Software Engineering Solved MCQs (Set-1) PDF
Software Engineering Solved MCQs (Set-1) PDF
m
2. A ---------------is a set or group of component that interact to accomplish some
o
purpose.
. c
A. System
te
B. Software
a
C. Subsystem
q M
D. Physical system
c
Answer: A
M
3. System consists of----------------
A. Standards
B. Measurement
C. Compare
D. All of above
Answer: D
4. Elements of system.
A. Output/Input
B. Control
C. Feedback
D. All of above
Answer: D
5. We can define information system as a set of devices, procedures, rules but most
of the
work performs manually
A. Formal Information system
B. Manmade Information system
C. Informal information system
D. All of above
Answer: B
8. -------- refers to the process of examining a business situation with the intent of
improving it
through better procedures and methods.
A. Software Anticipation
B. Software Investigation
C. Software Requirement
D. System analysis
Answer: D
10. Which is the first step in the software development life cycle ?
A. Analysis
B. Design
C. Problem/Opportunity Identification
D. Development and Documentation
Answer: C
11. Decision makers who are concerned with tactical (short-term) operational
problems and
decision making are
A. middle managers
B. executive managers
C. supervisors
D. mobile managers
Answer: A
14. ________ expressly designed for the support of individual and collective
decision making.
A. MIS
B. DSS
C. TPS
15. -----------The system which are represented conceptually non Physical systems
are called
A. Abstract system
B. System model
C. Open system
D. Closed system
Answer: A
16. ------------it shows a two dimensional depicting system elements and their
linkages.
A. Schematic Models
B. Flow system models
C. Static system models
D. Dynamic system models
Answer: A
17. ---------------It shows the flow of material ,energy and information that hold
system
together.
A. Schematic Models
B. Flow system models
C. Static system models
D. Dynamic system models
Answer: B
18. ------------- This type of model exhibits are pair of relationship such as activity
time or cost
quantity.
A. Schematic Models
B. Flow system models
C. Static system models
D. Dynamic system models
Answer: C
20. An -----------system is a one which does not provide for its own control or
modification.
A. Open System
B. Closed system
C. MIS
D. DIS
Answer: A