Inspection Request Form: Requested By: Noted by

The document contains 6 inspection request forms for the Aruga Mactan Sales Lounge and Model Unit project located in Punta Engaño, Lapu-Lapu City. The forms request inspections of excavation, gravel beds, rebar installation, and column starter bars at various locations and dates in October 2019. Rex Calma of OMC structural coordination submits the requests, which are noted by project manager Homer Calicdan and will be witnessed and approved or disapproved by Patrick Junther Sazon and Hennessy Lopio of RLC structural inspection and coordination.

Uploaded by

prea cabasag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views65 pages

Inspection Request Form: Requested By: Noted by

The document contains 6 inspection request forms for the Aruga Mactan Sales Lounge and Model Unit project located in Punta Engaño, Lapu-Lapu City. The forms request inspections of excavation, gravel beds, rebar installation, and column starter bars at various locations and dates in October 2019. Rex Calma of OMC structural coordination submits the requests, which are noted by project manager Homer Calicdan and will be witnessed and approved or disapproved by Patrick Junther Sazon and Hennessy Lopio of RLC structural inspection and coordination.

Uploaded by

prea cabasag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 65

PROJECT : Aruga Mactan Sales Lounge and Model Unit

LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 002 Request Date: October 16, 2019 Trade:

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of excavation of footing F-1 Grid Line 2/Af Tower A
10/16/2019
2 Inspection of excavation at COF-1 Grid Line 1/Ac-Ad Tower A

Requested by: Noted by:

Rex Calma Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga Mactan Sales Lounge and Model Unit
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 003 Request Date: October 16, 2019 Trade:

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of gravel bed for COF-2 Grid Line 1/Ae-Af Tower A
2 Inspection of gravel bed for COF-1 Grid Line 1/Ac-Ad Tower A 10/16/2019

3 Inspection of gravel bed at F-1 Grid Line 2/Af Tower A

Requested by: Noted by:

Rex Calma Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga Mactan Sales Lounge and Model Unit
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 004 Request Date: October 16, 2019 Trade:

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of rebar installation for COF-2 Grid Line 1/Ae-Af Tower A
2 Inspection of rebar installation for COF-1 Grid Line 1/Ac-Ad Tower A
10/18/2019
3 Inspection of rebar installation for F-1 Grid Line 2/ Af Tower A
4 Inspection of column starter bar at grid line 1/ Ac-Af, RC-1 and RC-2 Tower A

Requested by: Noted by:

Rex Calma Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga Mactan Sales Lounge and Model Unit
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 005 Request Date: October 20, 2019 Trade:

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of column starter bar at grid line 2/Af RC-4 Tower A 10/20/2019

Requested by: Noted by:

Rex Calma Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga Mactan Sales Lounge and Model Unit
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 006 Request Date: October 26, 2019 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of Excavation for footing, MF-2 at 3-4/ Ae-Af. Tower A
2 Inspection of Gravel bedding for footing, MF-2 at 3-4/ Ae-Af. Tower A 10/28/2019

3 Inspection of Elevation and Thickness of footing MF-2 at 3-4/ Ae-Af. Tower A

Requested by: Noted by:

Rex Calma Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga Mactan Sales Lounge and Model Unit
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 009 Request Date: November 14, 2019 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of rebar for FTB-1 and FTB-2 along GL Af/1-3 and 1/Ad-Ae Tower A 14-Nov-19

Requested by: Noted by:

Rex Calma Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga Mactan Sales Lounge and Model Unit
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0010 Request Date: November 21, 2019 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection of Excavation for MF-1 and Isolated footing F-5, F-4 and F-6 at Back 21-Nov-19
1 parking Tower A
Inspection of Gravel bed for MF-1 and Isolated footing F-5, F-4 and F-6 at Back 21-Nov-19
2 parking Tower B & C
3 Inspection 0f Excavation for Retaining Wall..See attached Tower B & C 21-Nov-19

Requested by: Noted by:

Rex Calma Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0013 Request Date: February 20, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of Excavation for RW-3 /RWF-3, UTWF-1 and UTWF-2 of Domestic Tower A 20-Feb-20
Water Tank

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0015 Request Date: February 28, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of Rebars and Formworks on RWF-3, UWTWF-1, UWTWF-2 Tower A 28-Feb-20

2 Inspection of Rebars and Formworks on RWF-1 Tower B 28-Feb-20

3 Inspection of Rebars and Formworks on RWF-2 Tower C 28-Feb-20

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0016 Request Date: March 04, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of Formworks on Footing F - 2, F - 3 and F - 5. Located at GL 6 - Tower B and Tower 07-Mar-20
14''/Bb/Cb. C

Inspection of Colum Starter Bars on Footing F - 2, F - 3 and F - 5. Located at GL 6 - Tower B and Tower
2 07-Mar-20
14''/Bb/Cb. C

Inspection of Footing Rebars on Footing F - 2, F - 3 and F - 5. Located at GL 6 - Tower B and Tower


3 07-Mar-20
14''/Bb/Cb. C

Inspection of Excavation on Footing F - 2, F - 3 and F - 5. Located at GL 6 - Tower B and Tower


4 07-Mar-20
14''/Bb/Cb. C

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0017 Request Date: March 04, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of Excavation on MF - 3, located at GL 5 - 6/Ac - Af Zone A 07-Mar-20

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0017 Request Date: March 09, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of Formworks on MF - 3, located at GL 5 - 6/Ac - Af Zone A 12-Mar-20

2 Inspection of Rebars on MF - 3, located at GL 5 - 6/Ac - Af Zone A 12-Mar-20

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:


Patrick Junther Sazon Hennessy Lopio
STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0019 Request Date: March 10, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of Column Starter Bars at MF - 3. GL 5 - 6/Ac - Af. Zone A 13-Mar-20

2 Inspection of Shear wall Starter Bars at MF - 3. GL 5 - 6/Ac - Af. Zone A 13-Mar-20

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0020 Request Date: March 17, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of Column RC - 6 Starter Bars at MF - 4. GL 7/Bc Zone B 20-Mar-20

2 Inspection of Column RC - 6 Starter Bars at MF - 4. GL 8/Bc Zone B 20-Mar-20

3 Inspection of Column RC - 7 Starter Bars at MF - 4. GL 7/Bd Zone B 20-Mar-20

4 Inspection of Column RC - 7 Starter Bars at MF - 4. GL 8/Bd Zone B 20-Mar-20

5 Inspection of Column RC - 8 Starter Bars at MF - 4. GL 9/Bc Zone B 20-Mar-20

6 Inspection of Column RC - 9 Starter Bars at MF - 4. GL 9/Bd Zone B 20-Mar-20

7 Inspection of Excavation at MF - 4. GL 7 - 9/Bc - Bd. Zone B 20-Mar-20

8 Inspection of Formworks at MF - 4. GL 7 - 9/Bc - Bd. Zone B 20-Mar-20

9 Inspection of Footing Rebars at MF - 4. GL 7 - 9/Bc - Bd. Zone B 20-Mar-20

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:


Patrick Junther Sazon Hennessy Lopio
STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0021 Request Date: March 18, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for Excavation of MF - 6 at G.L. 10 - 11/Bc - Bf Zone B 21-Mar-20

2 Inspection for vertical rebars of RW - 3 at G.L. 1 - 4/Ac Zone A 21-Mar-20

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0022 Request Date: April 02, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for Excavation of COF - 4 at G.L. 12/Cc - Cd Zone C 05-Apr-20

2 Inspection for Excavation of COF - 4 at G.L. 13/Cc - Cd Zone C 05-Apr-20

3 Inspection for Excavation of MF - 7 at G.L. 14 - 14'/Cc - Cd Zone C 05-Apr-20

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0023 Request Date: April 13, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for bottom bars of COF - 4 at G.L. 12/Cc - Cd Zone C 16-Apr-20

2 Inspection for bottom bars of COF - 5 at G.L. 13/Cc - Cd Zone C 16-Apr-20

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0024 Request Date: April 14, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for bottom bars of MF-7 at G.L. 14-14''/Cc-Cd Zone C 17-Apr-20
2 Inspection for starter bars of RC-10 at G.L 12/Cc Zone C 17-Apr-20
3 Inspection for starter bars RC-11 at G.L 12/Cd Zone C 17-Apr-20
4 Inspection for starter bars RC-12 at G.L 13/Cc Zone C 17-Apr-20
5 Inspection for starter bars RC-13 at G.L 13/Cd Zone C 17-Apr-20

Requested by: Noted by:

Alexis Mercado Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0025 Request Date: April 21, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for Top bars of COF-4 at G.L 12 / Cc-Cd Zone C 24-Apr-20
2 Inspection for Top bars of COF-5 at G.L. 13 / Cc-Cd Zone C 24-Apr-20
3 Inspection for excavation of MF-5 at G.L. 7-8 / Ce-Cf Zone B 24-Apr-20
4 Inspection for formworks of MF-5 at G.L. 7-8 / Ce-Cf Zone B 24-Apr-20

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0026 Request Date: May 04, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection of starter bars of RC-12 at G.L. 14/Cc Zone C 07-May-20
2 Inspection of starter bars of RC-13 at G.L. 14/Cd Zone C 07-May-20
3 Inspection for starter bars of RSW-4 at G.L. 14'-14"/Cc-Cd Zone c 07-May-20
4 Inspection of top bars of MF-7 Zone c 07-May-20
5 Inspection of bottom bars of MF-5 Zone B 07-May-20
6 Inspection of starter bars of RC-6 at G.L. 7/Bf Zone B 07-May-20
7 Inspection of starter bars of RC-6 at G.L. 8/Bf Zone B 07-May-20
8 Inspection of starter bars of RC-7 at G.L. 7/Be Zone B 07-May-20
9 Inspection of starter bars of RC-7 at G.L. 7/Be Zone B 07-May-20
10 Inspection of starter bars of RC-8 at G.L. 9/Be Zone B 07-May-20
11 Inspection of starter bars of RC-9 at G.L. 9/Bf Zone B 07-May-20
12 Inspection of formworks of RWF-4 at G.L. Bi and Ci Zone B and C 07-May-20
13 Inspection of rebars of RWF-4 at G.L. Bi and Ci Zone B and C 07-May-20

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0027 Request Date: May 19, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for top bars of MF-5 Zone B 22-May-20
2 Inspection for Formworks and Rebars of RWF-4 at G.L. 6 Zone B 22-May-20
3 Inspection for Formworks and Rebars of RWF-4 at G.L. 14" Zone C 22-May-20
4 Inspection for formworks of RW-1 and RW-2 at G.L. 6-14' Zone B and C 22-May-20

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0028 Request Date: May 21, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for rebars of columns and shear wall at Zone A Zone A 24-May-20
2 Inspection for formworks of columns and Shear wall at Zone A Zone A 24-May-20
3 Inspection for rebars and formworks of F-5, and F-6 at G.L 7-8/Bg-Bh Zone B 24-May-20
4 Inspection for Formworks and rebars of RWF-14"/Ca-Cc Zone B and C 24-May-20

5 Inspection for formworks and rebars of FTB-1 at G.L. 6-10'/Bb and 10'- Zone B and C 24-May-20
14'/Cb

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0029 Request Date: June 09, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for bottom bars of MF-6 Zone C 12-Jun-20
2 Inspection for top bars of MF-6 Zone C 12-Jun-20
3 Inspection for starter bars of Columns and shear walls at MF-6 Zone C 12-Jun-20
4 Inspection for rebars and formworks of F-5 at G.L. 9/Bh Zone B 12-Jun-20
5 Inspection for formworks of f-5 at G.L. 11-12/Cg'-Ch Zone C 12-Jun-20
6 inspection for rebars of RW-10 at G.L. 12-14"/Cc Zone C 12-Jun-20
7 Inspection for formworks of Columns at MF-4 and MF-5

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0030 Request Date: July 09, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for Bottom bars of MF-8 Zone C 12-Jul-20
2 Inspection for Topb Bars of MF-8 Zone C 12-Jul-20
3 Inspection for starter bars of Columns at MF-8 Zone C 12-Jul-20
Inspection for formworks and rebars of Isolated footings at G.L. 11-14' /
4 Cg and 9 / Bg Zone B 12-Jul-20

5 Inspection for Forworks of RW-4 Zone C 12-Jul-20

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0031 Request Date: August 05, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for Excavation of MF-8 ZONE C 08-Aug-20
2 Inspection for rebars and formworks of FTB's at back parking area ZONE B & C 08-Aug-20

3 Inspection for rebars and formworks of FTB's connecting MF-4,5,6,7,8,COF-4, and ZONE B & C 08-Aug-20
COF-5

4 Inspection for Rebars and formworks of Columns at COF-4, 5, MF-7, and MF-8 ZONE C 08-Aug-20

08-Aug-20

Requested by: Noted by:

Arjay Mandap Homer Calicdan


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0032 Request Date: August 15, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection for formworks and rebars of columns, shear walls, and Retaining walls
1 Zone B 18-Aug-20
at MF-3
2 inspection for formwrks and rebars of RSW-4 Zone C 18-Aug-20

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0033 Request Date: August 15, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 inspection for formworks and rebars of RSW-3, & RSW-6 Zone B 18-Aug-20

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0034 Request Date: August 31, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for Rebars and formworks of Columns at MF-4, and MF-5 Zone B 03-Sep-20

2 Inspection for Rebars and Formworks of Columns, Shear wall, and Retaining wall Zone B 03-Sep-20
at MF-3

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0035 Request Date: September 03, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for rebars and formworks of FTB-1 at G.L. 4-5/Ad-Af Zone A 06-Sep-20

2 Zone B 06-Sep-20
Inspection for Rebars and Formworks of RWF-4 at G.L. 14"/Cd-Cf

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0036 Request Date: September 08, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for rebars and formworks of RWF-4 at G.L. 14"/Cc-Cg Zone c 11-Sep-20

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0037 Request Date: September 14, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for rebars of beams and girders at G.L. 5-10/Bc-Bf (Zone B) Zone c 17-Sep-20
2 inspection for formworks of beams and girders at G.L. 5-10/Bc-Bf (Zone B) Zone c 17-Sep-20
3 Inspection for formworks of slab at G.L. 5-10/Bc-Bf (Zone B) Zone c 17-Sep-20

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0038 Request Date: September 22, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for rebars (Bottom and Top) Slabs at G.L. 5-10/Bc-Bf (Zone B) Zone B 22-Sep-20
2 Inspection for rebars (Ties) on Columns at G.L. 5-10/Bc-Bf (Zone B) Zone B 22-Sep-20

3 Zone B 22-Sep-20
Inspection for Formworks on Slabs, Beams and Girdersat G.L. 5-10/Bc-Bf (Zone B)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0039 Request Date: September 30, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for rebars of beams and girders at Zone C Zone C 03-Oct-20
2 Inspection for rebars of slab at Zone C Zone c 03-Oct-20

3 Inspection fo formworks of Retaning walls, shearwalls, columns, beams, girders, Zone C 03-Oct-20
and slab at Zone C
4 inspection for coordinates and elevation of beams, slab, and columns at Zone C Zone C 03-Oct-20

5 Inspection for formworks and rebars of FTB-3 at G.L. 10-14'/Cc Zone B & C 03-Oct-20

Requested by: Noted by:

Arjay Mandap Erickson Rivera


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0040 Request Date: October 07, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for rebras of RSW and Columns at Zone B Zone B 07-Oct-20

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0041 Request Date: October 20, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Rebar inspection for Girders, Beams, and Slab at Zone A (GF) Zone A 20-Oct-20
2 Formworks inspection for Girders, Beams, and Slab at Zone A (GF) Zone A 20-Oct-20

3 Zone C 20-Oct-20
Rebar and formworks Inspection for Columns, and Shear Walls at Zone C (LGF-GF)

Requested by: Noted by:

Arjay Mandap Erickson Rivera


Structural Coordinator - OMC Project Manager

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0042 Request Date: November 10, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for Formworks of Slab, Beams, & Girders, at GF Zone B Zone B 13-Nov-20

2 Zone B 13-Nov-20
Inspection for Rebars of Slab, Beams, & Girders, at GF Zone B

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0043 Request Date: November 16, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for rebars of Columns at Zone A (GF-2F) Zone A 19-Nov-20

2 Zone B 13-Nov-20
Inspection for formworks of Columns at Zone A (GF-2F)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0044 Request Date: November 25, 2020 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Formworks inspection for Slab, Beams, and Girders at GF Zone C Zone C 28-Nov-20

2 Rebars inspection for Slab, Beams, and Girders at GF Zone C Zone C 28-Nov-20

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0045 Request Date: January 18, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Rebar and formworks inspection for Column at G.L. 11/Cc-Cf, & 12-14'/Cd-Cf Zone C 18-Jan-21

2 Rebar and formworks inspection for RSW-2 Zone B 18-Jan-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Patrick Junther Sazon Hennessy Lopio


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0046 Request Date: January 25, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Beams, and slab formworks inspection for Zone A (2nd Floor) Zone A 25-Jan-21

2 Beams, and slab rebar inspection for Zone A (2nd Floor) Zone A 25-Jan-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0047 Request Date: February 05, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection for Formworks and rebars of Columns at G.L. 12-14/Cc Zone C 05-Feb-21

2 Beams, and slab rebar inspection for Zone B (2nd Floor) Zone B 05-Feb-21

3 Zone B 05-Feb-21
Beams, and Slab Formworks inspection for Zone B (2nd Floor)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0048 Request Date: February 22, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
formworks and rebar inspection for Beams, and slab at G.L. 10-
1 14"/Cc-Cf (2nd Floor) Zone C 22-Feb-21

2 Formworks and rebar inspection for RSW - 4 (GF-2F) Zone C 22-Feb-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0049 Request Date: March 04, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
formworks and rebar inspection for Beams, Balconies, Canopy and slab at 1-5'/Ac-
1 Af Zone A 04-Mar-21

2 Formworks and rebar inspection for RSW - 1/Stair - 1 (2F-3F) Zone A 04-Mar-21

3 Front Parking 04-Mar-21


Formworks inspection for coluimns at Front parking (LGF-GF)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0050 Request Date: March 09, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Formworks and rebar inspection for beams, and slab at Zone B (3F) Zone B 09-Mar-21

2 Formworks and rebar inspection for columns, and shearwalls, at Zone B (2F-3F) Zone B 09-Mar-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0051 Request Date: March 18, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Formworks inspection for RW-1 at G.L. 12-14"/Ca, 14"/Ca-Cc Zone C 18-Mar-21

2 Rebar Inspection for RW-1 at G.L. 12-14"/Ca, 14"/Ca-Cc Zone C 18-Mar-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0051 Request Date: March 23, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Formworks inspection for Slab, Girders, and Beams at G.L. 10-11/Bc-Bf Zone B 23-Mar-21

2 Rebar Inspection Slab, Girders, and Beams at G.L. 10-11/Bc-Bf Zone B 23-Mar-21

3 Formworks Inspection for RSW-3, and RSW-6 (2F-3F) Zone B 23-Mar-21

4 Rebar Inspection for RSW-3, and RSW-6 (2F-3F) Zone B 23-Mar-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0053 Request Date: March 29, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Formworks inspection for Columns, Slab, Girders, and Beams at G.L. 1-5'/Ac-
1 Af Zone A 29-Mar-21

2 Rebar Inspection for Columns, Slab, Girders, and Beams at G.L. 1-5'/Ac- Zone A 29-Mar-21
Af

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0054 Request Date: April 06, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection for Formworks of Columns, Beams, girders, and Slab at G.L. 6-8/Bf-Bi
1 (Basement -LGF) Zone B 06-Apr-21

2 Inspection for Rebar of Columns, Beams, girders, and Slab at G.L. 6-8/Bf- Zone B 06-Apr-21
Bi (Basement - LGF)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0055 Request Date: April 12, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspectio for Formworks of Columns, Beams, Girders, and slab at
1 G.L. 5-10/Bc-Bf (3F-5F) Zone B 12-Apr-21

2 Inspectio for Rebars of Columns, Beams, Girders, and slab at Zone B 12-Apr-21
G.L. 5-10/Bc-Bf (3F-5F)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0056 Request Date: April 13, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection for Formworks of Columns, Beams, Girders, and slab at
1 G.L. 8-12/Bf-Bg (Zone B Basement - LGF) Zone B 13-Apr-21

2 Inspection for Rebars of Columns, Beams, Girders, and slab at Zone B 13-Apr-21
G.L. 8-12/Bf-Bg (Zone B Basement - LGF)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0057 Request Date: April 23, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection for Columns, Beams, Girdes, and slab Rebars at
1 G.L. 11-14" Zone C (2F-3F) Zone C 23-Apr-21

2 Inspection for Columns, Beams, Girdes, and slab Formworks at Zone C 23-Apr-21
G.L. 11-14" Zone C (2F-3F)

3 Inspection for Columns setting out at G.L. 11-14" Zone C (2F-3F) Zone C 23-Apr-21
4 Inspection for walls setting out at G.L. 11-14" Zone C (2F-3F) Zone C 23-Apr-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0058 Request Date: April 29, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection for columns, Beams, Girders, and Slab Rebar at G.L. 8-13/Bg-Bi
1 (Basement-LGF) Zone B 29-Apr-21

2 Inspection for columns, Beams, Girders, and Slab Formworks at G.L. 8-13/Bg-Bi Zone B 29-Apr-21
(Basement-LGF)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0060 Request Date: May 04, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection for Columns, Slab, Beams, RSW-3, and RSW-6 Formworks at G.L. 10-
1 11/Cc-Cf (3F-5F) Zone B 07-May-21

2 Inspection for Columns, Slab, Beams, RSW-3, and RSW-6 Rebars at G.L. 10-11/Cc- Zone B 07-May-21
Cf (3F-5F)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0060 Request Date: May 10, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 formworks inspection for columns at G.L. 8-12/Bg (LGF-GF) Zone C 10-May-21

2 formworks inspection for RW-4 at 14"/Cg, 7-8/Bi (LGF-GF) Zone C 10-May-21

3 Rebars inspection for columns at G.L. 8-12/Bg (first lift from footing) Zone C 10-May-21
4 Rebars inspection for RW-4 at 14"/Cg, 7-8/Bi (first lift from footing) Zone C 10-May-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0062 Request Date: May 13, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection request for Formworks at Zone C G.L. 10-14'' (3F-5F) Zone C 14-May-21

2 Inspection request for Rebar at Zone C G.L. 10-14'' (3F-5F) Zone C 14-May-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0063 Request Date: May 19, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection request for Formworks at Zone C G.L. 12-14"/Cf-Ci (Basement-LGF) Zone C 20-May-21

2 Inspection request for Rebars at Zone C G.L. 12-14"/Cf-Ci (Basement-LGF) Zone C 20-May-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0064 Request Date: May 27, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection request for rebars at Zone A G.L. 1-5/Ac-Af (5F-6F) Zone A 28-May-21

2 Inspection request for formworks at Zone A G.L. 1-5/Ac-Af (5F-6F) Zone A 28-May-21

3 Inspection request for columns rebars at G.L. 13-14'/Cg-Ch (LGF-GF) Zone C 28-May-21

4 Inspection request for columns formworks at G.L. 13-14'/Cg-Ch (LGF-GF) Zone C 28-May-21

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0065 Request Date: June 29, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection request for Columns, and Shearwalls rebars and formworks (5F-6F) Zone B

2 Inspection request for Slab, Beams, and Girders rebar and Zone B
formworks (5F-6F)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0066 Request Date: June 29, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection request for Columns, and Shear walls rebars and formworks (5F-6F) Zone C

2 Inspection request for Slab, Beams, and Girders rebar and Zone C
formworks (5F-6F)

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0067 Request Date: July 05, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection request for Slab, beams, gitders, & retaining wall Formworks at Zone B
1 GF G.L. 6-8/Bf-Bi Zone B

2 Inspection request for Slab, beams, gitders, & retaining wall Rebars at Zone B GF Zone B
G.L. 6-8/Bf-Bi

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0068 Request Date: July 13, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
Inspection Request for Slab, Beams, Girders Columns, and RSW-1 Rebars at 7F G.L.
1 1-5/ Ac-Af Zone A

2 Inspection request for Slab, Beams, Girders, Columns, and RSW-1 at 7F G.L. Zone A
1-5/Ac-Af

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0068 Request Date: July 13, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection request for RW-4 formworks at LGF-GF Back parking G.L. 9-13/Bi Zone B

2 Inspection request for RW-4 rebars at LGF-GF Back parking G.L. 9-13/Bi Zone B

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)


PROJECT : Aruga by Rockwell - Residential Tower Phase 1
LOCATION : Punta Engaño, Lapu-Lapu City

INSPECTION REQUEST FORM


Reference No. : IR No.- 0070 Request Date: July 24, 2021 Trade: Structural

Requested
Item No. Item Description Location Remarks
Date Time
1 Inspection request for Slab, beams, and girders formworks at GF G.L. 8-11/Cf-Ci Zone B

2 Inspection request for Slab, beams, and girders rebars at GF G.L. 8-11/Cf-Ci Zone B

Requested by: Noted by:

Arjay Mandap Rex Calma


Structural Coordinator - OMC Project in Charge

Item No. Results of Inspection (RLC)

Item No. Remarks/Comments/Recommendations (RLC)

Witnessed by: Approved/Dissapproved by:

Reynaldo Haboc Jr. Patrick Junther Sazon


STRUCTURAL INSPECTOR - RLC STRUCTURAL COORDINATOR - RLC

Form S-022 Revision no. 001 (Sept. 2018)