS No.039 ERWIN ANTHONY Y. GARCIA
PRESIDENT
FRACTIONATION PLANT 100mtd
S-01
PRC NO. : 0047186 PTR NO. : 2555009 PRC NO. : 36528 PTR NO. : 6504329 C
VALID UNTIL : 07/22/22 PLACE ISSUED: KORONADAL CITY VALID UNTIL : 1-28-2022 PLACE ISSUED: PROJECT LOCATION : TACURONG , SULTAN KUDARAT PROJECT LOCATION : TACURONG , SULTAN KUDARAT