This document contains a checklist for external plastering with 15 items to inspect. It includes inspecting scaffolding, surface preparation of the wall, mix proportions, materials used, and finished quality of the plaster. The checklist is to be filled by noting observations in the accepted and rejected columns and signed off on once completed to ensure all plastering criteria are met.

Uploaded by

Santosh Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
258 views3 pages

Checklist For External Plaster

This document contains a checklist for external plastering with 15 items to inspect. It includes inspecting scaffolding, surface preparation of the wall, mix proportions, materials used, and finished quality of the plaster. The checklist is to be filled by noting observations in the accepted and rejected columns and signed off on once completed to ensure all plastering criteria are met.

Uploaded by

Santosh Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

SONU BUILDERS PRIVATE LIMITED

==========================================================================
CHECKLIST FOR EXTERNAL PLASTER
Sr.No: _______________
Name of the Project: ________________________________________________ Date: ____________________
Location: _____________________________________________________________________________________
Reference Drawing /Sketch No.: ________________________________________ Revision No.: _________

Sr.No Particulars Description Accepted Rejected Remarks


Before start of Plastering
1 Scaffolding
Design/Scaffolding material Approved
used Steel Props
1.1 Minimum spacing between the
scaffolding & wall surface
shall be in between 300mm to
400mm n any
1.2 Is scaffolding supported taken
through the wall
2 Is any pipe penetrating the
wall.
3 RCC Surface hacked Hack-aid chemical

properly/hacked chemical brand name ______

applied.
4 Are Joints between RCC
Member & Brickwork filled Filled with
properly CM______
5 Curing of surface is done in
advance before plastering
6 Honey Comb / bulge if any in
RCC members rectified.
During plastering

Check List No. Rev. No. R0 Effective Date : 01/04/2023


SONU BUILDERS PRIVATE LIMITED
==========================================================================
7 Grade of cement / batch No. PPC/OPC 43 grade

7.1 Is the mixer is available for the


mortar mixing
8 Level patches put at every 1.2
M interval for level
9 Proportion of Mix 1st coat: ____
2nd coat: _____
WP ____ml/bag
Water _______
L/bag
10 WP compound brand
name/shelf life

11 Polypropylene Fibres Brand


name / shelf life
12 Bulkage correction of sand
made Bulkage %
--------------
After plastering
13 Is plastered surface checked
for line/plumb/level
13 Is plastered surface finish is as
per sample
14 Before Removal of Scaffolding
are all holes filled / finished
properly.
15 Is the area cleaned after
completion

Check List No. Rev. No. R0 Effective Date : 01/04/2023


SONU BUILDERS PRIVATE LIMITED
==========================================================================
Note: Put (√) Mark in Accepted & Rejected Column as per the observation.

Write (NA) in columns wherever it is not applicable.


Name of the Person Designation Signature Date

Inspected By

Approved by

Check List No. Rev. No. R0 Effective Date : 01/04/2023

You might also like