RAILWAY PROJECT ‐ CP N‐02
DIVER GEAR CHECKLIST
RIVER CROSSING ‐ PAMBALING RIVER
EARTHWORKS: Temporary Works
Diver Request Number: 001 Date:
Row Location:
1 Cylinder daily appearance condition
2 First stage valve O‐ring
3 Pressure reading
4 Valve stem Leak test
5 Hand wheel
REGULATOR Y N Y N
1 Regulator daily appearance condition
2 Check for any anomalies on the LP and HP hoses
3 check for any damage O‐ring
4 Purge valve test
5 Gauge checking/reading
6 Second stage / octopus
7 Mouth piece
8 Dial breath (if necessary)
BOUYANCY CONTROL DEVICE Y N Y N
1 BCD daily appearance condition
2 Manual inflator hose and damp valve
3 Check for any damage O‐ring
4 Over pressure relief valve
5 Air bladder
6 Shoulder straps
7 BCD clips
8 cummerbund
9 Back plate/strap
10 Rising fresh water after using
Date:
Professional Diver:
(Name & Signature)
Remarks :
Date:
Safety Supervisor/Officer:
(Name & Signature)
MALOLOS‐CLARK RAILWAY PROJECT ‐ CP N‐02
PRE AND POST DIVE CHECKLIST
RIVER CROSSING ‐ PAMBALING RIVER
EARTHWORKS: Temporary Works
Diver Request Number: 001 Date:
Row Location:
1 Did the dive supervisor conduct a pre‐dive conference with all the dive team present?
2 Were the following discussed as a minimum?
2.1 The mission or scope of work.
2.2 The location
2.3 Diving gears/tools and craft to be used
2.4 Diving procedures
2.5 Maximum working depth with estimated bottom times
2.6 Water velocity, currents
2.7 Visibility
2.8 Names and duties of personnel on the dive team
Will there be an underwater tender/diver stationed at the underwater point of entry for enclosed or
2.9
physically confining spaces?
3 Dive Log has been filled out for pre dive information?
POST DIVE Y N Y N
1 Did the dive supervisor have a dive team debriefing that covered the following as a minimum?
1.1 A discussion of post dive activities including repetitive dives
1.2 Surface Interval Time Record
Diver rescue procedures conducted by the dive team, including responsibilities of team members, best
location(s)
1.3 where injured divers may be removed from the water, and best location(s) for performing first aid/
stabilization prior
to emergency medical assistance arrival.
2 Dive Log has been filled out for pre dive information?
Date:
Professional Diver:
(Name & Signature)
Remarks :
Date:
Safety Supervisor/Officer:
(Name & Signature)
MALOLOS‐CLARK RAILWAY PROJECT ‐ CP N‐02
DIVE LOG RECORD
RIVER CROSSING ‐ PAMBALING RIVER
EARTHWORKS: Temporary Works
Name:
Date: Dive Number: (For multiple dives in one day)
Row Location:
Vessel /Platform:
Environmental Conditions: Current: Water Temp:
Visibility: Maximum Depth of Dive:
Time In: Time Out: Bottom Time:
Decompression Tables: Depth and duration of Safety Stop:
Incidents/ Discomfort Injuries:
Diver's Signature: Supervisor's Signature:
Name:
Date: Dive Number: (For multiple dives in one day)
Row Location:
Vessel /Platform:
Environmental Conditions: Current: Water Temp:
Visibility: Maximum Depth of Dive:
Time In: Time Out: Bottom Time:
Decompression Tables: Depth and duration of Safety Stop:
Incidents/ Discomfort Injuries:
g
Supervisor's Signature: