Internship Report - 3
Internship Report - 3
Internship Report - 3
8th Semester
2023
A
Internship Mentor
Mr. Amjad Khan
Site Engineer
CUBE CONSTRUCTION ENGINEERING LTD., VADODARA
Project Advisor
Prof. Priyanka S. Patel
I would like to express my special thanks to Mr. Amjad Khan for their kind support to
me during my training. They also helping me a lot in completion of my project work.
The project work is most practical and existing of my learning experience which could be
assets for me in my future career. It is my sincere duty to thanks all those people who
helped me directly and indirectly in this project.
Last but not the least, I am thankful to all those who have directly or indirectly helped
me in bringing my work to its present form.
CERTIFICATE
This is to certify that the Project report, submitted along with the project entitled
“INTERNSHIP IN THE CUBE CONSTRUCTION ENGINEERING LTD” has been
carried out by PATEL BHAVIN R. (190190106033) under my guidance in partial
fulfillment for the degree of Bachelor of Engineering in Civil Engineering 8th Semester
of Gujarat Technological University, Ahmedabad during academic year 2022-23. These
students have successfully completed project under my guidance.
EXAMINER’S CERTIFICATE
This is to certify that the dissertation entitled “INTERNSHIP IN THE
CUBE CONSTRUCTION ENGINEERING LTD” submitted by PATEL
Internal Examiner:
I hereby declare that the Project Reports submitted for the project entitled “INTERNSHIP
ABSTRACT
The internship bridges between theory and practice provides students with practical,
field-based, real world experiences during their years of study. During this training
period, the students learn how to relate our theoretical knowledge with practical
fields. What are the difficulties faced by an engineer? How to manage everything &
what are the difficulties faced by an engineer.
This time period discusses the skill gained and experienced gathered during this 7
weeks training.
Keyword: Excavation, Levelling, Footing, Column, Rubble Soling, PCC, Raft Foundation.
Table of Contents
1.0 INTRODUCTION...........................................................................................1
3.1 EXCAVATION.......................................................................................... 3
3.2 RUBBLE SOLING.....................................................................................3
3.3 P.C.C. WORK...........................................................................................4
3.4 KOTA STONE.......................................................................................... 5
3.5 RAFT FOUNDATION................................................................................5
3.6 CASE STUDIES:......................................................................................6
3.6.1 DEEP EXCAVATION IN AN URBAN AREA:.........................................6
3.6.2 HISTORY OF RAFT FOUNDATION BEHAVIOR FOR A LARGE-
SCALED BUILDING COMPLEX:.....................................................................7
4.0 METHODOLOGY..........................................................................................8
5.0 SUMMARY....................................................................................................9
6.0 REFERENCES............................................................................................10
List of Tables
List of Figures
FIGURE 1.1: COMPANY LOGO.............................................................................1
List of Abbreviation
RL – Reduced Level
1.0 INTRODUCTION
No. of Blocks: 4
No. of Floors: 8
Area:
3.1 EXCAVATION
Excavation is the process of moving earth, rock or other materials with tools,
equipment or explosives. It also includes trenching, wall shafts, tunnelling and
underground. It is the preliminary activity of the construction project.
At my site, Excavation depth for P.M. Room 3m. and Hospital building 8m.
a) To provide a hard & firm base or sub-base for the upper structural layers.
b) To increase the bearing capacity of the soil or strata.
c) To provide a leveled base above the undulated strata for PCC or any such
works.
Plain cement concrete is the mixture of cement, fine aggregate (sand) and coarse
aggregate without steel. PCC is an important component of a building which is
laid on the soil surface to avoid direct contact of reinforcement of concrete with
soil and water.
Materials used in Plain Cement Concrete are Cement, Coarse Aggregate, and
Fine Sand & Water.
possesses.
At my site, used the 25mm thick kota stone having the size of 600×600mm kota
with the water-proofing agent in the slury
Tehran-Iran)
The wall had been designed for 19m depth at first. But after reaching to -19.00
meter depth, the landlord decided to increase the depth of excavation up to -
20.00 meter. By the use of nailing and anchoring method and because of such a
flexible method, it was possible to extend the excavation.
This case study describes the field observation of settlement of a raft foundation
for a large-scale building complex in Nagoya city in Japan. The complex consists
of a 28 story hotel, a 15 story office building and a low-storied banquet hall in the
middle all of which are supported on a single 80 m square basement on raft
foundation. Since the load on the foundation is non-uniform, the differential
settlement of the foundation was investigated analytically, taking into
consideration the interaction between the ground and the raft. To confirm the
validity of the design, measurements were conducted for about 2 years during the
building construction. The maximum ground heave caused by the excavation was
42 mm and the maximum settlement caused by the building construction was 28
mm. The changes in the elastic modulus of the ground agree well with a
decrease ratio which in turn is evaluated based on a decrease of the mean
principal stress caused by excavation and a decrease of ground rigidity caused
by shear strain. The measured distribution of the displacement and stress are in
relatively good agreement with the results of an analysis which incorporates the
interaction of the building frame and the soil.
RUBBLE RAFT
EXCAVATION P.C.C. WORK KOTA STONE
SOLING FOUNDATION
Surface
Surveying Excavation Formwork Reinforcement
Preparation
Removal of
Waterproofing Demolding Final finishing
Formwork
4.0 METHODOLOGY
5.0 SUMMARY
The internship is a bridge between the theoretical knowledge and the practical or
the reality work at the field of construction or civil engineering work.
I was able to acquire a high level of confidence to deal with problems that arise in
a building construction.
6.0 REFERENCES