Safe Work Method Statement: (SWMS)
Safe Work Method Statement: (SWMS)
Safe Work Method Statement: (SWMS)
2021 I/N:
P237_RBPG5_P1000
Use the Risk Matrix and Hierarchy of Controls to complete this SWMS
Robert Bosh _SWMS-001
This task has an Yes Site Name: Bosch PgP5- P1000 Infrastructure Works Package
emergency response
plan? □ Yes □ No
Name of Main Contractor IAQ Solutions Sdn Bhd Site Address: Di atas Plot 350, Persiaran Cassia Selatan 3 ,
Taman Perindustrian Batu Kawan , Mukim
Seberang Perai,Pulau Pinang untuk Tetuan Robert
Bosch, Semiconductor Manufacturing Penang Sdn
Bhd
Subcontractor Name Charter Built Engineering Sdn. Bhd Subcontractor Phone: 019-4000150 – Nabil (PM)
Sub-contractor Office 73-3-27 & 28 Arena Curve Jalan Mahsuri, Description of Work Installation of Site Hoarding
Address 11950 Bayan Lepas, Pulau Pinang. Activity/ Task
Administrative Controls No PPE Required Safety Helmet
Safety Shoes
High visibility Vest
Fire retardant coverall – Hot work activity
Face shield – Hot work activity
Leather glove – Hot work activity
Chemical glove ex: synthetic rubber
3ply Mask & dust mask
Eye protection - Chemical work
UV protection clothing
1
Who else was consulted/involved in preparing this method William – Project Manager
statement Mohd Syaifullah – Site Supervisor
List Names Elengovan - SHO
Zulhelmi - SSS
2
Sequence of basic steps Potential hazards and risks (Describe Initial risk Control methods and level of control Describe the key/significant way Level of Residual risk
Describe each step in the the key hazards and risks for each step assessment Before to control the risk and then refer to the hierarchy of controls. Hierarchy assessment
activity – most will have – there will normally be more than the controls are in of Control After all controls
4-8 steps. Follow the one per step. Number each hazard place. Refer to the (1,2,3,4,5,6) are in place.
flow of the product or e.g. 1a, 1b, 1c; 2a, 2b, 2c. risk assessment Refer to the risk
process. matrix assessment
Hazard No. & Write in (VL,L,M,H,C) Controls matrix
Step No. 1 1.a) Bad weather conditions MODERATE 1. Inspection on weather, site condition prior 4 LOW (L)
Area to be (soil unstable) (M) to start work. Ensure lightning detector
installed with 1.b) Slip trip & fall functioning
hoarding shall be 2. Proper access & egress 5
demarcated on 3. Toolbox Briefing / aid & to workers prior to
site following the work start
site pre-comp plan
Step No. 2 1.a) Bad weather conditions MODERATE 1. Inspection on weather, site condition prior 4 LOW (L)
Excavation of (soil unstable) (M) to start work. Ensure lightning detector
concrete footing 1.b) Machine overturns functioning
(300mm (w) x 1.c) Hit by moving machine 2. Competent operators 5
300mm (l) x 300mm 3. Machineries are inspected
(d)) to be carried 4. Traffic management plan - 15km/j speed
out at the marked limit, signage, pedestrian walkaways isolate
locations using safe cross for pedestrian walkway
backhoe.
5. Flag man / traffic control
6. Vehicles/machinery onsite well maintained
to include, flashing lights, horn, mirrors,
audible siren
7. Toolbox Briefing / aid & to workers prior to
work start
3
2.a) Hot weather condition 8. All workers should be advice to drink a lot 5
of water during works under hot weather
9. Suitable UV protection clothing ( full arm 6
covers , neck cover available)
2.b) Chemical & 10. Comply with MSDS for chemicals and 6
fuel inhalation appropriate PPE for handling chemical &
fuel (eye protection, n95 mask & chemical
glove ex: synthetic rubber)
Step No. 3 1.a) Bad weather conditions MODERATE 1. Inspection on weather, site condition prior 4 LOW (L)
(soil unstable) (M) to start work. Ensure lightning detector
Installation of 1.b) Slip, trip & fall functioning
Site hoarding : 2. Toolbox Briefing / aid & to workers prior to 5
Hoarding post work start
shall be nailed 1.c) Manual handling 3. Buddy system 5
together with
the horizontal
members on
ground before
lifting up
vertically by
manpower.
- Fix the
diagonal
support
immediately
after the posts
been lifted.
-Install
temporary
4
structure to
secure the
erected frame
and cast the
footings using
Grade 20 ready
mix concrete on
the same day
for those been
erected.
- Install the
approved metal
deck
immediately
after the
concrete has
achieved the
required
strength
COVID-19
-Positive 1.a) Expose/contact to HIGH (H) Comply and implement COVID 19 Regulations and 5 MODERATE
confirmed case others workers controls include: (M)
at site 2.b) Workers suspect/ 1. To required Covid19 swab test prior to
person under surveillance enter / before site orientation
(PUI) turn to +ve case after 2. Implementation screening protocol prior to
14days enter site. All workers / visitors high or low
2.c) Work delay risk temperature screened and recorded.
5
3. Health declaration to all workers. All
workers / management with symptoms or
temperature >37.8 not allowed to entering
site.
4. To maintain 1m social distancing especially
during toolbox Briefing / aid, site gathering
& confined area such as meeting event.
5. Disinfection & sanitizing for daily basis
6. Face mask should be wear all the time
during carry out the activities.
7. Posted reminder & highlighting during
Toolbox briefing for using hand sanitiser &
keep wash hand.
8. Emergency response plan
6
Risk Assessment Consider the likelihood of a hazard event occurring
Very unlikely to Unlikely to Possibly could Likely to Very Likely to
MATRIX
Consider the severity of the injuries/ illness
happen happen happen happen Happen
Catastrophic
(e.g. Fatality) Moderate Moderate High Critical Critical
Major
(e.g. permanent disability) Low Moderate Moderate High Critical
Moderate
(e.g. Hospitalization, short
Low Moderate Moderate Moderate High
or long term disability)
Minor
(e.g. First Aid)
Very Low Low Moderate Moderate Moderate
Superficial
(e.g. no treatment required) Very Low Very Low Low Low Moderate
7
HIERARCHY OF CONTROL
MINIMISE
2 Substitute the Hazard – with a safer alternative If it isn’t reasonable practical then …
3 Isolate the Hazard – as much a possibly away from the workers If it isn’t reasonable practical then …
4 Use Engineering Controls – Adapt tools or equipment to reduce the If it isn’t reasonable practical then …
risk
5 Use Administrative Controls – change work practices and If it isn’t reasonable practical then …
Least Effective
organization
6 Use Personal Protective Equipment – this is the last option after
you have considered all other options for your workplace
8
Safe Work Method Statement (SWMS) sign-on
All workers must sign this register to show that they have been trained in the processes and will work to the requirements of this SWMS
Worker name IC/Passport No. Signature Worker name IC/Passport No. Signature
Sirajul-(Foreigner) BX 0781677
Taleb-(Foreigner) BR 0868165
9
Referring to Document (eg:SWMS IAQ -001): _________________________
Please Attach:
□ Contractor Emergency Response Plan
□ Drawing / Sketch of work area
□ Supporting photos of work environment
□ Supporting ISO Signage for work area
10
EMERGENCY RESPONSE PLAN
PREPARED BY:
ELEN
SAFETY & HEALTH OFFICER
11/01/2021
EMERGENCY RESPONSE PLAN
Table of Contents
1 GENERAL………………………………………………………………3
2 COMMUNICATION……………………………………………………4
3 EMERGENCY PREPAREDNESS…………………………………...4
5. EMERGENCY DRILLS…………………………………………..……5
6 RESPONSE GUIDELINES…………………………………………....5
TABLE 3- FIRE…………………………………………………………………8
ESCALATION PROCESS…………………………………………………….10
EMERGENCY RESPONSE PLAN
PURPOSE AND SCOPE
This procedure describes the IAQ Solutions Sdn Bhd guidelines on emergency
responses to ensure prompt and safe action is taken.
This procedure applies to all health, safety and environmental emergencies with a
emphasis to the IAQ Solutions Sdn Bhd requirements in the event of Personal Injury
Accidents or Fire emergencies. Separate plans may be needed for other possible
emergency situations as determined by the Project Risk Assessments.
These include – and are not limited to – civil unrest, and tsunamis, storms, flooding,
uncontrolled discharges of contaminants.
DEFINITIONS HSE:
RESPONSIBILITY
PROCEDURE
1.0 General
The Project Manager shall ensure that the project has in place a viable and up to date
Emergency Response Plan. This plan needs to be clear, well understood by all parties
EMERGENCY RESPONSE PLAN
and practiced at regular intervals as determined by the Project Health & Safety and
Environmental Plans.
This Emergency Response Plan shall include allocated responsibilities, contact details
for Project personnel, contact details for local Authorities, Emergency Services,
personnel off site, communication flows, emergency response actions, plans and maps
as a minimum.
It is recommended that an initial risk assessment during project start up consider all
likely hazards from fuel spills to serious injuries to office fires, as examples. The risk
assessment process then forms the basis for a project specific Emergency Response
Plan and a Fire Protection Plan.
2.0 Communication
As a minimum, the Project Manager shall ensure that - HSE Communication Flow and
Emergency Telephone Numbers are complete, kept up to date and circulated on Project
HSE Notice Boards.
Other directives or notices may also be posted as applicable. The Project Manager shall
take all necessary steps to ensure that this information is communicated and
understood by all employees and sub-contractors working on the site.
The Project Manager shall take all necessary steps to ensure that the workplace has
adequate reliable means of communication internally and to the outside community.
All personnel must familiarize themselves with the location of the first aid equipment,
fire- fighting equipment, exits, muster points and rescue equipment such as stretchers.
Spill kits, stretchers, First Aid Boxes and fire extinguishers must be fully accessible
always.
The Project Manager shall ensure that the workplace meets all local regulatory health,
safety and environmental requirements with regards to emergency preparedness. The
HSE Officer/Manager shall advise the Project Manager on this issue.
Equipment necessary to assist the Emergency Response Team deal with potential
emergencies will be made available at the workplace.
Where appropriate, the Emergency Response Team will liaison with external
emergency services to coordinate efforts.
The Project Manager shall arrange for all Emergency Response Plans to be tested at
intervals determined in the Project Health and Safety and Environmental Plans.
Where the project or workplace has interfaces with other parties, drills should be
coordinated with the involvement of the other parties. Following the drill, a debrief
meeting shall be conducted to evaluate the performance of the emergency plan
execution.
The Project Manager shall ensure that all employees are aware of the correct
responses to various emergency situations. These response guidelines are attached
below as:
Upon discovering an accident, take the time to assess the situation to make the area
safe and to prevent further injury to those involved.
Take appropriate precautions according to the type of damage and the cause of the
accident.
Examples are:
Vehicle accident
Switch off the vehicle’s ignition and warn people not to smoke. Make use of bystanders
to control traffic or crowds, to call for help and, if they are capable, to assist with first aid.
Electrical accidents
Switch off the current or break contact between the injured person and the power
source. Do not touch the victim or any live wires! Use non-conducting material, such
as a dry stick, to remove house wires from the casualty.
Ensure that the current is turned off or that loose wires are kept at a safe distance until
the casualty is removed to safety. Do not approach fallen high-tension power lines until
a power company official gives permission. Apply artificial respiration if necessary.
Machinery
Shut off running or moving machinery.
Chemical spills
Switch off any likely sources of ignition. Contain the spilt material and isolate the area.
EMERGENCY RESPONSE PLAN
Table 2 - Response Guidelines - Personal Injury Incident
Do not panic, the first priority in the case of any accident is to obtain proper medical
assistance for the victim.
The following steps should be followed in the event of an incident, generally in the order
they are listed:
Assess the hazards at the scene and make the area safe for yourself, the victim
and others. Typical hazards to be aware of are; live electrical lines, moving
equipment or machinery, traffic, hazardous chemicals, fires and collapsing
structures. Only move the victim if they are in immediate danger.
Send someone to call for emergency help. Locate the nearest First Aiders or any
personnel trained in First Aid. If no qualified personnel are available, locate the
nearest telephone and call (999) for an ambulance. (Please refer to Project
Manager or HSE Officer/Manager
Your name and telephone number from which the call is being placed (if
applicable)
Protect and shelter the victim until medical help arrives and post somebody at the
site entrance to direct the ambulance to the accident.
Immediately after attending to the victim, the Project HSE Representative or crew
Supervisor shall complete an Incident Report. In the case of fatal accidents, the
Police and the nearest relevant HSE Authorities (Department of Safety & Health
(DOSH) shall be informed immediately through Phone call or Fax and follow by
JKKP 6 (Within a week)
EMERGENCY RESPONSE PLAN
Table 3 - Response Guidelines - Fire
Proceed to the nearest telephone and ask whoever is present to call the fire brigade or
do so yourself.
Attack the fire with correct fire-fighting extinguishers or other suitable fire-fighting
equipment.
Persons should be posted at site entrance to direct fire brigade to scene of fire.
A roll call of all employees will be taken when premises have had to be evacuated.
Keep a check of personnel movements so that an accurate roll call can be made.
The emergency exit plan shall be prepared by the Project HSE Representative and will
show the position of all exits and which route to take to get to an exit for each section.
EMERGENCY RESPONSE PLAN
EMERGENCY RESPONSE PLAN
WORKER
TOILET
SMOKING
SHED
FEMALE TOILET MALE
TOILET
SICK BAY
PANTRY &
WAITING AREA
TRAINING
ARCHIVE
ROOM
FOCUS CONSULTANT
ROOM 1 MALE FEMALE
DESIGN
CONSULTANT
LCM AREA
225mmTHK. HALF ROUND `U' DRAIN
OFFICE
SHOE RACK
CAR PARK MEETING ROOM 1
BOOT WASHING
MAIN
CONTRACTOR
OFFICE
C/RER
OFFICE
(100 lots)
SUS SINK
225mmTHK. HALF ROUND `U' DRAIN
CANTEEN
ASSEMBLY
ZONE
SUS SINK
2
HOARDING
300mmØ PIPE CULVERT 300mm(W)x300mm(D) `V' DRAIN
FGL 3.35 FGL 2.60 FGL 2.95 FGL 3.10 FGL 3.05
FGL 3.15
3 4 5 6
1
7
FGL 3.10
2
IW/DW TANK 1
IW/DW TANK 2
7 x 6.5 x 7.5m(H)
(208m³)
7 x 6.5 x7.5m(H)
(208m³)
2
FGL 3.15 1 FGL 3.15 11 FGL 3.15 1 FGL 3.15
FIRE WATER TANK 1
(600m³)
16 x 6.5 x7.5m(H)
8 10
9
3500 3500
DN
UP
FALL TRENCH
FFL +2.80
Fence Fence
FALL FALL UP
planter
61m(L)x31m(W)x1.9m(D) 13
FFL +2.80
10770
10100
1350
DN DN
Quotation No : 1
RAW-M/Pole
Metal Pole
** Material : 2” MS Square Pipe
** Size 7ft height & 2ft under the soil.
** Black Painting finishing
** Qty 2pcs
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size :600mm Diameter
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Reflective Red Sticker
9 10 11 12 Accessories Supporting Structure
finishing
13 14 15 16 N/A N/A
** JKR Standard
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 2 & 3
P P
RAW-M/Pole
Metal Pole
** Material : 2” MS Square Pipe
** Size 7ft height & 2ft under the soil.
** Black Painting finishing
** Qty 1pcs
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size : 300mm(W) x 400mm(H)
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Blue Reflective Sticker
9 10 11 12 Accessories Supporting Structure
finishing
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 4
300mm
400mm
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3M Sticker
N/A N/A 1 Side Printing
Size : refer above
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 5
Dilarang
menggunakan kamera
No camera
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3M Sticker
N/A N/A 1 Side Printing
Size : 300mm(W) x 400mm(H)
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 6
ANDA MEMASUKI
KAWASAN BUNYI BISING,
SILA GUNAKAN PELINDUNG
TELINGA YANG SESUAI
You Are Entering High
Noise Area, Please Wear
Hearing Protection Device
NOISE READING
DATE CHECKED
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3M Sticker
N/A N/A 1 Side Printing
Size : 400mm(W) x 600mm(H)
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 7
Gunakan topi
keselamatan
Wear safety helmets
Gunakan kasut
keselamatan
Wear protective footwear
Gunakan
baju keselamatan
Wear safety vest
Gunakan
pelindung mata
Wear eye protection
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size : 400mm(W) x 600mm(H)
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 8
BERHENTI STOP
RAW-M/POLE
Metal Pole
** Material: 2'' MS Square Pipe
** Size: 7 ft height & 2 ft under the soil.
** 2 Pole (left & right))
** Black painting finishing
** Qty: 2 pcs
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size :1800mm(W) X 300mm(H)
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 9
Item 14
900mm
150mm
RAW-M/Stand
A Stand
** Material: 1'' X 1 MS Pole
** Size: 600mm X 900mm X 150mm
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size :900mm(W) X 600mm(H)
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal A Stand
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 10
Item 15
RAW-M/POLE
Metal Pole
** Material: 2'' MS Square Pipe
** Size: 7 ft height & 2 ft under the soil.
** Black painting nishing
** Qty: 2 pcs
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size :600mm(W) X 400mm(H)
Yes Glossy 2 Side Printing
Rev :
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook :
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 11
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size : 1200mm(W) x 600mm(H)
Yes Glossy 2 Side Printing
Rev : -
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker Finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal Pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 12 Quotation No : 13
400mm 1800mm
1200mm
600mm
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size : Refer above
Yes Glossy 2 Side Printing
Rev : -
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker Finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal Pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 14
Dilarang merokok
No smoking
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size : 400mm(W) x 600mm(H)
Yes Glossy 2 Side Printing
Rev : -
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker Finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal Pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 15
400mm
600mm
Dilarang merokok
No smoking
Metal Stand
- Material : 1” Square Pipe + Supporting
frame
- Size 7 ft height
- Black painting finishing
- Supporting Frame (400mm x 600mm)
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material :
N/A N/A 1 Side Printing
Size : 400mm(W) x 600mm(H)
Yes Glossy 2 Side Printing
Rev : -
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker Finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal Stand
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 16
FRONT BACK
1800mm
Tempat Tempat
berkumpul berkumpul
semasa semasa
1200mm
kecemasan kecemasan
Emergency Emergency
assembly assembly
point point
Metal Pole
- Material : 2” MS Square Pipe
- 2 pole (left & right)
- 7ft Height on the ground & 2ft under
the soil
- Black painting finishing
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material :
N/A N/A 1 Side Printing
Size : 1800mm(W) x 1200mm(H)
Yes Glossy 2 Side Printing
Rev : -
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker Finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal Pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork
approved by customer.
ARTWORK CONFIRMATION
SAFE (SIGNAGE)
SYARIKAT JAYA GANESH (AS0084384-V)
Quotation No : 17
400mm
600mm
Dilarang masuk
tanpa kebenaran
No admittance to
unauthorised persons
Please chop, sign and email back the artwork to us when you wish to confirm your order, thank you.
Other Information
Drill Holes Lamination Printing instruction Material : 3mm ACP
N/A N/A 1 Side Printing
Size : Refer Above
Yes Glossy 2 Side Printing
Rev : -
1 2 3 4 Matt 2 Side Printing (2 pcs)
5 6 7 8 Remark : Sticker finishing
9 10 11 12 Accessories Supporting Structure
13 14 15 16 N/A N/A
Double Sided Tape Metal Chain: Alluminium Frame
N/A Plastic Chain: Supportive Frame(Metal)
Yes Beaded Chain: Metal Pole
Cable Tie U-Channel (Aluminium)
Book Ring U-Channel (Acrylic)
Hook
Remark:
1) Goods are not returnable or exchangeable once the artwork is confirmed.
2) The CMYK color (Cyan-Magenta-Yellow-black) model is used in printing. Actual color may
vary from shop drawing due to file conversion.
3) Syarikat Jaya Ganesh no responsibility for any mistakes, errors or incorrect artwork due to
insufficient information provided by customer.
4) Syarikat Jaya Ganesh shall not beheld responsible for cost incurred due to rework for any artwork