Speaker:

ENGR. CHERRY ROSE B. BOMBALES


Engineer II / Air & Water Permitting Section
EMB-NCR
Introduction

Areas of Jurisdiction

Requirements

Process Flow of Discharge Permit Application

Walk-Through on the Actual Permit Application


Implementation of the OPMS-WDP

11 September 2017
OPMS was deployed for testing
and to document observations
and issues
Implementation of the OPMS-WDP

01 July 2018
Full Online application shall start

To provide “dedicated computer/s” to be


used by walk-in clients and “technical
assistance” to system users (thru the
planning and information system
management unit)
Enforcement Of Wastewater Discharge
Permitting System

All owners and operators of facilities that discharge


regulated effluents are required to secure
“Discharge Permit”
DISCHARGE PERMIT

is the legal authorization granted by the DENR to


discharge wastewater into a water body
Issuance of
Discharge Permit
(DP)

Environmental Management Laguna Lake Development


Bureau Authority
(EMB) (LLDA)
Regions I, II, III, V, VI, VII, VIII, IX, X, XI,
XII, XIII, CAR and
some areas in NCR, IV-A, IV-B
EMB-NCR JURISDICTION
Paranaque Malabon
Las Pinas Navotas
Makati Valenzuela
Mandaluyong San Juan
1. Rizal – All Local Government Units
• 1 City
• 13 Municipalities

2. Laguna – All Local Government Units


• 6 Cities
• 24 Municipalities
3. Cavite:
• Municipality of Silang
• Municipality of Carmona
• Municipality of General
Mariano Alvarez (GMA)
• Tagaytay City
4. Batangas
• Tanauan City
• Municipality of Malvar
• Municipality of Santo
Tomas
5. Quezon
• Municipality of Lucban
6. Metro Manila
• Taguig City
• Caloocan City
• Pasay City
• Muntinlupa City
• City of Manila
• Pasig City
• Marikina City
• Quezon City
• Municipality of Pateros
Registration of an Account
• Government Issued ID
• Company ID
• Authorization Letter / PCO Accreditation
1. New Application
2. Renewal Application
New Application
(1) Engineer’s Report with at least containing the following:
• Nature of project or business;
• Brief description of manufacturing process involved;
• Production capacity, quality or volume and the generic name of the products;
• The nature and character of the applicant’s wastewater and its physical and chemical
composition;
• Total daily volume of discharge of raw wastewater;
• Treatment process and estimated treatment efficiency; The expected quality of the effluent
and other discharge shall meet the Effluent standards of the DENR;
• The total daily volume of water consumption and discharge of final treated wastewater
effluent;
• The name of receiving body of water and its official water classification and in case of land
discharge, the nearest receiving body of water and its official water classification;
• Information on flow measurement equipment and procedure;
• Pollution prevention/Environmental Management System plan or program;
• DENR ID Number as Hazardous waste generator (if applicable); and
• State the cost incurred in the installation and maintenance of wastewater treatment facility; if
any.
New Application
(2)Drawing requirements (in 50cm x 90 cm paper) signed
by the President/General Manager and duly signed and
sealed by a Registered Chemical or Sanitary Engineer.
• Vicinity Map of the Plant;
• The wastewater line layout from the wastewater sources to the WTF;
and
• Plan and elevation drawings of the WTF as-built with complete
specifications.
New Application
(3) Certificate of Accreditation of the Pollution Control Officer
or appointment/designation as such by the Managing Head.
(4) Environmental Compliance Certificate (ECC) or
Certificate of Non-Coverage(CNC) copy.
(5) Official receipt for the payment of applicable fees.
(6) Water billing statement for the whole year
Renewal Application
(1) Certificate of Accreditation of the Pollution Control
Officer or appointment/designation as such by the Managing
Head.
(2) Water billing statement for the whole year
(3) Latest Wastewater Discharge Permit.
(4) Result of sampling analysis of the establishment’s
wastewater characteristics for four quarters in previous year
together with the Self Monitoring Report;
(5) Proof of compliance to permit conditions (if required).
Accomplish the Upload the
Register an Submit
Application Required
Account Application
Form Documents
Log in to emb.gov.ph
opms.emb.gov.ph
Registration
Create an Account
The Step by Step Procedure
Step 1: General Information
Step 1: General Information
Step 1: General Information
Step 1: General Information
Step 1: General Information
Step 1: General Information
Step 1: General Information
Step 1: General Information
Step 2: Product Information
Step 3: Water Pollution Information
Step 3: Water Pollution Information
Step 4 : Treatment System Information
Step 4 : Treatment System Information
Step 4 : Treatment System Information
Step 4 : Treatment System Information
Step 4 : Treatment System Information
Step 5: The Application Form
Sample Application Form
Step 6 : Upload Required Documents
Uploading a file….
Submit Application
Mode of Payment

✓Payment thru RO Cashier

✓Payment Thru Land Bank Link Biz Portal


Mode of Payment

➢Download Order of Payment


Mode of Payment

➢Download Order of Payment


Order of Payment
Mode of Payment
✓Payment Thru Land Bank Link Biz Portal
Copy the following data:
• Total Due
• Application ID
• Application Type
• OP Number
• Date

*User Manual is available on


the opms.emb.gov.ph
Payment Thru Land Bank Link Biz Portal
Other updates
“Locators and
establishments that are
connected to existing WTP
of ECOZONES and
malls/buildings,
respectively are exempted
from securing DP.”

However, a certificate of
interconnection/connection must be
issued by the operator of the said WTP
and said certificate must be submitted
to the concerned EMB RO.
Any questions?